1. The document provides analysis for basic rates for various items of work in building construction including excavation, brickwork, concrete, plastering, painting, flooring, roofing, etc. The analysis breaks down the rates into costs for materials, labour, transport, plant and overheads.
2. For excavation work, soils have been classified into soft-loose, ordinary, hard-dense, mud-wet clay, soft disintegrated rock, and hard rock. Analysis is provided for excavation in each soil type to a maximum depth of 1.5m, with additional labour required for deeper excavation.
3. The overhead and profit factor applied to the basic rates is 148.5%
1. The document provides analysis for basic rates for various items of work in building construction including excavation, brickwork, concrete, plastering, painting, flooring, roofing, etc. The analysis breaks down the rates into costs for materials, labour, transport, plant and overheads.
2. For excavation work, soils have been classified into soft-loose, ordinary, hard-dense, mud-wet clay, soft disintegrated rock, and hard rock. Analysis is provided for excavation in each soil type to a maximum depth of 1.5m, with additional labour required for deeper excavation.
3. The overhead and profit factor applied to the basic rates is 148.5%
1. The document provides analysis for basic rates for various items of work in building construction including excavation, brickwork, concrete, plastering, painting, flooring, roofing, etc. The analysis breaks down the rates into costs for materials, labour, transport, plant and overheads.
2. For excavation work, soils have been classified into soft-loose, ordinary, hard-dense, mud-wet clay, soft disintegrated rock, and hard rock. Analysis is provided for excavation in each soil type to a maximum depth of 1.5m, with additional labour required for deeper excavation.
3. The overhead and profit factor applied to the basic rates is 148.5%
Introductory Notes 1-8 1. Excavation 9-13 2. Anti termite treatment 13 3. Earthwork 14-1 4. Earthwork su!!ort 1"-19 #. $oncrete 2%-4 . &im'er (ormwork 4"-#3 ". )tee* rein(orcement #3 8. +rickwork #4-1 9. ,o**ow '*ock masonry 2 1%. -andom -u''*e masonry 3 11. .ressed ti**in/ 4 12. 0a** ti*in/ 1 &erra22o ti*es #- 13. -oo(in/ "-"1 14. -oo( !*um'in/ "2-"3 1#. $ei*in/ "4-"" 1. 3oors 1 windows "8-83 1". Ironmon/ery 84-89 18. .*asterin/ 89-9# 19. .ointin/ 1 3ecoratin/ 9-1%3 2%. .*um'in/ 4.5$6 1%4-11 21. Externa* draina/e 4Ew !i!es6 11" 22. .*um'in/ 4$.I. !i!es6 118-119 23. 7anho*es 1 8u**eys 12%-121 24. )anitary (ittin/s 122-12 1 2#. 8utters 1 3own !i!es 12"-13% MATERIAL AND LABOUR ANALYSIS FOR BUILDING WORKS Analysis for Basic Rats The Material and Labour component required for the various items of work including the minimal plant required for same is detailed in the analysis of the Basic Rates which have been included in the following pages. Basic Rat The basic rate is analyzed under the following headings !a" Materials The quantities of material required for the items are computed from known data and e#perience. Their total value is calculated on the basis of current costs of purchase at sources of supply. $nless% otherwise stated wastage is allowed in the norms. !b" Transport This component provides for the cost of transport of material from sources of supply to the sites of work. This component is usually added to the material cost. !c" Labour The labour wages are as approve d by the &overnment from time to time and on the basis of an ' hour working day. !d" (lant This component provides for the minimum plant required for the items of work. The cost of tools and implements is provided for tin the overheads allowances. !e" Basic )ost The Basic )ost is the sum of the costs of items !a"% !b"% !c" * !d" above. 2 O!r"a# s $ %rofit factor +verhead costs include such cost that cannot be considered as direct productive work on the ,ob. These may be generally grouped as follows &a' (o) O!r"a#s That vary with and are caused directly by the individual ,obs and. &)' Gnral O!r"a#s -hich include costs of maintaining an office% workshop and yard in which to do business whether or not there is a ,ob under way. /uch e#penses are continuous and may be shared by the ,ob turnover. The common items that make up the overhead costs are listed below. The cost of the overhead items involved on a ,ob is assessed as a percentage of the Basic cost of the ,ob. 0n the case of the construction 1gencies e#ecuting building construction works the overheads component may be listed as below 2ob +verheads !/ite +verheads" 3 of Basic )ost 4. /upervision of work !wages of work supervisors" 4.5 6. /upervision of labour !wages of &angers" 7.5 8. Temporary works !a" 1ccess Road and Maintenance 5.6 !b" /ite buildings for accommodation of part labour 5.9 !c" )entral sores building 5.: !d" ;encing and protection 5.8 !e" (rovision of water% lights etc. 5.8 !f" )learing and tidying up 5.6 !g" )ollection of building materials including cement and steel 5.75 7. -atchers for field stores and security of sites. 5.' <. Tools and implements for miscellaneous work 5.= 3 :. !a". /etting out and measurements 5.< !b". (roviding samples for testing 5.6 9. Transportation of supervisory staff 4.5 '. 2ob office% furniture% stationary% supplies% water% lights etc. 5.= =. -ages of ,ob office staff 4.6 45. Transportation of ,ob office staff 5.7 44. !a". Bonds for Bid performance and fidelity &uarantee 5.8 !b". 0nsurance of work and workmen>s compensation 5.< 46. !a". 0nterest in )apital 0nvestment 4.: !b". Business Turnover Ta# 8.5 4=.5 &eneral +verheads 48. ?ead office and rent% lights% telephone% stationary supplies% furniture etc. for same 5.: 47. /alaries of ?ead +ffice Manager% @ngineers% Technical 1ssistants% Araughtsman% )lerks% /tenos% Typists% Minor staff and Arivers 4.6 4<. Transportation and subsistence of ?ead office staff 4.5 4:. 0nsurance% 0nterest and Ta#es on business 5.7 49. Legal e#penses and )onsultancy fees 5.6 4'. -orkshop * Bard rents% sheds% garages * supplies 6.65 4=. /alaries of workshop * yard storekeepers% Arivers% ;oremen Mechanics * workmen 5.7 :.5 %rofits Ten percent !453" of the Basic costs is allowed as profit to the )ontractor. O!r"a#s an# %rofit Factor )ombining the factors for overheads and the profits factor we get 8<3 of the Basic Rate as the +verhead and (rofit factor which is also called the CMarkDupE on the Basic Rate. ie the Basic Rate is multiplied by the factor 4.8< to obtain the working rate. 4 This Basic Rate 1nalysis does not include for the use of heavy plant and equipment. This analysis provides for a labour intensive method of work with a minimal use of machinery. The machinery allowed in this analysis is the concrete mi#er% the vibrator and a hoist in the case of a multiDstoreyed building for the lift of materials to the various floors. This analysis is applicable for a building having a ma#imum of four storeys Fie ground and three floors. 0f a building has more than four floors or when the )ontract period is compressed to a few months% then it will be necessary to allow for the use of heavy machinery such as tower cranes% mobile cranes% dumpers loaders% batching plant for the mi#ing of concrete% bins for the storage of concrete material etc. and also for the employment of contract managers and additional staff. The cost of such items of work will not be accommodated within the 8<3 CMarkDupE and will have to be provided for in separate items such as preliminaries to the contract. *on!rsion I+,rial to Mtric To )onvert Rate per To Rate per Multiply by )ube M 8 5.8<8 /quare M 6 5.459< /q.ft M 6 45.9<'7 L.ft M 8.6' )wt Gg 5.56 1llowances to be made in the .................. got lift in respect of work on upper floors D 5 0n the analysis of the various items of work in the following pages the rates refer to work on the ground floor. To these rates the percentages !of the surround floor rates" indicated in the table below should be added to obtain the rates applicable to the 4 st % 6 nd and 8 rd floors. This /./.R. is limited to work on the ground and 8 upper floors only. &round to 4 st floor &round to 6 nd floor &round to 8 rd floor )oncrete !cube" 83 <3 93 =E brick work !sqr." <3 93 =3 =E brick work !cube" <3 93 453 7 HE Brickwork !sqr." <3 93 453 /teel Reinf I !cwt" 6 H3 <3 93 (lastering !sqr" <3 453 4<3 (ainting !sqr" 83 :3 =3 ;loor tiling !sqr" 63 73 :3 -all tiling !sqr" 63 73 :3 Roof calicut tiles !sqr" 83 :3 =3 Roof 1sbestos !sqr" 83 <3 93 )eiling work 83 <3 93 J+T@ @1RT? -+RG 1JA L1JA/)1(0J& 4. /olis met with in e#cavation have been classified as follows 4. /oftKLoose soil 6. +rdinary soil 8. ?ardKAense soil 7. MudK-et clay <. /oft disintegrated rock !ie rock not requiring blasting" :. ?ard rock D !a". -here blasting is approved. !b" -here blasting is prohibited. 6. The analysis has been prepared for each of the above categories as shown in items Jos 8D=. 6 8. ?owever% in the preparation of estimates for purposes of calling for Tenders% only two B.+.L. item would be included in the B.+.L. as against the B./.R. item Jos. 8% 7% <% :% 9% ' * =. The description of these two B.+.L. items would be as follows. !a". @#cavation in any material met with e#cept rock requiring blasting !b". @#cavation in rock requiring blasting. 