REGULATIONS FOR THE TECHNICAL SUPERVISION AND CLASSIFICATION 1. Application 1.1 These Regulations assign the requirements on the technical supervisions and classifications of Fixed Offshore Platforms (herein after refered to as the platforms) operating in Vietnamese continental shelf. The Regulations are to e compulsor! applied for the "tages# designing$ construction$ operation$ maintenance and technical supervision of platforms. 1.% The technical supervision and classification for various t!pes of platforms are to e carried out ! Viet nam Register or "hipping (V&R'"). 1.( Relevant Rules and Regulations of other )lassification "ocieties for *aterial "tructures$ 'quipments and "afet!$ can e used if it is agreed ! V&R'". 2. Clai!ication %.1 )lass assignment The platforms are designed. Faricated$ installed in accordance +ith$ and under the surve!s in compliance +ith these Regulations +ill e assigned a class ! V&R'". %.% *aintenance of class The platforms +hich have een classed +ith V&R'" +ill maintain the assigned class and character until$ as a result of surve!s inspections or test +hich have een carried out$ the platforms are found to e in full! compliance +ith the relevant requirements in "ection ( of this Regulation. ,n! damage or defect +hich ma! affect the class assigned is to e reported to V&R'" +ithout dela! and an application for surve!s is to e sumitted ! O+ner-Operator or their Representative. %.( )haracter of classification and class notations %.(.1 )haracter of classification VIETNAM STANDARDS TCVN 6171 : 1996 Platforms classed +ith V&R'" +ill e assigned either of the follo+ing characters of classification as applicale# a. . V&R'" . indicating that .the platform has een constructed under V&R'" supervision and is in compliance +ith the requirements of the Regulations and is maintained in good and efficient technical condition/ . . V&R'" . indicating that the platform has een constructed under supervision of another )lassification "ociet! recogni0ed ! V&R'"$ and after examination and surve!s it has een found to e in compliance +ith the requirements of the Regulations and is maintained in good and efficient technical condition. %.(.% )lass notations %.(.%.1 Platforms classed +ith V&R'"$ depend on their specific conditions$ +ill e assigned one or more appropriate class notations appended to the character of classification assigned to indicate the special features of the platform$ e.g# . Template T!pe . 1rilling Platform . Production Platform . Oil "torage Platform . ,ccommodation Platform %.(.%.% )ertificates and characters of classification The characters of classification together +ith the class notations +ill e entered in )ertificates of )lassification for Fixed Offshore Platforms in the order as descried aove. For instance# a fixed template t!pe drilling platform constructed under the supervision of V&R'" and provided +ith effective corrosion protection$ its characters of classification and class notations are as follo+s # . V&R'" . Template T!pe 1rilling Platform. )orrosion )ontrol %.2 3ithdra+al of )lass The class assigned to a platform ! V&R'" +ill e +ithdra+n under an! one of the follo+ing conditions# . &f it is not sumitted to surve!s for maintenance of class as required in "ection ( at the proper time +hich is noted in the )ertificate / VIETNAM STANDARDS TCVN 6171 : 1996 . 3hen the O+ner fails to repair such damages and defects that affect the class of the platform in accordance +ith V&R'" requirements/ . 3hen requested ! the O+ner of the platform. %.4 Reclassification 3hen reclassification or class reinstatement is desired for a platform for +hich the class previousl! +as assigned ! V&R'" and has een +ithdra+n$ a special surve! for reclassification$ appropriate to the age and technical conditions of the platform$ +ill e carried out ! V&R'". &f$ at such surve!$ the platform is found that its conditions are full! compliance +ith the Regulations. V&R'" ma! reinstate its original class or assign such other class as ma! e deemed necessar!. %.5 )ertificate of )lassification %.5.1 &ssurance of )lassification )ertificate. 6pon the completion of the construction surve!$ classification surve! for first entr! or reclassification surve! of a platform$ if it is found that the platform complies full! +ith the Regulations$ a classification certificate +ill e issued to the applicant ! V&R'". %.5.