Sunteți pe pagina 1din 10

: :

: :
: :
DESIGN BASIS
BASED ON PROCESS FLOW DIAGRAM
GAS RATE = 145600 lb/hr Refer to Hysis Simulation
GAS RATE FOR DESIGN = 160160 lb/hr 10% tolerance
LIQUID RATE = 46100 lb/hr Assume or refer to Hysis Simulation
LIQUID RATE FOR DESIGN = 50710 lb/hr 10% tolerance
AQUEOUS RATE = 0 lb/hr Assume or refer to Hysis Simulation
AQUEOUS RATE FOR DESIGN = 0 lb/hr 10% tolerance
OPERATING PRESSURE = 989.5 psia
DESIGN PRESSURE 1072.5 psig
TEMPERATURE = 650 o
F
LIQUID DENSITY = 38.83 lb/ft
3 Refer to Hysis Simulation
AQUEOUS DENSITY = 62.43 lb/ft
3 Refer to Hysis Simulation
WITH MIST ELIMINATOR ( YES/NO ) = YES (Vane Pack Mist Elim.)
K FACTOR = 0.405 Fig 7-9 GPSA Sect 7 or
0.2714 Table 1. W.Y. Svrcek, W.D. Monnery
CALCULATION 0.271 Selected K Factor
GAS DENSITY = 4.010 lb/ft
3 Refer to Hysis Simulation
MIXED LIQUID DENSITY = 38.830 lb/ft
3
ACTUAL GAS RATE = 11.094 ft
3
/sec
ACTUAL GAS RATE REFER TO HYSIS FOR CHECK = 11.000 ft
3
/sec Refer to Hysis Simulation
LIQUID RATE = 21.766 ft
3
/min
LIQUID RATE REFER TO HYSIS FOR CHECK = 21.000 ft
3
/min Refer to Hysis Simulation
GAS VELOCITY = 0.800 ft/sec Equation 7-7 GPSA Sect 7
HOLD UP VOLUME VH = 217.658 ft
3 Refer to Svrcek & MonneryTable 2. Liquid holdup and surge times
SURGE VOLUME VS = 108.829 ft
3 Refer to Svrcek & MonneryTable 2. Liquid holdup and surge times
HOLD UP + SURGE VOLUME (V2) = 326.487 ft
3 Assume that total hold up + surge volume is 60% total volume
CORROSION ALLOWANCE = 3 mm
= 0.11811 inch
ALLOWABLE STRESS = 17500 psi
WELDED EFFICIENCY = 0.85
TRIALL & ERROR :
The table below should be hiden during printing
DT AT AL1 AV UV LMIN Remark LSELECTED AHOLD UP
HHOLD
UP
HSURG
E
ft ft
2
ft ft ft ft
2
ft ft ft ft
2
ft ft ft sec ft/sec ft ft ft ft
2
ft ft
1 5.18 5.00 21.03 0.833 0.80 0.83 0.16 0.10 2.19 2.00 1.04 2.00 0.39 0.36 7.50 28.80 25.88 28.80 2.50 1.48 3.70 Oke 28.80 7.56 0.36 0.39 2.01 0.33
2 5.58 4.00 24.40 0.833 0.82 0.83 0.15 0.09 2.28 2.00 1.12 2.00 0.36 0.32 7.87 22.92 22.30 22.92 2.50 1.41 3.53 Oke 22.92 9.50 0.39 0.41 2.30 0.44
3 4.87 6.00 18.62 0.833 0.79 0.83 0.17 0.11 2.12 2.00 0.97 2.00 0.41 0.39 7.20 35.11 29.22 35.11 2.50 1.54 3.85 Oke 35.11 6.20 0.33 0.37 1.79 0.25
4 7.02 2.00 38.73 0.917 0.88 0.92 0.13 0.08 2.97 2.00 1.40 2.00 0.28 0.23 9.09 12.24 14.05 14.05 2.50 1.22 3.05 Oke 14.05 15.49 0.40 0.42 2.96 1.15
5 6.14 3.00 29.56 0.917 0.84 0.92 0.15 0.09 2.76 2.00 1.23 2.00 0.33 0.28 8.36 17.72 18.41 18.41 2.50 1.33 3.32 Oke 18.41 11.82 0.40 0.42 2.58 0.63
HLA
NLA
LLA
(HHOLD
UP/DT)
134.5 mm
PROJECT
CLIENT
SERVICE
PETRONAS CARIGALI PAKISTAN
DEETHANIZER REFLUX DRUM
L = 6986 mm
HV =
Min 12.0 Inch
LLA
NLA
HLA
Surge =
Hold Up =
Min 12.0 Inch
254.0 mm
HV
(HV/DT) (AV/AT)
L
HLL =
609.6 mm
701.2 mm
TYPE
CASE
HORIZONTAL, 2 PHASE
DESIGN FLOW RATE
TAG NO
PT.ISTANA KARANG LAUT
HORIZONTAL SEPARATOR
ID = 1699 mm
Trial
No
L/DT (AL1/AT) (HL1/DT)
HL1
(AHOLD UP/AT)
A
A
LL
A
H
A
S
Coulson Ricardson
Coulson Ricardson
Coulson Ricardson

S-ar putea să vă placă și