7. This classification has been adopted !where tenders are called" to avoid any dispute that may arise as to the e#act nature of the soil that will be met with when the actual e#cavation is carried out. The tenderer is e#pected to e#amine the site and to form his own opinion of the nature of the soil that is met with and rate his tender accordingly. <. The classification of the soils in Jote 4 above and the analysis provided for the different type of soil will help the estimator in arriving at the actual cost of e#cavation% for which he will have to allow in his estimate. :. $nder Jote 4 !:" b ?ard Rock% and analysis is provided for removing ?ard Rock met with in foundation e#cavations where blasting is prohibited or cannot be done% like in built up areas where blasting can cause damage to ad,oining buildings. 9. 0n the e#cavation items Jos . 8 to =% the labour norm allowed in the items is for an e#cavation up to a ma#imum depth of <> 5E. ;or e#cavations beyond the depth of <> 5E an additional unskilled labourer should be added for every additional depth of <> 5>> or part thereof for each cube of e#cavation beyond the original <> 5>> depth. 7 0tem Aescription Rate 1mount 4. Removing top soil to a depth not e#ceeding :E * deposition as directed within site. (er /quare )onsider an area of 45.oo sqrs. ie <.55 cubs of e#cavation. 45 days $K/G labourer Rate per 45.55 square. Rate per square 6. @#cavation over site to reduce level% in any material e#cept rock requiring blasting including depositing and leveling as directed up to distance not e#ceeding 85> 5E. (er cube 4 <K' day $K/k labour Rate per cube 8. @#cavation in trenches for wallsKcolumn pits in softKloose soil from 5> 5E to <> 5E deep and depositing e#cavated material to distance not e#ceeding 85> 5E !@arth work support to be paid separately where necessary". (er cubeD 4 day $K/k labourer Rate per cube 8 0tem Aescription Rate 1mount 7. @#cavation in trenches for wallsKcolumn pits in ordinary soil form o> 5>> to <> 5>> deep and depositing e#cavated material not e#ceeding 85> 5>>. (er cube 6 M days $K/k labourer Rate per cube <. @#cavation in trenches for wallsKcolumn pits in ?ardKdense soil up to a depth of <> 5>> and depositing e#cavated material up to a distance not e#ceeding 85> 5>>. (er cube 8 H days $K/k labourer Rate per cube :. @#cavation in trenches for wallsKcolumn pits in MudKwet soil up to a depth of <> 5>> and depositing e#cavated material to distance not e#ceeding 85> 5>>. (er cube 8 days $K/k labourer Rate per cube 9 0tem Aescription Rate 1mount 7. @#cavation in trenches for wallsKcolumn pits in soft disintegrated rock !not requiring blasting" up to a depth of <> 5>> and depositing e#cavated material to distance not e#ceeding 85> 5>>. (er cube 6 H days $K/k labourer Rate per cube 8. @#cavation in trenches for wallsKcolumn pits in ?ard rock requiring blasting up to a depth of <> 5>> and depositing e#cavated material to a distance not e#ceeding 85> 5>>. (er cube Materials 5.9<lbs blasting powder 45lft fuse 4lb ,umper steel ;uel * forge D653 of material cost Labour 4 day /k labourer 6 days $K/k labourer Rate per cube 10 0tem Aescription Rate 1mount 9. Benching rock in foundation in 8>>D:>> steps. !Blasting prohibited" (er 45Dsouare feet Arilling% chipping * wedgingD 4 H day /k labourer /teel% fuel * forgeD6<3 of labour cost. )ollecting * Aisposing F 4 H day $K/k labourer per 45 sq.ft. Rate per sq.ft. 10. 1JT0DT@RM0T@ TR@1TM@JT 1ntiDtermite treatment on e#cavated foundation and compacted soil under floors. (er square Materials 4: lbs A.A.T. powder !'3in 65 gals of water" 65 gals water Labour H day $K/k labourer Rate per cube J+T@ 1lternative Mi#es !a". )opper Japhthenate !<3 in 7 to ' gals of fuel oil" !b". /odium 1rsenate !453 in 46 to 65 gals" of water. !c". Aieldrine !5.83 in 4= gals of water". 11 0tem Aescription Rate 1mount 11. @arthwork FBackfilling * compacting Backfilling to trenches with selected earth available at site. (er cube 4 day $K/k labourer Rate per cube 12. Back filling to trenches with imported material (er cube 4.5 cube earth delivered at site. 1llow 4<3 compaction filling * )ompacting 4 M $K/k labourer Rate per cube 13. ;illing under floors including leveling% watering * compacting in 8E layers with available and selected earth at site. (er cube 6 Aays $K/k labourer Rate per cube 12 0tem Aescription Rate 1mount 14. ;illing under floors including leveling% watering * compacting in 8E layers with imported selected earth. (er cube 4.5 cube earth delivered at site. allow for 4<3 compaction 6 days $K/k labourer Rate per cube 15. )utting turf sods% loading to hand carts and transporting up to 85 yards% laying and watering for 85 days. !Royalty for turf% pegging and transport beyond 85 yards paid separately". (er square )utting turf sods% loading and transporting to site and unloading. 6 H days $K/k labourer Laying turf rods at site H days $K/k labourer -atering for 85 days 4 H days $K/k labourer :5 gals. -ater. Rate per square J+T@ Rate does not include for !a". Royalty for turf !b". Transport of turf !c". (egs on sloping site !d". -ater 13 0tem Aescription Rate 1mount 16. @arthwork support !open planking" in trenches up to a depth of <> 5>>. )onsider trench 4<> 5>> long 8> 5>> wide and <> 5>> depth +pen planking to both faces. Total area N 6K4<> 5>> # <> 5>> N 4<5 sq. ft (er 4<5 sq. ft Materials 49.<5 sq.ft class 00 timber !7uses" 1dd <3 on above for wedges. Labourer 4 days carpenter 8 days $K/k labourer Total per 4<5 sq.ft Rate per square 14 0tem Aescription Rate 1mount 17. @arthwork support !close plunking" in trenches up to <> 5>> depth. )onsider trench 4<> 5>> long 8> 5>> wide and <> 5>> height of planking to both faces. Total area of planking 6K4<> 5>> O <> 5>> ie 4<5 sq.ft. (er 4<5 sq.ft. Materials 85.55 cu.ft class 00 timber !7 uses" 1dd <3 on above for wedges. Labour 6 days carpenter : days $K/k labourer Total per 4<5 sq.ft. Rate per square 15 0tem Aescription Rate 1mount 18. @arth work support !clone planking" in deep e#cavation in trenches up to 4<> 5>> depth. )onsider trench of length of 4<> 5>> width <> :>> at top 8> :>> at bottom Then area supported is 6K4<> O 4<> ie. 7<5 sq.ft. Materials 455.55 cu.ft class 00 timber !7 uses" 1dd <3 on above for wedges. Labour ' days carpenter 65 days $K/k labourer Total per 7<5 sq.ft Rate per square 16 *ON*RETE (reamble 1ssumptions 4. Mi#ing concrete using a concrete mi#er 47K45 cu.ft. )apacity and manual loading are the basis on which the norms are worked. 6. 1 gang of one skilled and si# unskilled labourers produce 8.55 cubes of concrete per day using a 47K45 cu.ft capacity concrete mi#er. This is as per accepted practice. 8. The production of concrete is at the mi#er siteI transporting mi#ed concrete and placing same in position is paid for separately. 7. 0n concrete items 6: to 8= both inclusive% placing of concrete in columns% beams and floor slabs on the ground floor the labour component allowed is for the placing of concrete between the ground floor and the top of the 4 st floor slab which area is called the ground floor area. /imilarly the area between the top of the 4 st floor slab and the top of the 6 nd floor slab is called the 4 st floor area etc. 17 0tem Aescription Rate 1mount 19. Mi#ing concrete 48: !4 HE" (er cube Materials 48 cwt !<5 kg bags" cement 5.<8 cubes sand 5.=6 cubes 4 HE metal 4K8 day hire of mi#er water !445 gals" Labour 4K8 day skilled labourer 6 days $K/k labourer Rate per cube J+T@ !a". -ater available at site. !b". 0f% water is not available allowances should be made for transport of water. !c". /and Fincludes 4<3 for bulking. 18 0tem Aescription Rate 1mount 20. Mi#ing concrete 46 H < !4E" (er cube Materials 47 cwt cement !<5 kg. bags" 5.:5 cubes sand 5.=5 cubes 4E metal 4K8 day hire of mi#er water !455 gals" Labour 4K8 day skilled labourer 6 days unskilled labourer Rate per cube Jote !a". -ater available at site. !b". 0f water is not available allowance should be made for transport of water. !c". /and F0ncludes 4<3 for bulking. 19 0tem Aescription Rate 1mount 21. Mi#ing concrete 467 !8K7E" (er cube Materials 4' cwt cement !<5 Gg bags" 5.<5 cubes sand 5.'' cubes PE metal 4K8 day hire of mi#er waterD!465 gals" labour 4K8 day skilled labourer 6 days $K/k labourer Rat ,r c-) J+T@ !a". -ater available at site !b". 0f water is not available at site allowance must be made for transport of water. !c". /andD includes 4<3 for bulking. 20 0tem Aescription Rate 1mount 22. Mi#ing concrete 4 4 H 8 !8K7E" (er cube Materials 68 cwt cement !<5 Gg bags" 5.76 cubes sand 5.'6 cubes PE metal 4K8 day hire of mi#er -ater !4<5 gals" Labour 4K8 day skilled labourer 6 days $K/k labourer Rate per cube J+T@ !a". -ater available at site. !b". 0f water is not available allowance must be made for transport of water. !c". /andDincludes 4<3 for bulking. 21 0tem Aescription Rate 1mount 23. Mi#ing concrete 4 4 H 6 !8K7E" (er cube Materials 84 cwt cement !<5 Gg bags" 5.77 cubes sand 5.=: cubes PE metal 4K8 day hire of mi#er -ater !655 gals" Labour 4K8 day skilled labourer 6 days $K/k labourer Rate per cube J+T@ !a". -ater available at site. !b". 0f water is not available allowance must be made for transport of water. !c". /andDincludes 4<3 for bulking. 22 0tem Aescription Rate 1mount 24. 6E thick cement concrete screed in foundation at depths not e#ceeding <> 5E. (er square Materials 4K: cube concrete 1dd 453 for wastage Labour 4K' day /k labourer H day $K/k labourer Rate per square J+T@ ;or laying concrete at depths more than <>5E. 1dd 4K: day unskilled labourer for each additional <> 5E or part thereof per square. 23 0tem Aescription Rate 1mount 25. 8E thick cement concrete screed in foundation at depths not e#ceeding <> 5E. (er square Materials M cube concrete 1dd 453 for wastage Labour 4K' day /k labourer P day $K/k labourer Rate per square J+T@ ;or laying concrete at depths more than <> 5E. 1dd M day unskilled labourer for each additional <> 5E or part thereof per square.