% 'ndorsement of )lassification )ertificates # The )lassification )ertificate for platforms issued ! V&R'" +ill continue to e valid$ provided that the platforms are su7ected to the anual surve!s for maintenance of class as prescried in "ection ( of the Regulations and the results of the surve!s are found satisfactor! to the requirements of the Regulations . %.5.( &ssuance of Provisional )lassification )ertificates # Pending the issuance of the )lassification )ertificates$ +here a result of surve!s is found that the platform is in a fit an efficient condition and in compliance +ith the regulations$ V&R'" ma! issue a corresponding Provisional )lassification )ertificates to enale the platform to e put into service in the shonest possile period of time. The duration of a Provisional )lassification )ertificate is not to exceed six months from the completion date of the surve!s. VIETNAM STANDARDS TCVN 6171 : 1996 ". S#$%&' (.1 )lassification "urve! during construction (.1.1 ,pproval of plans and documents (.1.1. 1 Prior to construction of a platform intended to e classed +ith V&R'" the O+ner or their ,gent have to sumit to V&R'"$ for approval the documents and plans as required in (.1.1.% elo+. ,dditional plans and documents ma! e required$ if considered necessar! ! V&R'". (.1.1.% Plans and documents to e sumitted to V&R'" for approval# a) Plans and documents of overall structure# . "pecifications for overall structure and equipment/ . 8eneral arrangement (including foundation$ machiner!$ electrical installations and equipment$ arrangement of all spaces)/ . 9oadings for all dec:s/ . "tructures anal!sis/ . Fatigue design or fatigue anal!sis of the structure/ . )onstruction profile and scantling calculations according to the Ru1es/ . )alculations for significant operational loading from drilling derric:$ riser tensioners and other similar significant landing/ . 1ec:s and superstructures/ . Piles and template/ . "cantlings of principal machineries and oilers (including foundation of crane and strength calculations)/ . ,rrangement of structural fire protection and thermal insulation/ . ,rrangement of the fire doors$ explosion.proof doors$ +indo+s and closing appliances of openings/ . Tan: sounding tales/ . )orrosion protection s!stem/ . )onstruction and +elding details and procedures (including farication$ +elding$ qualit! control. to+ing (including stailit! calculation)$ installation (including piledriving)$ examination and tests$ etc.)/ VIETNAM STANDARDS TCVN 6171 : 1996 . 1isposition of ha0ardous areas/ . Fire control plan/ . ,rrangement of mooring equipment/ . ;elicopter dec: and its strength calculations/ . ,rrangement of fire fighting appliances. . Operation manuals (parts relating to "afet!) . 1ocuments relating to the foundation and environment# . 1esign specifications/ . 1ata of environmental conditions/ < "ea states (including +ater depth. highest and lo+est tidal level maximum riser of sea surface +ithout s+eil$ velocit! and direction of )urrent and variation of the current velocit! +ith the depth of +ater$ the height$ period and direction of +ave and extreme sea +ater temperature)/ < 3eather conditions (including velocit! and direction of stead! +ind and gust and the air temperature)/ < 'arthqua:e/ Foundation (including information of general geological surve!$ topographic surve! general$ outline of the soil encountered$ geoph!sical investigation$ sea ed soil "tructure investigation$ determination of sea current and sea +ater near sea ed$ mechanical "trength of soil and soil mechanic calculation). c. Plans and documents referring to machiner!# . "pecifications of machiner!/ . "pecifications of pumping and piping s!stems/ . 8eneral arrangement of engine and oiler rooms$ pump room and emergenc! po+er station/ . ,rrangement of schematic diagram of piping s!stems # < "team piping/ < )ondensate oiler feed and lo+off piping/ < "taning air piping/ < Fuel oil piping/ < 9uricating oil piping/ VIETNAM STANDARDS TCVN 6171 : 1996 < )ooling +ater piping/ < Oil fuel heating piping/ < Fire extinguishing$ ventilating$ air$ sounding$ draining and overflo+ piping/ . ,rrangement and calculations of fire detection and fire extinguishing installations/ . Torsional viration calculation for shaning and strength calculations for it principal components/ . "chematic diagrams and arrangement of inert gas s!stem/ . ,rrangement of slushing s!stem/ . ,rrangement of oil-gas processing s!stems/ . ,rrangement of fuel oil s!stem for helicopters and details of safet! measures/ Plans of engines urning natural gas and purified crude oil and details of safet! measures/ . Piping arrangement of oiler urning natural gas and purified crude oil and detail of safet! measures/ . 