INDEX

CONTENT PAGE NO.


Introductory Notes 1-8
1. Excavation 9-13
2. Anti termite treatment 13
3. Earthwork 14-1
4. Earthwork su!!ort 1"-19
#. $oncrete 2%-4
. &im'er (ormwork 4"-#3
". )tee* rein(orcement #3
8. +rickwork #4-1
9. ,o**ow '*ock masonry 2
1%. -andom -u''*e masonry 3
11. .ressed ti**in/ 4
12. 0a** ti*in/ 1 &erra22o ti*es #-
13. -oo(in/ "-"1
14. -oo( !*um'in/ "2-"3
1#. $ei*in/ "4-""
1. 3oors 1 windows "8-83
1". Ironmon/ery 84-89
18. .*asterin/ 89-9#
19. .ointin/ 1 3ecoratin/ 9-1%3
2%. .*um'in/ 4.5$6 1%4-11
21. Externa* draina/e 4Ew !i!es6 11"
22. .*um'in/ 4$.I. !i!es6 118-119
23. 7anho*es 1 8u**eys 12%-121
24. )anitary (ittin/s 122-12
1
2#. 8utters 1 3own !i!es 12"-13%
MATERIAL AND LABOUR ANALYSIS FOR BUILDING WORKS
Analysis for Basic Rats
The Material and Labour component required for the various items of work
including the minimal plant required for same is detailed in the analysis of the
Basic Rates which have been included in the following pages.
Basic Rat
The basic rate is analyzed under the following headings
!a" Materials
The quantities of material required for the items are computed from
known data and e#perience. Their total value is calculated on the basis
of current costs of purchase at sources of supply. $nless% otherwise
stated wastage is allowed in the norms.
!b" Transport
This component provides for the cost of transport of material from
sources of supply to the sites of work. This component is usually added
to the material cost.
!c" Labour
The labour wages are as approve d by the &overnment from time to
time and on the basis of an ' hour working day.
!d" (lant
This component provides for the minimum plant required for the items of
work. The cost of tools and implements is provided for tin the overheads
allowances.
!e" Basic )ost
The Basic )ost is the sum of the costs of items !a"% !b"% !c" * !d" above.
2
O!r"a# s $ %rofit factor
+verhead costs include such cost that cannot be considered as direct
productive work on the ,ob. These may be generally grouped as follows
&a' (o) O!r"a#s
That vary with and are caused directly by the individual ,obs and.
&)' Gnral O!r"a#s
-hich include costs of maintaining an office% workshop and yard in which
to do business whether or not there is a ,ob under way. /uch e#penses
are continuous and may be shared by the ,ob turnover.
The common items that make up the overhead costs are listed below. The
cost of the overhead items involved on a ,ob is assessed as a percentage of
the Basic cost of the ,ob. 0n the case of the construction 1gencies e#ecuting
building construction works the overheads component may be listed as below
2ob +verheads !/ite +verheads" 3 of Basic )ost
4. /upervision of work !wages of work supervisors" 4.5
6. /upervision of labour !wages of &angers" 7.5
8. Temporary works
!a" 1ccess Road and Maintenance 5.6
!b" /ite buildings for accommodation of part labour 5.9
!c" )entral sores building 5.:
!d" ;encing and protection 5.8
!e" (rovision of water% lights etc. 5.8
!f" )learing and tidying up 5.6
!g" )ollection of building materials including cement
and steel 5.75
7. -atchers for field stores and security of sites. 5.'
<. Tools and implements for miscellaneous work 5.=
3
:. !a". /etting out and measurements 5.<
!b". (roviding samples for testing 5.6
9. Transportation of supervisory staff 4.5
'. 2ob office% furniture% stationary% supplies% water% lights etc. 5.=
=. -ages of ,ob office staff 4.6
45. Transportation of ,ob office staff 5.7
44. !a". Bonds for Bid performance and fidelity &uarantee 5.8
!b". 0nsurance of work and workmen>s compensation 5.<
46. !a". 0nterest in )apital 0nvestment 4.:
!b". Business Turnover Ta# 8.5
4=.5
&eneral +verheads
48. ?ead office and rent% lights% telephone% stationary
supplies% furniture etc. for same 5.:
47. /alaries of ?ead +ffice Manager% @ngineers%
Technical 1ssistants% Araughtsman% )lerks% /tenos% Typists%
Minor staff and Arivers 4.6
4<. Transportation and subsistence of ?ead office staff 4.5
4:. 0nsurance% 0nterest and Ta#es on business 5.7
49. Legal e#penses and )onsultancy fees 5.6
4'. -orkshop * Bard rents% sheds% garages * supplies 6.65
4=. /alaries of workshop * yard storekeepers% Arivers% ;oremen
Mechanics * workmen 5.7
:.5
%rofits
Ten percent !453" of the Basic costs is allowed as profit to the )ontractor.
O!r"a#s an# %rofit Factor
)ombining the factors for overheads and the profits factor we get 8<3 of the
Basic Rate as the +verhead and (rofit factor which is also called the CMarkDupE
on the Basic Rate. ie the Basic Rate is multiplied by the factor 4.8< to obtain
the working rate.
4
This Basic Rate 1nalysis does not include for the use of heavy plant and
equipment. This analysis provides for a labour intensive method of work with
a minimal use of machinery. The machinery allowed in this analysis is the
concrete mi#er% the vibrator and a hoist in the case of a multiDstoreyed building
for the lift of materials to the various floors.
This analysis is applicable for a building having a ma#imum of four storeys Fie
ground and three floors.
0f a building has more than four floors or when the )ontract period is
compressed to a few months% then it will be necessary to allow for the use of
heavy machinery such as tower cranes% mobile cranes% dumpers loaders%
batching plant for the mi#ing of concrete% bins for the storage of concrete
material etc. and also for the employment of contract managers and additional
staff.
The cost of such items of work will not be accommodated within the 8<3
CMarkDupE and will have to be provided for in separate items such as
preliminaries to the contract.
*on!rsion I+,rial to Mtric
To )onvert Rate per To Rate per Multiply by
)ube M
8
5.8<8
/quare M
6
5.459<
/q.ft M
6
45.9<'7
L.ft M 8.6'
)wt Gg 5.56
1llowances to be made in the .................. got lift in respect of work on upper
floors D
5
0n the analysis of the various items of work in the following pages the rates
refer to work on the ground floor.
To these rates the percentages !of the surround floor rates" indicated in the
table below should be added to obtain the rates applicable to the 4
st
% 6
nd
and
8
rd
floors. This /./.R. is limited to work on the ground and 8 upper floors only.
&round to
4
st
floor
&round to
6
nd
floor
&round to
8
rd
floor
)oncrete !cube" 83 <3 93
=E brick work !sqr." <3 93 =3
=E brick work !cube" <3 93 453
7 HE Brickwork !sqr." <3 93 453
/teel Reinf I !cwt" 6 H3 <3 93
(lastering !sqr" <3 453 4<3
(ainting !sqr" 83 :3 =3
;loor tiling !sqr" 63 73 :3
-all tiling !sqr" 63 73 :3
Roof calicut tiles !sqr" 83 :3 =3
Roof 1sbestos !sqr" 83 <3 93
)eiling work 83 <3 93
J+T@
@1RT? -+RG 1JA L1JA/)1(0J&
4. /olis met with in e#cavation have been classified as follows
4. /oftKLoose soil
6. +rdinary soil
8. ?ardKAense soil
7. MudK-et clay
<. /oft disintegrated rock !ie rock not requiring blasting"
:. ?ard rock D !a". -here blasting is approved.
!b" -here blasting is prohibited.
6. The analysis has been prepared for each of the above categories as
shown in items Jos 8D=.
6
8. ?owever% in the preparation of estimates for purposes of calling for
Tenders% only two B.+.L. item would be included in the B.+.L. as against
the B./.R. item Jos. 8% 7% <% :% 9% ' * =. The description of these two
B.+.L. items would be as follows.
!a". @#cavation in any material met with e#cept rock requiring blasting
!b". @#cavation in rock requiring blasting.
7. This classification has been adopted !where tenders are called" to avoid
any dispute that may arise as to the e#act nature of the soil that will be
met with when the actual e#cavation is carried out. The tenderer is
e#pected to e#amine the site and to form his own opinion of the nature
of the soil that is met with and rate his tender accordingly.
<. The classification of the soils in Jote 4 above and the analysis provided
for the different type of soil will help the estimator in arriving at the
actual cost of e#cavation% for which he will have to allow in his estimate.
:. $nder Jote 4 !:" b ?ard Rock% and analysis is provided for removing
?ard Rock met with in foundation e#cavations where blasting is
prohibited or cannot be done% like in built up areas where blasting can
cause damage to ad,oining buildings.
9. 0n the e#cavation items Jos . 8 to =% the labour norm allowed in the
items is for an e#cavation up to a ma#imum depth of <> 5E. ;or
e#cavations beyond the depth of <> 5E an additional unskilled labourer
should be added for every additional depth of <> 5>> or part thereof for
each cube of e#cavation beyond the original <> 5>> depth.
7
0tem Aescription Rate 1mount
4. Removing top soil to a depth not e#ceeding :E
* deposition as directed within site.
(er /quare
)onsider an area of 45.oo sqrs. ie <.55 cubs of
e#cavation. 45 days $K/G labourer
Rate per 45.55 square.
Rate per square
6. @#cavation over site to reduce level% in any
material e#cept rock requiring blasting
including depositing and leveling as directed up
to distance not e#ceeding 85> 5E.
(er cube
4 <K' day $K/k labour
Rate per cube
8. @#cavation in trenches for wallsKcolumn pits in
softKloose soil from 5> 5E to <> 5E deep and
depositing e#cavated material to distance not
e#ceeding 85> 5E !@arth work support to be paid
separately where necessary".
(er cubeD
4 day $K/k labourer
Rate per cube
8
0tem Aescription Rate 1mount
7. @#cavation in trenches for wallsKcolumn pits in
ordinary soil form o> 5>> to <> 5>> deep and
depositing e#cavated material not e#ceeding
85> 5>>.
(er cube
6 M days $K/k labourer
Rate per cube
<.
@#cavation in trenches for wallsKcolumn pits in
?ardKdense soil up to a depth of <> 5>> and
depositing e#cavated material up to a distance
not e#ceeding 85> 5>>.
(er cube
8 H days $K/k labourer
Rate per cube
:.
