OBJECTIVE

THE OBJECTIVE OF STARTING UP


OF THE TURBOGENERATOR IS TO
BRING A UNIT ON LOAD AND
RAISE IT TO THE RATED OUTPUT
WITHIN THE OPTIMUM TIME BUT
WITHOUT UNDUE STRESSES ON
THE TURBINE COMPONENTS.

TYPES OF START UP
Turbine Start up are classified as
Cold, Hot & Warm Start up

Cold Start up If HPT metal Temp


r
<150
0
C.

Warm start up If HPT metal temp


r
betw
n

150 to 350
0
C.

Hot start up If HPT metal temp > 350


0
C.

General Preparation of Start up
All the repair work on the t!rbine are
"omplete# an# all PTWs are cancelled.
All the T!rbo$!per%ior& intr!ment are
a%ailable.
'enerator e("itation &tem)'T * +AT
"oolin, &tem)eal oil &tem et".are -.
All the interlo"k an# prote"tion of
T!rbine * 'enerator are alrea#& "he"ke#
!p an# kept I/.

Unit status before Turbine Rolling

Turbo-Generator on Burring gear with all


Turbo supervisory paraeters are noral!

Boiler is lighte" up #on"ition with one or


two oil elevations are $%s!

&P-'P Bypass is in #harge" #on"ition!

Boiler loa" in"e( is )* to +,, T%&r!

Stea paraeter are rea"y -or rolling!


.!S! Pr! /*-0, 1s#! &R& Pr! +2-+0 1s#!
.!S! an" &R& Tep
r
! 3 /2, to /*,
,
4

Start up Considerations

During the startup the Turbine is subjected


to Non-Steady state operation.

This covers the operating cond


n
where Speed,
steam ressure

and temperature change with
time.

!nder these cond


n
turbine components which
are e"posed to temperature changes subjected
to therma# stress and e"pansion.

$or turbine #i%e point o% view, it is very much


necessary to #imit the e"tent o% these
temperature changes.

To take "are of the abo%e fa"tor the operator
ha to follow the re"ommen#ation from
T!rbine 0tre 1%al!ator an# tart the 2ollin,
pro"e#!re b& followin, Criteria "!r%e 3
1
to 3
4

ri,ht from the be,innin,.

TURB$5E STRESS E6A'UATOR


The T!rbine i e5!ippe# with the T01 whi"h
pro%i#e a#e5!ate ,!i#an"e to the operator b&
in#i"atin, temp
r
mar,in an# 6oa# mar,in.

Thee 7ar,in ha%e been #eri%e# on the bai
of A"t!al Thermal 0tre an# 7aterial 8ati,!e.





Frequent and substantial departures


from criteria curves and TSE
Indication can result

a.Reduction in total life of Turbine
b.Non permissible deformation.
and
c.Cracking of Turbine Components.

RESETTING THE TURBINE
9h& T!rbine 2eettin,:
9hen the T!rbine trip #!e to 1le"tri"al or
7e"hani"al Prote"tion Trip oil #rain 5!i"kl&.
In the aben"e of the Trip oil T!rbine 0top an#
Control %l% "loe 5!i"kl&.
0o the Trip oil i bai"all& re5!ire# for keepin,
the 10; an# I; in open "on#
n
an# ,ettin,
re5!ire# 0e"on#ar& oil pre
r
for openin, the
HPC; an# IPC;.
.

The Trip oil a,ain "an be ,enerate#
a,ain b& 2eettin, the T!rbine.
No to !eset t"e Turbine We "a#e to
$% !eset t"e &nit Or 'aster Trip !ela(%
)% Brin* t"e Startin* +e#ice to ,ero%

+<IT or 7A0T12 T2IP 216A= "an be
reet
1. >& 2eettin, >oiler 7ater 8!el Trip
2ela&.
1. All 'enerator Trip 2ela& 2eet.
and
3. T!rbine 1le"tri"al Prote"tion to be
2eet.



The ?ero poition of tartin, #e%i"e ,enerate

a. 0tart !p oil an# b. A!( tart !p oil.
A!( tart !p oil i re5!ire# to reet Trip ,ear.
0tart !p oil i re5!ire# for openin, 10; an#
I;.
It alo en!re that the "ontrol %l% openin, are
pre%ente# till 10; an# I; are opene#.




