Active Pressure
-7.00
-9.00
Total Land side
-15.00
3
Total Excav. side
-15.00
2nd STEP
Passive Active
1.00
-1.00
-3.00
-400 -340 -280 -220 -160 -100 -40 20 80 140 200 260
-5.00
Active Pressure
-7.00
-9.00
Total Land side
Passive Pressure
-11.00
-13.00
Total Excav. side
-15.00 4
-13.00
Total Excav. side
-15.00
3rd STEP
Passive Active
1.00
-1.00
-3.00
-400 -340 -280 -220 -160 -100 -40 20 80 140 200 260
-5.00
Active Pressure
-7.00
-9.00
Total Land side
Passive Pressure
-11.00
-13.00
Total Excav. side 5
Water Excav. side
-13.00
Total Excav. side
-15.00
6
CA TRE NHO BRIDGE
WALL CALCULATION
Wall properties & Excavation data:
Sheet pile type: OT-22
Modulus of elasticity: E(kPa) = 2.0E+08
General dimensions (mm): Width: 610 Height: 260 Thickness: 10
Coefficient of efficiency for: Moment of inertia a = 0.45 Section modulus b = 0.6
Section properties per wall width: A(cm2) = 114.3 aI(cm4) = 23541.75 bZ(cm3) = 1320
Sheet pile top level: htop (m) = 2.00
Sheet pile length: LSP (m) = 16.27
Excavation level: 1st Step h1st (m) = 0.00
2nd Step h 2nd
(m) = -3.03
3rd Step h3rd (m) = -1.60
Strut & bracing level: Strut 1 h ST1
(m) = 1.00
1st Step: Cantilever retaining wall
Point O at: hO (m) = 0.00 Total Pressure (kN)
Active equivalent force: F1 (kN) = 18.66
at: Z1 (m) = 0.62 0.00
Passive equivalent force F2 are calculated from the -160 -120 -80 -40 0 40
equilibrium moments at the assumed fixity of the wall:
-5.00
Point C at: hC (m) = -3.31
and F 2
(kN) = -49.96
at: Z2 (m) = -1.84 -10.00
Required embedded length D (m): 3.31
Design embedded depth of sheet pile:
1.2D (m) = 3.97 -15.00
hT (m) = -3.97
Sheet pile length: L SP
(m) = 5.97 -20.00
Detailed calculation:
Level Total pressure F1 Arm01 M01 F2 Arm02 M02
1.60 3.34
1.39 4.61 0.8 1.5 1.2
1.39 4.61 0.0 1.4 0.0
1.00 9.81 2.8 1.2 3.4
0.60 15.15 5.0 0.8 4.0
0.60 13.32 0.0 0.6 0.0
0.00 20.07 10.0 0.3 3.0
0.00 -7.93 0.0 0.0 0.0 0.0 0.0 0.0
-1.60 -15.46 -18.7 -0.8 15.0
-3.03 -20.32 -25.6 -2.3 59.2
-3.03 -20.32 0.0 -3.0 0.0
-5.50 -22.69 -5.7 -3.2 18.0
-7.00 -24.13
-7.00 -68.89
-14.50 -87.32
Detailed calculation:
Level Total pressure F1 Arm01 M01 F2 Arm02 M02
1.60 3.34
1.39 4.61
1.39 4.61
1.00 9.81
0.60 15.15 5.0 0.8 4.0
0.60 13.32 0.0 0.6 0.0
0.00 20.07 10.0 0.3 3.0
0.00 20.07 0.0 0.0 0.0
-1.60 38.07 46.5 -0.8 -37.2
-3.03 56.02 67.2 -2.3 -155.6
-3.03 28.02 0.0 -3.0 0.0
-5.50 18.50 57.5 -4.3 -245.1
-7.00 12.72 23.4 -6.3 -146.3
-7.00 -32.04 0.0 -7.0 0.0 0.00 -7.00 0.00
-14.50 -72.18 -86.16 -8.13 700.55
Pressure table
Level Total pres. Assumptions:
1.00 9.81 - Wall is considered as simple beam supported at Strut 1 and point O.
0.60 15.15 - Pressure is simplified as a uniform load and two linearly varying loads.
0.60 13.32 from to
0.00 20.07 Span length: 8.00 m 1.00 -7.00
0.00 20.07
-1.60 38.07 Maximum bending moment of wall: Mmax (kN.m) = 252.50
-3.03 56.02 Maximum deflection: Dmax (mm) = 60.0
-3.03 28.02 Maximum shear force could be: At strut 1: QST (kN) = -123.46
-5.50 18.50 At O: QO (kN) = -86.16
-7.00 12.72
=> Qmax (kN) = -123.46
8
Flexural stress:
#REF! 1320 #REF!
Compression stress
0.00 300000 0