@#cavation in trenches for wallsKcolumn pits in
MudKwet soil up to a depth of <> 5>> and
depositing e#cavated material to distance not
e#ceeding 85> 5>>.
(er cube
8 days $K/k labourer
Rate per cube
9
0tem Aescription Rate 1mount
7. @#cavation in trenches for wallsKcolumn pits in
soft disintegrated rock !not requiring blasting"
up to a depth of <> 5>> and depositing
e#cavated material to distance not e#ceeding
85> 5>>.
(er cube
6 H days $K/k labourer
Rate per cube
8. @#cavation in trenches for wallsKcolumn pits in
?ard rock requiring blasting up to a depth of <>
5>> and depositing e#cavated material to a
distance not e#ceeding 85> 5>>.
(er cube
Materials
5.9<lbs blasting powder
45lft fuse
4lb ,umper steel
;uel * forge D653 of material cost
Labour
4 day /k labourer
6 days $K/k labourer
Rate per cube
10
0tem Aescription Rate 1mount
9. Benching rock in foundation in 8>>D:>> steps.
!Blasting prohibited"
(er 45Dsouare feet
Arilling% chipping * wedgingD
4 H day /k labourer
/teel% fuel * forgeD6<3 of labour cost.
)ollecting * Aisposing F
4 H day $K/k labourer
per 45 sq.ft.
Rate per sq.ft.
10. 1JT0DT@RM0T@ TR@1TM@JT
1ntiDtermite treatment on e#cavated
foundation and compacted soil under floors.
(er square
Materials
4: lbs A.A.T. powder
!'3in 65 gals of water"
65 gals water
Labour
H day $K/k labourer
Rate per cube
J+T@ 1lternative Mi#es
!a". )opper Japhthenate !<3 in 7 to '
gals of fuel oil"
!b". /odium 1rsenate !453 in 46 to 65 gals"
of water.
!c". Aieldrine !5.83 in 4= gals of water".
11
0tem Aescription Rate 1mount
11. @arthwork FBackfilling * compacting
Backfilling to trenches with selected earth
available at site.
(er cube
4 day $K/k labourer
Rate per cube
12. Back filling to trenches with imported material
(er cube
4.5 cube earth delivered at site.
1llow 4<3 compaction
filling * )ompacting
4 M $K/k labourer
Rate per cube
13.
;illing under floors including leveling% watering
* compacting in 8E layers with available and
selected earth at site.
(er cube
6 Aays $K/k labourer
Rate per cube
12
0tem Aescription Rate 1mount
14. ;illing under floors including leveling% watering
* compacting in 8E layers with imported
selected earth.
(er cube
4.5 cube earth delivered at site.
allow for 4<3 compaction
6 days $K/k labourer
Rate per cube
15. )utting turf sods% loading to hand carts and
transporting up to 85 yards% laying and
watering for 85 days. !Royalty for
turf% pegging and transport beyond 85 yards
paid separately".
(er square
)utting turf sods% loading and transporting to
site and unloading.
6 H days $K/k labourer
Laying turf rods at site
H days $K/k labourer
-atering for 85 days
4 H days $K/k labourer
:5 gals. -ater.
Rate per square
J+T@
Rate does not include for
!a". Royalty for turf
!b". Transport of turf
!c". (egs on sloping site
!d". -ater
13
0tem Aescription Rate 1mount
16. @arthwork support !open planking" in trenches
up to a depth of <> 5>>.
)onsider trench 4<> 5>> long
8> 5>> wide and <> 5>> depth
+pen planking to both faces.
Total area N 6K4<> 5>> # <> 5>> N 4<5 sq. ft
(er 4<5 sq. ft
Materials
49.<5 sq.ft class 00 timber !7uses"
1dd <3 on above for wedges.
Labourer
4 days carpenter
8 days $K/k labourer
Total per 4<5 sq.ft
Rate per square
14
0tem Aescription Rate 1mount
17. @arthwork support !close plunking" in trenches
up to <> 5>> depth.
)onsider trench 4<> 5>> long 8> 5>> wide and <>
5>> height of planking to both faces.
Total area of planking
6K4<> 5>> O <> 5>> ie 4<5 sq.ft.
(er 4<5 sq.ft.
Materials
85.55 cu.ft class 00 timber !7 uses"
1dd <3 on above for wedges.
Labour
6 days carpenter
: days $K/k labourer
Total per 4<5 sq.ft.
Rate per square
15
0tem Aescription Rate 1mount
18. @arth work support !clone planking" in deep
e#cavation in trenches up to 4<> 5>> depth.
)onsider trench of length of 4<> 5>>
width <> :>> at top
8> :>> at bottom
Then area supported is 6K4<> O 4<>
ie. 7<5 sq.ft.
Materials
455.55 cu.ft class 00 timber !7 uses"
1dd <3 on above for wedges.
Labour
' days carpenter
65 days $K/k labourer
Total per 7<5 sq.ft
Rate per square
16
*ON*RETE
(reamble
1ssumptions
4. Mi#ing concrete using a concrete mi#er 47K45 cu.ft. )apacity and manual
loading are the basis on which the norms are worked.
6. 1 gang of one skilled and si# unskilled labourers produce 8.55 cubes of
concrete per day using a 47K45 cu.ft capacity concrete mi#er. This is as per
accepted practice.
8. The production of concrete is at the mi#er siteI transporting mi#ed concrete
and placing same in position is paid for separately.
7. 0n concrete items 6: to 8= both inclusive% placing of concrete in columns%
beams and floor slabs on the ground floor the labour component allowed is
for the placing of concrete between the ground floor and the top of the 4
st
floor slab which area is called the ground floor area. /imilarly the area
between the top of the 4
st
floor slab and the top of the 6
nd
floor slab is
called the 4
st
floor area etc.
17
0tem Aescription Rate 1mount
19.
Mi#ing concrete 48: !4 HE"
(er cube
Materials
48 cwt !<5 kg bags" cement
5.<8 cubes sand
5.=6 cubes 4 HE metal
4K8 day hire of mi#er
water !445 gals"
Labour
4K8 day skilled labourer
6 days $K/k labourer
Rate per cube
J+T@
!a". -ater available at site.
!b". 0f% water is not available allowances
should be made for transport of
water.
!c". /and Fincludes 4<3 for bulking.
18
0tem Aescription Rate 1mount
20. Mi#ing concrete 46 H < !4E"
(er cube
Materials
47 cwt cement !<5 kg. bags"
5.:5 cubes sand
5.=5 cubes 4E metal
4K8 day hire of mi#er
water !455 gals"
Labour
4K8 day skilled labourer
6 days unskilled labourer
Rate per cube
Jote
!a". -ater available at site.
!b". 0f water is not available allowance
should be made for transport of
water.
!c". /and F0ncludes 4<3 for bulking.
19
0tem Aescription Rate 1mount
21.
Mi#ing concrete 467 !8K7E"
(er cube
Materials
4' cwt cement !<5 Gg bags"
5.<5 cubes sand
5.'' cubes PE metal
4K8 day hire of mi#er
waterD!465 gals"
labour
4K8 day skilled labourer
6 days $K/k labourer
Rat ,r c-)
J+T@
!a". -ater available at site
!b". 0f water is not available at site
allowance must be made for transport
of water.
!c". /andD includes 4<3 for bulking.
20
0tem Aescription Rate 1mount
22.
Mi#ing concrete 4 4 H 8 !8K7E"
(er cube
Materials
68 cwt cement !<5 Gg bags"
5.76 cubes sand
5.'6 cubes PE metal
4K8 day hire of mi#er
-ater !4<5 gals"
Labour
4K8 day skilled labourer
6 days $K/k labourer
Rate per cube
J+T@
!a". -ater available at site.
!b". 0f water is not available allowance
must be made for transport of water.
!c". /andDincludes 4<3 for bulking.
21
0tem Aescription Rate 1mount
23.
Mi#ing concrete 4 4 H 6 !8K7E"
(er cube
Materials
84 cwt cement !<5 Gg bags"
5.77 cubes sand
5.=: cubes PE metal
4K8 day hire of mi#er
-ater !655 gals"
Labour
4K8 day skilled labourer
6 days $K/k labourer
Rate per cube
J+T@
!a". -ater available at site.
!b". 0f water is not available allowance
must be made for transport of water.
!c". /andDincludes 4<3 for bulking.
22
0tem Aescription Rate 1mount
24. 6E thick cement concrete screed in foundation
at depths not e#ceeding <> 5E.
(er square
Materials
4K: cube concrete
1dd 453 for wastage
Labour
4K' day /k labourer
H day $K/k labourer
Rate per square
J+T@
;or laying concrete at depths more than <>5E.
1dd 4K: day unskilled labourer for each
additional <> 5E or part thereof per square.
23
0tem Aescription Rate 1mount
25. 8E thick cement concrete screed in foundation
at depths not e#ceeding <> 5E.
(er square
Materials
M cube concrete
1dd 453 for wastage
Labour
4K' day /k labourer
P day $K/k labourer
Rate per square
J+T@
;or laying concrete at depths more than <> 5E.
1dd M day unskilled labourer for each
additional <> 5E or part thereof per square.

24
0tem Aescription Rate 1mount
26. :E thick cement concrete floor !mass
concrete".
(er square
Materials
5.<5 cubes concrete
1dd <3 for wastage
-ater !655 gals"
Labour
H day /k labourer
4 M day $K/k labourer
Rate per square
J+T@
!a". -ater available at site.
!b". 0f water is not available allowance
must be made for transport of water.
25
0tem Aescription Rate 1mount
27.
)ement concrete in 7 HE O :E columns in
ground floor.
)onsider 67 Jo. columns each 7HCO :EO45>5E
ie 5.7< cubes.
(er 5.7< cube
Materials
5.7< cubes concrete
1dd 453 for wastage
4 day hire of vibrator
Labour
4 day mason
4 day carpenter
8 days $K/k labourer
4 day /k labourer !vibrator"
)uring
2ute ?essian D455 sq.ft.
water D495gals
4 day $K/k labourer
Total for 5.7< cubes or
675 4.ft of columns.
Rate per cube
+r Rate per L.ft
26
of column.
J+T@
4. ;or columns in 4
st
floor add 83 to
ground floor rate.
6. ;or columns in 6
nd
floor add <3 to
ground floor rate.
8. ;or columns in 8
rd
floor add 93 to
ground floor rate.
7. -ater available at site.
<. 0f water is not available allowance must
be made for transport of water.