24 0tem Aescription Rate 1mount 26. :E thick cement concrete floor !mass concrete". (er square Materials 5.<5 cubes concrete 1dd <3 for wastage -ater !655 gals" Labour H day /k labourer 4 M day $K/k labourer Rate per square J+T@ !a". -ater available at site. !b". 0f water is not available allowance must be made for transport of water. 25 0tem Aescription Rate 1mount 27. )ement concrete in 7 HE O :E columns in ground floor. )onsider 67 Jo. columns each 7HCO :EO45>5E ie 5.7< cubes. (er 5.7< cube Materials 5.7< cubes concrete 1dd 453 for wastage 4 day hire of vibrator Labour 4 day mason 4 day carpenter 8 days $K/k labourer 4 day /k labourer !vibrator" )uring 2ute ?essian D455 sq.ft. water D495gals 4 day $K/k labourer Total for 5.7< cubes or 675 4.ft of columns. Rate per cube +r Rate per L.ft 26 of column. J+T@ 4. ;or columns in 4 st floor add 83 to ground floor rate. 6. ;or columns in 6 nd floor add <3 to ground floor rate. 8. ;or columns in 8 rd floor add 93 to ground floor rate. 7. -ater available at site. <. 0f water is not available allowance must be made for transport of water. 28. )ement concrete in :E O :E columns in ground floor. )onsider 4' Jo. columns :EO:E each 45>5E high ie 5.7< cubes. (er 5.7< cubes Materials 5.7< cubes concrete 1dd 453 for wastage 4 day hire of vibrator Labour 4 day mason 4 day carpenter 4 day /k labourer !vibrator" 8 days $K/k labourer )uring 2ute ?essian D'5 sq.ft 27 waterD475 gals 4 H days $K/k labourer Total for 5.7< cubes or 4'5 4.ft of column Rate per cube +r Rate per L.ft of column J+T@ 4. ;or columns in 4 st floor add 83 to ground floor rate. 6. ;or column in 6 nd floor add <3 to ground floor rate. 8. ;or columns in 8 rd floor add 93 to ground floor rate. 7. -ater available at site <. 0f water is not available allowance must be made for transport of water. 28 0tem Aescription Rate 1mount 29. )ement concrete in =E O = columns in ground floor. )onsider ' Jo. =E O =E columns each 45>5E high ie 5.7< cubes. (er 5.7< cubes Materials 5.7< cubes concrete 1dd 453 for wastage 4 day hire of vibrator Labour 4 day mason 4 day carpenter 4 day /G labourer !vibrator" 8 days $K/k labourer )uring 2ute ?essian D:5 sq.ft water D455 gals H day $K/k labourer Total per 5.7< cubes or '5 l.ft of column. Rate per cube +r Rate per 4.ft of column J+T@ 4. ;or columns in 4 st floor add 83 to ground floor rate. 6. ;or columns in 6 nd floor add <3 to 29 ground floor rate. 8. ;or columns in 8 rd floor add 93 to ground floor rate. 7. -ater available at site <. 0f water is not available allowance must be made for transport of water. 30. )ement concrete in 46EO46E columns in ground floor. )onsider < Jo. columns 46EO46E each 45>5E high. (er 5.<5 cubes Materials 5.<5 cubes concrete 1dd <3 for wastage 75sq.ftD2ute ?essian 4 day hire of vibrator water !455 gals" Labour 4 day mason 4 day carpenter 4 day /k labourer !vibrator" 8 days $K/k labourer 4 H days $K/k labourer !curing" Total per 5.<5 cube or <5l.ft of column Rate per cube Rate per l.ft of column 30 J+T@ 4. ;or column in 4 st floor add 83 to ground floor rate. 6. ;or columns in 6 nd floor add <3 to ground floor rate. 8. ;or columns in 8 rd floor add 93 to ground floor rate. 7. -ater available at site. <. 0f water is not available allowance must be made for transport of water. 31 0tem Aescription Rate 1mount 31. )ement concrete in 48 HE O 48 H Ccolumns in ground floor. )onsider 7 Jo. )olumns 48 HE O 48 HCeach 45>5E high i.e. 5.<4 cubes. (er 5.<4 cubes Materials 5.<4 cubes concrete 1dd <3 for wastage 4 day hire of vibrator )uring 2ust ?essian 7< sq.ft -aterD455 gals 4 H days $K/k labourer Total for 5.<4 cubes +r 75 4.ft of column Rate per cube +r Rate per 4.ft column Jote !a". water available at site. !b". 0f water is not available allowances must be made for transport of water. 32 0tem Aescription Rate 1mount 32. )ement concrete in :EO:E beam upto 4 st floor level. )onsider 4'5 L.ft of beam :EO:E i.e.5.7< cubes. (er 5.7< cubes Materials 5.7< cubes concrete 1dd 453 for wastage 4 day hire of vibrator Labour 4 day mason 4 day carpenter 4 day /G labourer !vibrator" 7 days $K/k labourer )uring 2ute ?essian =5 sq.ft. water 4'5 gals 4H days $K/k labourer Total per 5.7< cube or 4'5 4.ft of column. Rate per cube +r Rate per 4.ft column Jote !a". water available at site. !b". 0f water is not available allowance must be made for transport of water. 33 0tem Aescription Rate 1mount 33. )ement concrete in =EO:E beam upto 4 st floor level. )onsider 465 L.ft =EO:E beam i.e.5.7< cubes. (er 5.7< cubes Materials 5.7< cubes concrete 1dd 453 for wastage 4 day hire of vibrator
Labour 4 day mason 4 day carpenter 4 day /G labourer !vibrator" 7 days $K/k labourer )uring 2ute ?essian 9< sq.ft. water 4<5 gals 4H days $K/k labourer Total per 5.7< cube or 465 4.ft of beam. Rate per cube +r Rate per 4.ft column Jote !a". water available at site. !b". 0f water is not available allowance must be made for transport of water. 34 0tem Aescription Rate 1mount 34. )ement concrete in =E#=E beam upto 4 st floor level. )onsider '5>5E length of =E#=E beam i.e.5.7< cubes. (er 5.7< cubes Materials 5.7< cubes concrete 1dd 453 for wastage 4 day hire of vibrator
Labour 4 day mason 4 day carpenter 4 day /G labourer !vibrator" 7 days $K/k labourer )uring 2ute ?essian :5 sq.ft. water 465 gals 4H days $K/k labourer Total per 5.7< cube +r '5 4.ft of beam. Rate per cube +r Rate per 4.ft column Jote !a". water available at site. !b". 0f water is not available allowance must be made for transport of water. 35 0tem Aescription Rate 1mount 35. <E thick R.)) floor slab in 4 st floor. )onsider <E thick slab 45> 5E # 46> 5E Qolume of concrete <5.55 cu.ft. (er <5.55 cubes Materials <5.55 cu.ft. concrete 1dd 453 for wastage 4 day hire of vibrator
Labour 4 day mason 4 day carpenter 4 day /G labourer !vibrator" 7 days $K/k labourer )uring 2ute ?essian 85 sq.ft. water 4<5 gals 4H days $K/k labourer Total per <5 cu.ft or 465 sq.ft. Rate per cube +r Rate per 4.ft column Jote !a". water available at site. !b". 0f water is not available allowance must be made for transport of water. 36 0tem Aescription Rate 1mount 36. :E thick R.)) floor slab in 4 st floor. )onsider 45> 5E R 45> 5E panelN <5 cu.ft Materials <5.55 cu.ft. concrete 1dd 453 for wastage 4 day hire of vibrator
Labour 4 day mason 4 day carpenter 4 day /G labourer !vibrator" 7 days $K/k labourer )uring 2ute ?essian 6< sq.ft. water =5 gals 4H days $K/k labourer (er <5.55 cu.ft or 455.55 sq.ft Rate per cube Jote !a". water available at site. !b". 0f water is not available allowance must be made for transport of water. 37 0tem Aescription Rate 1mount 37. )ement concrete in 7 HC R :E lintels in ground floor. )onsider 675 L.ft i.e. 7< cu.ft. Materials 7<.55 cu.ft. concrete 1dd 453 for wastage 4 day hire of vibrator
Labour 4 day mason 4 day carpenter 4 day /G labourer !vibrator" 7 days $K/k labourer )uring 2ute ?essian 45 sq.ft. water =5 gals 4H days $K/k labourer per 5.7< cube or 675 L.ft of lintel. Rate per L.ft of lintel Jote !a". water available at site. !b". 0f water is not available allowance must be made for transport of water. 38 0tem Aescription Rate 1mount 38. )ement concrete in =EO=E lintels in ground floor. )onsider '5 L.ft of lintel i.e. 7< cu.ft concrete. Materials 7<.55 cu.ft. cement concrete 1dd 453 for wastage 4 day hire of vibrator
Labour 4 day mason 4 day carpenter 4 day /G labourer !vibrator" 7 days $K/k labourer )uring 2ute ?essian :5 sq.ft. water =5 gals 4H days $K/k labourer per 5.7< cube or '5 L.ft of lintel. Rate per L.ft Jote !a". water available at site. !b". 0f water is not available allowance must be made for transport of water. 39 0tem Aescription Rate 1mount 40. )ement concrete in 46EO4<E lintels in ground floor. )onsider length of 8:> 5E i.e. 7< cu.ft Materials 7<.55 cu.ft. concrete 1dd 453 for wastage 4 day hire of vibrator
