Description
Sub Total
(USD)
25,000.00
1.00 Preliminaries
2.00 External Works
2.01 Site Preparation
2.02 Drains, Sumps and Drainage Crossings
10,000.00
10,000.00
20,000.00
60,000.00
80,000.00
320,000.00
460,000.00
6,000.00
19,000.00
25,000.00
530,000.00
HVAC
Fire Protection System
Electrical and Telephone
Process Piping
Total Cost
Not Included
Not Included
Not Included
Not Included
530,000.00
Description
3.00
2
1
1.1
1.2
1.3
1.4
Packing Plant
Grd Floor
Packing Area
Cold Room
Process Area & Tempering Area
Utilities
3,300
1500
700
900
200
2,500.00
2,800.00
2,500.00
1,600.00
########## 1,250,000.00
########## 653,333.33
########## 750,000.00
320,000.00
106,666.67
2
2.1
2.2
2.3
2.4
1st Floor
Cold Room
Process Area & Tempering Area
Utilities
Office
3300
500
1900
100
800
2,800.00
2,500.00
1,600.00
1,800.00
########## 466,666.67
########## 1,583,333.33
160,000.00
53,333.33
########## 480,000.00
4 Canopy
1200
600.00 720,000.00
240,000.00
5 Roof
3300
500.00 ##########
550,000.00
6,133,333.33
6,973,333.33
Remarks
Description
Level 0.000
Level 7.200
Level 10.200
Level 12.700
Level 15.250
Level 17.800
Level 20.500
Level 23.200
Level 25.900
Level 28.6
Roof Area
Total
1 USD to RM Rate =
3.00
Remarks
1 USD to RM Rate =
Item
Description
1 Site Preparation
2 Roads
3.1 Drains
3.2 Sumps
3.3 Drainage Crossings
Total For Drains, Sumps & Crossings
4 Fencing
5 Decorative Fencing
6.1 Main Entrance Gate
6.2 Culvert
Total For Main Entrance Gate & Culvert
7
8
9
10
11
12
13
14
15
16
17
18
External Sewerage
Sewerage Treatment Plant
Flag Post
Landscaping & Turfing
External Water Supply
Weighbridge Foundation
Container Yard
Receiving Yard
Tank Bundwall
Fat Trap
Fire Fighting Tank (300MT)
Pipe Gantties (2m Wide Gantry)
Quantity
36,000
8,736
Unit
m2
m2
915
20
1
m
nos
sum
756
3.00
183,000.00
40,000.00
20,000.00
243,000.00
350.00 264,600.00
88,200.00
31
600.00
18,600.00
6,200.00
1
1
no
nos
45,000.00
45,000.00
45,000.00
45,000.00
15,000.00
15,000.00
30,000.00
1
1
1
4,000
1
54
800
800
340
1
1
450
sum
sum
no
m2
sum
m2
m2
m2
m
sum
sum
m
60,000.00
150,000.00
6,000.00
45.00
240,000.00
2,500.00
250.00
250.00
300.00
10,000.00
240,000.00
2,400.00
60,000.00
150,000.00
6,000.00
180,000.00
240,000.00
135,000.00
200,000.00
200,000.00
102,000.00
10,000.00
240,000.00
##########
20,000.00
50,000.00
2,000.00
60,000.00
80,000.00
45,000.00
66,666.67
66,666.67
34,000.00
3,333.33
80,000.00
360,000.00
Remarks
RC Roads
1 no 18m x 3m
1m Height
1 USD to RM Rate =
Item
Description
1 Guardhouse
2 Gas Generation Foundation (For 6 Nos x
500MT Hydrogneation Tanks
3 Coal Warehouse Building
4 Coal Boiler Building
5 Power Generation Building
Size
4m x 3m
32m x 19m
36m x 30m
36m x 30m
24m x 30m
3.00
1,050.00 ##########
1,800.00 ##########
1,800.00 ##########
378,000.00
648,000.00
432,000.00
Remarks
Inclusive of Deflector
Wall