28.
)ement concrete in :E O :E columns in ground
floor.
)onsider 4' Jo. columns :EO:E each 45>5E
high ie 5.7< cubes.
(er 5.7< cubes
Materials
5.7< cubes concrete
1dd 453 for wastage
4 day hire of vibrator
Labour
4 day mason
4 day carpenter
4 day /k labourer !vibrator"
8 days $K/k labourer
)uring
2ute ?essian D'5 sq.ft
27
waterD475 gals
4 H days $K/k labourer
Total for 5.7< cubes
or 4'5 4.ft of column
Rate per cube
+r Rate per L.ft of column
J+T@
4. ;or columns in 4
st
floor add 83 to
ground floor rate.
6. ;or column in 6
nd
floor add <3 to
ground floor rate.
8. ;or columns in 8
rd
floor add 93 to
ground floor rate.
7. -ater available at site
<. 0f water is not available allowance must
be made for transport of water.
28
0tem Aescription Rate 1mount
29. )ement concrete in =E O = columns in ground
floor.
)onsider ' Jo. =E O =E columns each 45>5E high
ie 5.7< cubes.
(er 5.7< cubes
Materials
5.7< cubes concrete
1dd 453 for wastage
4 day hire of vibrator
Labour
4 day mason
4 day carpenter
4 day /G labourer !vibrator"
8 days $K/k labourer
)uring
2ute ?essian D:5 sq.ft
water D455 gals
H day $K/k labourer
Total per 5.7< cubes
or '5 l.ft of column.
Rate per cube
+r Rate per 4.ft of column
J+T@
4. ;or columns in 4
st
floor add 83 to
ground floor rate.
6. ;or columns in 6
nd
floor add <3 to
29
ground floor rate.
8. ;or columns in 8
rd
floor add 93 to
ground floor rate.
7. -ater available at site
<. 0f water is not available allowance must
be made for transport of water.
30. )ement concrete in 46EO46E columns in ground
floor.
)onsider < Jo. columns 46EO46E each 45>5E high.
(er 5.<5 cubes
Materials
5.<5 cubes concrete
1dd <3 for wastage
75sq.ftD2ute ?essian
4 day hire of vibrator
water !455 gals"
Labour
4 day mason
4 day carpenter
4 day /k labourer !vibrator"
8 days $K/k labourer
4 H days $K/k labourer !curing"
Total per 5.<5 cube or
<5l.ft of column
Rate per cube
Rate per l.ft of column
30
J+T@
4. ;or column in 4
st
floor add 83 to ground floor
rate.
6. ;or columns in 6
nd
floor add <3 to ground
floor rate.
8. ;or columns in 8
rd
floor add 93 to ground floor
rate.
7. -ater available at site.
<. 0f water is not available allowance must be
made for transport of water.
31
0tem Aescription Rate 1mount
31. )ement concrete in 48 HE O 48 H Ccolumns in
ground floor.
)onsider 7 Jo. )olumns 48 HE O 48 HCeach
45>5E high i.e. 5.<4 cubes.
(er 5.<4 cubes
Materials
5.<4 cubes concrete
1dd <3 for wastage
4 day hire of vibrator
)uring
2ust ?essian 7< sq.ft
-aterD455 gals
4 H days $K/k labourer
Total for 5.<4 cubes
+r 75 4.ft of column
Rate per cube
+r Rate per 4.ft column
Jote
!a". water available at site.
!b". 0f water is not available allowances must be
made for transport of water.
32
0tem Aescription Rate 1mount
32. )ement concrete in :EO:E beam upto 4
st
floor
level.
)onsider 4'5 L.ft of beam :EO:E i.e.5.7< cubes.
(er 5.7< cubes
Materials
5.7< cubes concrete
1dd 453 for wastage
4 day hire of vibrator
Labour
4 day mason
4 day carpenter
4 day /G labourer !vibrator"
7 days $K/k labourer
)uring
2ute ?essian =5 sq.ft.
water 4'5 gals
4H days $K/k labourer
Total per 5.7< cube
or 4'5 4.ft of column.
Rate per cube
+r Rate per 4.ft column
Jote
!a". water available at site.
!b". 0f water is not available allowance must be
made for transport of water.
33
0tem Aescription Rate 1mount
33. )ement concrete in =EO:E beam upto 4
st
floor
level.
)onsider 465 L.ft =EO:E beam i.e.5.7< cubes.
(er 5.7< cubes
Materials
5.7< cubes concrete
1dd 453 for wastage
4 day hire of vibrator

Labour
4 day mason
4 day carpenter
4 day /G labourer !vibrator"
7 days $K/k labourer
)uring
2ute ?essian 9< sq.ft.
water 4<5 gals
4H days $K/k labourer
Total per 5.7< cube
or 465 4.ft of beam.
Rate per cube
+r Rate per 4.ft column
Jote
!a". water available at site.
!b". 0f water is not available allowance must be
made for transport of water.
34
0tem Aescription Rate 1mount
34. )ement concrete in =E#=E beam upto 4
st
floor
level.
)onsider '5>5E length of =E#=E beam i.e.5.7<
cubes.
(er 5.7< cubes
Materials
5.7< cubes concrete
1dd 453 for wastage
4 day hire of vibrator

Labour
4 day mason
4 day carpenter
4 day /G labourer !vibrator"
7 days $K/k labourer
)uring
2ute ?essian :5 sq.ft.
water 465 gals
4H days $K/k labourer
Total per 5.7< cube
+r '5 4.ft of beam.
Rate per cube
+r Rate per 4.ft column
Jote
!a". water available at site.
!b". 0f water is not available allowance must be
made for transport of water.
35
0tem Aescription Rate 1mount
35. <E thick R.)) floor slab in 4
st
floor.
)onsider <E thick slab 45> 5E # 46> 5E
Qolume of concrete <5.55 cu.ft.
(er <5.55 cubes
Materials
<5.55 cu.ft. concrete
1dd 453 for wastage
4 day hire of vibrator

Labour
4 day mason
4 day carpenter
4 day /G labourer !vibrator"
7 days $K/k labourer
)uring
2ute ?essian 85 sq.ft.
water 4<5 gals
4H days $K/k labourer
Total per <5 cu.ft or 465 sq.ft.
Rate per cube
+r Rate per 4.ft column
Jote
!a". water available at site.
!b". 0f water is not available allowance must be
made for transport of water.
36
0tem Aescription Rate 1mount
36. :E thick R.)) floor slab in 4
st
floor.
)onsider 45> 5E R 45> 5E panelN <5 cu.ft
Materials
<5.55 cu.ft. concrete
1dd 453 for wastage
4 day hire of vibrator

Labour
4 day mason
4 day carpenter
4 day /G labourer !vibrator"
7 days $K/k labourer
)uring
2ute ?essian 6< sq.ft.
water =5 gals
4H days $K/k labourer
(er <5.55 cu.ft
or 455.55 sq.ft
Rate per cube
Jote
!a". water available at site.
!b". 0f water is not available allowance must be
made for transport of water.
37
0tem Aescription Rate 1mount
37. )ement concrete in 7 HC R :E lintels in ground
floor.
)onsider 675 L.ft i.e. 7< cu.ft.
Materials
7<.55 cu.ft. concrete
1dd 453 for wastage
4 day hire of vibrator

Labour
4 day mason
4 day carpenter
4 day /G labourer !vibrator"
7 days $K/k labourer
)uring
2ute ?essian 45 sq.ft.
water =5 gals
4H days $K/k labourer
per 5.7< cube
or 675 L.ft of lintel.
Rate per L.ft of lintel
Jote
!a". water available at site.
!b". 0f water is not available allowance must be
made for transport of water.
38
0tem Aescription Rate 1mount
38. )ement concrete in =EO=E lintels in ground floor.
)onsider '5 L.ft of lintel i.e. 7< cu.ft concrete.
Materials
7<.55 cu.ft. cement concrete
1dd 453 for wastage
4 day hire of vibrator

Labour
4 day mason
4 day carpenter
4 day /G labourer !vibrator"
7 days $K/k labourer
)uring
2ute ?essian :5 sq.ft.
water =5 gals
4H days $K/k labourer
per 5.7< cube
or '5 L.ft of lintel.
Rate per L.ft
Jote
!a". water available at site.
!b". 0f water is not available allowance must be
made for transport of water.
39
0tem Aescription Rate 1mount
40. )ement concrete in 46EO4<E lintels in ground
floor.
)onsider length of 8:> 5E i.e. 7< cu.ft
Materials
7<.55 cu.ft. concrete
1dd 453 for wastage
4 day hire of vibrator

Labour
4 day mason
4 day carpenter
4 day /G labourer !vibrator"
7 days $K/k labourer
)uring
2ute ?essian 75 sq.ft.
-ater =5 gals
4H days $K/k labourer
per 5.7< cube
+r 8: L.ft of lintel.
Rate per L.ft of lintel
Jote
!a". water available at site.
!b". 0f water is not available allowance must be
made for transport of water.
40
0tem Aescription Rate 1mount
41. /awn timber formwork to =E # =E cement
concrete column in ground floor.
(er square ft.
)onsider column length of <> 5E
)ontact area D4<.5 sq.ft.
!a" . M1G0J& M+$LA
!4" Materials
4'.4<E sq.ft 4E thick class 00 timber.
49.45 L.ft 6E # 6E class 00 timber in yokes.
4:.46 L.ft 6E # 4E class 00 timber battens.
4H lb wire nails.
!6" ;abricating
H day carpenter
H day $K/G labourer 55555555
Total )ost 5 55555555
1llow in I7 uses cost
of mould per use D 5 55555555
!b". 1ssembling !(er use"
Materials
46 Jos. 4:mm 4'E long bolts !65 uses"
H litre mould oil
8< L.ft 7E # 6E props !45 uses"
Labour
M day carpenter
M day $K/k labourer
41
)ost of 1ssembling I 5 55555555
(er use. 5 55555555
!c". Aismantling cleaning * repairing
!per use"
M day carpenter5
M day $K/k labourer
)ost of dismantling 55555555
per use. 55555555
Rate per square
42
0tem Aescription Rate 1mount
42. /awn timber formwork for concrete beams in
ground floor
)onsider =E # 46E beam of 65> 5E long. )ontact
area << sq.ft.
!1". Making the mould
!a". :5 sq. ft. 4E timber planks
!b". 67 L.ft 6E # 4E battens
!c". 7< L.ft 6E # 6E ledgers
!d". 85 L.ft 7E # 6E bearers at bottom of
mould.