Labour 4 day mason 4 day carpenter 4 day /G labourer !vibrator" 7 days $K/k labourer )uring 2ute ?essian 75 sq.ft. -ater =5 gals 4H days $K/k labourer per 5.7< cube +r 8: L.ft of lintel. Rate per L.ft of lintel Jote !a". water available at site. !b". 0f water is not available allowance must be made for transport of water. 40 0tem Aescription Rate 1mount 41. /awn timber formwork to =E # =E cement concrete column in ground floor. (er square ft. )onsider column length of <> 5E )ontact area D4<.5 sq.ft. !a" . M1G0J& M+$LA !4" Materials 4'.4<E sq.ft 4E thick class 00 timber. 49.45 L.ft 6E # 6E class 00 timber in yokes. 4:.46 L.ft 6E # 4E class 00 timber battens. 4H lb wire nails. !6" ;abricating H day carpenter H day $K/G labourer 55555555 Total )ost 5 55555555 1llow in I7 uses cost of mould per use D 5 55555555 !b". 1ssembling !(er use" Materials 46 Jos. 4:mm 4'E long bolts !65 uses" H litre mould oil 8< L.ft 7E # 6E props !45 uses" Labour M day carpenter M day $K/k labourer 41 )ost of 1ssembling I 5 55555555 (er use. 5 55555555 !c". Aismantling cleaning * repairing !per use" M day carpenter5 M day $K/k labourer )ost of dismantling 55555555 per use. 55555555 Rate per square 42 0tem Aescription Rate 1mount 42. /awn timber formwork for concrete beams in ground floor )onsider =E # 46E beam of 65> 5E long. )ontact area << sq.ft. !1". Making the mould !a". :5 sq. ft. 4E timber planks !b". 67 L.ft 6E # 4E battens !c". 7< L.ft 6E # 6E ledgers !d". 85 L.ft 7E # 6E bearers at bottom of mould. !e". 6 lbs wire nails. Labour !a". 4 H day carpenter !b". 6 day $K/k laburers Total cost of mould 55555555 5555555 5 1ssuming 7 uses )ost per use 1dd 453 for repairs 55555555 )ost per use 55555555 !B". 1ssembling Materials !a". 445 L.ft 7E # 6E vertical props. !45 uses" !b". '5 L.ft 6E # 6E bracing to mould 43 and props. !c". <5 L.ft 6E # 6E bracing to a set of props. !d". :.5 sq.ft 4E timber base plate to props. !e". 66 Jos )ost of materials for assembling. 1ssuming an average of : uses. )ost of materials per uses. 1dd 453 cost of materials for repairs. 55555555 Total cost of materials (er use. 55555555 !)". Labour * /undries Labour !a". 4 day carpenter !b". 6 day $K/k labourer !c". H gal mould oil !d". H lbs nails 55555555 )ost per use 55555555 !A". Aismantling and )leaning Labour !a". H day carpenter !b". 6 day $K/k labourer )ost of labour for 55555555 dismantling per use. 55555555 Total cost for making the mould assembling 44 aligning dismantling and cleaning for << sq.ft per use. !1SBS)SA" )ost of formwork per 55555555 square. 55555555 43.. /awn timber formwork for underside of first floor slab. )onsider a slab of dimensions 65E5E#45>5E )ontact area N 6.5 sqrs. !1". Making panels !4". Materials !a". 665 sq.ft 4E thick tongue and grooved timber planks. !b". 464 lft 7E#6E runners at 6>5E centers. !c". 7 lbs. wire nails. !6". Labour !a". 8 days carpenter !b". 8 days $K/k labourer 55555555 Total cost of making panels. 55555555 1ssuming 7 uses cost per use. 1dd 653 for repairs. 55555555 Total cost of panels per use. 5555555 !B". 1ssembling Materials !a". :=5 l.ft 7E#6E vertical timber props. !45uses" !b". :: l.ft 6E#6E bracing for props. !c". 466 Jo. wedges. 45 !d". 88 sq.ft 4E base plates for props. )ost of materials for assembling. 1ssuming : uses cost of materials for assembling per use. 1dd 653 of above for repairs. Total cost of materials for 55555555 assembling per use. 5555555 !)". Labour * sundries for assembling !a". 4 day carpenter !b". 7 days $K/k labourer !c". 4 gal mould oil for assembling. !d". 6 lbs wire nails. Total cost per use for 5555555 assembling. 5555555 !A". Aismantling * )leaning Labour !a". H day carpenter !b". 6 days $K/k labourer Total cost for dismantling 5555555 per use. 5555555 Total cost for assembling per 5555555 use for 655 sq.ft !1SBS)SA" 5555555 )ost of formwork per square 46 0tem Aescription Rate 1mount 44. Mild steelKfor steel reinforcement to lintels slab beams for columns bent to shape laid in position and tied &.0. wire as directed. Materials 4 cwt M./. KTor steel rods including transport to site. !1llow for wastage 4<3" 4 H lbs 4: B-& binding wire 1dd 4.<3 of steel cost for spacers or chairs. Labour 4 Aay blacksmith 4 day $Ksk labourer Rate per cwt. 47 0tem Aescription Rate 1mount 45. Brick work in cement sand 4< in foundation up to A.(.) (er )ube Materials 47<5 bricks 1dd <3 wastage 7.5 cwt cement !<5kg bags" 5.6< cubes sand water !4<5 gals" Labour 8 days mason 7 days $K/k labourer Rate per cube 48 0tem Aescription Rate 1mount 46. Brick work cement * sand 4' in foundation up to A.(.) (er cube Materials 47<5 bricks 1dd <3 wastage 6 4K8 cwt cement !<5 Gg bags" 8K' cubes sand water !4<5 gals" Labour 8 days mason 7 days $K/k labourer Rate per cube 49 0tem Aescription Rate 1mount 47. Brickwork in cement and sand 4< in 7E thick walls in ground floor (er square Materials <<5 bricks 1dd <3 for wastage 4.85 cwt cement !<5 Gg bags" 5.45 cubes sand water !<5 gals" Labour 4 H days mason 6 days $K/k labourer /caffolding F1dd <3 5555555 Total 5555555 Rate per square 50 0tem Aescription Rate 1mount 48. =E thick brick wall cement sand 4< in ground floor. (er square Materials 45=5 bricks 1dd <3 for wastage 8.55 cwt cement !<5 Gg bags" 5.65 cubes sand -ater !44< gals" Labour 6 4K7 days mason 8 8K7 days $K/k labourer /caffolding F1dd 83 5555555 Total 5555555 Rate per square 51 0tem Aescription Rate 1mount 49. Brickwork 48 H thick in cement sand 4< in superstructure in ground floor. (er square Materials 4:85 bricks 1dd <3 for wastage 7.<5 cwt cement !<5 Gg bags" 5.85 cubes sand -ater !495 gals" Labour 8 H days mason < H days $K/k labourer /caffolding F1dd 63 5555555 Total 5555555 Rate per square 52 0tem Aescription Rate 1mount 50. =E brick walls in cement sand 4' in superstructure in ground floor. (er square !ie.5.9< cubes" Materials 45=5 bricks 1dd <3 for wastage 4.9< cwt cement !<5 Gg bags" 5.85 cubes sand -ater !44< gals" Labour 6 4K7 days mason 8 days $K/k labourer /caffolding F1dd 83 5555555 Total 5555555 Rate per square 53 0tem Aescription Rate 1mount 51. 7 H thick brick wall !wire cut" in cement and sand 4< in ground floor. !;acing to brickwork measured separately" (er square Materials <<5 wire cut bricks 1dd 63 for wastage 4.65 cwt cement !<5 Gg bags" 5.'5 cube sand -ater F 85 gals Labour 4 H days mason 6 days $K/k labourer /caffolding F1dd <3 5555555 Total 5555555 Rate per square 54 0tem Aescription Rate 1mount 52. =E thick in cement and sand 4< with wire cut bricks. !;acing to brickwork measured separately" (er square 45'5 wire cut bricks 1dd 73 for wastage 6.<5 cwt cement !<5 kg bags" 5.48 cubes sand water !455 gals" Labour 6 M days mason 8 P days $K/k labourer /caffolding F1dd 83 5555555 Total 5555555 Rate per square 55 0tem Aescription Rate 1mount 53. 48 HE thick brick wall !wire cut" in cement and sand 4< in ground floor. !;acing to brick work measured separately" (er square Materials 4:85 wire cut bricks 1dd 63 for wastage 7.<5 cwt cement !4<5 Gg bags" 5.85 cubes sand -ater 4<5 gals Labour 8 P days mason < H days $K/k labourer /caffolding F1dd 63 5555555 Total 5555555 Rate per square 54. @#tra over for facing including raised pointing 4K'E thick in cement and sand 44 mi#ture in ground floor. (er square Materials 5.<5 cwt cement !<5 Gg bags" 4.55 cu.ft sand 4K45 gals cid -ater 45 gals Labour < days mason 8 H days $K/k labourer Rate per square 56 0tem Aescription Rate 1mount 55. 8E thick floor paved in lime mortar 6< in ground floor. (er square Materials 8<5 bricks 4.65 cwt slaked lime 5.44 cubes sand water !7< gals" Labour 4 M days mason 6 H days $K/k labourer Rate per square 56. /teps 4>D4 4K6E # 5> :E in brick in cement and sand 4< with H C thick cement and sand 46 rendering including necessary e#cavation. (er 45 l.ft Materials 465 bricks 5.<5 cwt cement !<5 Gg bags" 5.5< cubes sand water !4< gals" Labour H day mason H day $K/k labourer Rate per 45 l.ft Rate per l.ft 57 0tem Aescription Rate 1mount 57. Brick drains in cement and sand 4<% =E wide and :ED=E average depth including cement rendering HC thick 46 to e#posed faces with 4>:E ramp including necessary e#cavation. (er 45 l.ft Materials 475 bricks 5.'5 cwt cement !<5 Gg bags" 5.5< cubes sand water !65 gals" Labour 4 M day mason 4 M day $K/k labourer Rate per 45 l.ft Rate per l.ft 58 0tem Aescription Rate 1mount 58. Brick drains in cement and sand 4<% =E wide and :ED=E average depth including cement rendering HC thick 46 to e#posed faces without ramp including necessary e#cavation. (er 45 l.ft Materials 445 bricks 5.95 cwt cement !<5 Gg bags" 5.57 cubes sand water !4< gals" Labour 4 day mason 4 M day $K/k labourer Rate per 45 l.ft Rate per l.ft 59 0tem Aescription Rate 1mount 59. 'E thick ?ollow block work in cement and sand mortar 4< in ground floor !cavities unfilled" (er square 45>5E # 45> 5E area !size of each block 4:E # 'E # 8E" Materials 446 ?ollow cement bricks 1llow <3 for wastage 5.9< cwt cement !