Hazard Identifcation Plan

Page 1 of 6
Rev. No.: 0
Project Activity: ABQAIQ PLANTS BATTERY EXHAUST FAN MONITORING
PO #
Contractor: Technca! " In#$%tra! Ser&ce% Co'(an) *ate: +,-Ma)-./

0o1 Locaton : S(ec2) Act&t) to 1e a%%e%%e# :- A%%e%%'ent tea' 'e'1er S3nat$re
ABQAIQ ABQAIQ PLANTS BATTERY EXHAUST FAN
MONITORING
. En3r4 A#! I5a6
7 En3r4 Fa%ee!
+ M$ha''a# Sa5# Sha'%
SR Ta%8 POTENTIAL
HA9AR*
(What can cause
harm?)
CONTROL MEASURE
(What can be done to prevent it from going wrong?)
1.
*%'ant!n3:Re(!ace'ent o2
e!ectrca!!) contro!!e#
n%tr$'ent%: E;ha$%t Fan%
Stored Energy
High Voltage
Electrical
Hazard
Hand injury
Slip and Trip
Damage
product or
equipment
oad fall
.4 Co'(!) <th ARAMCO CSM Secton 7-+ =*e'o!ton>
74 Co'(!) <th GI 74.,, =?or8 Per't S)%te'>@ GI A4,.7
=I%o!atonB Loc8o$t an# $%e o2 Ho!# Ta3%> an# ARAMCO CSM
Secton IC-I =E!ectrct)>
!. "nly quali#ed $ competent electrician% &ill 'e allo&ed to perform
electrical jo'
(. )lo%e %uper*i%ion 'y competent %uper*i%or
+. ,dequate )la%% ,-) #re e.tingui%her readily a*aila'le
6. ine% to 'e &or/ed on properly identi#ed
0. Safe manual handling practice%1 i.e. accurate 'ody and hand po%ition
%hall 'e maintained &hile remo*ing of *ale% and 2ange% &hene*er
needed.
3. ,&are a'out po%%i'le pinch point
4. 5%e of appropriate PPE6%1 i.e. ru''er molded glo*e% for electrician%1
eye 7 for demolition cre&1 goggle%1 %afety %hoe%1 hand glo*e%1 hard
hat.
18. Pre9:o' Safety ;n%truction <P:S;=
>. Rch H)#ro3en
Concentraton n 1atter)
roo'4
E!ectroc$tonB contact <th
ac#%B a!8a!neB
?i%/ of
E.plo%ion1 #re1
injury1 damage
to equipment$
property. S/in
'urn%1 @ire
hazard
1. , Hydrogen 9in 9air mi.ture of (A or greater %u'%tantially increa%e%
the ri%/ of an e.plo%ion. The concentration of Hydrogen %hould 'e
/ept 'elo& 1 A to pro*ide a %afety factor. ;n%tead of continuou%ly
running the fan1 it% operation may 'e interloc/ed &ith Hydrogen
detector acti*ation a'o*e 1A <or >8A of E1 &hiche*er i% lo&er=
concentration.
>. Per%on% &ho handle 'atterie% mu%t 'e a&are of the ri%/% in*ol*ed and
are recognized a% a %uBciently trained per%on.
Hazard Identifcation Plan
Page > of 6
Rev. No.: 0
Project Activity: ABQAIQ PLANTS BATTERY EXHAUST FAN MONITORING
PO #
!. Co good% may 'e %tored in the charging area
(. Co &or/ %hould ta/e place1 &hich can gi*e oD %par/%.
+. Co large metal o'ject1 %uch a% an ,luminum ladder or %caDold
material1 may 'e ta/en into the 'attery room
6. SuBciently trained per%on% may only 'e authorized to
connect and di%connect the facilitie%
den%ity of the electrolyte
charging the 'attery
0. Safety in%truction% detailing the hazard% of the &or/ to 'e carried out
mu%t 'e a*aila'le in charging area.