!e". 6 lbs wire nails.
Labour
!a". 4 H day carpenter
!b". 6 day $K/k laburers
Total cost of mould 55555555
5555555 5
1ssuming 7 uses
)ost per use
1dd 453 for repairs 55555555
)ost per use 55555555
!B". 1ssembling
Materials
!a". 445 L.ft 7E # 6E vertical props.
!45 uses"
!b". '5 L.ft 6E # 6E bracing to mould
43
and props.
!c". <5 L.ft 6E # 6E bracing to a set of
props.
!d". :.5 sq.ft 4E timber base plate to
props.
!e". 66 Jos
)ost of materials for assembling.
1ssuming an average of : uses.
)ost of materials per uses.
1dd 453 cost of
materials for repairs. 55555555
Total cost of materials
(er use. 55555555
!)". Labour * /undries
Labour
!a". 4 day carpenter
!b". 6 day $K/k labourer
!c". H gal mould oil
!d". H lbs nails 55555555
)ost per use 55555555
!A". Aismantling and )leaning Labour
!a". H day carpenter
!b". 6 day $K/k labourer
)ost of labour for 55555555
dismantling per use. 55555555
Total cost for making the mould assembling
44
aligning dismantling and cleaning for << sq.ft per
use. !1SBS)SA"
)ost of formwork per 55555555
square. 55555555
43.. /awn timber formwork for underside of first floor
slab.
)onsider a slab of dimensions 65E5E#45>5E
)ontact area N 6.5 sqrs.
!1". Making panels
!4". Materials
!a". 665 sq.ft 4E thick tongue and
grooved timber planks.
!b". 464 lft 7E#6E runners at 6>5E
centers.
!c". 7 lbs. wire nails.
!6". Labour
!a". 8 days carpenter
!b". 8 days $K/k labourer 55555555
Total cost of making panels. 55555555
1ssuming 7 uses cost per use.
1dd 653 for repairs. 55555555
Total cost of panels per use. 5555555
!B". 1ssembling
Materials
!a". :=5 l.ft 7E#6E vertical timber props.
!45uses"
!b". :: l.ft 6E#6E bracing for props.
!c". 466 Jo. wedges.
45
!d". 88 sq.ft 4E base plates for props.
)ost of materials for assembling.
1ssuming : uses cost of materials for assembling
per use.
1dd 653 of above for repairs.
Total cost of materials for 55555555
assembling per use. 5555555
!)". Labour * sundries for assembling
!a". 4 day carpenter
!b". 7 days $K/k labourer
!c". 4 gal mould oil for assembling.
!d". 6 lbs wire nails.
Total cost per use for 5555555
assembling. 5555555
!A". Aismantling * )leaning Labour
!a". H day carpenter
!b". 6 days $K/k labourer
Total cost for dismantling 5555555
per use. 5555555
Total cost for assembling per 5555555
use for 655 sq.ft !1SBS)SA" 5555555
)ost of formwork per square
46
0tem Aescription Rate 1mount
44. Mild steelKfor steel reinforcement to lintels slab
beams for columns bent to shape laid in position
and tied &.0. wire as directed.
Materials
4 cwt M./. KTor steel rods including transport to
site.
!1llow for wastage 4<3" 4 H lbs 4: B-& binding
wire
1dd 4.<3 of steel cost for spacers or chairs.
Labour
4 Aay blacksmith
4 day $Ksk labourer
Rate per cwt.
47
0tem Aescription Rate 1mount
45.
Brick work in cement sand 4< in foundation up
to A.(.)
(er )ube
Materials
47<5 bricks
1dd <3 wastage
7.5 cwt cement !<5kg bags"
5.6< cubes sand
water !4<5 gals"
Labour
8 days mason
7 days $K/k labourer
Rate per cube
48
0tem Aescription Rate 1mount
46.
Brick work cement * sand 4' in foundation up
to A.(.)
(er cube
Materials
47<5 bricks
1dd <3 wastage
6 4K8 cwt cement !<5 Gg bags"
8K' cubes sand
water !4<5 gals"
Labour
8 days mason
7 days $K/k labourer
Rate per cube
49
0tem Aescription Rate 1mount
47.
Brickwork in cement and sand 4< in 7E thick
walls in ground floor
(er square
Materials
<<5 bricks
1dd <3 for wastage
4.85 cwt cement !<5 Gg bags"
5.45 cubes sand
water !<5 gals"
Labour
4 H days mason
6 days $K/k labourer
/caffolding F1dd <3 5555555
Total 5555555
Rate per square
50
0tem Aescription Rate 1mount
48.
=E thick brick wall cement sand 4< in ground
floor.
(er square
Materials
45=5 bricks
1dd <3 for wastage
8.55 cwt cement !<5 Gg bags"
5.65 cubes sand
-ater !44< gals"
Labour
6 4K7 days mason
8 8K7 days $K/k labourer
/caffolding F1dd 83 5555555
Total 5555555
Rate per square
51
0tem Aescription Rate 1mount
49.
Brickwork 48 H thick in cement sand 4< in
superstructure in ground floor.
(er square
Materials
4:85 bricks
1dd <3 for wastage
7.<5 cwt cement !<5 Gg bags"
5.85 cubes sand
-ater !495 gals"
Labour
8 H days mason
< H days $K/k labourer
/caffolding F1dd 63 5555555
Total 5555555
Rate per square
52
0tem Aescription Rate 1mount
50.
=E brick walls in cement sand 4' in
superstructure in ground floor.
(er square !ie.5.9< cubes"
Materials
45=5 bricks
1dd <3 for wastage
4.9< cwt cement !<5 Gg bags"
5.85 cubes sand
-ater !44< gals"
Labour
6 4K7 days mason
8 days $K/k labourer
/caffolding F1dd 83 5555555
Total 5555555
Rate per square
53
0tem Aescription Rate 1mount
51.
7 H thick brick wall !wire cut" in cement and
sand 4< in ground floor.
!;acing to brickwork measured separately"
(er square
Materials
<<5 wire cut bricks
1dd 63 for wastage
4.65 cwt cement !<5 Gg bags"
5.'5 cube sand
-ater F 85 gals
Labour
4 H days mason
6 days $K/k labourer
/caffolding F1dd <3 5555555
Total 5555555
Rate per square
54
0tem Aescription Rate 1mount
52.
=E thick in cement and sand 4< with wire cut
bricks.
!;acing to brickwork measured separately"
(er square
45'5 wire cut bricks
1dd 73 for wastage
6.<5 cwt cement !<5 kg bags"
5.48 cubes sand
water !455 gals"
Labour
6 M days mason
8 P days $K/k labourer
/caffolding F1dd 83 5555555
Total 5555555
Rate per square
55
0tem Aescription Rate 1mount
53. 48 HE thick brick wall !wire cut" in cement and
sand 4< in ground floor.
!;acing to brick work measured separately"
(er square
Materials
4:85 wire cut bricks
1dd 63 for wastage
7.<5 cwt cement !4<5 Gg bags"
5.85 cubes sand
-ater 4<5 gals
Labour
8 P days mason
< H days $K/k labourer
/caffolding F1dd 63 5555555
Total 5555555
Rate per square
54. @#tra over for facing including raised pointing
4K'E thick in cement and sand 44 mi#ture in
ground floor.
(er square
Materials
5.<5 cwt cement !<5 Gg bags"
4.55 cu.ft sand
4K45 gals cid
-ater 45 gals
Labour
< days mason
8 H days $K/k labourer
Rate per square
56
0tem Aescription Rate 1mount
55. 8E thick floor paved in lime mortar 6< in ground
floor.
(er square
Materials
8<5 bricks
4.65 cwt slaked lime
5.44 cubes sand
water !7< gals"
Labour
4 M days mason
6 H days $K/k labourer
Rate per square
56. /teps 4>D4 4K6E # 5> :E in brick in cement and
sand 4< with H C thick cement and sand 46
rendering including necessary e#cavation.
(er 45 l.ft
Materials
465 bricks
5.<5 cwt cement !<5 Gg bags"
5.5< cubes sand
water !4< gals"
Labour
H day mason
H day $K/k labourer
Rate per 45 l.ft
Rate per l.ft
57
0tem Aescription Rate 1mount
57. Brick drains in cement and sand 4<% =E wide and
:ED=E average depth including cement rendering
HC thick 46 to e#posed faces with 4>:E ramp
including necessary e#cavation.
(er 45 l.ft
Materials
475 bricks
5.'5 cwt cement !<5 Gg bags"
5.5< cubes sand
water !65 gals"
Labour
4 M day mason
4 M day $K/k labourer
Rate per 45 l.ft
Rate per l.ft
58
0tem Aescription Rate 1mount
58. Brick drains in cement and sand 4<% =E wide and
:ED=E average depth including cement rendering
HC thick 46 to e#posed faces without ramp
including necessary e#cavation.
(er 45 l.ft
Materials
445 bricks
5.95 cwt cement !<5 Gg bags"
5.57 cubes sand
water !4< gals"
Labour
4 day mason
4 M day $K/k labourer
Rate per 45 l.ft
Rate per l.ft
59
0tem Aescription Rate 1mount
59. 'E thick ?ollow block work in cement and sand
mortar 4< in ground floor !cavities unfilled"
(er square
45>5E # 45> 5E area !size of each block 4:E # 'E #
8E"
Materials
446 ?ollow cement bricks
1llow <3 for wastage
5.9< cwt cement !<5 Gg bags"
5.5: cubes sand
Labour
4 H days mason
6 H days $K/k labourer
/caffolding F1dd 83 555555555
Total 555555555
Rate per square
60
0tem Aescription Rate 1mount
60. 7E thick ?ollow block masonry in cement and
sand mortar 4< with cavities unfilled.
(er square
45> 5E # 45> 5E area !size of each block 4:E # 'E #
7E"
Materials
446 ?ollow cement bricks
1llow <3 for wastage
5.75 cwt cement !<5 Gg bags"
5.58 cubes sand
Labour
4 day mason
6 days $K/k labourer
/caffolding F1dd <3 555555555
Total 555555555
Rate per square
61
0tem Aescription Rate 1mount
61. Random Rubble masonry in cement mortar 4< in
foundation.
(er cube !47E thick"
Materials
4.85 cubes :E F =E rubble
9.6< cwt cement !<5 Gg bags"
5.85 cube sand.