9ist of spare parts/ . ,rrangement of oilers and pressure vessels . =oiler construction. d. Plans and documents referring to electrical installations# . "pecifications for electrical equipment (including technical specifications for the products inspected ! other classification societies recogni0ed ! V&R'")/ . 9ist of electrical equipment/ . 'lectric loading calculations/ . )alculations for short circuit currents at main usars$ su.s+itchoard usars and the secondar! side of transformers/ . "chematic diagrams and arrangement of main and emergenc! s+itchoards (including atter! charging and discharging panel)/ . 'lectric po+er distriution diagrams$ (including cale t!pes$ cross sections and lengths$ and circuit over.current protection values)/ . ,rrangement of electric po+er equipment/ . "chematic diagrams and arrangement of main lighting$ emergenc! lighting and VIETNAM STANDARDS TCVN 6171 : 1996 temporar! emergenc! lighting/ . ,rrangement of electric equipment in ha0ardous areas (+ith the ma:e and t!pe and construction of equipment indicated and to e provided +ith &nspection )ertificates issued ! the competent organi0ations$ if it is agreed ! V&R'")/ . "chematic diagrams of electric circuits for automatic control s!stem/ . 9ist of spare parts. e) ,n! modification to the approved plans and documents is also to e sumitted to V&R'" for approval. (.1.% "urve! (.1.%.1 "teel$ +elding consumales$ steam turines$ diesel engines$ oilers$ pressure vessels and other equipments and materials intended to e used or installed on the platforms are to e inspected ! V&R'" in accordance +ith the regulations on qualit! control of manufacture. The! can e accepted ! V&R'" if the! hold )ertificates of qualit! issued ! recogni0ed Organi0ations. Onl! the materials and equipments holding certificate of qualit! can e used for construction and repair of the platform. (.1.%.% Platforms are to e constructed in accordance +ith the approved plans. 1uring the construction V&R'" are to e satisfied that the materials used$ +or:manship and arrangements are satisfactor! and compl! +ith the approved plans and the the relevant existing Rules and "tandards. (.1.%.( 1uring construction$ the structures$ equipment$ machineries$ pressure vessels$ piping s!stems$ electrical installations$ etc. of the platforms are to e examined and tested in the presence of and to the satisfaction of V&R'" in accordance +ith the approved plans and requirements of the Regulations. The test programmes are to e agreed +ith V&R'". The relevant test reports sumitted ! the manufacturers and ma:ers are to e chec:ed and signed ! V&R'". (.% ,nnual "urve! ,ll platforms are to e surve!ed once for ever! t+elve months +ithin ( months efore or after each anniversar! date of the fist or the latest "pecial "urve!. (.%.1 "tructure (.%.1.1 The platform is to e examined so far as is necessar! and practicale$ in VIETNAM STANDARDS TCVN 6171 : 1996 order that the Regulations are satisfied as to its general condition. The extent of the surve! +ill normall! consist of a close visual examination of upper structure do+n to and including the splash 0one. 3here access from fixed ladders and +al:+a!s is not possile$ staging ma! e required. Particular attention +ill e paid to the follo+ing items as relevant# a. 'xtent and thic:ness of an! marine gro+th. . )orrosion. c. &mpact or other accidental d. )ondition of fenders. (.%.1.% &n the event that +hen carr!ing out the surve!s if there is some dout of possile prolem$ V&R'" ma!$ at its discretion$ request supporting inspections of specific area. e.g thic:ness calirations of corroded areas$ magnetic particle inspection of +elded 7oints$ marine gro+th measurements$ and records of operating *anual. (.%.1.( The ,nnual "urve! +ill also include a visual examination of all other upper area structures +ith particular note eing made of the follo+ings# a) ;elidec:$ including condition of safet! nets$ mar:ings and supporting structure. ) 3al:+a!s and handrails. c) =oat landing stations and rendering. d) ,ccommodation modules# ventilation$ cooling$ heating and pressuri0ation. e) >on.slip surfaces on exterior and interior +al:+a!s. f) ,nti.pollution s!stem or devices. g) 1rilling rig$ equipment and tan:s h) Radio to+er. i) Flare to+er-oom. 7) )rane pedestals. :) 1rains and venting. &) ,n! alterations to dec: +eights. m) =ridges. (.