Sunteți pe pagina 1din 73

DRILLING & PRODUCTION

By:
Engr. Saleem Qadir Tunio
INTRODUCTION TO OIL & GAS INDUSTRY &
SUSTAINABLE DEVELOPMENT (PCB/PDB 1012)
MAY 2014 SEMSTER
6/17/2014 1
Lecturer details
Office : Block 16, Level 03
Room : 22
Email: saleem_tunio@petronas.com.my
Tel # : 368-7055


6/17/2014 2
Outlines
Familiarity with:
Drilling & Completion concepts
Drilling rig types & accessories
Drilling fluids
Types of completions
6/17/2014 3
4
INTRODUCTION
Oil/Gas Well drilling
To bore/drill a hole in the sub-surface, usually to extract
hydrocarbons such as oil and gas.

This drilling exists in two types;
On-shore (on land)
Off-shore (in sea/ocean)
6/17/2014
5
Well is drilled in several stages.
Normally starts with drilling a hole of 30 to 36 inches
diameters down to a depth of 150 to 250 m.
A steel pipe called casing is lowered into the well and
cemented to the wall.
After the cement has hardened, drilling is resumed with a
smaller drill bit.
6/17/2014
INTRODUCTION
6
At a certain depth the drilling is stopped and another
string of casing is set and cemented.
This procedure will be repeated for each string until the well
has reached the depth of the reservoir.
Number of casing strings may vary from well to well
depending on well depth and formations to be drilled.
6/17/2014
INTRODUCTION
7
DRILLING RIG COMPONENTS
Rotary Rig
Components
6/17/2014
8


Drill bit: is a cutting tool used to create cylindrical
holes. Rotary table from rotating system will rotate the
Kelly pipe, drill pipe and bit. Rotating the bit provides an
axial force to create the hole.

Kelly: is a primary link between the drilling rigs surface
equipment and the bit. Kellys are manufactured with
either square or hexagonal cross-sections. API kellys
come in two standard lengths: 40 ft and 54 ft.

Drill String Components
6/17/2014
9
Drill String Components
Drill Pipe: is a steel pipe available in three length
ranges: Range 1 (18 to 22 ft), Range 2 (27 to
30 ft) and Range 3 (38 to 45 ft).

Drill Collar: is a steel pipe thicker than drill pipe. It
is used to provide additional weight to
the bit and optimize drilling rates.
10


Drill String Components
Casing: is a steel pipe used during the
drilling of a well.

Casing types: Conductor Casing ,Surface Casing,
Intermediate Casing, Production
Casing
6/17/2014
11
CASING SIZES
Available Casing Sizes :
36 in. OD
30 in. OD
24 in. OD, 20 in. OD
13 3/8 in. OD, 10 in. OD
9 5/8 in, OD, 7 in. OD
5 in. OD
4 in. OD
4 in. OD
Where OD is Outside Diameter.

6/17/2014
12 6/17/2014
13 6/17/2014
14 6/17/2014
15 6/17/2014
16 6/17/2014
17 6/17/2014
18 6/17/2014
19
TYPES OF DRILLING RIG
Offshore wells, the types of rigs are:

Jack-ups where the water depth is less than 100m
Semi-Submersibles in hostile waters too rough for
Drill Ship and depths over 100m
Drill Ships in calm waters with depths over 100m
6/17/2014
20
TYPES OF DRILLING RIG
Jack-up Rig
6/17/2014
21
TYPES OF DRILLING RIG
Jack-up Rig
Jack-ups are used for most of the offshore exploration drilling world-wide.
Jack-up has a floating hull with retractable legs which can be jacked down
to the sea bed. Hull can be lifted until it is clear off the sea surface. The legs
support the hull.
In shallow and relatively calm waters the Jack up has the advantage of
being able to leave a free standing well with a surface completion once it is
finished.
6/17/2014
22
TYPES OF DRILLING RIG
Semi-submersible Rig
6/17/2014
23
TYPES OF DRILLING RIG
Semi-submersible Rig
Semi-Submersibles are used mostly in the range of water depths from
100-600 m.
This rig is not bottom-supported, but it is designed to float and it can
operate in water depths of up to 3000 ft.
In areas where water depths exceed 100m and heavy weather can be
expected, then semi-submersibles must be used.
6/17/2014
24
TYPES OF DRILLING RIG
Drill Ship
6/17/2014
25
TYPES OF DRILLING RIG
Drill Ship
Drill ships are used to drill the well in deep water ( up to 7000 ft ).
It is most suited in calmer waters and less harsh environment.
It can move between locations at high speed compared to semi-submersible
rigs.

6/17/2014
26
TYPES OF LAND RIG
Land Rig
6/17/2014
27
LAND RIGS
Conventional rigs


Mobile rigs

Portable mast


6/17/2014
28
SYSTEMS
Three systems

(1) Hoisting
(2) Circulating
(3) Rotary
6/17/2014
29
(1) Hoisting system

A large pulley system which is used to run and
pull equipment into and out of the well. Main
component is a draw-work which consists of a
clutch, gear and brake.
6/17/2014
30
(2) Circulating system

It is a system used to circulate drilling fluid down and
up the drilling string. Main functions of the system
are
To remove drilled cuttings from the borehole
To exert a hydrostatic pressure to prevent
formation fluid entering the borehole.
Drilling fluid is used as a circulation fluid (water +
bentonite + weighting material + chemicals).

6/17/2014
31
(3) Rotary system

The system is used to rotate the drilling string and
to rotate the drill bit on the bottom of the hole.

