Activity ID

Activity Name

Original Early Start


Duration

100-670-01 - Ritz Carlton Hotel, Phase 2 Stage 1B - Tea Lounge, Library Bar & Public Toilets
Pre construction works
General

84 15-Jun-14

June
08
15
06-Sep-14

70 15-Jun-14

23-Aug-14

19 15-Jun-14

06-Jul-14

A1020

WO confirmation

1 15-Jun-14

15-Jun-14
15-Jun-14

A1030

Kick off meeting

1 16-Jun-14

16-Jun-14
16-Jun-14

A1040

Submission of performance bond

10 17-Jun-14

28-Jun-14
17-Jun-14

A1050

Receipt of advance payment

Shop drawings
Tea lounge area
A1060
Receipt of documents from client

34 16-Jun-14
0 16-Jun-14

24-Jul-14
16-Jun-14

1 16-Jun-14

16-Jun-14
16-Jun-14

16-Jun-14
29-Jun-14

Preparation of fit out drawings

18 29-Jun-14

19-Jul-14

Submission of fit out drawings

1 20-Jul-14

20-Jul-14

A1090

Approval of fit out drawings

4 21-Jul-14

24-Jul-14

33 29-Jun-14
25 29-Jun-14

05-Aug-14
27-Jul-14

A1480

Submission of fit out drawings

7 22-Jul-14

29-Jul-14

A1490

Approval of fit out drawings

8 28-Jul-14

05-Aug-14

33 16-Jun-14

23-Jul-14

25 16-Jun-14

14-Jul-14
16-Jun-14

A1110

Samples preparation

A1120

Submission of samples

1 15-Jul-14

15-Jul-14

A1130

Approval of samples

7 16-Jul-14

23-Jul-14

63 16-Jun-14

17-Aug-14

Key material procurement


A1400

Procurement of rugs

63 16-Jun-14

17-Aug-14
16-Jun-14

A1410

Procurement of wall papers

63 16-Jun-14

17-Aug-14
16-Jun-14

A1420

Procurement of fabrics

49 16-Jun-14

03-Aug-14
16-Jun-14

58 17-Jun-14

23-Aug-14

A1140

Production of prototypes

24 17-Jun-14

14-Jul-14
17-Jun-14

A1150

Approval for prototypes

4 15-Jul-14

19-Jul-14

A1160

Full joinery production

30 20-Jul-14

23-Aug-14

70 29-Jun-14

06-Sep-14

58 29-Jun-14

25-Aug-14

5 29-Jun-14
0 29-Jun-14

03-Jul-14

Joinery production

Construction works
Tea Lounge
Preliminary works
A1170
Site access

29-Jun-14

05-Aug-14

14-Jul-14
15-Jul-14

15-Jul-14

16-Jul-14

23-Jul-14
17-Aug-14
17-Aug-14
03-Aug-14
14-Jul-14

15-Jul-14

19-Jul-14

20-Jul-14

23-Aug-14

29-Jun-14

1 02-Jul-14

02-Jul-14

A1210

Fixing scaffolding

1 03-Jul-14

03-Jul-14

MEP works
A1250
Refinishing of existing AC grills

15 10-Jul-14
7 10-Jul-14

27-Jul-14
17-Jul-14

10-Jul-14

5 10-Jul-14

15-Jul-14

10-Jul-14

Critical Remaining Work

September
07
14

29-Jul-14

28-Jul-14

Protection of floor

Remaining Work

31

27-Jul-14
22-Jul-14

A1190

Date: 23-Jun-14

24

24-Jul-14

29-Jun-14

01-Jul-14

Actual Work

August
10
17

20-Jul-14

21-Jul-14

3 29-Jun-14

Project Start: 15-Jun-14

03

19-Jul-14
20-Jul-14

Mobilization

Hot & cold water pipes installaiton

27

06-Jul-14

A1180

A1330

20

28-Jun-14

05-Aug-14

A1080

06

16-Jun-14

44 16-Jun-14

A1070

29

July
13

15-Jun-14

06-Jul-14

Joinery drawings (Mock up and production as per pictures and


specification)

Samples

22

7 29-Jun-14

A1100

Library Bar area


A1470
Preparation of fit-out drawings

2014

Early Finish

29-Jun-14

01-Jul-14

02-Jul-14

02-Jul-14

03-Jul-14

100-670-01 - Ritz Carlton Hotel, Phase 2


Stage 1B - Tea Lounge, Library Bar Public
Toilets

03-Jul-14
17-Jul-14
15-Jul-14

Date

Revision

Checked Approved

Activity ID

Activity Name

Original Early Start


Duration

2014

Early Finish

A1340

Drainage pipes installation

4 16-Jul-14

June
08
15
20-Jul-14

A1350

Switches & sockets inatallation

5 22-Jul-14

27-Jul-14

9 05-Jul-14
9 05-Jul-14

14-Jul-14
14-Jul-14

24 15-Jul-14
10 15-Jul-14

11-Aug-14
26-Jul-14

Ceiling refinishing
A1200
Refinishing existing wooden ceiling
Floor refinishing
A1230
Refinishing existing wooden floor