%.1.2 3here an! examination reveals defects of an! :ind V&R'" ma! require additional items to e inspected and an! necessar! remedial +or: is to e carried VIETNAM STANDARDS TCVN 6171 : 1996 out. (.%.1.4 3here +ells are drilled close to piling and there is reason to elieve that this ma! adversel! effect the foundations$ the drilling and +ell installation record are to e examined as required ! V&R'" to estalish +hether reassessment of the integrit! of the foundations ma! e necessar! . (.%.% *achiner! and process plant (.%.%.1 , general examination of machiner! and process spaces is to e carried out +ith particular attention eing given to the essential s!stems$ auxiliar! machiner! and to the existence of an! fire and explosion ha0ards. 'mergenc! escape routes are to e chec:ed to ensure that the! are free of ostruction. (.%.%.% "urve! of the plant and process equipment is to e carried out ta:ing account of the maximum surve! intervals sho+n in Tale 1. (.%.%.( The scope of surve! is to emrace ut not necessaril! e limited to the follo+ing# a) Rotating and reciprocating equipment to e examined and maintenance records to e inspected/ ) &nspection of caliration and test records for safet! devices$ safet! valves and other over.pressure protection devices/ c) 8eneral examination and revie+ of inspection of caliration and test records for process and production pipelines/ . d) 'xamination of emergenc! generators and fire pumps +ith running tests/ e) 8eneral examination and revie+ of )ertification of lifting equipment/ f) 'xamination of pressure vessels and revie+ of periodical are inspection documentation/ g) 8eneral examination of production equipment and revie+ of inspection documentation# h) 8eneral examination of drilling equipment and revie+ of inspection documentation/ i) 'xamination of selected s!stems and-or revie+ of documentation$ emracing/ . &dentification of :e! items in the s!stems/ . Visual examination for +ear and tear$ corrosion and pitting and seals/ VIETNAM STANDARDS TCVN 6171 : 1996 . >on destructive examination and thic:ness measurements/ . )ritical parameters test for pressure$ temperature and for sealing/ . "!stem functions# "tart operate and shut.do+n/ . Protection devices# relief valves and non.return valves# . )ontrol engineering fearores# < &nstrumentation and monitoring equipment/ < ,larms/ < &nterloc:s and safet! s!stem < Operating of remote and automatic controls < 1ispla! and communication s!stems/ (.%.( 'lectrical (.%.(.1 The electrical machiner!$ the s+itchgear$ cale and other electrical equipment are to e generall! examined under operating conditions so far is practicale. (.%.(.% The emergenc! source(s) of po+er$ its associated circuits and +here fitted$ the transitional source(s) of po+er are to e tested. (.%.(.( The operation of identification lights$ foghorns and navigation lights +here fitted is to e verified. (.%.(.2 , general examination of electrical equipment in ha0ardous areas is to e made to ensure that it is suitale for its application and that the integrit! of the equipment has not een impaired due to corrosion$ missing olts$ etc. Tests are to e made on alarms and interloc:s associated +ith pressuri0ed equipment or spaces. Tale 1# *aximum surve! intervals for plants and process equipment &tems *aximum time to completion of first surve! from date of uild (month) *aximum intervals et+een susequent surve!s from date of uild (month) Fire and unfired pressure vessel$ steam receivers$ air receivers$ etc.$ (see >otes 1$%$( and 2) 14 >ot to exceed 5? "afet! valves and devices 14 >ot to exceed 5? VIETNAM STANDARDS TCVN 6171 : 1996 &tems *aximum time to completion of first surve! from date of uild (month) *aximum intervals et+een susequent surve!s from date of uild (month) 1iesel prime movers$ gas turine$ air compressors$ geared machiner!$ and pumps 14 >ot to exceed 5? Pipe s!stem$ service and transfer +ithin unit area (selected sections) 14 >ot to exceed 5? Pipe hangers and expansion devices 14 >ot to exceed 5? ;eat exchanger clean and examine 14 >ot to exceed 5? ,ir +inches (except +here used for manriding purposes) (? >ot to exceed 5? Tan:age (? >ot to exceed 5? 