TERMS OF REFERENCE

Project : PROPOSED REPLACEMENT AND REPAIR OF ROOF PANELS


INCLUDING REPAINTING OF TRUSS, PURLINS, SAG ROD, TENTION
ROD AND STEEL LOUVERS
Location :

GENERAL SPECIFICATIONS:
Supply of Labor, Materials, Consumables, Equipment and Supervision and other
pertinent requirements for the completion of the above-mentioned project (See
attached Plans, and scope of or!s"#
SCOPE OF WORKS:
Building 04
$# %ismantlin& of e'istin& old roof includin& haulin&
(# )rimmin& * dismantlin& of industrial chimney affected by installation of ne roof#
+# Cleanin& of e'istin& steel trusses, c-purlins, sa& rods, tension rod and steel louvers usin&
rust converter (turco", include minor repair on louvers#
a# Cleanin& of surface area#
b# -pplications of rust remover to eliminate corrode steel usin& )urco#
.# Paintin& of steel trusses, c-purlins, sa& rods, tension rod and louvers, usin& epo'y primer
&ray (to coats"
/# 0eplacement of defective steel c-purlins (1' 21' $#(mm th!#
3# Supply and install of materials usin& pre painted 4#3mm th!# lon& span rib type roof panels
or approved equal usin& sin&le bubble insulation, includin& bendin& materials and
accessories#
2# Cleanin& and de-clo&&in& of e'istin& donspout and strainers#
5# Cleanin& and application of cementations ater proofin& for concrete &utters# ( (-coats"
Building 01
$# Supply and install of materials usin& pre painted 4#3mm th!# lon& span rib type roof panels
or approved equal usin& sin&le bubble insulation, includin& bendin& materials and
accessories# (see !ey plan"
(# 0epair6replacement of roof usin& pre-painted same profile on e'istin& corru&ated type
4#/mm th!# (end portion of roof see !ey plan"#
+# 0eplacement of dama&e C-purlins (1' 21' $#3mm th!#
.# Plu&&in& of holes on roof panels usin& 7ulca seal#
/# Cleanin& and de-clo&&in& of e'istin& donspout and strainers#
1
3# 8nstallation of ne donspout +19 pvc pipe series 344#
2# Cleanin& of e'istin& steel trusses, c-purlins, sa& rods, tension rod and steel louvers usin&
rust converter (turco", include minor repair on louvers#
c# Cleanin& of surface area#
d# -pplications of rust remover to eliminate corrode steel usin& )urco#
5# Paintin& of steel trusses, c-purlins, sa& rods, tension rod and louvers, usin& epo'y primer
&ray (to coats"#
:# 0e-ali&nment of an&ular steel truss
GUARANTEE:
)he contractor shall &uarantee that the or!s are free from defect in or!manship and
materials and remain so for a period of one ($" year from date of acceptance of or!# -ny
defects appearin& ithin the covered period shall be refurbished in the e'pense of the
Contractor# )he Contractor shall be indemnify and save harmless the ;ner, from and
a&ainst all liability such as injuries or disabilities to persons, dama&e to property, e'penses,
le&al claims, action and suit#
DURATION
<inety or!in& days (:4" or!in& days upon issuance of P#;#
WARRANT
;ne ($" year minimum on or!manship * contractor supply materials, e'cept for ne
roof panels ith $4 year minimum#
NOTATION
$#Contractor to submit itemi=ed bid brea!don for materials and labor, direct cost * mar!-
up#
(#-ll construction or!ers must be in proper uniform ith respective 8%#
+#Construction or!ers must follo the house rules implemented by )P8#
.#%elivery of construction materials is coordinated to )P8-CM%#