Data Required for sizing a PV system include the following: the mean daily irradiation in the plane of the array at the chosen site for e$ery month of a typical year# typical year# the estimated cell temperature rise a!o$e am!ient of the modules in the array# the selected!attery# the estimated percentage energy losses in the array from module mismatch, ca!les and $oltage drop across mismatch.
Data Required for sizing a PV system include the following: the mean daily irradiation in the plane of the array at the chosen site for e$ery month of a typical year# typical year# the estimated cell temperature rise a!o$e am!ient of the modules in the array# the selected!attery# the estimated percentage energy losses in the array from module mismatch, ca!les and $oltage drop across mismatch.
Data Required for sizing a PV system include the following: the mean daily irradiation in the plane of the array at the chosen site for e$ery month of a typical year# typical year# the estimated cell temperature rise a!o$e am!ient of the modules in the array# the selected!attery# the estimated percentage energy losses in the array from module mismatch, ca!les and $oltage drop across mismatch.
Input Data Required For PV System Sizing Sizing The daily or hourly load requirements during a The daily or hourly load requirements during a typical year typical year The required security of supply, taing into The required security of supply, taing into account the !ac"up source, if any# account the !ac"up source, if any# The mean daily irradiation in the plane of the The mean daily irradiation in the plane of the array at the chosen site for e$ery month of a array at the chosen site for e$ery month of a typical year# typical year#
Data Required cont%d Data Required cont%d The ma&imum num!er of consecuti$e sunless days liely The ma&imum num!er of consecuti$e sunless days liely to !e e&perienced# to !e e&perienced# The mean daily am!ient temperature for e$ery month of The mean daily am!ient temperature for e$ery month of a typical year# a typical year# The estimated cell temperature rise a!o$e am!ient of the The estimated cell temperature rise a!o$e am!ient of the modules in the array# modules in the array# Typical current"$oltage characteristics of the module at Typical current"$oltage characteristics of the module at $arious irradiances# $arious irradiances#
Data Required cont%d Data Required cont%d The selected D' !us $oltage# The selected D' !us $oltage# The ma&imum allo(a!le depth of discharge of The ma&imum allo(a!le depth of discharge of the !attery# the !attery# The estimated percentage energy losses in the The estimated percentage energy losses in the !attery, po(er conditioning equipment and !attery, po(er conditioning equipment and control system# control system# The estimated losses in the array from module The estimated losses in the array from module mismatch, ca!les and $oltage drop across mismatch, ca!les and $oltage drop across !locing diodes# !locing diodes# The estimated losses from dust and shading# The estimated losses from dust and shading#
Types of )ateri al s J Single Crystal J Polycrystalline J Thin-Film
*ff"+rid Design
*ff"+rid Design ,&le Step -. Determine the D' /oad# D' De$ice De$ice 0 1ours of 2 D' 3att"1rs 3atts Daily 4se per Day Refrigerator 56 78 -,886 /ighting fi&tures -96 8 566 De$ice : -7 ; <5 Total D' 3att"hrs=Day >:? 7,-@5
Step 7. Determine the :' /oad, 'on$ert to D' :' De$ice De$ice 0 1ours of 2 :' 3att"1rs 3atts Daily 4se per Day De$ice A -B9 5 -,696 Pump ;6 6#9 86 Tele$ision -B9 7 @96 Total :' 3att"hrs=Day -,886 Di$ided !y 6#;9 CIn$erter, lossesD Total D' 3hrs=Day >A? -,5<8
Step @. Determine the Total System /oad Total D' /oads >:? 7,-@5 Total D' /oads >A? -,5<8 Total System /oad @,;@6 3hrs=Day Step 8. Determine Total D' :mp"hours=Day Total System /oad = System Eominal Voltage 2 C@,;@6 3hrs=DayD = -7 Volts 2 @-< :mp"hrs=Day Step 9. Determine Total :mp"hr=Day (ith Aatteries Total :mp"hrs=Day 0 -#7C/osses and safety factorD @-< :mp"hrs=Day 0 -#7 2 @;7#; or @;@ :mp"hrs=Day
Step 5. Determine Total PV :rray 'urrent
Total Daily :mp"hr requirement = Design InsolationF @;@ :mp"hrs = 9#6 pea solar hrs 2 B5#5 :mps F Insolation Aased on *ptimum Tilt for Season Step B. Select PV )odule Type 'hoose AP Solar"Solare& )S0"56 module. )a& Po(er 2 56 3 CSTPD )a& 'urrent 2 @#95 :mps )a& Voltage 2 -5#; Volts Eominal *utput Voltage -7 Volts
Total PV :rray 'urrent = C)odule *perating 'urrentD 0 C)odule Derate FactorD B5#5 :mps = C@#95 :mps=)oduleDC6#<6D 2 7@#<6 modules 4se 78 )odules Step ;. Determine Eum!er of )odules in Parallel Step <. Determine Eum!er of )odules in Series System Eominal Voltage = )odule Eominal Voltage -7 Volts = C-7 Volts=moduleD 2 - )odule Step -6. Determine Total Eum!er of )odules Eum!er of modules in parallel 0 Eum!er of modules in Series 78 0 - 2 78 modules
Step --. Determine )inimum Aattery 'apacity >Total Daily :mp"hr=Day (ith Aatteries CStep 9D 0 Desired Reser$e Time CDaysD? = Percent of 4sa!le Aattery 'apacity C@;@ :mp"hrs=Day 0 @ DaysD = 6#;6 2 -,8@5 :mp"hrs Step -7. 'hoose a Aattery 4se an Interstate 47S G -66 Flooded /ead :cid Aattery Eominal Voltage 2 5 Volts Rated 'apacity 2 776 :mp"hrs
Step -@. Determine Eum!er of Aatteries in Parallel Required Aattery 'apacity CStep --D = 'apacity of Selected Aattery -,8@5 :mp"hrs = C776 :mp"hrs=AatteryD 2 5#9 4se 5 Aatteries Step -8. Determine Eum!er of Aatteries in Series Eominal System Voltage = Eominal Aattery Voltage -7 Volts = C5 Volts=AatteryD 2 7 Aatteries Step -9. Determine Total Eum!er of Aatteries Eum!er of Aatteries in Parallel 0 Eum!er of Aatteries in Series 5 0 7 2 -7 Aatteries
H " H " " H @ : -7 V @ : -7 V @ : 78 V @ : -7 V @ : -7 V H H " " H " 5 : -7 V Series. Voltage is additi$e Parallel. 'urrent is additi$e
Step -B. 'omplete Aalance of System a# 'omplete the design !y specifying the. 'harge 'ontroller In$erter 3ire Sizes CAattery (ill ha$e larger gage due to higher currentsD Fuses and Disconnects Stand!y +enerator, if needed Aattery 'harger, if needed )anual Transfer S(itch, if needed# Step -5. Determine the need for a Stand!y +enerator to reduce other 'omponents Cnum!er of )odules and AatteriesD# Se$eral iterations may !e necessary to optimize costs#
d# *!tain permits as required# !# Determine mounting method. Roof mount +round mount (ith racs +round mount (ith pole# c# :ssure proper grounding for safety# Step -B C'ont#D.