<5 Gg bags" 5.5: cubes sand Labour 4 H days mason 6 H days $K/k labourer /caffolding F1dd 83 555555555 Total 555555555 Rate per square 60 0tem Aescription Rate 1mount 60. 7E thick ?ollow block masonry in cement and sand mortar 4< with cavities unfilled. (er square 45> 5E # 45> 5E area !size of each block 4:E # 'E # 7E" Materials 446 ?ollow cement bricks 1llow <3 for wastage 5.75 cwt cement !<5 Gg bags" 5.58 cubes sand Labour 4 day mason 6 days $K/k labourer /caffolding F1dd <3 555555555 Total 555555555 Rate per square 61 0tem Aescription Rate 1mount 61. Random Rubble masonry in cement mortar 4< in foundation. (er cube !47E thick" Materials 4.85 cubes :E F =E rubble 9.6< cwt cement !<5 Gg bags" 5.85 cube sand. -ater 455 gals Labour 7 days mason : days $K/k labourer Rate per cube 62. Random Rubble masonry in cement mortar 4< in superstructure. (er cube !47E thick" Materials 4.85 cubes :E F =E rubble 9.6< cwt cement !<5 Gg bags" 5.85 cube sand. -ater 455 gals Labour 7 H days mason 9 days $K/k labourer /caffoldingD 1dd 83 555 5 Total 5 55 Rate per cube 0tem Aescription Rate 1mount 63. (ressed floor tiles bedded in HC cement mortar 62 46 and pointing in neat cement in ground floor. (er square Materials 66< pressed titles 'E 'E 1dd <3 for wastage 4 M cwt cement !<5 Gg bags" 5.59 cubes sand M lb wa# polish M lb coloured pigment 6 lbs cotton waste Labour 7 days mason 7 days $K/k labourer H day $K/k labourer for polishing Rate per square 63 0tem Aescription Rate 1mount 64. &lazed tiles fi#ed to walls including bedding in cement mortar 46 and raking in ground floor. !/pecials measured separately" (er square Materials 755 glazed tiles :E # :E 1dd 453 for wastage on cutting 6 H cwt cement !<5 Gg bags" 5.44 cubes sand 4 lb white cement Labour 7 days mason 7 days $K/k labourer M day $K/k labourer for cleaning Rate per square 64 0tem Aescription Rate 1mount 65. Terrazzo floor tiles on HE thick cement and sand 46 in ground floor. (er square Materials 455 46E # 46E terrazzo tiles 1dd <3 for wastage 4 M cwt cement !<5 Gg bags" 5.59 cubes sand )oloured pigment !6 lbs" H lb wa# polish 6 lb cotton waste Labour 7 days mason 8 days $K/k labourer H day $K/k labourer !polishing" Rate per square 65 0tem Aescription Rate 1mount 66. Timber framework for calicut pattern tile hip roof in single storey building consisting of wall plate% beam% ridge plate% rafters etc. !preservative treatment to be measured separately" (er :.55 square Materials 87.55 cu.ft timber 1dd 453 for wastage ::5 4.ft 6E # 4E reefers 1dd <3 wastage ' lb wire nails :E long 6 lb wire nails 6E long Labour 9 days carpenter ' days $K/k labourer Total per :.55 squares. Rate per square 0tem Aescription Rate 1mount 66 67. Roof covering with calicut pattern clay tiles in single storied building. !Timber frame work * ride covering measured separately" (er :.55 square Materials 9<5 titles Labour 8 days carpenter 8 days $K/k labourer (er :.55 squares. Rate per square 68. Timber framework for corrugated asbestos sheet roof in single storey building (er 8.:5 sqrs. Materials 48 H cu.ft timber purling 1dd 453 for wastage Labour 6 H days carpenter 8 days $K/k labourer Total per 8.:5 squares. Rate per square 67 0tem Aescription Rate 1mount 69. Roof covering with corrugated asbestos sheets !timber frame work and ridge covering measured separately". (er 8.:5 squares Materials 765 sq.ft asbestos corrugated sheets. 96 Jos. roofing screws and washers. Labour 4 day carpenter 6 days $K/k labourer (er 8.:5 square Rate per square 70. +ne layer half round clay titles over corrugated asbestos roof covering. (er square Materials :<5 half round clay tiles Labour 6 days $K/k labourer Rate per square 68 0tem Aescription Rate 1mount 71. 1sbestos close fittings ridging fi#ed complete with roofing screws or bolts !hook" (er 48> 7E length Materials 7 pairs ridges 8> 'E long 4: roofing screws or bolts Labour M day carpenter M day $K/k labourer (er 48> 7E ridging Rate per lft. 72. Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 447 (er 46 lft ridging Materials = ridge tiles 4K8 cwt cement !<5 Gg bags" 5.56 cubes sand 4< lbs slaked lime H lb colouring powder Labour M day mason M day $K/k labour (er 46 l.ft ridging Rate per l.ft 69 0tem Aescription Rate 1mount 73. PE #=E high valance board fi#ed with brass screws to ends of rafters !for tile roofing" (er 455 l.ft Materials 9<.55 sq.ft 4E planks 1dd <3 for wastage 95 Jos. 4 HE brass screws Labour 8 days carpenter 8 days $K/k labourer /caffolding F 1dd <3 5555 Total per 455 l.ft Total 5555 Rate per L.ft 74. PE # =E high barge board fi#ed with brass screws at 6> 5E centres to sides of rafters. (er 455 l.ft Materials 9<.55 sq. ft 4E thick planks 1dd <3 for wastage <5 Jos. 4 H brass screws Labour 8 days carpenter 8 days $K/k labourer /caffolding F 1dd <3 5555 Total per 455 l.ft Total 5555 Rate per L.ft 70 0tem Aescription Rate 1mount 75. R++; (L$MB0J& 4' B.-.&. !4.6 mm" galvanised iron sheet valley gutter 8> 5E girth overall once bent with end laps not less than =E width including PE tongued and grooved planks laid to slope and profile on timber members. )onsider 4<> 5E Materials 6 &.0 sheet !'> # 7>" M gal wood preservative 5.45 cwt cement !<5Gg bags" 5.5< cwt slaked lime 4.55 cu.ft sand <5.55 sq.ft planks 6 4bs 4 ME wire nails Labour !a". ;i#ing boarding and applying wood preservative 4 day carpenter 4 day $K/k labour !b". Making * fi#ing &.0 sheets H day tinker H day $K/k labourer !c". Building sidesD M day mason H day $K/k labourer Total per 4<.55 L.ft Rate per L.ft 0tem Aescription Rate 1mount 71 76. 4' B.-.&. !4.6 mm" galvanised iron flashing 4> :E girth overall 8 times bent with end laps not less than :E% lead soldered% turned and tucked up to not less than :E into chase cut in wall and printed in cement mortal 46 lower and dressed over roof covering not less than 4> 5E wide. )onsider 4<> 5E L.ft Materials 4 &.0. sheet '> # 5E # 7> 5E 5.5< cwt cement !<5 Gg bags" 4.55 cu.ft sand 4 lb soldering lead Labour )utting bending% soldering * fi#ing H day tinker 4K8 day mason !caulking" P day $K/k labourer Total per 4<.55 L.ft Rate per L.ft 72 0tem Aescription Rate 1mount 77. ......... framework for 7> 5E # 7> 5E flat asbestos ceiling !sheet measured separately"% )omprising of 7E # 6E ,oists and 6E # 6E bearers in class 0 timber. (er 4.=< square Materials '.55 cu.ft timber class 0 4 Lb 6E nails 6: Jos. fibreK plastic plugs 6< lbs cement 6.55 cu.ft sand 6E brushD M use 4K8 gal tar rap Labour 6 H days carpenter H day mason 4 H days $K/k labourer Total per 4.=< square /caffolding F 1dd 83 5555 Total 5555 Rate per square 73 0tem Aescription Rate 1mount 78. ?orizontal ceiling lining using 7> 5E R 7> 5E flat asbestos cement sheets fi#ed with and including beading and cove mouldings on timber framework. !Timber framework * painting measured separately". (er 4.=< square Materials 645 sq. ft flat asbestos sheets :5 l.ft 6E # 6E halmilla cove mouldings 46< l.ft 4 HC # HE halmilla beadings M lb F ME clout nails ' doz 4 HE brass screws Labour 4 H days carpenter 6 days $K/k labourer /caffolding D1dd 83 5555 Total D 5555 Total for 4.=< square = 74 0tem Aescription Rate 1mount 79. PE thick tongued and grooved Lunumidella ceiling boards fi#ed horizontal on 7E # 6E class 0 timber ,oists at 6> 5E centres with 4 HE brass nails. )onsider room 4<> 5E # 48> 5E ie 4.=< sqrs. Materials 44< L.ft 7E # 6E timber ,oists 64< sq.ft :E # P Lunumidella )eiling planks. 8 Lbs cement 7.55 cu.ft sand 7 Gg. 4HC brass nails Labour Making holes% fi#ing ,oists * making goodD 4 day mason 4 day carpenter 8 days $K/k labourer ;i#ing ceiling boards 8 days carpenter 7 days $K/k labourer /caffolding F 1dd 83 Total per 4.=< sqrs. 5555 Total 5555 Rate per square. 75 0tem Aescription Rate 1mount 80. PE # :E wide tongued and grooved Lunumidella ceiling boards fi#ed to underside of roof rafters% !e#isting" with 4 HE brass nails including levelling with timber strips where necessary. )onsider room 4<> 5E # 46> 5E 4.'5 squares. Materials 665.55 sq.ft ceiling planks 75.55 l.ft 6E # ME timber strips 6.55 Gg. PE nails 7.55 kg 4 HE brass nails. Labour 8 days carpenter : days $K/k labourer /caffolding F1dd 83 5555 Total 5555 Total per 4.'5 sqrs. Rate per square. 