-ater 455 gals
Labour
7 days mason
: days $K/k labourer
Rate per cube
62. Random Rubble masonry in cement mortar 4< in
superstructure.
(er cube !47E thick"
Materials
4.85 cubes :E F =E rubble
9.6< cwt cement !<5 Gg bags"
5.85 cube sand.
-ater 455 gals
Labour
7 H days mason
9 days $K/k labourer
/caffoldingD 1dd 83 555 5
Total 5 55
Rate per cube
0tem Aescription Rate 1mount
63. (ressed floor tiles bedded in HC cement mortar
62
46 and pointing in neat cement in ground floor.
(er square
Materials
66< pressed titles 'E 'E
1dd <3 for wastage
4 M cwt cement !<5 Gg bags"
5.59 cubes sand
M lb wa# polish
M lb coloured pigment
6 lbs cotton waste
Labour
7 days mason
7 days $K/k labourer
H day $K/k labourer for polishing
Rate per square
63
0tem Aescription Rate 1mount
64. &lazed tiles fi#ed to walls including bedding in
cement mortar 46 and raking in ground floor.
!/pecials measured separately"
(er square
Materials
755 glazed tiles :E # :E
1dd 453 for wastage on cutting
6 H cwt cement !<5 Gg bags"
5.44 cubes sand
4 lb white cement
Labour
7 days mason
7 days $K/k labourer
M day $K/k labourer for cleaning
Rate per square
64
0tem Aescription Rate 1mount
65. Terrazzo floor tiles on HE thick cement and sand
46 in ground floor.
(er square
Materials
455 46E # 46E terrazzo tiles
1dd <3 for wastage
4 M cwt cement !<5 Gg bags"
5.59 cubes sand
)oloured pigment !6 lbs"
H lb wa# polish
6 lb cotton waste
Labour
7 days mason
8 days $K/k labourer
H day $K/k labourer !polishing"
Rate per square
65
0tem Aescription Rate 1mount
66. Timber framework for calicut pattern tile hip roof
in single storey building consisting of wall plate%
beam% ridge plate% rafters etc. !preservative
treatment to be measured separately"
(er :.55 square
Materials
87.55 cu.ft timber
1dd 453 for wastage
::5 4.ft 6E # 4E reefers
1dd <3 wastage
' lb wire nails :E long
6 lb wire nails 6E long
Labour
9 days carpenter
' days $K/k labourer
Total per :.55 squares.
Rate per square
0tem Aescription Rate 1mount
66
67. Roof covering with calicut pattern clay tiles in
single storied building.
!Timber frame work * ride covering measured
separately"
(er :.55 square
Materials
9<5 titles
Labour
8 days carpenter
8 days $K/k labourer
(er :.55 squares.
Rate per square
68. Timber framework for corrugated asbestos sheet
roof in single storey building
(er 8.:5 sqrs.
Materials
48 H cu.ft timber purling
1dd 453 for wastage
Labour
6 H days carpenter
8 days $K/k labourer
Total per 8.:5 squares.
Rate per square
67
0tem Aescription Rate 1mount
69. Roof covering with corrugated asbestos sheets
!timber frame work and ridge covering measured
separately".
(er 8.:5 squares
Materials
765 sq.ft asbestos corrugated sheets.
96 Jos. roofing screws and washers.
Labour
4 day carpenter
6 days $K/k labourer
(er 8.:5 square
Rate per square
70. +ne layer half round clay titles over corrugated
asbestos roof covering.
(er square
Materials
:<5 half round clay tiles
Labour
6 days $K/k labourer
Rate per square
68
0tem Aescription Rate 1mount
71. 1sbestos close fittings ridging fi#ed complete
with roofing screws or bolts !hook"
(er 48> 7E length
Materials
7 pairs ridges 8> 'E long
4: roofing screws or bolts
Labour
M day carpenter
M day $K/k labourer
(er 48> 7E ridging
Rate per lft.
72. Ridging covering with calicut pattern ridge tiles
bedded in cement lime mortar 447
(er 46 lft ridging
Materials
= ridge tiles
4K8 cwt cement !<5 Gg bags"
5.56 cubes sand
4< lbs slaked lime
H lb colouring powder
Labour
M day mason
M day $K/k labour
(er 46 l.ft ridging
Rate per l.ft
69
0tem Aescription Rate 1mount
73. PE #=E high valance board fi#ed with brass
screws to ends of rafters !for tile roofing"
(er 455 l.ft
Materials
9<.55 sq.ft 4E planks
1dd <3 for wastage
95 Jos. 4 HE brass screws
Labour
8 days carpenter
8 days $K/k labourer
/caffolding F 1dd <3 5555
Total per 455 l.ft Total 5555
Rate per L.ft
74. PE # =E high barge board fi#ed with brass screws
at 6> 5E centres to sides of rafters.
(er 455 l.ft
Materials
9<.55 sq. ft 4E thick planks
1dd <3 for wastage
<5 Jos. 4 H brass screws
Labour
8 days carpenter
8 days $K/k labourer
/caffolding F 1dd <3 5555
Total per 455 l.ft Total 5555
Rate per L.ft
70
0tem Aescription Rate 1mount
75.
R++; (L$MB0J&
4' B.-.&. !4.6 mm" galvanised iron sheet valley
gutter 8> 5E girth overall once bent with end laps
not less than =E width including PE tongued and
grooved planks laid to slope and profile on timber
members.
)onsider 4<> 5E
Materials
6 &.0 sheet !'> # 7>"
M gal wood preservative
5.45 cwt cement !<5Gg bags"
5.5< cwt slaked lime
4.55 cu.ft sand
<5.55 sq.ft planks
6 4bs 4 ME wire nails
Labour
!a". ;i#ing boarding and applying
wood preservative
4 day carpenter
4 day $K/k labour
!b". Making * fi#ing &.0 sheets
H day tinker
H day $K/k labourer
!c". Building sidesD
M day mason
H day $K/k labourer
Total per 4<.55 L.ft
Rate per L.ft
0tem Aescription Rate 1mount
71
76. 4' B.-.&. !4.6 mm" galvanised iron flashing 4>
:E girth overall 8 times bent with end laps not
less than :E% lead soldered% turned and tucked up
to not less than :E into chase cut in wall and
printed in cement mortal 46 lower and dressed
over roof covering not less than 4> 5E wide.
)onsider 4<> 5E L.ft
Materials
4 &.0. sheet '> # 5E # 7> 5E
5.5< cwt cement !<5 Gg bags"
4.55 cu.ft sand
4 lb soldering lead
Labour
)utting bending% soldering * fi#ing
H day tinker
4K8 day mason !caulking"
P day $K/k labourer
Total per 4<.55 L.ft
Rate per L.ft
72
0tem Aescription Rate 1mount
77. ......... framework for 7> 5E # 7> 5E flat asbestos
ceiling !sheet measured separately"% )omprising
of 7E # 6E ,oists and 6E # 6E bearers in class 0
timber.
(er 4.=< square
Materials
'.55 cu.ft timber class 0
4 Lb 6E nails
6: Jos. fibreK plastic plugs
6< lbs cement
6.55 cu.ft sand
6E brushD M use
4K8 gal tar rap
Labour
6 H days carpenter
H day mason
4 H days $K/k labourer
Total per 4.=< square
/caffolding F 1dd 83 5555
Total 5555
Rate per square
73
0tem Aescription Rate 1mount
78.
?orizontal ceiling lining using 7> 5E R 7> 5E flat
asbestos cement sheets fi#ed with and including
beading and cove mouldings on timber
framework. !Timber framework * painting
measured separately".
(er 4.=< square
Materials
645 sq. ft flat asbestos sheets :5 l.ft 6E # 6E
halmilla cove mouldings
46< l.ft 4 HC # HE halmilla beadings
M lb F ME clout nails
' doz 4 HE brass screws
Labour
4 H days carpenter
6 days $K/k labourer
/caffolding D1dd 83 5555
Total D 5555
Total for 4.=< square =
74
0tem Aescription Rate 1mount
79.
PE thick tongued and grooved Lunumidella
ceiling boards fi#ed horizontal on 7E # 6E class 0
timber ,oists at 6> 5E centres with 4 HE brass
nails.
)onsider room 4<> 5E # 48> 5E ie 4.=< sqrs.
Materials
44< L.ft 7E # 6E timber ,oists
64< sq.ft :E # P Lunumidella
)eiling planks.
8 Lbs cement
7.55 cu.ft sand
7 Gg. 4HC brass nails
Labour
Making holes% fi#ing ,oists * making goodD
4 day mason
4 day carpenter
8 days $K/k labourer
;i#ing ceiling boards
8 days carpenter
7 days $K/k labourer
/caffolding F 1dd 83
Total per 4.=< sqrs. 5555
Total 5555
Rate per square.
75
0tem Aescription Rate 1mount
80. PE # :E wide tongued and grooved Lunumidella
ceiling boards fi#ed to underside of roof rafters%
!e#isting" with 4 HE brass nails including levelling
with timber strips where necessary.
)onsider room 4<> 5E # 46> 5E
4.'5 squares.
Materials
665.55 sq.ft ceiling planks
75.55 l.ft 6E # ME timber strips
6.55 Gg. PE nails
7.55 kg 4 HE brass nails.
Labour
8 days carpenter
: days $K/k labourer
/caffolding F1dd 83 5555
Total 5555
Total per 4.'5 sqrs.
Rate per square.
76
0tem Aescription Rate 1mount
81. Aoor single hung 8> 8E # 9> 5E high overall with
frame having 4 MC thick sash and 8 PE R 6 PE
timber frame. ! glazing% ironmongery * painting
measured separately"
(er 66.9< square feet !8> 8E # 9> 5E "
Materials
!a". ;rameD
4 H cu.ft 7E # 8E timber
6 Jo. spur stones
: Jo. fibreKplastic plugs
-ith 7E long brass screws.
6 Jo. <K'E mild steel dowels 7E long.
!b". /ashD
47 sq.ft 4 H planks
< sq.ft 4E planks
Labour
< days carpenter
4 H days $K/k labourer
Total per 66.9< sq.ft
Rate per square foot
77
0tem Aescription Rate 1mount
82. Aoor glazed and panelled double hung 7> 5E #
9>5E high overall with frame including 4 ME thick
sash and 8 PE # 6 PE frame. !glazing%
ironmongery and painting measured separately"
(er6'.55 square feet !7> 5E # 9> 5E"
Materials
!a". ;rame
4 6K8 cu.ft 7E # 8E timber
6 Jo. spur stones
: Jo. fibreKplastic plug with
7E long screws
6 Jos. <K'E dia mild steel
dowels 7E long.