9ifting appliances$ including po+er and manual operated overhead travelling cranes$ moile cranes$ +all or 7i cranes$ derric: cranes$ chain loc:s$ run+a!s$ fixed and moile gantries (see note 4) 5 5 or after repair or rene+al of parts lifting appliances.load and radius indicators and arlams (see note4) 5 5 or after repair or rene+al of parts 9ifting appliances$ hoo:s$ ropes$ chains$ cluches$ ra:es$ trac: +heels$ pulle!s$ gear$ limiting devices$ anchoring arrangements (see note 4) 5 5 or after repair or rene+al of parts Radio to+er$ uner oom$ drill derric:$ cro+n loc:$ 14 14 VIETNAM STANDARDS TCVN 6171 : 1996 &tems *aximum time to completion of first surve! from date of uild (month) *aximum intervals et+een susequent surve!s from date of uild (month) traveling$ main hoo: and s+ivel 'lectrical equipment >ot to exceed 5? >ot to exceed 5? Pressuri0ation and ventilation s!stem including fire dampers 14 14 3ell control equipment 'xamination of maintenance records 1rilling equipment 'xamination of maintenance records )losed and safe drains and venting s!stems including caissons 14 14 >OT'"# 1. 1efinition of the extent of a pressure vessel# . To first circumferential 7oint of externall! +elded attachment. . To flange face connecting to external attachment. . To first threaded connection on external attachment. %. 3here such vessels are so constructed that internal inspection is prevented ! normal means$ agreed test are to e carried out to V&R'"@ s satisfaction. (. 3here it is impractical to present all pressure vessels for first inspection$ a sufficient numer or vessels from each s!stem shall e examined$ as agreed et+een the operator and V&R'"$ to estalish the extent of the corrosion and conditions of the s!stem 2. ,ll pressure vessels are to e su7ect to the "ociet!@s surve! at least once in each surve! c!cle$ irrespective of an! inspections initiated ! the operator. 4. Periodic crane inspections are to e in accordance +ith the requirements of V&R'" Rules for 9ifting ,ppliances in a *arine 'nvironment. (.%.2 Fire protection$ detection and extinction (.%.2.1 The fire protection$ detection and extinction arrangements are to e examined. The examination is to include# . The identification of an! agreed additions or modifications +hich have een VIETNAM STANDARDS TCVN 6171 : 1996 made to the arrangements since the previous surve!. ,n! such additions and modifications are to e accordance +ith the approved design. ,n! material or equipment of supplied for addition or modification should have )ertificate of qualit! accepted ! V&R'". . Verification that all arrangement are in good condition and suitale for service until the next surve! is due. (.%.2.% "urve!s carried out ! the other >ational ,uthorit! of the countr! ma! e accepted$ at the discretion of V&R'"$ as meeting the requirements of (.%.2.1. (.%.4 9ife.saving appliances$ radio communications and safet! of navigation %.%.4.1 3here mandator! classification requirement is concerned$ the installed equipment is to e examined and tested as necessar! to V&R'" satisfaction. (.%.5 *arine risers (gas$ oil) (.%.5.1 . @ The usual surve!s +ill include close visual examination of risers do+n to and including the splash 0one +ith particular attention to the follo+ing# . 8eneral inspection ased on operational conditions under +hich the installation has operated$ e$g.$ thermal exposure$ internal pressure or environmental loads. . Verif! adequac! of clearances et+een risers and the installation . )hec: of condition of riser fastenings$ clamps$ olts$ flanges$ etc. . Visual inspection of protecting fenders in the splash 0one for damage$ loose mounting or corrosion. . Pressure testing of external protection cover in splash 0one +here applicale. . )hec: of condition of paint or other anti.corrosive coating. (.%.A )orrosion protection (.%.A. 1 , chec: of the corrosion protection s!stem is to e carried out efore or during the first ,nnual "urve! to verif! that it is functioning in accordance +ith the approved design. Thereafter$ surve! requirements are as sho+n in 4.%.A. (.%.B Operation *anual (.%.B.1 V&R'" +ill verif! that an up.to.date approved cop! of the *anual is availale on the installation. (.( =iennial "urve!s (.(.1 8eneral VIETNAM STANDARDS TCVN 6171 : 1996 @(.(.1.1 =iennial surve!s are carried out once for ever! %2 months in acordance +ith section (.% and (.(.% (.(.1.% 3here$ due to environmental conditions$ it is impractical to carried out under+ater surve!s aout the due date$ the +or: ma! e carried out during the calm +eather period preceeding or after the due date. (.(.% 6nder+ater "urve!s (.(.%.1 1iving and in.+ater surve! operations are to e carried out ! firms recogni0ed ! V&R'". )ontinued recognition ! V&R'" +ill e dependent on the firm@s standard of +or: eing maintained to the satisfaction of V&R'". (.(.%.