76 0tem Aescription Rate 1mount 81. Aoor single hung 8> 8E # 9> 5E high overall with frame having 4 MC thick sash and 8 PE R 6 PE timber frame. ! glazing% ironmongery * painting measured separately" (er 66.9< square feet !8> 8E # 9> 5E " Materials !a". ;rameD 4 H cu.ft 7E # 8E timber 6 Jo. spur stones : Jo. fibreKplastic plugs -ith 7E long brass screws. 6 Jo. <K'E mild steel dowels 7E long. !b". /ashD 47 sq.ft 4 H planks < sq.ft 4E planks Labour < days carpenter 4 H days $K/k labourer Total per 66.9< sq.ft Rate per square foot 77 0tem Aescription Rate 1mount 82. Aoor glazed and panelled double hung 7> 5E # 9>5E high overall with frame including 4 ME thick sash and 8 PE # 6 PE frame. !glazing% ironmongery and painting measured separately" (er6'.55 square feet !7> 5E # 9> 5E" Materials !a". ;rame 4 6K8 cu.ft 7E # 8E timber 6 Jo. spur stones : Jo. fibreKplastic plug with 7E long screws 6 Jos. <K'E dia mild steel dowels 7E long. !b". /ashes : days carpenter 6 days $K/k labourer Total for 6'.55 sq.ft Rate per square foot 78 0tem Aescription Rate 1mount 83. (lywood door single hung 8> 4 H C # :> 4 H C overall with frame having 4 ME thick sash and 8 ME # 6 PE frame. !0ronmongery and painting measured separately" (er 64.9< square feet !8> 4 HE # :> 4 HE Materials !a". ;rame 4.'5 cu.ft 7E # 8E timber 6 Jo. spur stones : Jo. fibreK(lastic plugs with 7E long brass screws. !b". /ashD 4 Jo :> =E # 6> =E plywood sash Labour 8K7 day carpenter 8K' day $K/k labourer 4K7 day mason !fi#ing frame" 4K7 day $K/k labourer !D do D " Total per 64.9< square feet. Rate per square foot
79 0tem Aescription Rate 1mount 84. Aoor ledged% braced and battened single hung 6>:E # :>:E overall% with frame having 9K=E thick tongued * grooved planks and 8 PE # 6 PE frame. !0ronmongery and painting measured separately" (er 4:.6< sq.ft !6> :E # :> :E" Materials !a". ;rameD 4.95 cu.ft 7E #8E timber 6 Jo spur stones : Jo fibreKplastic plugs with 7E long brass screws 6 Jo <K'E mild steel dowels 7E long. !b". 64.55 sq.ft 4E thick planks 8 doz 4 M long brass screws. Labour 6 M days carpenter 4 day $K/k labourer M day mason !fi#ing frame" M day $K/k labourer !D doD " Total per 4: M sq.ft Rate per square foot 0tem Aescription Rate 1mount 80 85. -indow% glazed 9> 5E # 7> 5E high overall with frame comprising 8 Jo openable sashes and 8 PE # 6 PE frame and mullions. !&lazing % ironmongery and painting measured separately" (er window 9> 5E # 7> 5E !sashes" ie per 6'.55 sq.ft !a". ;rameD 8.65 cu.ft 7E # 8E timber 7 Jo fibreKplastic plugs with 7E long brass screws !b". /ashesD =.6< sq.ft 8E # 4 H C timber Labour : days carpenter 6 H days $K/k labourer H day mason !fi#ing frame" H day $K/k labourer !DdoD" Total per 6'.55 sq.ft Rate per square foot 81 0tem Aescription Rate 1mount 86. 4K:E clear sheet glass panes e#ceeding 4> 5E but not e#ceeding 7 square feet cut and fi#ed with timber beadings to doors and windows. )onsider sash 8> 5E 7> 5E high with 8E 4 ME style and 7 Jos. glass panes. (er =.55 sq.ft Materials =.55 sq. ft glass panes 85 L.ft HE # HE beading 7 doz brass panel pins Labour H day glazier H day $K/k labourer Total per =.55 sq.ft Rate per square foot 82 0tem Aescription Rate 1mount 87. 0R+JM+J&@RB Btt hinges<E # 6 HE Materials 4 H pairs butt hinges 6 doz PE brass screws Labour M day carpenter M day $K/k labourer (er 4 H pairs. Rate per pair 88. Tee hinges :E # 46E Materials 4 pair Tee hinges 4 H doz PE iron screws Labour 6 hrs carpenter 6 hrs $K/k labourer Rate per pair 83 0tem Aescription Rate 1mount 89. Rim lock Materials 4 rim lock with screws Labour 6 hrs carpenter 6 hrs $K/k labourer Rate per Jo. 90. Mortice lock Materials 4 mortice lock with screws Labour H day carpenter H day $K/k labourer Rate per Jo. 91. )asement stays. Materials 7 casement stays 4:D HC brass screws Labour 6hrs carpenter 6 hrs $K/k labourer Total for 7 Jo. Rate per Jo. 84 0tem Aescription Rate 1mount 92. Aoor closer !?ydraulic" Materials 4door closer 'D8K7E brass screws Labour 6 hrs carpenter 6 hrs $K/k labourer Rate per Jo. 93. TowerKskeleton brass bolts. Materials 4 TowerK skeleton bolt 45 F HC brass screws Labour H hr carpenter H hr $K/k labourer
Rate per Jo. 94. Barrel bolt 7E Materials 4 barrel bolt 'D4K6E brass screws Labour H hr carpenter H hr $K/k labourer
Rate per Jo. 85 0tem Aescription Rate 1mount 95. )asement fasteners Materials : casement fasteners 67D4K6E brass screws Labour H day carpenter H day $K/k labourer Total per : Jos. Rate per Jo. 96. /pring loaded fanlight catches. Materials : brass fanlight catches 6 doz HC brass screws Labour H day carpenter H day $K/k labourer Total for : Jos. 86 0tem Aescription Rate 1mount 97. Araw rings Materials : draw rings 4 doz HE brass screws Labour 4 hr carpenter 4 hr. $K/k labourer Total for : Jos. Rate per Jo. 98. PE thick A()% in cement sand 46 finished with 6 coats hot tar and blinded with sand. (er square Materials 6.6< cwt cement 5.44 cube sand 4 H gals bitumen firewood !45 lbs" -ater 45 gals Labour 4M days mason 6H $K/k labourer Rate per square 87 0tem Aescription Rate 1mount 99. <K'E thick plastering to wall in lime and sand 6< including floating with lime putty. (er square Materials 4.85 cwt slaked lime 5.59 cubes sand water 45 gals Labour 4 day masonD 4 P days $K/k labourer /caffolding F1dd 83 5555 Total 5555 Rate per square 100. <K'E thick plastering to wall in cement sand 48 including cement floating (er square Materials 4.75 cwt cement !<5 Gg bags" 5.5: cube sand -ater 45 gals Labour 4 day mason 4 H days $K/k labourer /caffolding F 1dd 83 5555 Total 5555 Rate per square 88 0tem Aescription Rate 1mount 101. 8K'E thick plastering to soffit of slab in cement and sand 48 including floating with lime putty. (er square Materials 5.'5 cwt cement !<5kg bags" 5.4: cwt slaked lime 5.58 cubes sand -ater < gals. Labour 6 H days mason 6 H days $K/k labourer /caffoldingD 1dd 83 5555 Total 5555 Rat per sqr. 102. 8K'E thick plastering to sides and soffit of beams in cement and sand 48 including floating with lime putty. Materials 5.'5 cwt cement !<5 Gg bags" 5.4: cwt slaked lime 5.58 cube sand water < gals Labour 6 day mason 6 days $K/k labourer /caffolding F1dd 83 5555 Total 5555 Rate per square 89 0tem Aescription Rate 1mount 103. <K8E thick plastering to wall in lime cement and sand 44< finished semiDrough with wooden float. (er square Materials 5.'5 cwt cement !<5 Gg bags" 5.75 cwt slaked lime 5.59 cubes sand -ater D45 gals Labour 4 days mason 4 H days $K/k labourer /caffolding F1dd 83 5555 Total 5555 Rate per square 104. <K8E thick plastering to wall in lime cement and sand 44< finished smooth with lime putty floating. Materials 5.'5 cwt cement !<5 Gg bags" 5.:5 cwt slaked lime 5.59 cubes sand -ater !45 gals" Labour 4 H days mason 4 H days $K/k labourer /caffolding F1dd 83 5555 Total D 5555 Rate per square Ra 90 0tem Aescription Rate 1mount 105. HE thick rendering in cement and sand 48 finished smooth. (er square Materials 4.59 cwt cement !<5Gg bags" 5.5< cube sand -ater 45 gals Labour 4 day mason 4 H days $K/k labourer !curing" M day $K/k labourer !)uring" Rate per square 106. HE thick rendering in cement and sand 46 in floors% finished sooth. (er square Materials 4.<5 cwt cement !<5 kg bags" 5.5< cubes sand -ater 45 gals. Labour 4 day mason. 4 H days $K/k labourer M day $K/k labourer !curing" Rate per square 91 0tem Aescription Rate 1mount 107. PE thick rendering in cement and sand 48 finished smooth. (er square Materials 4.9< cwt cement !<5 kg bags" 5.5' cube sand -ater 45 gals Labour 4 ME days mason 6 days $K/k labourer M day $K/k labourer !curing" Rate per square 108. PE thick rendering in cement and sand 46 in flooring finished smooth. (er square Materials 6.6< cwt cement !<5 kg bags" 5.5' cubes sand -ater 45 gals Labour 4 M days mason 6 day $K/k labourer M day $K/k labourer !curing" Rate per square 92 0tem Aescription Rate 1mount 109. PE thick rendering in cement and sand 46 in coloured cement floors finished smooth. (er square Materials 6.6< cwt cement !<5 kg bags" 5.5' cubs sand < lbs powdered pigment -ater 45 gals Labour 4 M days mason 6 day $K/k labourer M day $K/k labourer !curing" Rate per square 110. HE :E skirting in cement and sand 48 pro,ected or flush to walls finished with floating including forming groove. (er 45.l.ft Materials 5.45 cwt cement !<5Gg bags" 5.558 cube sand 5.6<lbs powdered pigment Labour 8K' day mason <K4: $K/k labourer Total per 45 l.ft Rate per l.ft. J+T@ -here coloured skirting is not required% delete provision for powdered pigment. 