!b". /ashes
: days carpenter
6 days $K/k labourer
Total for 6'.55 sq.ft
Rate per square foot
78
0tem Aescription Rate 1mount
83. (lywood door single hung 8> 4 H C # :> 4 H C
overall with frame having 4 ME thick sash and 8
ME # 6 PE frame. !0ronmongery and painting
measured separately"
(er 64.9< square feet !8> 4 HE # :> 4 HE
Materials
!a". ;rame
4.'5 cu.ft 7E # 8E timber
6 Jo. spur stones
: Jo. fibreK(lastic plugs with
7E long brass screws.
!b". /ashD
4 Jo :> =E # 6> =E plywood sash
Labour
8K7 day carpenter
8K' day $K/k labourer
4K7 day mason !fi#ing frame"
4K7 day $K/k labourer !D do D "
Total per 64.9< square feet.
Rate per square foot

79
0tem Aescription Rate 1mount
84. Aoor ledged% braced and battened single hung
6>:E # :>:E overall% with frame having 9K=E thick
tongued * grooved planks and 8 PE # 6 PE
frame. !0ronmongery and painting measured
separately"
(er 4:.6< sq.ft !6> :E # :> :E"
Materials
!a". ;rameD
4.95 cu.ft 7E #8E timber
6 Jo spur stones
: Jo fibreKplastic plugs
with 7E long brass screws
6 Jo <K'E mild steel dowels
7E long.
!b". 64.55 sq.ft 4E thick planks
8 doz 4 M long brass screws.
Labour
6 M days carpenter
4 day $K/k labourer
M day mason !fi#ing frame"
M day $K/k labourer !D doD "
Total per 4: M sq.ft
Rate per square foot
0tem Aescription Rate 1mount
80
85. -indow% glazed 9> 5E # 7> 5E high overall with
frame comprising 8 Jo openable sashes and 8 PE
# 6 PE frame and mullions.
!&lazing % ironmongery and painting measured
separately"
(er window
9> 5E # 7> 5E !sashes" ie per 6'.55 sq.ft
!a". ;rameD
8.65 cu.ft 7E # 8E timber
7 Jo fibreKplastic plugs with
7E long brass screws
!b". /ashesD
=.6< sq.ft 8E # 4 H C timber
Labour
: days carpenter
6 H days $K/k labourer
H day mason !fi#ing frame"
H day $K/k labourer !DdoD"
Total per 6'.55 sq.ft
Rate per square foot
81
0tem Aescription Rate 1mount
86. 4K:E clear sheet glass panes e#ceeding 4> 5E but
not e#ceeding 7 square feet cut and fi#ed with
timber beadings to doors and windows.
)onsider sash 8> 5E 7> 5E high with 8E 4 ME style
and 7 Jos. glass panes.
(er =.55 sq.ft
Materials
=.55 sq. ft glass panes
85 L.ft HE # HE beading
7 doz brass panel pins
Labour
H day glazier
H day $K/k labourer
Total per =.55 sq.ft
Rate per square foot
82
0tem Aescription Rate 1mount
87. 0R+JM+J&@RB
Btt hinges<E # 6 HE
Materials
4 H pairs butt hinges
6 doz PE brass screws
Labour
M day carpenter
M day $K/k labourer
(er 4 H pairs.
Rate per pair
88. Tee hinges :E # 46E
Materials
4 pair Tee hinges
4 H doz PE iron screws
Labour
6 hrs carpenter
6 hrs $K/k labourer
Rate per pair
83
0tem Aescription Rate 1mount
89.
Rim lock
Materials
4 rim lock with screws
Labour
6 hrs carpenter
6 hrs $K/k labourer
Rate per Jo.
90.
Mortice lock
Materials
4 mortice lock with screws
Labour
H day carpenter
H day $K/k labourer
Rate per Jo.
91.
)asement stays.
Materials
7 casement stays
4:D HC brass screws
Labour
6hrs carpenter
6 hrs $K/k labourer
Total for 7 Jo.
Rate per Jo.
84
0tem Aescription Rate 1mount
92. Aoor closer !?ydraulic"
Materials
4door closer
'D8K7E brass screws
Labour
6 hrs carpenter
6 hrs $K/k labourer
Rate per Jo.
93. TowerKskeleton brass bolts.
Materials
4 TowerK skeleton bolt
45 F HC brass screws
Labour
H hr carpenter
H hr $K/k labourer

Rate per Jo.
94. Barrel bolt 7E
Materials
4 barrel bolt
'D4K6E brass screws
Labour
H hr carpenter
H hr $K/k labourer

Rate per Jo.
85
0tem Aescription Rate 1mount
95.
)asement fasteners
Materials
: casement fasteners
67D4K6E brass screws
Labour
H day carpenter
H day $K/k labourer
Total per : Jos.
Rate per Jo.
96.
/pring loaded fanlight catches.
Materials
: brass fanlight catches
6 doz HC brass screws
Labour
H day carpenter
H day $K/k labourer
Total for : Jos.
86
0tem Aescription Rate 1mount
97. Araw rings
Materials
: draw rings
4 doz HE brass screws
Labour
4 hr carpenter
4 hr. $K/k labourer
Total for : Jos.
Rate per Jo.
98. PE thick A()% in cement sand 46 finished with 6
coats hot tar and blinded with sand.
(er square
Materials
6.6< cwt cement
5.44 cube sand
4 H gals bitumen
firewood !45 lbs"
-ater 45 gals
Labour
4M days mason
6H $K/k labourer
Rate per square
87
0tem Aescription Rate 1mount
99.
<K'E thick plastering to wall in lime and sand 6<
including floating with lime putty.
(er square
Materials
4.85 cwt slaked lime
5.59 cubes sand
water 45 gals
Labour
4 day masonD
4 P days $K/k labourer
/caffolding F1dd 83 5555
Total 5555
Rate per square
100. <K'E thick plastering to wall in cement sand 48
including cement floating
(er square
Materials
4.75 cwt cement !<5 Gg bags"
5.5: cube sand
-ater 45 gals
Labour
4 day mason
4 H days $K/k labourer
/caffolding F 1dd 83 5555
Total 5555
Rate per square
88
0tem Aescription Rate 1mount
101.
8K'E thick plastering to soffit of slab in cement
and sand 48 including floating with lime putty.
(er square
Materials
5.'5 cwt cement !<5kg bags"
5.4: cwt slaked lime
5.58 cubes sand
-ater < gals.
Labour
6 H days mason
6 H days $K/k labourer
/caffoldingD 1dd 83 5555
Total 5555
Rat per sqr.
102.
8K'E thick plastering to sides and soffit of beams
in cement and sand 48 including floating with
lime putty.
Materials
5.'5 cwt cement !<5 Gg bags"
5.4: cwt slaked lime
5.58 cube sand
water < gals
Labour
6 day mason
6 days $K/k labourer
/caffolding F1dd 83 5555
Total 5555
Rate per square
89
0tem Aescription Rate 1mount
103. <K8E thick plastering to wall in lime cement and
sand 44< finished semiDrough with wooden
float.
(er square
Materials
5.'5 cwt cement !<5 Gg bags"
5.75 cwt slaked lime
5.59 cubes sand
-ater D45 gals
Labour
4 days mason
4 H days $K/k labourer
/caffolding F1dd 83 5555
Total 5555
Rate per square
104. <K8E thick plastering to wall in lime cement and
sand 44< finished smooth with lime putty
floating.
Materials
5.'5 cwt cement !<5 Gg bags"
5.:5 cwt slaked lime
5.59 cubes sand
-ater !45 gals"
Labour
4 H days mason
4 H days $K/k labourer
/caffolding F1dd 83 5555
Total D 5555
Rate per square Ra
90
0tem Aescription Rate 1mount
105. HE thick rendering in cement and sand 48
finished smooth.
(er square
Materials
4.59 cwt cement !<5Gg bags"
5.5< cube sand
-ater 45 gals
Labour
4 day mason
4 H days $K/k labourer !curing"
M day $K/k labourer !)uring"
Rate per square
106. HE thick rendering in cement and sand 46 in
floors% finished sooth.
(er square
Materials
4.<5 cwt cement !<5 kg bags"
5.5< cubes sand
-ater 45 gals.
Labour
4 day mason.
4 H days $K/k labourer
M day $K/k labourer !curing"
Rate per square
91
0tem Aescription Rate 1mount
107. PE thick rendering in cement and sand 48
finished smooth.
(er square
Materials
4.9< cwt cement !<5 kg bags"
5.5' cube sand
-ater 45 gals
Labour
4 ME days mason
6 days $K/k labourer
M day $K/k labourer !curing"
Rate per square
108. PE thick rendering in cement and sand 46 in
flooring finished smooth.
(er square
Materials
6.6< cwt cement !<5 kg bags"
5.5' cubes sand
-ater 45 gals
Labour
4 M days mason
6 day $K/k labourer
M day $K/k labourer !curing"
Rate per square
92
0tem Aescription Rate 1mount
109. PE thick rendering in cement and sand 46 in
coloured cement floors finished smooth.
(er square
Materials
6.6< cwt cement !<5 kg bags"
5.5' cubs sand
< lbs powdered pigment
-ater 45 gals
Labour
4 M days mason
6 day $K/k labourer
M day $K/k labourer !curing"
Rate per square
110. HE :E skirting in cement and sand 48 pro,ected
or flush to walls finished with floating including
forming groove.
(er 45.l.ft
Materials
5.45 cwt cement !<5Gg bags"
5.558 cube sand
5.6<lbs powdered pigment
Labour
8K' day mason
<K4: $K/k labourer
Total per 45 l.ft
Rate per l.ft.
J+T@ -here coloured skirting is not required%
delete provision for powdered pigment.
93
0tem Aescription Rate 1mount
111. (repare and apply one coat of preservative !oil
type" to structural timber including touching up
cut ends etc. after fi#ing.
(er one square
Materials
6.9< ltr. wood preservative !oil type"
8E brush !4K45 use"
Labour
P day painter
H day $K/k labourer
Rate per square
112. (repare surface of steel truss and apply two
coats of antiDcorrosive primer.
)onsider one square
Materials
6 M ltr. 1ntiDcorrosive primer 5.4< ltr. Mineral
turpentine or thinner.
