Sunteți pe pagina 1din 4

ORLANDO Delacruz SANEDRIN

# 52 Purok 20, Police Village, Cordillera Road San Carlos Heights, Upper Irisan , BAGUIO CITY

Contact # (mobile) +63 9151891481/09237446087 (Philippines)
Landline: 074-4221349 (Baguio)

email address : orlandsanedrin@yahoo.com



EDUCATIONAL ATTAINMENT :



Primary Rivera Village Elementary School (1976, Graduated)


Secondary Arellano University, J.A.S.H.S. (Jose Abad Santos High School
(1980, Graduated)


Vocational Lyceum of the Philippines
course : Industrial Electronics / Graduated (1980-81)


Tertiary / College FAR EAST AERO TECHNOLOGY INSTITUTE UNIVERSITY
(F.E.A.T.I.)
course : B.S. Electronic and Communication Engineering / Graduated 1988










Summary Statement for my experience;

Experience Technical Professional who works well with minimum supervision, Computer
literate, with strong Electronic, Communication and Electrical skills. Customer oriented
problem solver with an ability to adapt to new situations. A quick learner with a desire for
continues personal growth.



Diverse Technical experience includes:

Telephone PABX and Network systems
Security System and Closed Circuit Television
Paging and Audio/Video Systems
Component level Troubleshooting
NICET Level III in Fire Alarm System
Electrical works (In-House and Building)





WORK EXPERIENCED:
(CURRENT COMPANY)


AL_YAMAMA for Trading and Contracting, LTD
Position : Sr. Electrician (Saudi Elecric Co.) September 01 at present
(note : contract end March2011)

AL DIWAN AL ARABIC Const. Est.
( KING FAISAL AIRBASE, project maintenance, TABUK KSA )

Position : SAFETY ENGINEER (TAIF, Air Base) MAY AUG. 30, 2010

AIR FIELD LIGHTING (AFL)/ Technician

Electrical Department (External H.V./AFL) JULY 2007- MAY 2010


SAUDI SERVICES and OPERATION COMPANY, LTD (S.S.O.C.) 2006 2007
(KING FAISAL AIRBASE ,project maintenance, TABUK KSA )

position : AIR FIELD LIGHTING (AFL) Technician

Electrical Department (External H.V./AFL)


MANILA INTERNATIONAL AIRPORT AUTHORITY (M.I.A.A.) 2006 1989

Position : (In-charge/AFL section) AIR FIELD LIGHTING

ENGINEERING Dept. /Electrical Division


RESISTIVE COMMUNICATION SERVICES (R.C.S.) 1999 2006
(Business Owner)

Position : Manager/Engineer



PHILIPPINE AIRLINE (P.A.L.) 1989 1990

position : supervisor ( C.C.T.V.) / Technical section (close circuit Tele-vision)






Scope of WORKS / Job Description ( from different Companies )



MANILA INTERNATIONAL AIRPORT AUTHORITY (M.I.A.A.) 2006 1989
Electrical Circuitry
Isolating Transformer
Series Circuit cables and Test Insulation Resistance by means of 500V-1000V Meager
Constant Current Regulators
Circuit selector cabinets, Instrumentation and Controls (PLC)
Remote Control System
Remote Control Cable
Daily, Weekly and Monthly check (Runway edge light, Taxiway edge light, Approach light , Center-line lights
and P.A.P.I. lights) VASI/PAPI light and Sub-Station)
Coordination from Tower personnel

RESISTIVE COMMUNICATION SERVICES (R.C.S.) 1999 - 2006
Computer programming,
Cisco Router comm., switch Hub and Modem (transmit and received)
Network design and structured cabling (LAN,WAN and Fiber Optic)
Electronics and Communication design (RF,VHF,UHF and Antennae Installation)
Electrical design and service Installation
Testing and Commissioning
Project Estimation

Essential duties and functions:
-- Knowledge of OSP design and be capable of designing OSP work orders, provide administrative and field support to
the OSP provisioning process and be familiar with OSP engineering concepts, such as copper cable, fiber optic cable
and coax cable.
-- Ability to utilize facility analysis process to select areas for rehabilitation, coordinate field work, prepare work order
drawings and update work order records and reports in ARES.
-- Knowledge of telephone industry standards, accessing, reading and interpreting mechanized assignment records,
PC applications, OSP record and/or computer aided drafting systems and able to interact with all on-line computer
systems.
-- Knowledge is also required in infrastructure plans (highway, sewer, bridge, etc.) and survey information for the
elimination and prevention of conflicts with existing or proposed underground, site obstacles, and for proper installation
location within easements and public right of way.
-- Good understanding of pair bonding zone (PBZ) for the terminals from the central office.
-- Ability to utilize facility analysis process to select areas for rehabilitation, coordinate field work, prepare work order
drawings and update work order records and reports in BSTCAD by using different tools such as MET^2 FEI, ACR,
LFACS, PLANET, AOTL,OPEDS and removing bridge tap.
RF Engineer and network communication
Carried out several drive test project both Stationary testing and Active Drive Testing using TEMS Investigation 6.0
and 6.1, BU-303 GPS receiver. Used several phones for both data and voice communication, Microsoft Streets and
Maps, Ethereal 3.1 and MapInfo Professional. Conduct Drive test by using TEMS Investigation 6.1 and Agilent tool
E6474A. Analyze drive test data by Using Net Optimizer & TEMS Investigation. Check the system throughput for both
download and upload to the recommended level by EDGE. Find the reason for drop call & make recommendation to
reduce drop call. Find the reason for low data rate for stationary and drive test.
COMPUTER KNOWLEDGE
CAD Tools Mentor Graphics, AutoCAD, BSTCAD, ARES
Programming Language FORTRAN77, Visual Basic
Working Environment DOS, Windows 2000 & XP, UNIX
Others OrCAD, PSPICE, Origin, MS Office
RELEVANT COURSEWORK
Telecommunication Antenna & Radiation Fields and waves




PHILIPPINE AIRLINE (P.A.L.) 1989 - 1990
(C.C.T.V.) supervisor, Technical section (close circuit Tele-vision monitoring)


SAUDI SERVICES and OPERATION COMPANY, LTD (S.S.O.C.) 2006 2007
(KING FAISAL AIR-BASE project maintenance TABUK, KSA)

Isolating Transformer
Series Circuit cables
Constant Current Regulators
Remote Control System, Remote control cable and Instrumentation and Controls
VASI/PAPI, Runway edge, Taxiway edge, Approach, Sock wind lights (daily ,weekly and Monthly check)
Coordination from Tower personnel


AL-DIWAN AL ARABIC CONSTRUCTION,EST. 2007 - 2010
(KING FAISAL AIR-BASE project maintenance TABUK, KSA)

Isolating Transformer,Series Circuit cables,Constant Current Regulators
Remote Control System, Remote control cable and Instrumentation and Controls
VASI/PAPI, Runway edge, Taxiway edge, Approach lights, Sock wind lights (daily ,weekly and Monthly check)
Coordination from Tower personnel

SAFETY ENGINEER (under, AL-DIWAN AL ARABIC/ AL YAMAMA) MAY-AUG.30,2010
(location : AIRBASE, TAIF, KSA)

S-ar putea să vă placă și