3. Co Equipment %hould 'e placed &ithin 1 m of 'attery1 or directly
a'o*e it1 in &hich hot %urface% or %par/% may occur.
4. Eelding1 drilling and grinding &or/ %hould not 'e carried out &hen the
charging proce%% i% ta/ing place. The%e &or/% %hould 'e carried out >
hour% after the charging ha% %topped and the *entilation ha% 'een
running.
18. Safety goggle% %hould 'e pro*ided for operator% &or/ing in thi% area.
11. ;f it i% una*oida'le to /eep the 'atterie% in the oBce %pace1 the area%
%hould 'e indicated 'y %tripe% on the 2oor.
1>. Ehen mi.ing electrolyte acid mu%t 'e added to &ater ne*er &ater to
acid
1!. S&itch oD 'attery charger 'efore connecting or di%connecting 'attery
1(. ,l&ay% di%connect negati*e terminal #r%t and po%iti*e terminal la%t
!.
USE OF LA**ERS
=A% a 'ean% o2 e3re%% :
n3re%% to an# 2ro'
e!e&ate# or 1e!o< 3ro$n#
<or8 area% 2or %hort
#$raton>
,ccidental fall
&hen
de%cending $
a%cending
ladder%
@all of ladder
&hen
improperly
%ecured
,ccidental fall
from damage
ladder
Po%%i'le trap of
per%onnel &hen
acce%% ladder i%
.4 Co'(!) <th AR4AMCO CSM =Secton ..-D47 La##er% an# Ste(
La##er%>
>. -oth hand% free of o'ject% &hen a%cending $ de%cending ladder%
!. ;nclined ladder% %et F appro.imately 08G &ith the horizontal
(. adder% %ecured 'y %ide rail% not 'y rung%
+. Top of ladder% e.tended ! feet <mm= 'eyond %tepping oD point $
landing
6. Defecti*e ladder% readily mar/ed and remo*ed
0. ?ung% not u%ed to %upport material% $ load%
3. Hetal ladder% or &et &ooden ladder% not u%ed near or on energized
electrical equipment
4. ,cce%% ladder% mu%t 'e continuou% from highe%t $ farthe%t point of
&or/ location to di%charge point on the ground
18. adder not more than !8 feet long $ high &ithout landing
11. Pre9:o' Safety ;n%truction <P:S;=
Hazard Identifcation Plan
Page ! of 6
Rev. No.: 0
Project Activity: ABQAIQ PLANTS BATTERY EXHAUST FAN MONITORING
PO #
not continuou%
Electric %hoc/
&hen u%ing &et
of metal ladder%
near li*e
electrical
equipment
(. SCAFFOL*ING AN* ?ORE
PLATFORM
<Eor/ at height=
Ele*ated &or/
area%
ScaDold failure
@alling hazard
"'ject $ de'ri%
falling from
height
.4 Co'(!) <th ARAMCO CSM =Secton II-D ?or8n3 (!ace%B
!a##er%B an# %caFo!#n3%>
74 Co'(!) <th GI G4,,. =Sa2et) reH$re'ent 2or %caFo!#n3> "
GI74!,, =?or8 Per't Proce#$re>
!. "nly trained %caDolder &ill 'e allo&ed.
(. ScaDold in%pected prior to u%e or remo*al
+. )ompetent %caDolding foreman $ %uper*i%or
6. ScaDold complete &ith guard rail% <top $ mid rail%=I toe 'oard%1 acce%%
ladder%1 clo%ed dec/ing1 'a%e $ %ole plate%1 'race%
0. Tagging procedure o'%er*ed
3. 5%e 'ag for lo&ering the tool%1 material%.
4. Hea*y duty ca%ter &ith 'ra/e <mo'ile %caDold=
18. Ho'ile %caDold i% not mo*ed &ith per%on on platform
11. ,cce%% ladder% e.tended at lea%t ! feet 'eyond %tepping oD point
1>. )oupler% %ecurely #.ed $ not loo%e
1!. ScaDold &renche% %tring tied
1(. Co thro&ing of tool%1 clamp%1 tu'e%1 etc.
