Project Logo

Project Name : BEACH VILLA (B+G+1+PH) ON BVN 55-60, PEARL QATAR


Project No. : 242 Form No.: P07-F06 / Rev. 0 / Nov. 2012
Client Consultant Contractor Subcontractor
MR. FAHAD ALFARDAN







Method Statement for ____________________ Form No. P07-F06 / Rev. 0 / Nov. 2012
AEB-CSD Quality Forms Page 1 of 7
METHOD STATEMENT FOR aaaaaaa
METHOD STATEMENT No: REV : 0
ORIGINATOR : DISCIPLINE: Architectural
Title :
PROVIDE TITLE OF ACTVITES HERE


REV DATE STATUS REVISION DETAILS
REVIEWER / APPROVER
Sub
Con
Main
Con
EXTERNAL
0 12-Nov.-12 FA FOR REVIEW & APPROVAL




















Status Code:
D : Draft FI : For Information FC : For Construction
P : Preliminary FA : For Approval
* External Authorization (Client),
where required


Distribution :


Project Logo

Project Name : BEACH VILLA (B+G+1+PH) ON BVN 55-60, PEARL QATAR
Project No. : 242 Location: PEARL QATAR
Client Consultant Contractor Subcontractor
MR. FAHAD ALFARDAN






Method Statement for ____________________ Form No. P07-F06 / Rev. 0 / Nov. 2012
AEB-CSD Quality Forms Page 2 of 7


Table of Contents


1. Scope /Objectives
2. Reference
3. Access/Egress
4. Logistics
5. Health and Safety Hazards
6. Definitions
7. Responsibilities / Supervision
8. Procedures /Method to be Employed
9. Training
10. Working hours
11. House keeping
12. Manpower Requirement & Supervision
13. Material Requirement
14. Plant & Equipment Requirement
15. Q.C Approvals and other Documentation
16. Supporting documentation
17. Distribution
18. Other information
19. Site Safety Engineers Approval
20. Attachments (Compulsary)
Risk Assessment
Inspection and Test Plan
Checklist












Project Logo

Project Name : BEACH VILLA (B+G+1+PH) ON BVN 55-60, PEARL QATAR
Project No. : 242 Location: PEARL QATAR
Client Consultant Contractor Subcontractor
MR. FAHAD ALFARDAN






Method Statement for ____________________ Form No. P07-F06 / Rev. 0 / Nov. 2012
AEB-CSD Quality Forms Page 3 of 7

1. SCOPE & OBJECTIVES

This method statement describes the method of installation for.


2. REFERENCES

CONTRACT DRAWINGS & Contract Specification section 09500.


3. ACCESS/ EGRESS

Access will be through hoist lifts to carry out the work .


4. LOGISTICS

SubContractor will deploy a dedicated team for the ..


5. HEALTH & SAFETY HAZARDS

SubCon will comply with all safety measures as applicable to project safety requirements


6. DEFINITIONS

AEB Arab Engineering Bureau (Consultant/Engineer)

xxx xxx xxx (Main Contractor)

xxxx xxxx xxxx (Sub contractor Contractor)

MS Method Statement

QCP Quality Control Procedures

ITP Inspection and Test Plan

ITA Independent Testing Agency



7. RESPONSIBILITIES/ SUPERVISION

Project Manager

Construction Manager

Project Engineer
Project Logo

Project Name : BEACH VILLA (B+G+1+PH) ON BVN 55-60, PEARL QATAR
Project No. : 242 Location: PEARL QATAR
Client Consultant Contractor Subcontractor
MR. FAHAD ALFARDAN






Method Statement for ____________________ Form No. P07-F06 / Rev. 0 / Nov. 2012
AEB-CSD Quality Forms Page 4 of 7

Site Engineer

QA/QC Engineer

Safety Engineer


8. PROCEDURE / METHOD TO BE EMPLOYED:

Detailed procedures and methodology must be explained here


9. TRAINING

Proposed training to all operatives must be explained here


10. WORKING HOURS



11. HOUSE KEEPING

Working Areas will be kept clean by disposing the waste materials at the designated areas. At the end of days work,
installation supervisor will ensure that the debris are disposed off.


12. MAN POWER REQUIREMENT

Provide details of manpower to be utilized.


13. MATERIAL REQUIREMENT

Provide details of Material Approvals, requirements, etc


14. PLANT & EQUIPMENT REQUIREMENT

Provide details of equipment and tools to be utilized.


15. QC APPROVAL AND OTHER DOCUMENTRY REQUIREMENTS:

Follow approved Method Statement, ITP, QCP, HSE Plan, Material Approval & Checklist.


16. SUPPORTING DOCUMENTATION:

This MS to be read in conjunction with the below referenced documents
Project Logo

Project Name : BEACH VILLA (B+G+1+PH) ON BVN 55-60, PEARL QATAR
Project No. : 242 Location: PEARL QATAR
Client Consultant Contractor Subcontractor
MR. FAHAD ALFARDAN






Method Statement for ____________________ Form No. P07-F06 / Rev. 0 / Nov. 2012
AEB-CSD Quality Forms Page 5 of 7

Contract Specification & approved drawings.
Project Quality Plan
Project HSE Plan


17. DISTRIBUTION

Copies of this MS will be circulated to the following for Information & action
Sr. Construction Manager
Site Engineer
QA/QC Engineer
HSE Engineer


18. OTHER INFORMATION

Ensure that all the activities have been carried out to suit the site conditions and involved
With Site in charge

19. MAIN CONTRACTORS SAFETY ENGINEERS APPROVAL

APPROVAL STATUS SIGNATURE

Approved

Approved subject to compliance with
the following notes

Not Approved with reason


20. ATTACHMENTS (Compulsory)

Risk Assessment
Inspection & Test Plan
Quality Control Check Lists
Project Logo

Project Name : BEACH VILLA (B+G+1+PH) ON BVN 55-60, PEARL QATAR
Project No. : 242 Location: PEARL QATAR
Client Consultant Contractor Subcontractor
MR. FAHAD ALFARDAN






Method Statement for ____________________ Form No. P07-F06 / Rev. 0 / Nov. 2012
AEB-CSD Quality Forms Page 6 of 7



















































Project Logo

Project Name : BEACH VILLA (B+G+1+PH) ON BVN 55-60, PEARL QATAR
Project No. : 242 Location: PEARL QATAR
Client Consultant Contractor Subcontractor
MR. FAHAD ALFARDAN






Method Statement for ____________________ Form No. P07-F06 / Rev. 0 / Nov. 2012
AEB-CSD Quality Forms Page 7 of 7

S-ar putea să vă placă și