% 1ivers assisted surve!s are to e carried out under the surveillance of V&R'" and in a manner +hich +ill$ so far as is practicale$ enale V&R'" to satisf! itself thai no critical defect$ deterioration or omission has een overloo:ed. (.(.%.( The diving contractor must produce a report on completion of the inspection. The detailed close visual inspections should e pennanentl! recorded on video tape or still photographs. (.(.%.2 The detailed scope of the surve! is to e agreed +ith V&R'" in each case. ( . (.%.4 3here agreed inspections indicate that deterioration cor defects are occurring or +here damage or alterations to the unit have occurred et+een route surve!$ V&R'" ma! require the divers to extent their inspections to items not included in the agreed inspection list. 3here necessar!$ additional cleaning ma! also e required. (.(.%.5 The diving contractor +ill require to have all the necessar! equipment$ e.g. air diving and saturation diving equipment$ cleaning tools$ video recorders and cameras$ magnetic crac: detection equipment$ ultrasonic thic:ness gauges$ reference electrodes and high impedance voltmeters suitale for potential measurements and diving staff +ho have een accepted ! V&R'" for under+ater non.destructive examination (>.1.'). (.(.%.A The surve! is to include a general visual examination of the under+ater parts of the structure$ riser$ etc.$ (+ithout cleaning) +ith particular attention to the follo+ing# a) For steel "tructures# VIETNAM STANDARDS TCVN 6171 : 1996 . 'stimation of marine gro+th$ corrosion$ pitting$ arasion and +all thic:ness. . "urve! for ma7or damage. . )lose re.inspection of an! repairs or alterations carried out at or since the last Periodical "urve!. . 1etermination of location and extent of an! deris including dropped o7ects and spoil from drilling or cementing operations. . 8eneral visual inspection for missing anodes$ loose mountings$ and condition of sacrificial anodes. . Potential measurements at agreed pre.determined high "tress areas and other locations. Particular attention is to e paid to areas of coating rea:do+n. For impressed current corrosion protection s!stems a potential surve! +ill onl! e required at alternate =iennial "urve!s unless routine monitoring indicates that a prolem ma! exist. . "eaed scour surve! and chec: of anti.scour devices$ if applicale. . )hec: of the condition of mastic-sealants-paints. . )hec: of the integrit! of an! cladding (e.g.$ C*onel@ or copper nic:el allo!s. etc.). . )hec: of lateral and axial measurements et+een risers and the installation. . )hec: of condition of riser fastenings$ clamps$ olts$ flanges$ etc. . 1etection and possile mapping of damage to the riser and its accessories$ or to coating$ due to presence or proximit! of deris$ chains$ ropes$ etc. . For drilling installations$ chec: of equipment aove casing head$ including marine risers and lo+out preventer. . 3here the +ell.control s!stem is situated on the sea ed$ chec: of the piping do+n to and including )hristmas tree$ its control s!stem and actuators$ susea manifolds and devices to protect against ph!sical damage. (.2 "pecial "urve!s (.2.1 8eneral (.2.1.1 "pecial surve!s are to e carried out$ in general$ at 2.!earl! intervals. 3hen the special surve! is impractical at due date a surve! for extension of special surve! ma! e permitted ! V&R'" at the request of the o+ner or their VIETNAM STANDARDS TCVN 6171 : 1996 agents. &n this case a general examination +ith a scope sufficient for ascertaining the technical condition of the platform in particular that of primar! structure and racing as +ell as of machiner! and equipment is satisfactor! for the intended period of extension. &f the surve! is in compliance +ith the Regulations$ a period of extension not more than 1 month +ill e granted to the platform. &n this case a general examination +ith a scope sufficient for ascertaining the technical condition of the platform in particular that of primar! structure and racing as +ell as of machiner! and equipment is satisfactor! foe the intended period of extension. &f the surve! is in compliance +ith the Regulations$ a period of extension not more than 1% months +ill e granted to the platform. (.2.1.% The requirements of %.% and %.( are to e complied +ith. (.2.1.( The platform is to e prepared as necessar! for V&R'" to gain proper access for the careful inspection and examination of all items listed in this "ection. Proper staging is to e errected as necessar!. >ormal closed space are to e thoroughl! ventilated to ensure adequate levels of ox!gen in the air$ fuel tan:s and other similar spaces are to e gas freed as necessar! and paint$ lining$ insulation and other coating and coverings are to e removed locall!