Unit status before Turbine Rolling

Turbo-Generator on Burring gear with all


Turbo supervisory paraeters are noral!

Boiler is lighte" up #on"ition with one or


two oil elevations are $%s!

&P-'P Bypass is in #harge" #on"ition!

Boiler loa" in"e( is )* to +,, T%&r!

Stea paraeter are rea"y -or rolling!


.!S! Pr! /*-0, 1s#! &R& Pr! +2-+0 1s#!
.!S! an" &R& Tep
r
! 3 /2, to /*,
,
4

Openin* of ESVs and IVs

Be-ore opening o- Stop vlvs -ollowing "rains to


be 7ept opene"!
1. MS Strainer drains 2. HRH Strainer drains
3. Seat drain before ESVs 4. Seat drain before IVs.

TSE sele#te" in A"ission o"e!

&P-$P Tri "evi#e on!

Following S'4s o- the -ollowing e8upts are O5


a. Oil p/ps and Turnin !ear. b."# $ater in%e&tion
d. H#'V (ar)*up &ontrol +l+s.
e. ,ll drain +l+s.
The 4riteria -or .S an" &R& Superheat an" 9
+

an" 9
/
are satis-ie"!


STE-' WITH ./
O
S&0E!HE-T

!ECO''EN+E+ 'INI'&' C&!VE 1C&!VE2-3 -N+ '-4I'&'
1C&!VE2B3 '-IN STE-' TE'0E!-T&!E -HE-+ O5 T&!BINE
WHEN O0ENIN6 THE '-IN STO0 V-7VES%

0tartin, @e%i"e to be raie# to ABC
OBSERVATIONS

ESV 1& 2 are open.

HPCV warm up drain vlv !ar!


openin".

HPCV Sur#a$e and %id %e!al


Temp
r
!ar! &owin" in$reain"
!rend and !&e' &ould (e "iven
proper !ime !o !a(ili)e.

RAISE STARTIN* +EVICE TO ,-.
OBSERVATION
IV1 AN+ IV2 ARE /011 OPEN
Brin" !&e Tur(ine !o oa2in"
peed.
&e%ore ro##ing the turbine to soa'ing
speed it is to be ensured
1. TSE !o 2ep! on Tur(ine mode.
2. Cri!eria $urve 3
4
and 3
,
#or
openin" !&e $on!rol valve mu!
(e a!i#ied.

!ECO''EN+E+ 'INI'&' '-IN STE-' TE'0E!-T&!E -HE-+
O5 T&!BINE BE5O!E O0ENIN6 THE '-IN CONT!O7 V-7VES

!ECO''EN+E+ 'INI'&' !EHE-T TE'0E!-T&!E -HE-+ O5 I0
T&!BINE BE5O!E O0ENIN6 THE !EHE-T CONT!O7 V-7VES

1HC ho!l# be rea#& for operation an#


Speed controller i a"ti%e.

Tra"kin, @e%i"e to be kept D-<E.


(S!ar!in" devi$e !o (e made 56. in $ae
Tra$2in" +evi$e #a$ili!' i no! availa(le).

H&#ra!li" 'o%ernor to be kept b&pae#


b& raiin, the pee#er ,ear to 100C.

Speed Re#eren$e i raied !o -66


rpm

OBSE!V-TION

'ate %al%e 'earin, "loe at BA0 rpm.

F-P trip at 5A0 rpm.

T!rbine pee# tabiliGe at H00$H50 rpm.

All T!rbo !per%ior& parameter are normal.



Spee" raising to /,,,rp
Speed is raised to *+++ rpm once the
conditions are mentioned be#ow are
%u#%i##ed

TSE i ele$!ed on Tur(ine mode.

TSE upper mar"in 7 46


6
2.
Cri!eria $urve 3
-
i a!i#ied.
w&i$& enure !&e proper warmin" up o# HP
Tur(ine w.r.!. %.S.Tempera!ure.

The @ifferential 1(panion are within


limit.

The Top * >ottom temperat!re #ifferen"e


of "ain, are within limit I35 @e,J.