4 wire brush
6E brush !4K8 use"
Labour
4 H day painter
4 H day $K/k labourer
Rate per square
94
0tem Aescription Rate 1mount
113. 1pply one coat of antiDcorrosive primer and two
coats enamel paint on already shop primed and
erected steel roof truss.
)onsider one square
Materials
5.65 ltr. antiDcorrosive primer
4 4K8 ltr. enamel paint
5.65 ltr. Mineral turpentine or thinner.
6E brush !4K< use"
Labour
6 H days painter
4 day $K/k labourer
/caffolding F1dd 83 5555
Total 5555
Rate per square
114. (repare and apply two coats primer and finishing
coat of enamel paint to mild steel !angleK flat"
gate.
)onsider <5 sq.ft
Materials
4 H ltr. antiDcorrosive primer
6K8 ltr. enamel paint
5.65 ltr. mineral turpentine or thinner
H wire brush
6E brush !4K< use"
Labour
H day painter
P day $K/k labourer
Total per <5 sq.ft
Rate per square
95
0tem Aescription Rate 1mount
115. (ainting steel on new work with 6 coats of antiD
corrosive paint
(er square
Materials
6K8 ltr. antiDcorrosive paint
6E brush !4K< use"
Labour
4 H days painter
Rate per square
116. (ainting new timber work with two coats wood
preservative.
Materials
H gal wood preservative
6E brush !4K< use"
Labour
H day painter
Rate per square
117. (reparing and painting wood work with primer
and 6 coats enamel paint.
(er square
Materials
P ltr. primer
6.<5 ltr. enamel paint !6 coats"
6E brush !4K45 use"
6 sand papers
Labour
4 H days painter
H day $K/k labourer
Rate per square
0tem Aescription Rate 1mount
96
118. -hite or colour washing two coats in single
storey.
(er 45 squares
Materials
5.<5 cwt. boiled lime
6 lbs salt
H lb yellow ochre
6 oze blue
:E brush !4K8 use"
-ater 45 gals
Labour
6 H days painter
6 H days $K/k labourers
/caffolding F1dd 83
Total per 45.55 squares 555
Total 555
Rate per 45.55 squares
119. -hite or colour washing two storied building.
(er 45 squares
!1s per 45 squares"
1dd H day painter
H day $K/k labourers
/caffolding F1dd 83
555
Total 555
Rate per 45.55 squares
97
0tem Aescription Rate 1mount
120 (repare and apply one coat of 1lkali resistant
primer and two coats of emulsion paint to walls.
(er square
Materials
(rimer =5 ltr. primer
4.75 ltr. emulsion paint
-ater 5.45 gals
:E brush!4K45 use"
6 sand papers
Labour
4 M day painter
scaffolding D1dd 83 555
Total 555
Rate per 45.55 squares
121. )ement washing to walls of single storied
building 6 coats
(er 45 square
Materials
<K' cwt cement
4D:E coir brush
-ater < gals
Labour
6 days painter
6 days $K/k labourer
/caffoldingD1dd 8 3
Total per 45.55 sqrs. 5555
Total 5555
Rate per 45.55 squares
98
0tem Aescription Rate 1mount
122. (ainting walls with emulsion paint !6 coats"
(er square
4
st
)oat F 4K: gal emulsion paint
6
nd
)oat D 4K9 gal emulsion paint
:E brush F !4K45 use"
5.45 gals water
Labour
P day painter
/caffolding F1dd 83 5555
Total 5555
Rate per squares
123. (repare and apply one coat alkali resistant
primer and two coats of emulsion paint to soffit
of slabs.
)onsider 455 sqrs.
Materials
.=5 ltr. primer
4.<5 ltr. emulsion paint
:E brush !4K45 sue"
Labour
4 P days painter
scaffolding F1dd 83 5555
Total 5555
Rate per square
99
0tem Aescription Rate 1mount
124. Qarnishing two coats with copal varnish after
sandpapering.
(er square
5.75 gals !4.'5 ltr." varnish
8E brush !4K8 use"
6 Jo sand paper
Labour
H day painter
H day $K/k labourer
Rate per square
125. -a# polishing to timber in panels * floors.
(er square
Materials
P lb. wa# polish
H doz. sheets sandpaper
4K45 floor brush
H yards flannel cloth
Labour
8hrs. $K/k labourer
Rate per square
100
0tem Aescription Rate 1mount
126. (L$MB0J& F (Q) (0(@/
HE diameter (Q) pipes fi#ed to walls !specials
paid separtely"
(er 45 L.ft
Materials
48 L.ft pipes
8 clips and rails
6 grams solvent cement
Labour
4 hr. plumber
4 hr $K/k labourer
Total per 45. )+ L.ft
Rate per L.ft
127. PE dia meter (Q) pipes to walls !specials paid
separately"
(er 45 L.ft
Materials
48 L.ft pipes
8 clips and nails
8 gram. solvent cement
Labour
4 hr. plumber
4 hr. $K/k labourer
Total per 45 L.ft
Rate per L.ft
101
0tem Aescription Rate 1mount
128. 4E dia meter (Q) pipes fi#ed to walls !specials
paid separately"

(er 455 L.ft
Materials
455 L.ft pipes
1dd <3 for wastage
'D4E dia sockets
86 grms. solvent cement
8< clips and nails
Labour
H day plumber
H day $K/k labourer
Total per 455 L.ft
Rate per L.ft
129. 4 ME dia meter (Q) fi#ed to walls !specials paid
separately"
(er 455 Lft
Materials
455 L.ft pipes
1dd <3 for wastage
'D4 ME dia sockets
7' grms solvent cement
8< clips and nails
Labour
P day plumber
P day $K/k labourer
Total per 455 L.ft
Rate per L.ft
102
0tem Aescription Rate 1mount
130. 4 HC dia meter (Q) pipes laid to walls !specials
paid separately"
(er 455 L.ft
Materials
455L.ft pipers
1dd <3 for wastage
'D 4 HE dia sockets
:7 grms solvent cement
8< clips and nails
Labour
P day plumber
P day uK/k labourer
Total per 455 L.ft
Rate per L.ft
131. 6E dia motor (Q) pipes laid to walls !specials
paid separately"
(er 455 L.ft
Materials
455 L.ft pipes
1dd <3 for wastage
' F 6E dia sockets
8< clips and nails
446 grams solvent cement
Labour
P day plumbers
P day $K/k Labourer
Total per 455 L.ft
Rate per L.ft
0tem Aescription Rate 1mount
132. 8E dia meter (Q) pipes fi#ed to walls !specials
103
paid separately"
(er 455 lKft
Materials
455L.ft pipe
1dd <3 for wastage
'D8E sockets
655 grms. solvent cement
8< clips and screws
Labour
4day plumber
4 day $K/k labourer
Total per 455 L.ft
Rate per L.ft
133. @#cavation for laying HE to 8E dia meter (Q)
pipes in ground not less than 4ED:E deep% back
filling * compacting.
(er 455 L.ft
Labour
6 M days $K/k labourer
Total per 455 L.ft
Rate per L.ft
104
0tem Aescription Rate 1mount
134. )hasing brick for laying HE to 4 HE dia (Q)
pipes and making good average depth 6E !pipes
and specials paid separately"
(er 455 l.ft
Materials
5.45 cwt cement
5.54 cubes sand
Labour
8 days mason
8 days $K/k labourer
Total for 455 L.ft
Rate per L.ft
135. )hasing brickwork for laying 4 HE to 8E dia (Q)
pipes in ground or floor and making good.
1verage depth 8E !pipes * specials measured
separately"
(er 455 L.ft
Materials
5.65 cwt cement
5.58 cubes sand
Labour
8 H days mason
8 H days $K/k labourer
Total per 455 L.ft
Rate per L.ft
105
0tem Aescription Rate 1mount
136. HE dia (Q) specials vizDelbowsK bendsKsockets.
(er 45 specials
Materials
45D4K6E elbowsKbendsKsocket
65 grms solvent cement
Labour
6 hrs plumber
Total per 45 Jo.
Rate per Jo.
137. PCdia (Q) specials viz elbowsK bendsKsockets.
(er . . . .. .
Materials
45 D8K7E dia elbowsKbendsKsockets
85 grms solvent cement.
Labour
6 hrs. plumber
Total per 45 Jo.
Rate per Jo.
106
0tem Aescription Rate 1mount
138. 4C dia (Q) specials viz elbowsK bendsKsockets.
(er 45 specials
Materials
45 D4E dia elbowsKbendsKsockets
75 grms solvent cement.
Labour
6 hrs. plumber
Total per 45 Jo.
Rate per Jo.
139.
4 ME dia (Q) specials vizDelbows K bends
Ksockets.
(er 45 specials
Materials
45 Jo. 4 ME dia elbowsKbendsKsockets.
:5 grms solvent cement.
Labour
6 hrs plumber
Total for 45 Jo.
Rate per Jo.
107
0tem Aescription Rate 1mount
140. 4 ME dia (Q) specials vizDelbows K bends
Ksockets.
(er 45 specials
Materials
45 Jo. 4 ME dia elbowsKbendsKsockets.
:5 grms solvent cement.
Labour
6 hrs plumber
Total for 45 Jo.
Rate per Jo.
141.
6E dia specials vizDelbows K bends Ksockets.
(er 45 specials
Materials
45 D6E dia elbowsKbendsKsockets.
475 grms solvent cement.
Labour
H day plumber
Total for 45 Jo. specials
Rate per Jo.
108
0tem Aescription Rate 1mount
142.
6E dia (Q) specials vizDelbows K bends Ksockets.
(er 45 specials
Materials
45 D6 4K6E dia elbowsKbendsKsockets.
655 grms solvent cement.
Labour
H day plumber
Total for 45 Jo. specials
Rate per Jo.
143.
8E dia (Q) specials vizDelbows K bends Ksockets.
(er 45 specials
45 D 8E dia elbowsKbendsKsockets.
675 grms solvent cement.
Labour
H day plumber
Total for 45 Jo. specials
Rate per Jo.
109
0tem Aescription Rate 1mount
144. HE dia (Q) specials viz. tees.
(er 45 Tees
Materials
45D HE tees
85 grms solvent cement
Labour
H day plumber
Total for 45 Jo. tees
Rate per Jo.
145.
PE dia (Q) specials viz. Tees
(er 45 Tees
Materials
45 Jo.8K7E dia tee
7< grms solvent cement
Labour
H day plumber
Total for 45 Jo. Tee
Rate per Jo.
