PROJECT: 160 MW CCPP, STAGE-III, RAMGARH

TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
123.7MW GAS TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
Relay Details
Relay Type 7UM62
Make SIEMENS
Rated current 5A
GENERATOR DETAILS:
Rated Active Power = 123.7 MW
Rated Apparent Power = 145.5 MVA
Rated Voltage (U
Nmach
) = 11 kV 11000 V
Rated Current (I
Nmach
) = 7638.54 A
Power Factor = 0.85 lag
Rated Frequency = 50 Hz
X"d (Sub Transient Reactance) = 0.15 P.U
X'd (Transient Reactance) = 0.23 P.U
Xd (Direct Axis Reactance) = 1.941 P.U
Neutral Grounding Transformer Primary = 11000 V 11000X3 = 6351
Neutral Grounding Transformer Secondary = 220 V
NGT Secondary Reactor Value = 0.424 Ohms 300 A
Neutral Grounding Transformer Capacity = 25 KVA
Negative Sequence Capability I
2S
= 0.08 8.00 %
I2^2t = 8 Sec.
GENERATOR PT DETAILS:
PT Primary (U
N VT prim
) = 11000 V
PT Secondary = 110 V
PTR = 100
GENERATOR CT DETAILS:
CT Primary (I
N CT prim
) = 8500 A
CT Secondary = 5 A
CTR = 1700
GENERATOR TRANSFORMER DETAILS:
Rated Capacity = 150 MVA
HV Voltage Rating = 230000 V 230 kV
LV Voltage Rating = 11000 V 11 kV
% Impedance = 12.50 % 0.125
GENERATOR TRANSFORMER CT DETAILS:
HV Side CT Primary = 600 A
HV Side CT Secondary = 1 A
HV Side Neutral CT Primary = 600 A
HV Side Neutral CT Secondary = 1 A
NEUTRAL GROUNDING TRANSFORMER
HV Side = 11000 V (11000/3)
LV Side = 220 V
Neutral CT Primary = 400 A
Neutral CT Secondary = 5 A
Load Resistance = 0.424
Rprimary = 36.6
Full Load Current = 7638.54 A
CT Secondary Current = 7638.54x(5/8500) A
= 4.49 A
95% STATOR EARTH FAULT PROTECTION (64G)
For machines in Unit transformer connection the evaluation of the displacement voltage is sufficient.
Displacement Voltage:
Max Open Delta Voltage = 110.00 V
With 5% of setting = 5.5 V
With 110% of margin setting = 6.05 V
U0> = 6 V
SPML-S10IRJ01-DD-EE-01-A
CHKD
DSGN VS
MN
Page 1 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
123.7MW GAS TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
SPML-S10IRJ01-DD-EE-01-A
CHKD
DSGN VS
MN
100-% STATOR EARTH FAULT PROTECTION WITH 20HZ VOLTAGE INJECTION (64G)
THE FACTOR R SEF =
2
Transf
x(
Divider
/
MinCT
)
for
Transf
=
Neutral Transf
= (U
Nprim
/3)/(U
Nsec
)
= (11000/1.732)/(220)
= 28.87
The transformation ratio of the miniature CT is 400/5A

