PROJECT TITLE: DESIGN AND BUILD FOR PROPOSED DEVELOPMENT OF PERUMAHAN
GENERASI BAHARU FELDA (PGBF) USING IBS SYSTEM PHASE 5 (P5)
PACKAGE (A5-) AT !ILAYAH JENGKA AT FELDA KG" A!AH (#$ UNITS)% PAHANG DARUL MAKMUR" CONTRACT NO": &$$$#'(&( 1) OBJECTIVE 1.1. The objective of this method statement is to provide all materials, labor and equipment required to complete the painting works, together with ancillary work herein described and implied to the full intent of the drawings and schedules. 1.2. Provide finishes free of defects in materials and workmanship affecting appearance and performance. efects shall include, but not be limited to improper cleaning and preparation of surface, entrapped dust and dirt alligatoring, blisters, peeling, drips, runs, uneven coverage, misses, poor cutting in, improper use or application of materials. 1.!. "#amine the specifications and drawings for the work of other $ection regarding the provisions for prime and finish coats. Paint or finish all materials installed throughout the project which are required to be painted, and which are left unfinished or unpainted by other $ections. 1.%. &ll paints shall be factory tinted to required colors and thoroughly mi#ed before application. METHOD STATEMENT Title ' P&()T()* Document No. ' Page ' 1 of + 2) MATEIA!S 2.1 $ubmit name of paint manufacturer proposed for the work and complete list of materials intended for use on work prepared by paint manufacturer to the ,onsultant &rchitect and P.-. before materials area required. (ndicate approved manufacturer.s official certification that materials listed thereon is the top quality made by the company. /aterials delivered to the work shall conform to the accepted list. a. Paint and 0inishing /aterials ' 1ndiluted, highest grade, first line quality of the approved manufacturer, correctly labeled, bearing the brand and maker.s name, type of paint, color and code number. b. 1ndercoated' $ealer and Primer' /ade for the purpose by the approved manufacturer of finishing materials being used. c. Primer' rying time % hours ma#imum, high hiding pigments2 sealer low odor, alkyd or late# to suit substrate. d. Paint' &lkyds and vinyl Tape, low odor, quick drying, high hiding and low solvent content. e. 3rushes, -ollers and &pplication "quipment' The best of their respective kinds, clean and suitable for the work. METHOD STATEMENT Title ' P&()T()* Document No. ' Page ' 2 of + ") CONST#CTION METHOD ".1 Mi$ing !.1.1 "nsure that paint has not settled caked or thickened in the container, is readily dispersed with a paddle to a smooth consistency and has e#cellent application properties. !.1.2 1se all reducing and tinting materials as recommended by the approved manufacturer for the particular material reduced or tinted. !.1.! /i# materials thoroughly before application. ".2 In%&ection !.2.1 "#amination' "#amine the work upon which the work of this $ection depends prior to the application. (f surfaces cannot be put in proper condition by customary cleaning, sanding and puttying, report such defects in writing. !.2.2 &cceptance' 0ailure to report defects will constitute acceptance or surfaces. METHOD STATEMENT Title ' P&()T()* Document No. ' Page ' ! of + -efinish the faulty work at no e#pense to the "mployer. "." P'e&a'ation !.!.1 ust' ,lean floors, adjacent surfaces and surfaces to be painted before work is commenced. !.!.2 efects' "nsure that surfaces to be finished are clean, free from machine, tool or standing marks, dust, grease, soil or other e#traneous matter and all defects or sanding marks which could be detrimental to an acceptable finish. !.!.! &lkaline $urface' )eutrali4e highly alkaline surfaces with a neutrali4ing wash of %5 solution of 6inc $ulphate. $ubstitute %5 solutions of Tetrapotassium Pyrophosphate for surfaces to receive late# paints. 3rush off residue before painting. !.!.% /ask and cover surrounding surfaces, coordinate and remove ironmongery, electric plates and accessories as required to keep paint from adjacent surfaces. /ask labels and specification plates occurring on equipment to be painted. ".( A&&lication METHOD STATEMENT Title ' P&()T()* Document No. ' Page ' % of + !.%.1 &pproved /anufacturer.s (nstructions' &pply materials in accordance with the directions and instructions of the approved manufacturer of the materials. o not use adulterants. !.%.2 7orkmanship' 7ork shall be e#ecuted by approved workers specially trained and have an approved full time senior qualified representative at the site to direct the work. !.%.! Painting' 7ork shall be four8coat work throughout. Priming coat shall be color toned lighter than undercoat, undercoat lighter than the first finish coat' final coat shall be approved color. &pply on additional finish coat to surfaces scheduled to receive deep, dark or accent colors called for on the $chedules and for graphics !.%.% /asonry and ,oncrete' "nsure that surfaces are clean, free from contamination. $crap of mortar nibs of cement spatter. -emove from oil by washing with bleaching and remove efflorescence by dry brushing or washing with a diluted solution. 0inally rinse with clean water. ".) Cleaning !.9.1 Promptly as the work proceeds and on completion of work, remove all paint spilled, splashed or spattered. uring the progress of the work, keep the premises free from any unnecessary accumulation of tools, equipment, surplus materials and debris. &t the conclusion of the work, leave the premise neat and clean. METHOD STATEMENT Title ' P&()T()* Document No. ' Page ' 9 of + ".* En+i'onmental Con,ition% !.+.1 &ll areas shall be clean and dust free before painting is commenced !.+.2 1se sufficient clean drop cloths and protective covering s for full protection of floors, furnishings and work not being painted. Protect mechanical, electrical and special equipment and all other soiling during painting process. /ask adjoining work adjacent to work being painted or carefully cut8in87ithout overlaps. ,lean surfaces soiled by spillage of paint and paint spatters. (f cleaning operations damages the surface, repair or replace damage work without cost to the "mployer. !.+.! :n e#terior work, do not paint during or immediately following rain. !.+.% 3e responsible for damage to the work of this section until the building is complete and accepted by the "mployer. (n cases of damage, surfaces shall be cleaned and repainted to &rchitects satisfaction. !.+.9 o not paint surfaces e#posed to direct sun or where condensation has or will form due to the presence of high humidity and lack of proper ventilation METHOD STATEMENT Title ' P&()T()* Document No. ' Page ' + of +