110
0tem Aescription Rate 1mount
146.
4E dia (Q) specials vizDTees
(er 45 Tees
Materials
45 D4E dia Tees
:5 grms solvent cement
Labour
H day plumber
Total for 45 Jo. Tees
Rate per Jo.
147.
4 ME dia (Q) specials viz Tees
(er 45 Tees
Materials
45D4 ME dia Tees
go grms solvent cement
Labour
H day plumber
Total for 45 Jo. Tees
Rate per Jo.
111
0tem Aescription Rate 1mount
148.
4 HE dia (Q) specials viz Tees
(er 45 Tees
Materials
45 D 4 HE dia Tees
465 grams solvent cement
Labour
4 day plumber
Total for 45 Jo. Tees
Rate per Jo.
149.
6E dia (Q) specials viz Tees
(er 45 Tees
Materials
45 F 6E dia Tees
645 grms solvent cement
Labour
4 day plumber
Total for 45 Jo. Tees
Rate per Jo.
112
0tem Aescription Rate 1mount
150. 6 HE dia (Q) /pecials viz Tees
(er 45 Tees
Materials
45D 6 HE dia Tees
855 grms solvent cement
Labour
4 H days plumber
Total per 45 Jo. Tees
Rate per Jo.
151. 8E dia (Q) specials viz Tees
(er 45 Tees
Materials
45D8E dia Tees
8:5 grms solvent cement
Labour
4 H days plumber
Total for 45 Jo. Tees
Rate per Jo.
113
0tem Aescription Rate 1mount
152. 7E dia glazed earthenware pipes laid on :E thick
bedding in cement concrete 48:
!4 HE" including e#cavation average 6>5E depth%
back filling with selected e#cavated materials and
concrete hunching to ,oints.
(er455 L.ft
Materials
<5 F 7 C dia @- pipes
5.9< cubes cement concrete F 48: !4 HE"
6 lbs yarn
5.<5 cwt cement !,ointing"
7.55 cubes e#cavation
Labour
Laying concrete bedding
4 H day $K/k labourer
Laying and testing pipes
6 days plumber
6 days $K/k labourer
Backfilling F
6 H days $K/k labourer
Total for 455 L.ft
Rate per L.ft
114
0tem Aescription Rate 1mount
153. 7E dia ).0. soilKvent pipe fi#ed vertically to walls
,ointed with cement caulking. !/pecials measured
separately"
(er :> 5E length
Materials
:> 5E L.ft 7E dia ).0. pipe
1dd 453 for wastage
<K4: lbs yarn
4D timber plug :E # :E # 6E
6D 8E iron screws
6lbs cement
Labour
M day plumber
M day $K/k labourer
/caffolding F 1dd <3
Total for : L.ft 5555
Total 5555
Rate per L.ft
115
0tem Aescription Rate 1mount
154. 7E dia ).0. pipes fi#ed to walls ,ointed with lead
caulking. !/pecials measured separately"
(er :> 5E length
Materials
:> 5E L.ft 7E dia ).0. pipe
!1dd 453 for wastage"
: lbs lead
<K4: lbs yarn
4 wood plug :E # :E 6E
6D8E iron screws
4K4: cwt firewood
Labour
M day plumber
M day $K/k labourer
1dd 453 for sundries in cement and sand
/caffolding F 1dd <3 5555
Total 5555
vRate per L.ft
J8`````````````````````````````````````````````````````````````````````````
116
0tem Aescription Rate 1mount
155. 7E dia stoneware gulley with :E # :E # :E gulley
bo# including e#cavation% 7E cement concrete 4
6 7 !8K7E" base% surrounded by 7 HE thick
brickwork in cement and sand 4< e#tended :E
above top of gulley bo# including making
connection% HE cement and sand 46 rendering
internally and e#posed faces finished smooth
with neat cement floating and providing &.0.
grating on top of gully.
(er Jo.
Materials
4D7E /.-. gulley
7.55 cu.ft. e#cavation
<.<5 sq.ft 7 ME brickwork
5.'5 cu.ft cement concrete
467 !8K7E"
4.55sq.ft HE cement rendering 46
4D7E &. 0. grating.
Labour
M day mason
M day $K/k labourer
Rate per L.ft
117
0tem Aescription Rate 1mount
156. Manhole 6> 5E # 6> 5E internally with invert depth
not e#ceeding 6>5E including e#cavation%
backfilling :E cement concrete 467 !8K7E" base
with 8K'E dia meter mild steel rods at 7E centres
both ways% forming channels and benching in
similar concrete% 7 HE walls in brick in cement
4<% HE thick cement and sand 46 rendering
internally and e#posed surfaces including
channels% benching and 6E thick R)) removable
cover slab 6>8E#6>8E inlet and outlet connection
all complete to working order.
Materials
8<.55 cu.ft e#cavation
9.55 cu.ft cement concrete
467!8K7E" in base * channels
88.55 sq. ft 7 HE brickwork in cement 4<
6'.55 sq.ft HE cement rendering 46
4DRcc cover slab.
Labour
4 H days mason
6 H days $K/k labourer
Rate per Jo.
118
0tem Aescription Rate 1mount
157. 66E # 4:C glazed fireclay wash basin with HE dia
chromium plated pillar tap% waste plug%
chromium plated waste chin and stay% including
fi#ing wash basin on brackets% !water supply and
waste water connection measured separately"
(er Jo.
Materials
4 wash basin complete with brackets
4D4K6E tap
-aste plug and chain
7 wooden plugs
: F 4 HE brass screws
6 lbs cement
Labour
H day mason
4 day $K/k labourer
Rate per Jo.
119
0tem Aescription Rate 1mount
158. /ink 67E # 4<E R 9E overall vitreous )hina with
rubber plug and chromium plated chain waster
carried on iron brackets painted and fi#ed to
walls. !water supply and waste water connection
measured separately"
(er Jo.
Materials
4 sink 67E# 4<E # 9E
6 L iron brackets
6 lbs cement
6 tapered wooden blocks 6E thick
'D4 HE dia brass screws
Labour
H day mason
H day $K/k labourer
Rate per Jo.
120
0tem Aescription Rate 1mount
159. )loset pedestal type with LKL flushing cistern%
flush pipe double plastic seat cover% HE dia stop
cock% trap supplied * fi#ed complete to working
order
(er Jo.
Materials
4 low level suite complete
4D HE dia stop cock
6 lbs cement
M cu.ft sand
6D4 HE brass screws
Labour
M day mason
4 day plumber
4 day $K/k labourer
Rate per Jo.
121
0tem Aescription Rate 1mount
160. )loset squatting type with trap including high
level cistern fi#ed complete with flush pipe and
HE dia stop cock% all complete to working order
(er Jo.
4 squatting pan with trap
6 gals ).0. cistern with 4 ME flush%
pipe% chin and overflow pipe
4 clip
< wooden plugs
4dos. 4 HE brass screws
4D4K6E stop cock
M cwt cement
H cu.ft metal
M cu.ft sand
Labour
H day mason
4 day plumber
4 day $K/k labourer
Rate per Jo.
122
0tem Aescription Rate 1mount
161. Qitreous )hina bidet suite fi#ed complete to
working order
(er Jo.
Materials
4 bidet
Labour
4 day plumber
4 day $K/k labourer
Rate per Jo.
162. 7 Jo. Bowl type urinal with trap and 6 gals
capacity automatic flushing cistern and spreaders
complete to working orders.
Materials
7 $rinal Bowls
4 F 6 gal. cistern
' rawl plugs
4 spreader
7 wooden plugs !for cistern"
7 F 4 HE brass screws
7 lbs cement
4K' cu.ft sand
Labour
M day mason
4 day plumber
4 day $K/k labourer
Total per 7 Jo.
Rate per Jo.
0tem Aescription Rate 1mount
163. :E dia half round (Q) eaves gutter fi#ed to
123
timber valance board including gutter ,oiner and
brackets fi#ed at 4'E centres. !+ther specials
paid separately"
)onsider 67.55 L.ft
Materials
6D:E dia eaves gutter lengths
4 ,oiner
49 gutter brackets
87D8K7E brass screws
65 grms solvent cement
Labour
H day plumber
H day $K/k labourer
/caffolding 1dd <3 5555
Total per 67.55 L.ft Total 5555
Rate per 67.55 L.ft
124
0tem Aescription Rate 1mount
164. :E dia (Q) gutter head
)onsider 4 Jo. gutter head
Materials
4 (Q) gutter head
6 gutter ,oiners
6 gutter brackets
46 grams solvent cement
7D8K7E brass screws
Labour
4K' day plumber
4K' day $K/k labourer
/caffolding 1dd <3 5555
tt Total 5555
Rate per Jo.
125
0tem Aescription Rate 1mount
165. :E dia (Q) mitres consider 4 Jo. mitre
Materials
4 mitre hand
6 gutter ,oiners
6 brackets
46 grms solvent cement
7D8K7C brass screws
Labour
4K' day plumber
4K' day $K/k labourer
/caffolding F 1dd <3 5555
Total 5555
Rate per Jo.
166. :C dia (Q) and caps consider 4 Jo. end cap.
Materials
4 Jo. end cap
46 grms solvent cement
Labour
4K4: day plumber
4K4: day $K/k labourer
/caffolding F 1dd < 3 5555
Total 5555
Rate per Jo.
0tem Aescription Rate 1mount
167. 8 HE dia (Q) rain water down pipe fi#ed to brick
126
wall with wooden plugs buried in wall.
!/pecials measured separately"
consider 67 L.ft pipe length
Materials
6D8 HE dia pipe lengths
4D8 HE ,oiner
7 (Q) straps
' brass screws 4E long
85 grms solvent cement
Labour
4K8 day plumber
4K8 day $K/k labourer
/caffoldingD 1dd <3 5555
Total 5555
Rate per 67E 5> L.ft
Rate per L.ft
168. 8 HE dia (Q) elbow
Materials
4D:5
5
K'5
5
elbow
86 grams solvent cement
Labour
4K4: day plumber
4K4: day $K/k labourer
/caffolding F 1dd <3 5555
Total 5555
Rate per Jo.
127
0tem Aescription Rate 1mount
169. 8 HE dia (Q) shoe
Materials
4D:5
5
K'5
5
shoe
4< grms solvent cement
Labour
4K4: day plumber
4K4: day $Ksk labourer
Rate per Jo.
128