22

29

06
16-Jul-14

July
13

20
27
20-Jul-14

22-Jul-14
05-Jul-14
15-Jul-14

02-Aug-14

27-Jul-14

A1260

Water proofing & testing on floor

5 27-Jul-14

31-Jul-14

27-Jul-14

A1270

Protective screed

4 02-Aug-14 05-Aug-14

A1280

Ceramic tiles fixing

5 06-Aug-14 11-Aug-14

02-Aug-14

02-Aug-14
31-Jul-14

02-Aug-14

05-Aug-14

06-Aug-14
10-Jul-14

11-Aug-14

21-Jul-14

A1240

Reconditioning of screen

6 27-Jul-14

A1290

Wall covering

3 12-Aug-14 14-Aug-14

12-Aug-14

8 12-Aug-14 20-Aug-14
5 12-Aug-14 17-Aug-14

12-Aug-14

Fittings & fixtures


A1310
Installation of pastry counter
A1320

Installation of glass panels

27-Jul-14

02-Aug-14

3 18-Aug-14 20-Aug-14

FF & E Installation
A1360
Installation of rugs

14-Aug-14
17-Aug-14

18-Aug-14

4 21-Aug-14 25-Aug-14
1 21-Aug-14 21-Aug-14

20-Aug-14

21-Aug-14

21-Aug-14

A1370

Installation of curtain

2 23-Aug-14 24-Aug-14

A1380

Placing tables & chairs

2 24-Aug-14 25-Aug-14

24-Aug-14

25-Aug-14

A1390

Placing light fittings, planters etc.

2 24-Aug-14 25-Aug-14

24-Aug-14

25-Aug-14

Library Bar & Public Toilets


Preliminary works
A1500
Site access

60 29-Jun-14

06-Sep-14

4 29-Jun-14
0 29-Jun-14

02-Jul-14

Removal of existing fixtures & furniture

1 29-Jun-14

29-Jun-14

A1770

Demolition of existing flooring, bathroom walls, flooring & fittings

3 30-Jun-14

02-Jul-14

22-Jul-14

A1660

Switches & sockets inatallation

5 02-Aug-14 06-Aug-14

Floor refinishing
A1780
Nero Cannere lapatto tile flooring

02-Jul-14
22-Jul-14

6 30-Jul-14
5 30-Jul-14

23-Aug-14
05-Jul-14

29-Jul-14
26-Jul-14
02-Aug-14

05-Aug-14
04-Aug-14

06-Aug-14

30-Jul-14

4 02-Aug-14 05-Aug-14
44 03-Jul-14
2 03-Jul-14

04-Aug-14

02-Aug-14
03-Jul-14

05-Aug-14

05-Jul-14

A1820

Refinishing & regrouting of existing marble flooring

5 02-Aug-14 06-Aug-14

A1560

Installation of walnut engineered wood flooring

4 07-Aug-14 11-Aug-14

A1550

Refinishing stone steps and skirting

3 12-Aug-14 14-Aug-14

12-Aug-14

A1570

Water proofing & testing on floor

4 12-Aug-14 16-Aug-14

12-Aug-14

A1580

Protective screed

3 17-Aug-14 19-Aug-14

A1590

Ceramic tiles fixing @ toilets

3 20-Aug-14 23-Aug-14

Project Start: 15-Jun-14

Actual Work
Remaining Work

Date: 23-Jun-14

Critical Remaining Work

24-Aug-14

29-Jun-14

26-Jul-14

4 22-Jul-14

Painting on walls & ceiling - Library Bar area

30-Jun-14

06-Aug-14
29-Jul-14

Drainage pipes installation at Bar counter

A1790

29-Jun-14

14 22-Jul-14
7 22-Jul-14

A1650

Ceiling refinishing
A1800
Painting on walls & ciling @ Public rest room & locker room