93 0tem Aescription Rate 1mount 111. (repare and apply one coat of preservative !oil type" to structural timber including touching up cut ends etc. after fi#ing. (er one square Materials 6.9< ltr. wood preservative !oil type" 8E brush !4K45 use" Labour P day painter H day $K/k labourer Rate per square 112. (repare surface of steel truss and apply two coats of antiDcorrosive primer. )onsider one square Materials 6 M ltr. 1ntiDcorrosive primer 5.4< ltr. Mineral turpentine or thinner. 4 wire brush 6E brush !4K8 use" Labour 4 H day painter 4 H day $K/k labourer Rate per square 94 0tem Aescription Rate 1mount 113. 1pply one coat of antiDcorrosive primer and two coats enamel paint on already shop primed and erected steel roof truss. )onsider one square Materials 5.65 ltr. antiDcorrosive primer 4 4K8 ltr. enamel paint 5.65 ltr. Mineral turpentine or thinner. 6E brush !4K< use" Labour 6 H days painter 4 day $K/k labourer /caffolding F1dd 83 5555 Total 5555 Rate per square 114. (repare and apply two coats primer and finishing coat of enamel paint to mild steel !angleK flat" gate. )onsider <5 sq.ft Materials 4 H ltr. antiDcorrosive primer 6K8 ltr. enamel paint 5.65 ltr. mineral turpentine or thinner H wire brush 6E brush !4K< use" Labour H day painter P day $K/k labourer Total per <5 sq.ft Rate per square 95 0tem Aescription Rate 1mount 115. (ainting steel on new work with 6 coats of antiD corrosive paint (er square Materials 6K8 ltr. antiDcorrosive paint 6E brush !4K< use" Labour 4 H days painter Rate per square 116. (ainting new timber work with two coats wood preservative. Materials H gal wood preservative 6E brush !4K< use" Labour H day painter Rate per square 117. (reparing and painting wood work with primer and 6 coats enamel paint. (er square Materials P ltr. primer 6.<5 ltr. enamel paint !6 coats" 6E brush !4K45 use" 6 sand papers Labour 4 H days painter H day $K/k labourer Rate per square 0tem Aescription Rate 1mount 96 118. -hite or colour washing two coats in single storey. (er 45 squares Materials 5.<5 cwt. boiled lime 6 lbs salt H lb yellow ochre 6 oze blue :E brush !4K8 use" -ater 45 gals Labour 6 H days painter 6 H days $K/k labourers /caffolding F1dd 83 Total per 45.55 squares 555 Total 555 Rate per 45.55 squares 119. -hite or colour washing two storied building. (er 45 squares !1s per 45 squares" 1dd H day painter H day $K/k labourers /caffolding F1dd 83 555 Total 555 Rate per 45.55 squares 97 0tem Aescription Rate 1mount 120 (repare and apply one coat of 1lkali resistant primer and two coats of emulsion paint to walls. (er square Materials (rimer =5 ltr. primer 4.75 ltr. emulsion paint -ater 5.45 gals :E brush!4K45 use" 6 sand papers Labour 4 M day painter scaffolding D1dd 83 555 Total 555 Rate per 45.55 squares 121. )ement washing to walls of single storied building 6 coats (er 45 square Materials <K' cwt cement 4D:E coir brush -ater < gals Labour 6 days painter 6 days $K/k labourer /caffoldingD1dd 8 3 Total per 45.55 sqrs. 5555 Total 5555 Rate per 45.55 squares 98 0tem Aescription Rate 1mount 122. (ainting walls with emulsion paint !6 coats" (er square 4 st )oat F 4K: gal emulsion paint 6 nd )oat D 4K9 gal emulsion paint :E brush F !4K45 use" 5.45 gals water Labour P day painter /caffolding F1dd 83 5555 Total 5555 Rate per squares 123. (repare and apply one coat alkali resistant primer and two coats of emulsion paint to soffit of slabs. )onsider 455 sqrs. Materials .=5 ltr. primer 4.<5 ltr. emulsion paint :E brush !4K45 sue" Labour 4 P days painter scaffolding F1dd 83 5555 Total 5555 Rate per square 99 0tem Aescription Rate 1mount 124. Qarnishing two coats with copal varnish after sandpapering. (er square 5.75 gals !4.'5 ltr." varnish 8E brush !4K8 use" 6 Jo sand paper Labour H day painter H day $K/k labourer Rate per square 125. -a# polishing to timber in panels * floors. (er square Materials P lb. wa# polish H doz. sheets sandpaper 4K45 floor brush H yards flannel cloth Labour 8hrs. $K/k labourer Rate per square 100 0tem Aescription Rate 1mount 126. (L$MB0J& F (Q) (0(@/ HE diameter (Q) pipes fi#ed to walls !specials paid separtely" (er 45 L.ft Materials 48 L.ft pipes 8 clips and rails 6 grams solvent cement Labour 4 hr. plumber 4 hr $K/k labourer Total per 45. )+ L.ft Rate per L.ft 127. PE dia meter (Q) pipes to walls !specials paid separately" (er 45 L.ft Materials 48 L.ft pipes 8 clips and nails 8 gram. solvent cement Labour 4 hr. plumber 4 hr. $K/k labourer Total per 45 L.ft Rate per L.ft 101 0tem Aescription Rate 1mount 128. 4E dia meter (Q) pipes fi#ed to walls !specials paid separately"
(er 455 L.ft Materials 455 L.ft pipes 1dd <3 for wastage 'D4E dia sockets 86 grms. solvent cement 8< clips and nails Labour H day plumber H day $K/k labourer Total per 455 L.ft Rate per L.ft 129. 4 ME dia meter (Q) fi#ed to walls !specials paid separately" (er 455 Lft Materials 455 L.ft pipes 1dd <3 for wastage 'D4 ME dia sockets 7' grms solvent cement 8< clips and nails Labour P day plumber P day $K/k labourer Total per 455 L.ft Rate per L.ft 102 0tem Aescription Rate 1mount 130. 4 HC dia meter (Q) pipes laid to walls !specials paid separately" (er 455 L.ft Materials 455L.ft pipers 1dd <3 for wastage 'D 4 HE dia sockets :7 grms solvent cement 8< clips and nails Labour P day plumber P day uK/k labourer Total per 455 L.ft Rate per L.ft 131. 6E dia motor (Q) pipes laid to walls !specials paid separately" (er 455 L.ft Materials 455 L.ft pipes 1dd <3 for wastage ' F 6E dia sockets 8< clips and nails 446 grams solvent cement Labour P day plumbers P day $K/k Labourer Total per 455 L.ft Rate per L.ft 0tem Aescription Rate 1mount 132. 8E dia meter (Q) pipes fi#ed to walls !specials 103 paid separately" (er 455 lKft Materials 455L.ft pipe 1dd <3 for wastage 'D8E sockets 655 grms. solvent cement 8< clips and screws Labour 4day plumber 4 day $K/k labourer Total per 455 L.ft Rate per L.ft 133. @#cavation for laying HE to 8E dia meter (Q) pipes in ground not less than 4ED:E deep% back filling * compacting. (er 455 L.ft Labour 6 M days $K/k labourer Total per 455 L.ft Rate per L.ft 104 0tem Aescription Rate 1mount 134. )hasing brick for laying HE to 4 HE dia (Q) pipes and making good average depth 6E !pipes and specials paid separately" (er 455 l.ft Materials 5.45 cwt cement 5.54 cubes sand Labour 8 days mason 8 days $K/k labourer Total for 455 L.ft Rate per L.ft 135. )hasing brickwork for laying 4 HE to 8E dia (Q) pipes in ground or floor and making good. 1verage depth 8E !pipes * specials measured separately" (er 455 L.ft Materials 5.65 cwt cement 5.58 cubes sand Labour 8 H days mason 8 H days $K/k labourer Total per 455 L.ft Rate per L.ft 105 0tem Aescription Rate 1mount 136. HE dia (Q) specials vizDelbowsK bendsKsockets. (er 45 specials Materials 45D4K6E elbowsKbendsKsocket 65 grms solvent cement Labour 6 hrs plumber Total per 45 Jo. Rate per Jo. 137. PCdia (Q) specials viz elbowsK bendsKsockets. (er . . . .. . Materials 45 D8K7E dia elbowsKbendsKsockets 85 grms solvent cement. Labour 6 hrs. plumber Total per 45 Jo. Rate per Jo. 106 0tem Aescription Rate 1mount 138. 4C dia (Q) specials viz elbowsK bendsKsockets. (er 45 specials Materials 45 D4E dia elbowsKbendsKsockets 75 grms solvent cement. Labour 6 hrs. plumber Total per 45 Jo. Rate per Jo. 139. 4 ME dia (Q) specials vizDelbows K bends Ksockets. (er 45 specials Materials 45 Jo. 4 ME dia elbowsKbendsKsockets. :5 grms solvent cement. Labour 6 hrs plumber Total for 45 Jo. Rate per Jo. 107 0tem Aescription Rate 1mount 140. 4 ME dia (Q) specials vizDelbows K bends Ksockets. (er 45 specials Materials 45 Jo. 4 ME dia elbowsKbendsKsockets. :5 grms solvent cement. Labour 6 hrs plumber Total for 45 Jo. Rate per Jo. 141. 6E dia specials vizDelbows K bends Ksockets. (er 45 specials Materials 45 D6E dia elbowsKbendsKsockets. 475 grms solvent cement. Labour H day plumber Total for 45 Jo. specials Rate per Jo. 108 0tem Aescription Rate 1mount 142. 6E dia (Q) specials vizDelbows K bends Ksockets. (er 45 specials Materials 45 D6 4K6E dia elbowsKbendsKsockets. 655 grms solvent cement. Labour H day plumber Total for 45 Jo. specials Rate per Jo. 143. 8E dia (Q) specials vizDelbows K bends Ksockets. (er 45 specials 45 D 8E dia elbowsKbendsKsockets. 