1+. Co per%on% underneath %caDolding &or/% and area i% 'arricaded
16. Ha.imum height J ( time% the minimum 'a%e &idth <mo'ile=
+. Hot ?or8 =C$ttn3B Grn#n3B
?e!#n3 >
@ire
Electrocution
Eye ;njury
Property
Damage
E.po%ure to
Eelding @ume%
.4 Co'(!) <th ARAMCO CSM Secton I -.. =Fre Pre&enton>
>. @ollo& Eor/ Permit Procedure <K; >.188=
!. ,rea %hould 'e 'arricaded
(. ,ppropriate PPE6% < Eelding1 Krinding Helmet1 eather Klo*e%1 ong
Slee*e% Shirt =
+. ,ppro*ed and ;n%pected &elding machine%
6. )erti#ed Eelder%
0. Damage @ree Tool%
3. Prepare the &or/ area 'y cleaning a&ay all com'u%ti'le material%.
4. S/illed team %hould perform the jo'.
18. Sign 'oard 7 &arning %ign% including hot &or/ in progre%% %hould 'e
Hazard Identifcation Plan
Page ( of 6
Rev. No.: 0
Project Activity: ABQAIQ PLANTS BATTERY EXHAUST FAN MONITORING
PO #
po%ted
11. Eor/ area %creened &ith #re 'lan/et.
1>. @ire &atchman %hould 'e engaged throughout the &or/ &ith #re
e.tingui%her and de*ice% for control and eliminate the #re. He %hould
remain in the area for 1 hour after completion of &or/
1!. En%ure grounding of &elding machine
1(. Porta'le grinder mu%t ha*e &heel guard and dead man %&itch. 5%e
ear protection during grinding
1+. Eater -uc/et %hould 'e there
16. Pre%%ure Te%ted Ka% )ylinder%
10. Ka% )ylinder% %hould 'e free from oil and Krea%e
13. @itting% and Ho%e% %hould 'e cali'rated
14. ,l&ay% clo%e the cylinder *al*e 'efore attempting to %top lea/
>8. ;n%pect cylinder% for %afe condition 'efore u%e.
>1. Protect cylinder% from direct 2ame1 %unlight1 and other heat %ource%
>>. ;n%pect all gauge%1 regulator%1 ho%e%1 and cylinder% for damage
>!. Place 2a%h'ac/ arre%tor% at cylinder regulator%
>(. Defecti*e equipment %hall 'e remo*ed and replaced.
>+. ,ll equipment %hall 'e turned oD &hen not in u%e.
>6. , porta'le #re e.tingui%her %hall 'e a*aila'le

6.
COMPRESSE* AIR
EQUIPMENT
=0ac8 ha''er>
Coi%e e.po%ure
Hay cau%e
minor or major
phy%ical injury
@ire
.4 Co'(!) <th ARAMCO CSM Secton III - +4/ =Co'(re%%or%>
2. @ollo& &or/ permit procedure% <K; >.88=.
