Documente Academic
Documente Profesional
Documente Cultură
RAJA SURYA
An Introduction
Rajasurya was established in the year 1999 and today, it has grown up to a
level of undertaking any challenge in to Engineering.
“Time and Quality” are the principles and this alone has been the ‘Mantra’ of
our development.
Rajasurya has got its head quarters at Chennai, equipped with latest
technological background, infrastructure and a healthy financial resource.
Power, Petroleum and Process are the key areas in developing a nation and
Rajasurya is marching firmly and successfully towards these major sectors in a
remarkable way.
Our strength and facilities:
Spacious office located in Chennai with all modern office equipment and
Machinery.
solid work experience with leading MNC’s in the areas of boilers and auxiliaries.
Full familiarity with ASME, BS, DIN and other international codes and standards.
Excellent contacts with Indian customers and state / central government agencies.
OUR CAPABILITIES
Detail Engineering
Structural Drawings
Electrical Works
Painting Works
Dampers Erection
Erection of Fans
Overhauling of Pumps
Tilting Spares
Coupling Bolts
Oil Filters
Supply of HT Studs and Nuts for control vale inter connection Pipes
Thrust Block and Cap Nuts for Boiler Drum Man Hole Doors
1. Project Managers 1
3. Engineers 2
4. Supervisors 4
5. Material Controller 2
6. Formen 2
7. Fitters 3
8. Qualified Welders 5
10. Riggers 10
12. Khalasis 15
OUR MACHINERY
QTY. IN
o
1. Center Lathe 8 feet 01 No.
DESIGN ORDERS
1. Rate contract for OFF BHEL:PC:PUR:RC:001 1 year BHEL-CHENNAI
LOADING of Engineering Dt:16.08.2003
Drawings
SUPPLY ORDERS
Supply of coupling bolt and nuts for
1. PO NO. 07 S.178
cooling water main pumps. LP & HP TNEB
D.1596/ Dt 2 Months
Flush water pumps
01.12.07
1. BHEL – CHENNAI
CHENNAI-600 057
CHENNAI-600 018
CHENNAI-600 057
CHENNAI-600 057
PHATO GALLERY
RE TUBING OF PLATE
HEAT EXCHANGERS
FOR UNIT IV 110 MW
ETPS
BURNER ASSEMBLY
ERECTION UNIT I - 60
MW ETPS
BURNER ASSEMBLY
ERECTION UNIT I - 60
MW ETPS
MODIFIED RE
CIRCULATION DAMPER
ASSY. FOR UNIT III&IV
110MW ETPS
COLD AIR CONTROL
DAMPER ASSY. FOR
UNIT III&IV 110MW
ETPS
DURING LOYDS
INSPECTION GROUP
INSPECTING WATER
CHAMBER UNTI V 110
MW ETPS
DURING LOYDS
INSPECTION GROUP
INSPECTING WATER
CHAMBER UNTI V 110
MW ETPS
DURING LOYDS
INSPECTION GROUP
INSPECTING WATER
CHAMBER UNTI V 110
MW ETPS
DURING LOYDS
INSPECTION GROUP
INSPECTING WATER
CHAMBER UNTI V 110
MW ETPS
DURING LOYDS
INSPECTION GROUP
INSPECTING WATER
CHAMBER UNTI V 110
MW ETPS
DURING LOYDS
INSPECTION GROUP
INSPECTING WATER
CHAMBER UNTI V 110
MW ETPS
WATER CHAMBER
MACHINING OF STAY
BOLT FOR CONENSER
ETPS
FABRICATION OF SHED
TRESS WORK IN OUR
FACTORY
FABRICATION OF SHED
TRESS WORK IN OUR
FACTORY
FABRICATION OF SHED
TRESS WORK IN OUR
FACTORY
FABRICATION OF SHED
TRESS WORK IN OUR
FACTORY
FABRICATION OF SHED
TRESS WORK IN OUR
FACTORY
ARM FOR WATER
CHAMBER
REAR WATER
CHAMBER
BRACKET
ASSEMBLY
DURING POOJA
FOR COMPLETION
OF WATER
CHAMBER
OUR WORK SHOP
WATER CHAMBER
DOOR FOR UNIT V
110 MW
FABRICATION OF
SHED TRESS
WORK IN OUR
FACTORY
DURING TNEB
OFFICAL
INSPECTION
DURING HYDRO
TEST TNEB
OFFICAL
INSPECTION
OUR
MACHINIRIES
WATER CHAMBER
FOR UNIT V 110
MW
GUILLOTINE GATE
SPARES
DURING THE
ERECTION OF
COAL AND
VAPOUR PIPES
AND BENDS
MITRE BENDS
FOR COAL AND
VAPOUR PIPING
MITRE BEND
PREPARATION
BEARING
COOLING COIL
FOR BOILER
FEED PUMPS
MANUFACTURING
GRILLS FOR
ENNORE
THERMAL POWER
STATION
DURING THE
PLATE CUTTING
P.A.FAN LAYOUT
MARKING AND
INSPECTION
WITH TNEB
OFFICALS
P.A.FAN LAYOUT
CUTTING
P.A.FAN PRE -
ASSEMBLY
INSPECTION
WITH TNEB
OFFICALS
P.A.FAN CASING
P.A.FAN CASING
P.A.FAN CASING
DURING
ASSEMBLY OF
DIFFUSER MOUTH
PIECE FOR
P.A.FAN
DURING
ASSEMBLY OF
DIFFUSER MOUTH
PIECE FOR
P.A.FAN
AFTER WELDING
DIFFUSER MOUTH
PIECE FOR
P.A.FAN
AFTER WELDING
SUCTION BRANCH
FOR P.A.FAN
DURING FULL
ASSEMBLY OF
P.A.FAN
DURING FULL
ASSEMBLY OF
P.A.FAN AND
LOYDS
INSPECTION
GROUP
INSPECTING THE
ASSEMBLY
AFTER WELDING
DIFFUSER MOUTH
PIECE FOR P.A.FA
DURING FULL
ASSEMBLY OF
P.A.FAN
DURING FULL
ASSEMBLY OF
P.A.FAN