$ if required ! V&R'". (.2.% "tructure (.2.%.1 , general examination of the under+ater structure plus cleaning and close visual inspection$ supplemented +ith non.destructive examination of sdected +elds (e.g. ruular saddle +elds) is required. The extent of this examination is to e agreed +ith V&R'". These +elds ma! e inspected at "pecial "urve!s or pro rata ona continuous surve! asis. (.2.%.% For concrete structures a general inspection ! the R.O. V. is required over the surface of the structure. This +ould include emedment plates and an! other attachments to the structure. 1ivers inspection is onl! required at agreed locations and +ill generall! e for a particular prolem identified ! R. O. V. surve!. (.2.%.( 1ifferential settlement is to e assessed and the air gap to mean +ater level VIETNAM STANDARDS TCVN 6171 : 1996 is to e determined. (.2.%.2 )areful examination is to e made of those pans of the structure particularl! liale to excessive corrosion$ or to deterioration or damage$ from causes such as suppl! oat impact chafing or handling of drilling pipe$ stores$ etc. and due to +ater collection in corers of ul:heads and on +eather dec:s$ etc. (.2.%.4 The thic:ness of the material in an! ponion of the structure +here signs of +astage are evident is to e estalished. 'xcept +here it can e demonstrated that the "tructure remains fit for its intended purpose$ an! pans +hich are found defective or materiall! reduced in scantling are to e made good ! materials of approved scantlings and qualit!. ,ttention is to e given to the structure in +a! of discontinuities. "urfaces are to e suital! protected ! cathodic protection or coatings as necessar!. (>ote# drilling of an! primar! racing$ eam$ girder$ etc.$ +ill not e permitted). (.2.( *achiner! The full requirements of ( .%.% are to e complied +ith. (.2.2 'lectrical &nstallations %.2.2.1 The requirements of (.%.( together +ith the requirements of (.2.2 are to e complied +ith. (.2.2.% , test for insulation resistance is to e made +here practicale on the cales$ s+itchgear$ generators$ friotors$ heaters$ lighting fitting$ etc.$ and the insulation resistance is to e not less than 1?? ??? ohms et+een all insulated circuits and earth. The installation ma! e sudivided into an! desired extent ! opening s+itches$ removing fuses or disconnecting appliance for the purpose of this test. &n ha0ardous 0ones insulation resistance Ctests are to e carried out +hen the area concerned is gas free. (.2.2.( The fittings on main and emergenc! s+itchoards$ section oards and sudistriution fuse oards are to e examined and over.current protective devices and fuses inspected to verif! that the! provide suitale protection for respective circuits. (.2.2.2 8enerator circuit rea:ers are to e tested so far as practicale$ to verif! that the protective devices including preference tripping rela!s$ if fitted$ operate VIETNAM STANDARDS TCVN 6171 : 1996 satisfactoril! and are consistent +ith the overload capailit! of the prime movers. (.2.2.4 The electric cales are to e$ examined for sheath and insulation defects and defective means of support. This examination +ill e carried out +ith the minimum disturance of fixtures or casing unless opening up is found necessar!$ e.g. due to progressive reduction in insulation values. (.2.2.5 The motors concerned +ith essential services together +ith associated control and s+itchgear are to e examined$ if considered necessar!$ operated under +or:ing conditions. (.2.2.A 3here transformers or electrical apparatus are oil immersed the O+ner are to arrange for samples of oil to e ta:en and tested for rea:do+n voltage$ acidit! and moisture and the results made availale to V&R'". (.2.2.B ,s alternative to the )omplete "urve!$ the procedures detailed in (.2.2.D and (.2.2.1? ma! e applied +here the O+ner has an agreed planned maintenance scheme$ i.e.$ an inspection and maintenance scheme +hich covers on a rotational asis the entire electrical installation over maximum period of 4 !ears. (.2.2.D *aintenance records are to e examined at the time of the ,nnual "urve! and parts of the electrical installation +here the scheduled maintenance is overdue are to e thoroughl! examined and tested. (.2.2.1? "elected scheduled maintenance tests are to e +itnessed and ma7or items of equipment opened for maintenance are to e examined to V&R'"@s satisfaction. (.2.4 )ontrol engineering s!stems (.2.4.1 Remote and-or automatic controls$ alarms and safeguards fined to the utilit!