!. Ear plug% &orn 'y all aDected per%onnel
(. Eor/ing glo*e% &orn
+. @ace %hield% in addition to %afety goggle% &orn
6. ,ir ho%e% properly #.ed &ith ho%e damp% $ dou'ly %ecured &ith %afety
&ire% in each connection%
0. Porta'le #re e.tingui%her% a*aila'le
3. Earning notice LEar Protection ?equiredM in%talled at compre%%or unit.
0. LIFTING OPERATION CRANE
?ORES
?e*er%ing
mo'ile crane in
&or/ area
Equipment
failure
@alling hazard%
T&o 'loc/ing
Turn "*er
.4 Co'(!) <th ARAMCO CSM Secton III-."7 =CraneB L2tn3
EH$('ent " R33n3>
>. @ollo& Eor/ Permit Procedure <K; >.188=
!. ,?,H)" )erti#ed crane operator
(. Eind F >8 mph no lifting
+. )ontrol tagline% u%ed
6. "perating radiu% cleared of per%onnel
0. )rane &ith *alid ,?,H)" in%pection %tic/er
3. "perator6% ca' cleared of %ight o'%truction
Hazard Identifcation Plan
Page + of 6
Rev. No.: 0
Project Activity: ABQAIQ PLANTS BATTERY EXHAUST FAN MONITORING
PO #
4. oad chart and crane hand %ignal% po%ted
18. Pre9lift operation chec/li%t completed
11. Sling%1 %hac/le% ,?,H)" appro*edI SE mar/ed
1>. Co aluminum ferrule &ire rope %ling%
1!. ,ll lifting equipment $ acce%%orie% pre9in%pected
1(. ,nti9t&o 'loc/ing de*ice in%talled
1+. Sling% %oftener $ protection from %harp edge% u%ed
16. Hultiple inclined %ling% do not e.ceed 48 degree% included angle
10. oad 'eing lifted in equili'rium po%ition
13. Hand% oD from pinch point%
14. Co people at any time under the load
>8. Co unauthorized per%on in*ol*ed
>1. Spotter po%ted for re*er%ing crane%
>>. Pre9:o' Safety ;n%truction <P:S;=
3.
*RICING TO AN* FROM THE
PRO0ECT SITE *AILY
TraBc hazard%
Hotor *ehicle
colli%ion $
accident
Slippery road%
<during %tormy
&eather=
5n%afe act 'y
other%
1. Co'(!) <th GI A4,+,B TraIc " Cehc!e Sa2et) " ARAMCO CSM
Secton I-.+B Tran%portation
>. Dri*er% in po%%e%%ion of *alid S,K Dri*er6% icen%e
!. "'%er*e defen%i*e dri*ing
(. "'ey po%ted %peed limit% and traBc %ign% on and oD %ite
+. Eear %eat 'elt%
6. ?educe %peed under hazardou% &eather condition.
0. @ire e.tingui%her a*aila'le
3. Earning de*ice carried in *ehicle
4. Co riding at the 'ac/ of pic/up%
4.
HOUSE EEEPING =A!!
Act&te%>
@ire Hazard%
En*ironmental
Pollution
1. Eor/ area %hall 'e /ept free of accumulating con%truction de'ri%
>. )ollection and di%po%al of refu%e1 %crap%1 and ru''i%h material% %hall
'e at lea%t daily
!. Dumping of con%truction &a%te% %hall 'e allo&ed only in S,PHT
de%ignated di%po%al %ite
(. )on%truction equipment and material% %hall 'e maintained in an
orderly condition at all time%.
18.
E'er3enc) Pre(are#ne%%
,ccident$@ire $ @lood$
Sand Storm$ Earth
Nua/e
1. ;nform to the Emergency ?e%pon%e Team.
>. ,ll the equipment mu%t 'e %&itch oD.
!. The entire jo' mu%t 'e %topped.
(. SuBcient num'er of ga% ma%/ %hould 'e a*aila'le at %ite.
+. Detect the &ind direction through the &ind %oc/ and go to the %afe
a%%em'ly area.
6. Ta/e the head count 'y the %uper*i%or%.
0. Co one &ill get 'ac/ to the %ite unle%% 'y the clear in%truction.
Hazard Identifcation Plan
Page 6 of 6
Rev. No.: 0
Project Activity: ABQAIQ PLANTS BATTERY EXHAUST FAN MONITORING
PO #
3. ?eport Emergency immediately at Saudi ,ramco telephone 118 &ith
'elo& gi*en detail%
4. De%cri'e the location
18. Detail of the incident.
11. ?eport injurie%1 if any.
1>. Ki*e your name and num'er.
1!. &ait until further in%truction%