23-Aug-14

29-Jun-14

A1520

MEP works
A1630
Refinishing of existing AC grills

September
07
14

26-Jul-14

6 27-Jul-14

14-Aug-14
21-Jul-14

31

14-Jul-14

Refinishing stone steps and skirting

31 10-Jul-14
10 10-Jul-14

24

27-Jul-14

A1220

Wall refinishing
A1300
Preparation & painting on walls & ceiling

August
10
17

03

100-670-01 - Ritz Carlton Hotel, Phase 2


Stage 1B - Tea Lounge, Library Bar Public
Toilets

02-Aug-14

06-Aug-14

07-Aug-14

11-Aug-14
14-Aug-14

17-Aug-14
20-Aug-14

Date

16-Aug-14
19-Aug-14
23-Aug-14

Revision

Checked Approved

Activity ID

Activity Name

Original Early Start


Duration

Wall refinishing
A1610
Preparation & painting on walls & ceiling

32 22-Jul-14
9 22-Jul-14

2014

Early Finish
June
08
15
27-Aug-14
31-Jul-14

22

29

06

July
13

20

27

22-Jul-14

Vinyl wall covering @ toilet

2 07-Aug-14 09-Aug-14

07-Aug-14

A1830

Refinishing & regrouting of existing marble walls & skirting

4 07-Aug-14 11-Aug-14

07-Aug-14

A1600

Reconditioning of screen

6 12-Aug-14 18-Aug-14

A1620

Wall paper fixing to Library Bar walls library

4 24-Aug-14 27-Aug-14
27 02-Aug-14 01-Sep-14
3 02-Aug-14 04-Aug-14

24

31

September
07
14

31-Jul-14

A1810

Fittings & fixtures


A1930
Refinishing existing interior wooden doors, windows & pelmets

August
10
17

03

09-Aug-14
11-Aug-14

12-Aug-14

18-Aug-14
24-Aug-14

02-Aug-14

27-Aug-14

04-Aug-14

A1940

Installation of book shelves & bar shelves

4 05-Aug-14 09-Aug-14

05-Aug-14

A1950

Installation of Bar counter

7 05-Aug-14 12-Aug-14

05-Aug-14

A1840

Decorative screen partition of antique bronze finish

3 19-Aug-14 21-Aug-14

A1850

Installation of 12mm thk clear glass panels with wooden architraves

3 23-Aug-14 25-Aug-14

23-Aug-14

25-Aug-14

A1860

Full height glass door gate with gold-etched pattern

3 23-Aug-14 25-Aug-14

23-Aug-14

25-Aug-14

A1670

Reinstating of existing decorative wooden panel below vanity counter

2 24-Aug-14 25-Aug-14

24-Aug-14

A1870

Replacing existing counter tops & ledges at Public rest room & locker
room

7 24-Aug-14 31-Aug-14

24-Aug-14

A1680

Installation of glass panels

3 26-Aug-14 28-Aug-14

26-Aug-14

28-Aug-14

A1880

Sand blasted tempered clear glass with mashrabia accent design at


Public toilet

3 26-Aug-14 28-Aug-14

26-Aug-14

28-Aug-14

A1890

Installation of boyd lighting wall scone

3 30-Aug-14 01-Sep-14

FF & E Installation
A1900
Hanging client supplied art works

09-Aug-14
12-Aug-14
19-Aug-14

21-Aug-14

25-Aug-14
31-Aug-14

30-Aug-14

6 28-Aug-14 03-Sep-14
1 28-Aug-14 28-Aug-14

28-Aug-14

28-Aug-14

A1690

Placing of rugs

1 30-Aug-14 30-Aug-14

30-Aug-14

A1910

Installation of mirrors at toilets

4 30-Aug-14 02-Sep-14

30-Aug-14

A1920

Fixing sanitary fittings

3 30-Aug-14 01-Sep-14

30-Aug-14

A1700

Installation of curtain

2 31-Aug-14 01-Sep-14

31-Aug-14

A1710

Placing sofas and other loose furniture

3 31-Aug-14 02-Sep-14

31-Aug-14

A1720

Placing light fittings, planters etc.

4 31-Aug-14 03-Sep-14

31-Aug-14

Sangging, inspections, cleaning & handover


A1740
Testing & comissioning

26 07-Aug-14 06-Sep-14
3 07-Aug-14 10-Aug-14

A1730

Snagging & de-snagging

6 28-Aug-14 03-Sep-14

A1750

Client final inspection

1 04-Sep-14 04-Sep-14

A1760

Final cleaning

1 06-Sep-14 06-Sep-14

A1960

Handover

Project Start: 15-Jun-14

Actual Work
Remaining Work

Date: 23-Jun-14

Critical Remaining Work

07-Aug-14

30-Aug-14
02-Sep-14
01-Sep-14
01-Sep-14
02-Sep-14
03-Sep-14

10-Aug-14
28-Aug-14

03-Sep-14

04-Sep-14
06-Sep-14

06-Sep-14

100-670-01 - Ritz Carlton Hotel, Phase 2


Stage 1B - Tea Lounge, Library Bar Public
Toilets

01-Sep-14

04-Sep-14
06-Sep-14
06-Sep-14

Date

Revision

Checked Approved