0!ffi"ient 0team ,eneration in the >oiler


to meet the re5!irement of the T!rbine
for >lo"k 6oa#in, after 0&n"hroniation.

!ECO''EN+E+ '-4I'&' '-IN STE-' TE'0E!-T&!E -HE-+
O5 T&!BINE BE5O!E THE T&!BINE IS B!O&6HT TO !-TE+
S0EE+

Speed re#eren$e raied !o
8666rpm
OBSE!V-TION

;ibration le%el to be wat"he# at "riti"al


pee# at 1500 rpm an# BA00 r.p.m.

A-P "an be taken o!t at BK50 r.p.m.

All T0I parameter ho!l# preferabl&


within normal %al!e.
Turbine to be soaked at 3000 rpm to fulfill
X7 criteria.

!ECO''EN+E+ '-4I'&' '-IN !EHE-T TE'0E!-T&!E
BE5O!E T&!BINE IS 7O-+E+

*enera!or S'n$&roni)a!ion and Blo$2
loadin"

6oa# Controller to be wit"he# ON.

6oa# 2eferen"e to be et to B0 79.

6oa# limit to be et at 50 79.

6oa# 'ra#ient to be wit"he# ON.

6oa# 'ra#ient to be et on 10 79/7in.


6imit Pre!re 7o#e to be ele"te#.

'enerator 1arthin, 0wit"h to be opene#.

>! i#e Iolator an# 'enerator i#e Iolator to


be "loe#.

'enerator Prote"tion to be kept on that


breaker whi"h i to be "loe# for Loinin, with
,ri#.

All the T!rbo !per%ior& parameter are


"he"ke# an# en!re# that the& are normal.

S'n$&roni)a!ion Pro$edure

'enerator 8iel# >reaker "loe#.

'enerator Terminal ;olta,e b!ilt !p to 15.45.;


b& in"reain, e("itation %olta,e.

0&n"hro"ope wit"h kept on CH1C. mo#e.

;olta,e)8re5!en"& of in"omin, power are


mat"he# with the ame of r!nnin,I'ri#J.

'enerator breaker "loe# on"e DIn SynchronismE


lamp appear at 1B
-
"lo"k 0&n"hro"ope nee#le
poition. I2otation of nee#le ho!l# be in
"lo"kwie #ire"tionJ.

6oa# "ontroller take !p loa# to B0 79 th!


a%oi#in, trippin, of 'enerator on D6ow 8orwar#
Power Prote"tionE.

0tartin, #e%i"e raie# to 100C.

HP$6P >&pa "loe#.

All 70) H2H) C2H an# C&lin#er #rain are


"loe# after 5C loa#in, ha been #one.

Turbine Rolling with Hydraulic governor

T!rbine ha to be reet a !!al before


rollin,.

8ollowin, thin, are to be taken "are


of before raiin, 0tartin, #e%i"e.

Tra"kin, @e%i"e -ff.

0pee#er 'ear Poition Gero.

0pee# 2eferen"e poition Gero.


0pee# referen"e raie# to 100C.


1HC o!tp!t ,oe to 100C.

0tartin, #e%i"e poition raie# to A3C.


10;0 ,et opene#.

0tartin, #e%i"e f!rther raie# to 5HC.


I;0 ,et opene#.

Hen"eforth tartin, #e%i"e i raie# "aref!ll&


an# pee# i bro!,ht to H00 rpm b& trial an#
error metho#.

T!rbine oake# at H00 rpm.

>efore in"reain, pee# to 3000 rpm


a. T01 !pper mar,in>A0
0
.

b. 38 "riteria "!r%e atifie#.

0tartin, #e%i"e raie# to 100C non top.


a.T!rbine pee# rie to B400 rpm.

H&#ra!li" ,o%ernor take o%er at M0C of


rate# pee#IB400 rpmJ.
Hen"e f!rther pee# i raie# b& 0pee#er ,ear.


0pee#er ,ear poition f!rther raie# an#


pee# i tabiliGe# at 30B0 rpm.

T!rbine oake# at ame pee# to f!lfill 39


"riteria for f!rther loa#in,.

0&n"hroniGation an# >lo"k loa#in,Ib&


in"reain, pee#er ,earJ #one.