$ process and drilling equipment defined in Part A are to e tested to demonstrate that the! are in good +or:ing order. (.2.4.% , test of the emergenc! shut do+n s!stem including its interface +ith the fire and gas detection s!stem and other automatic initiations$ if fitted$ is to e carried out. (.2.4.( The pulic address s!stem and platform status indicators are to e tested to demonstrate the! are in good +or:ing order. (.2.5 Fire protection. detection and extinction The extent of inspection at the "pecial "urve! is the same as for ,nnual "urve!$ VIETNAM STANDARDS TCVN 6171 : 1996 see (.%.2 (.2.A 9ife.saving appliances$ radio communications and safet! of navigation The extent of examination and testing at the "pecial "urve! is to e as required for an ,nnual "urve!$ see (.(.4 (.4 )ontinuous surve!s (.4.1 , continuous surve! +ill e alternative for a "pecial "urve! at the request of O+ner. 3hen agreement is estalished for )ontinuous "urve! of a unit$ an agreed schedule of inspection is required to e dra+n up an adhered to. ,ll parts of the structure$ process plant$ machiner!$ electrical$ control and fire safet! equipment must e inspected and tested in rotation +ith a maximum interval of 4 !ears et+een consecutive examination of each part. (.4.% The inspection and testing of each item$ part$ compartment or component must e the same as that required for "pecial "urve!. (.4.( The schedule for )ontinuous "urve! is to ta:e account of inspections required at ,nnual "urve! and =iennial "urve!s. "pecial consideration +ill e given to an! detailed scheme of non.destructive examination of structural items$ sumitted ! the O+ner. (.4.2 &f inspections during )ontinuous "urve! reveal an! defects$ further parts are to e opened up and examined as considered ! V&R'". (.4.4 3here this method of surve! is adopted$ the first surve! c!cle +ill normall! commence from the date of uild. First surve!s are normall! made concurrentl! +ith the first ,nnual "urve! and the inspection schedule and content is to e agreed prior to that time. V&R'" reserves the right to revise the schedule in the light of operational experience. (.4.5 ,ll report$ documentation$ inspection records$ photographs$ fi1ms and video tapes generated ! planned maintenance and inspection are to e made availale to V&R'" on request. (.5 Occasional "urve!s Platforms classed +ith V&R'" to appl! for an occasional surve! in an! one of the follo+ing cases# . )hange of platform@ s name$ o+ner or port of registr!/ VIETNAM STANDARDS TCVN 6171 : 1996 . &n the event of damage of the structure or machiner! +hich affects the class/ . Postponement required due to special surve! cannot e effected at the due date$ ! the O+ner . Occasional surve! applications other than aove as required ! the O+ner. The scope of surve! +ill e defined for each particular case. (.A "urve! of Repairs (.A.1 3hen damage or defects are found in "tructure$ machiner! and equipment +hich affects the class it is to e reported to V&R'" ! the o+ner +ithout dela! and in this case the platform@s certificates cease to e valid. 9ocation$ character and extent of the damages-defects are to e detailed in the report. (.A.% The repair procedure$ repair +or:s are to e approved and conducted under supervision of V&R'". *aterials$ machiner!$ equipment used for repair are to e holding certificates recogni0ed ! V&R'" and in accordance +ith the approved plans and documents of the platform. (.A.( Onl! +hen the damages-defects have een repaired to the satisfaction of V&R'" the platform@s certificates resume their validit!. (. Clai!ication o! intallation not )#ilt #n*&$ #$%&' 2.1 Plans and documents 2.1.1 &n transferring class of the platform constructed under supervision of another )lassification "ociet!$ plans and documents descried in (.1.1 are to e sumitted to V&R'" ! the o+ner or their agents. 2.1.% &n addition$ historical records$ and also @as uilt@ plans of primar! and secondar! structure together +ith materials certificates and the surve! reports issued ! the previous )lassification "ociet! are also to e sumitted to V&R'". 2.% "cope of "urve! For the class assignment a surve! of not less severit! than that of a "pecial "urve!$ appropriate to the age of the platform$ +ill e carried out. 1epending on the actual technical condition of the platform the scope of the surve! ma! e reduced or increased ! V&R'" in comparison +ith that required VIETNAM STANDARDS TCVN 6171 : 1996 ! the Regulations.