Sunteți pe pagina 1din 4

Biomass

power plants
Reference list
Renewable energies
Kraftanlagen Mnchen GmbH
Ridlerstrae 31 c
80339 Munich
Germany
T: +49 89 6237-0
F: +49 89 6237-223
info@kraftanlagen.com
www.kraftanlagen.com
Customer Project / Our Supply Year
Reference list Page 1/3
Renewable energies
Biomass power plants
ewb Energie Wasser Bern
Engineering, supply, installation, commissioning and trial
operation of the energy and district heat control center. The
combined plant comprises a street waste incineration plant, a
wood-fired cogeneration plant and a gas and steam turbine
power plant
Bern-Forsthaus street waste incineration plant
(Switzerland)
2009 - 2012
Thermal furnace output
of biomass steam
generator:

27 MW
Combustion power of
waste:

13.8 t/h
Electrical output of
gas turbine:

45 MW
Electrical output of
steam turbine 1:

15.5 MW
Electrical output of
steam turbine 2:

27.2 MW
District heat output: 120 MW
N-ERGIE AG, Nuremberg
General contractor for the engineering, supply, installation,
commissioning and trial operation of a biomass heating power
plant
Sandreuth biomass heating power plant
2009 - 2011
Thermal furnace output: 23 MW
Electrical output: 6 MW max.
District heating capacity: 13.7 MW
Fuel: Untreated biomass (wood
choppings)
Stadtwerke Augsburg Energie
GmbH
General contractor for the engineering, supply and installation of
a biomass heating power plant
Augsburg biomass heating power plant
2006 - 2008
Thermal furnace output: 27.8 MW
Electrical output: 7.66 MW
District heating capacity: 15 MW
Fuel: Untreated biomass (wood
choppings)
BioMa Energie AG, Salzburg
General contractor for the engineering, supply and installation of
a biomass heating power plant
Biomass heating power plant, Ernsthofen (Austria)
2005 - 2006
Thermal furnace
performance:
23.7 MW
Electrical power
performance:
5 MW
District heating capacity: 10 MW
Fuel: Untreated biomass
(wood choppings, waste wood from
sawmills)
20.03.2014
Customer Project / Our Supply Year
Reference list Page 2/3
Renewable energies
Biomass power plants
SBH Biomasse-Heizkraftwerk
GmbH, Purkersdorf
General contractor for the engineering, supply and installation of
a biomass heating power plant
Biomass heating power plant, Ennsdorf (Austria)
2005 - 2006
Thermal furnace
performance:
23.7 MW
Electrical power
performance:
5 MW
District heating capacity: 10 MW
Fuel: Untreated biomass
(wood choppings, waste wood from
sawmills)
MVV Energie AG, Mannheim
General contractor for engineering, supply and installation of
biomass power plant on the Friesenheimer Insel in Mannheim
Biomass power plant, Mannheim
2002 - 2003
Thermal furnance
performance:

69 MW
Electrical power
performance:

20 MW
Fuel: Waste wood A III, A IV
Biomasse Heizkraftwerk
Pfaffenhofen GmbH
General contractor for engineering, supply and installation of
biomass heating and power plant incl. district heating and
process steam distribution grids
Biomass power plant, Pfaffenhofen
2000 - 2001
Thermal furnace
performance:

26.7 MW
Electrical power
performance:

6.1 MW
Performance of auxiliary
steam generators:

31 MW
District heating capacity: 32.5 MW
Fuel: Wood chips, bark, sawdust
Siemens Nederland N.V.
Basic engineering, supply and installation of water-steam cycle
Biomass power plant, Cujik (Netherlands)
1999
Thermal furnace
performance:

90 MW
Electrical power
performance:

25.0 MW
District heating capacity: 10 MW
Fuel: Biomass (Wood chips)
20.03.2014
Customer Project / Our Supply Year
Reference list Page 3/3
Renewable energies
Biomass power plants
STEAG Energie-Contracting
Heidelberg
Engineering, supply and installation of biomass heating plant incl.
district heating extraction
Biomass heating plant, Traunreut
1999
Thermal furnace
performance:

5 MW
Performance of auxiliary
steam generators:

18.8 MW
District heating capacity: 6 MW
Fuel: Wood chips, float
20.03.2014