The system includes rotary table and kelly which is a
rectangular-shaped pipe placed in the rotary table.
6/17/2014
32
HOISTING
SYSTEM
6/17/2014
33
One major component system of rotary drilling rig

To support the rotating system in drilling the well by
providing the appropriate equipment and working areas
needed for lifting, lowering and suspending the
tremendous weights

Hoisting equipment used to lift, lower and suspend the
drilling stem

6/17/2014
34
Draw works

Overhead tools (crown block, travelling block, hook, elevator )

Drilling line
6/17/2014
35
Draw-works: Specialized heavy-duty hoisting winch
Crown block: An assembly of pulleys called sheaves
Travelling block: An arrangement of sheaves
Hook: A large hook-shaped device
Elevators: An extremely rugged, heavy duty clamps
Drilling line: A heavy-duty wire rope
6/17/2014
36 6/17/2014
37
CIRCULATING
SYSTEM
6/17/2014
38
Components in Circulating system
1. Mud Pumps: to circulate large volume of drilling fluid under
high pressure.

2. Shale shaker: removes drill cuttings from the drilling fluid.

3. Desander: removes granular waste from drilling fluid.

4. Desilter: removes fine particles from drilling fluid.

5. Degasser: removes entrained gases from drilling fluid.
6/17/2014
39
CIRCULATING SYSTEM
6/17/2014
40
DRILLING MUD CIRCULATING SYSTEM
6/17/2014
41
ROTARY
SYSTEM
6/17/2014
42
Rotary System
Drive System
Top Drive System Kelly and Rotary Drive System
6/17/2014
43
Rotary System
Major components of
rotary system
O Rotary table with
Kelly
O Top Drive System
6/17/2014
44
Drill Bits
6/17/2014
45
Types of Drill Bits
6/17/2014
46
Types of Drill Bits
6/17/2014
47
Two basic categories:

1. Roller cutter bit (also known as roller cone bit)

- consists of cutting elements arranged on cones
(usually 3 cones) that rotate on bearings about
their own axis as the drill string turns the body of
the bit.

6/17/2014
48
2. Fixed cutter bit (also known as drag bit)

- consists of stationary cutting elements and is
rotated directly by the turning of the drill string.
6/17/2014
49
DRILLING
OPERATION
6/17/2014
50 6/17/2014
51 6/17/2014
52
CEMENTING
6/17/2014
Types of Borehole

53

According to Casing operation
1.Open Hole
2.Cased hole

According to conductivity of the borehole
1. Conductive (water base drilling mud)
2. Non-conductive borehole (oil base mud, air
drilled or cased holes)

Open hole Cased Hole
55
DRILLING
SEQUENCE

6/17/2014
56
Typical sequence of
operation
Rig up
6/17/2014
57
DRILLING SEQUENCE
Typical sequence of operation
Rig up

Drill surface hole
6/17/2014
58
DRILLING SEQUENCE
Typical sequence of operation
Rig up

Drill surface hole

Run & set surface casing
6/17/2014
59
DRILLING SEQUENCE
Typical sequence of operation
Rig up

Drill surface hole

Run & set surface casing

Cement surface casing


6/17/2014
60
DRILLING SEQUENCE
Typical sequence of operation
Rig up

Drill surface hole

Run & set surface casing

Cement surface casing

Drill intermediate hole
6/17/2014
61
DRILLING SEQUENCE
Typical sequence of operation
Rig up

Drill surface hole

Run & set surface casing

Cement surface casing

Drill intermediate hole

Run & set intermediate casing
6/17/2014
62
DRILLING SEQUENCE
Typical sequence of operation
Rig up

Drill surface hole

Run & set surface casing

Cement surface casing

Drill intermediate hole

Run & set intermediate casing

Cement intermediate casing
6/17/2014
63
DRILLING SEQUENCE
Typical sequence of operation
Rig up

Drill surface hole

Run & set surface casing

Cement surface casing

Drill intermediate hole

Run & set intermediate casing

Cement intermediate casing

Drill production hole
6/17/2014
64
DRILLING SEQUENCE
Typical sequence of operation
Rig up
Drill surface hole
Run & set surface casing
Cement surface casing
Drill intermediate hole
Run & set intermediate casing
Cement intermediate casing
Drill production hole
Cement production casing
6/17/2014
65
DRILLING SEQUENCE
Typical sequence of operation
Rig up
Drill surface hole
Run & set surface casing
Cement surface casing
Drill intermediate hole
Run & set intermediate casing
Cement intermediate casing
Drill production hole
Cement production casing
Drill production hole
6/17/2014
66
DRILLING SEQUENCE
Typical sequence of operation
Rig up
Drill surface hole
Run & set surface casing
Cement surface casing
Drill intermediate hole
Run & set intermediate casing
Cement intermediate casing
Drill production hole
Cement production casing
Drill production hole
Run & set liner
6/17/2014
67
DRILLING SEQUENCE
Typical sequence of operation
Rig up
Drill surface hole
Run & set surface casing
Cement surface casing
Drill intermediate hole
Run & set intermediate casing
Cement intermediate casing
Drill production hole
Cement production casing
Drill production hole
Run & set liner
Cement liner
6/17/2014
68
A string of tubing is set from
the producing zones to the
surface/ wellhead
Communicate reservoir to
surface
Provide conduit for fluid to
flow to the surface
Control the flow of fluid
reservoir
reservoir
reservoir
reservoir
6/17/2014
69 6/17/2014
70
TYPES OF SEPARATOR
6/17/2014
71
Christmas TREE and WELLHEAD
6/17/2014
72
UNITS of Oil and Gas Flow Rate
Oil Flow Rate: bbl/day or
BPD (barrels/day)
Gas Flow Rate: MMSCF/D

(Million Standard Cubic
Feet/day)

1M = 1000 standard cubic
feet
6/17/2014
THANKS