675 grms solvent cement. Labour H day plumber Total for 45 Jo. specials Rate per Jo. 109 0tem Aescription Rate 1mount 144. HE dia (Q) specials viz. tees. (er 45 Tees Materials 45D HE tees 85 grms solvent cement Labour H day plumber Total for 45 Jo. tees Rate per Jo. 145. PE dia (Q) specials viz. Tees (er 45 Tees Materials 45 Jo.8K7E dia tee 7< grms solvent cement Labour H day plumber Total for 45 Jo. Tee Rate per Jo. 110 0tem Aescription Rate 1mount 146. 4E dia (Q) specials vizDTees (er 45 Tees Materials 45 D4E dia Tees :5 grms solvent cement Labour H day plumber Total for 45 Jo. Tees Rate per Jo. 147. 4 ME dia (Q) specials viz Tees (er 45 Tees Materials 45D4 ME dia Tees go grms solvent cement Labour H day plumber Total for 45 Jo. Tees Rate per Jo. 111 0tem Aescription Rate 1mount 148. 4 HE dia (Q) specials viz Tees (er 45 Tees Materials 45 D 4 HE dia Tees 465 grams solvent cement Labour 4 day plumber Total for 45 Jo. Tees Rate per Jo. 149. 6E dia (Q) specials viz Tees (er 45 Tees Materials 45 F 6E dia Tees 645 grms solvent cement Labour 4 day plumber Total for 45 Jo. Tees Rate per Jo. 112 0tem Aescription Rate 1mount 150. 6 HE dia (Q) /pecials viz Tees (er 45 Tees Materials 45D 6 HE dia Tees 855 grms solvent cement Labour 4 H days plumber Total per 45 Jo. Tees Rate per Jo. 151. 8E dia (Q) specials viz Tees (er 45 Tees Materials 45D8E dia Tees 8:5 grms solvent cement Labour 4 H days plumber Total for 45 Jo. Tees Rate per Jo. 113 0tem Aescription Rate 1mount 152. 7E dia glazed earthenware pipes laid on :E thick bedding in cement concrete 48: !4 HE" including e#cavation average 6>5E depth% back filling with selected e#cavated materials and concrete hunching to ,oints. (er455 L.ft Materials <5 F 7 C dia @- pipes 5.9< cubes cement concrete F 48: !4 HE" 6 lbs yarn 5.<5 cwt cement !,ointing" 7.55 cubes e#cavation Labour Laying concrete bedding 4 H day $K/k labourer Laying and testing pipes 6 days plumber 6 days $K/k labourer Backfilling F 6 H days $K/k labourer Total for 455 L.ft Rate per L.ft 114 0tem Aescription Rate 1mount 153. 7E dia ).0. soilKvent pipe fi#ed vertically to walls ,ointed with cement caulking. !/pecials measured separately" (er :> 5E length Materials :> 5E L.ft 7E dia ).0. pipe 1dd 453 for wastage <K4: lbs yarn 4D timber plug :E # :E # 6E 6D 8E iron screws 6lbs cement Labour M day plumber M day $K/k labourer /caffolding F 1dd <3 Total for : L.ft 5555 Total 5555 Rate per L.ft 115 0tem Aescription Rate 1mount 154. 7E dia ).0. pipes fi#ed to walls ,ointed with lead caulking. !/pecials measured separately" (er :> 5E length Materials :> 5E L.ft 7E dia ).0. pipe !1dd 453 for wastage" : lbs lead <K4: lbs yarn 4 wood plug :E # :E 6E 6D8E iron screws 4K4: cwt firewood Labour M day plumber M day $K/k labourer 1dd 453 for sundries in cement and sand /caffolding F 1dd <3 5555 Total 5555 vRate per L.ft J8````````````````````````````````````````````````````````````````````````` 116 0tem Aescription Rate 1mount 155. 7E dia stoneware gulley with :E # :E # :E gulley bo# including e#cavation% 7E cement concrete 4 6 7 !8K7E" base% surrounded by 7 HE thick brickwork in cement and sand 4< e#tended :E above top of gulley bo# including making connection% HE cement and sand 46 rendering internally and e#posed faces finished smooth with neat cement floating and providing &.0. grating on top of gully. (er Jo. Materials 4D7E /.-. gulley 7.55 cu.ft. e#cavation <.<5 sq.ft 7 ME brickwork 5.'5 cu.ft cement concrete 467 !8K7E" 4.55sq.ft HE cement rendering 46 4D7E &. 0. grating. Labour M day mason M day $K/k labourer Rate per L.ft 117 0tem Aescription Rate 1mount 156. Manhole 6> 5E # 6> 5E internally with invert depth not e#ceeding 6>5E including e#cavation% backfilling :E cement concrete 467 !8K7E" base with 8K'E dia meter mild steel rods at 7E centres both ways% forming channels and benching in similar concrete% 7 HE walls in brick in cement 4<% HE thick cement and sand 46 rendering internally and e#posed surfaces including channels% benching and 6E thick R)) removable cover slab 6>8E#6>8E inlet and outlet connection all complete to working order. Materials 8<.55 cu.ft e#cavation 9.55 cu.ft cement concrete 467!8K7E" in base * channels 88.55 sq. ft 7 HE brickwork in cement 4< 6'.55 sq.ft HE cement rendering 46 4DRcc cover slab. Labour 4 H days mason 6 H days $K/k labourer Rate per Jo. 118 0tem Aescription Rate 1mount 157. 66E # 4:C glazed fireclay wash basin with HE dia chromium plated pillar tap% waste plug% chromium plated waste chin and stay% including fi#ing wash basin on brackets% !water supply and waste water connection measured separately" (er Jo. Materials 4 wash basin complete with brackets 4D4K6E tap -aste plug and chain 7 wooden plugs : F 4 HE brass screws 6 lbs cement Labour H day mason 4 day $K/k labourer Rate per Jo. 119 0tem Aescription Rate 1mount 158. /ink 67E # 4<E R 9E overall vitreous )hina with rubber plug and chromium plated chain waster carried on iron brackets painted and fi#ed to walls. !water supply and waste water connection measured separately" (er Jo. Materials 4 sink 67E# 4<E # 9E 6 L iron brackets 6 lbs cement 6 tapered wooden blocks 6E thick 'D4 HE dia brass screws Labour H day mason H day $K/k labourer Rate per Jo. 120 0tem Aescription Rate 1mount 159. )loset pedestal type with LKL flushing cistern% flush pipe double plastic seat cover% HE dia stop cock% trap supplied * fi#ed complete to working order (er Jo. Materials 4 low level suite complete 4D HE dia stop cock 6 lbs cement M cu.ft sand 6D4 HE brass screws Labour M day mason 4 day plumber 4 day $K/k labourer Rate per Jo. 121 0tem Aescription Rate 1mount 160. )loset squatting type with trap including high level cistern fi#ed complete with flush pipe and HE dia stop cock% all complete to working order (er Jo. 4 squatting pan with trap 6 gals ).0. cistern with 4 ME flush% pipe% chin and overflow pipe 4 clip < wooden plugs 4dos. 4 HE brass screws 4D4K6E stop cock M cwt cement H cu.ft metal M cu.ft sand Labour H day mason 4 day plumber 4 day $K/k labourer Rate per Jo. 122 0tem Aescription Rate 1mount 161. Qitreous )hina bidet suite fi#ed complete to working order (er Jo. Materials 4 bidet Labour 4 day plumber 4 day $K/k labourer Rate per Jo. 162. 7 Jo. Bowl type urinal with trap and 6 gals capacity automatic flushing cistern and spreaders complete to working orders. Materials 7 $rinal Bowls 4 F 6 gal. cistern ' rawl plugs 4 spreader 7 wooden plugs !for cistern" 7 F 4 HE brass screws 7 lbs cement 4K' cu.ft sand Labour M day mason 4 day plumber 4 day $K/k labourer Total per 7 Jo. Rate per Jo. 0tem Aescription Rate 1mount 163. :E dia half round (Q) eaves gutter fi#ed to 123 timber valance board including gutter ,oiner and brackets fi#ed at 4'E centres. !+ther specials paid separately" )onsider 67.55 L.ft Materials 6D:E dia eaves gutter lengths 4 ,oiner 49 gutter brackets 87D8K7E brass screws 65 grms solvent cement Labour H day plumber H day $K/k labourer /caffolding 1dd <3 5555 Total per 67.55 L.ft Total 5555 Rate per 67.55 L.ft 124 0tem Aescription Rate 1mount 164. :E dia (Q) gutter head )onsider 4 Jo. gutter head Materials 4 (Q) gutter head 6 gutter ,oiners 6 gutter brackets 46 grams solvent cement 7D8K7E brass screws Labour 4K' day plumber 4K' day $K/k labourer /caffolding 1dd <3 5555 tt Total 5555 Rate per Jo. 125 0tem Aescription Rate 1mount 165. :E dia (Q) mitres consider 4 Jo. mitre Materials 4 mitre hand 6 gutter ,oiners 6 brackets 46 grms solvent cement 7D8K7C brass screws Labour 4K' day plumber 4K' day $K/k labourer /caffolding F 1dd <3 5555 Total 5555 Rate per Jo. 166. :C dia (Q) and caps consider 4 Jo. end cap. Materials 4 Jo. end cap 46 grms solvent cement Labour 4K4: day plumber 4K4: day $K/k labourer /caffolding F 1dd < 3 5555 Total 5555 Rate per Jo. 0tem Aescription Rate 1mount 167. 8 HE dia (Q) rain water down pipe fi#ed to brick 126 wall with wooden plugs buried in wall. !/pecials measured separately" consider 67 L.ft pipe length Materials 6D8 HE dia pipe lengths 4D8 HE ,oiner 7 (Q) straps ' brass screws 4E long 85 grms solvent cement Labour 4K8 day plumber 4K8 day $K/k labourer /caffoldingD 1dd <3 5555 Total 5555 Rate per 67E 5> L.ft Rate per L.ft 168. 8 HE dia (Q) elbow Materials 4D:5 5 K'5 5 elbow 86 grams solvent cement Labour 4K4: day plumber 4K4: day $K/k labourer /caffolding F 1dd <3 5555 Total 5555 Rate per Jo. 127 0tem Aescription Rate 1mount 169. 8 HE dia (Q) shoe Materials 4D:5 5 K'5 5 shoe 4< grms solvent cement Labour 4K4: day plumber 4K4: day $Ksk labourer Rate per Jo. 128