Divider
= 5/2
= 2.5

MinCT
= 400/5
= 80
= (28.87^2)x(2.5/80)
THE FACTOR R SEF = 27.000
If for the Trip stage R<< a generator-side fault resistance of 1000 is chosen
A resistance of R<< SEF TRIP = (1000/27)
= 37.04
= 40
If for the Alarm stage R< a generator-side fault resistance of 3000 is chosen
A resistance of R< SEF ALARM = (3000/27)
= 111.11
= 120
THE EARTH CURRENT STAGE, SEF I>> = 0.2*(U
NGen
/RL)*(1/
Min CT
)
= 0.2x((11000/3)/36.6)x((1/400/5))
= 0.434 A
IMPEDANCE PROTECTION (21)
Maximunm load current setting:
Rated current of Generator = 7638.54 A
Max current at 95% voltage = 8041 A
As this relay should not pickup for overload,120% safty factor is considered
IMP I> = 6 A
Generator Transformer back-up impedance protection setting:
Generator Transformer Impedance at 11000V base = (11000x11000x0.125)/(150x1000000)
= 0.101 Ohms
Generator Transformer Impedance x 0.8 = (0.101x0.8)
= 0.081 Ohms
Secondary Impedance = 0.081x(CTR/VTR)
= 0.081x(1700/100)
ZONE Z1 = 1.000 Ohms
Line back-up impedance protection setting:
Line positive sequence impedance/Km = 0.075 Ohms
Line Voltage = 230000 V
Line Length = 210.000 km
= (0.075x210)
= 15.724 Ohms
System Impedance on 22000V base = (Imp. On 220000V base)x (11000x11000)/(230000x230000)
= 0.036 Ohms
Total Impedance = (Line Imp. + Transformer Imp.)x 1.1
= (0.036+0.101)x1.1
= 0.151 Ohms
Total Secondary Impedance = 0.151x(CTR/VTR)
ZONE Z2 = 3.000 Ohms
FACTOR UE = 72.17
Page 2 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
123.7MW GAS TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
SPML-S10IRJ01-DD-EE-01-A
CHKD
DSGN VS
MN
LOSS OF EXCITATION (40)
1/X
dsec
= (1/X
dmach
)x(I
Nmach
/U
Nmach
)x(U
N VT prim/
I
N CT prim
)
= (1/1.941)x(7638.54/11000)x(11000/8500)
= 0.46
CHAR 1
= 0.490
CHAR 2
1/X
dsec in
CHAR 2 is set to about 0.9 of CHAR 1 = 0.44
CHAR 3 is for dynsmic stability of the machine and is set between 1/X
d
and 1/X
d
'
1/X
d'sec
= (1/X
d'mach
)x(I
Nmach
/U
Nmach
)x(U
N VT prim/
I
N CT prim
)
= 3.907
CHAR 3
NEGATIVE SEQUENCE (OR) UNBALANCED LOAD (46)
pickup thershold Pickup Setting I2> = (I
2 max prim
/I
N machine
)x(I
N machine
/I
N CT prim
)
max. perm.(I
2 max prim
/I
N machine
) in permanent operation in our
machine
= 8.00 %
= (8)x(7638.54/8500)
I2 = %
Negative Sequence Factor K, Ksec = K
primary
x(I
N Machine
/I
N CT prim
)
2
K
primary = 8 sec.
= 8x(7638.54/8500)
FACTOR K = 7.20 sec.
Time for Cool Down, t
cooldown = K
primary
/(I
2 perm
/I
N
)
2
= 1250 sec.
GEN .POLE SLIPPING PROTECTION (OR) OUT-OF-STEP PROTECTION(78)
Z
b = (X'
d
)x(kV
2
/MVA)x(CTR/VTR)
Per unit Impedance (pu) = kV
2
/MVA
= 11^2/145.53
= 0.831 Ohms
= 0.831x (CTR/PTR)
= 14.200 Ohms
= 14.2x0.23
Z
b = 3 Ohms
Z
C = 0.85 x X
SC
X
SC = X
SC
prim x (kV
2
/MVA) x (CTR/VTR)
= kV
2
/MVA
= 11^2/150
= 0.807 Ohms
= 0.807x (CTR/PTR)
= 13.800 Ohms
= 1.725
Z
C = 0.85x1.725
= 1.000 Ohms
Muliplied by a safety factor of about 1.05, the setting value
1/X
dsec
is,
The power swing rectance of the machine must be considered, which is approximately the transient reactance
Z
b
=X'
d
Thus Z
C
is set to 85% of the transformer impedance X
SC
.
The reciprocal of secondary per unit synchronous direct
reactance is,
value1/xd CHAR. 3 situated approximately between the synchronous direct reactance xd and the transient
reactance xd'. However, it should be greater than 1.
Page 3 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
123.7MW GAS TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
SPML-S10IRJ01-DD-EE-01-A
CHKD
DSGN VS
MN
Z
a = 0.289 x Z
tot
Z
tot = Z
b
+ Z
C
= 4.000
Z
a = 1.00 Ohms
The covered system reactance should be 10,so
Z
d = 10 Ohms
Z
d
-Zc = 9.00 Ohms
THERMAL OVERLOAD PROTECTION (49)
K-FACTOR:
Imax prim = 115% X In
mach
= 1.15 X 7638.54
= 8784.32 A
IN
CT prim = 8500 A
K-FACTOR = Imax
prim
/ IN
CT

prim
= 1.1
TIME CONSTANT ():
Set Default Value as = 600 Sec
Q ALARM ( trip):
Q ALARM ( trip) issues thermal warning prior to tripping & is given in % of the tripping temperature level.
= 1/(K-FACTOR)
2
= 1/(1.1)^2
= 90.0 %
I ALARM:
This level is set in secondary amperes, and should be set equal to, or slightly less than, the permissible
continuous current K-FACTOR IN sec.
= IN sec
= 5 A
K-FACTOR:
Set Default Value as = 1
I MAX THERM.: = 3 X Nominal generator current
= 3 X In
mach
X (IN
CT Sec
/IN
CT Prim
)
= 3 X 7638.54 X (5/8500)
= 13.48 A
T EMERGENCY:
Set Default Value as = 100 Sec
TEMP. RISE I :
Nsec = N
Mach
x (INprim/INmach)
2
where, Nsec = Machine temperature with nominal secondary current
NMach = Machine temperature with nominal machine current
= 80 C (Considered for Calculation)
Inprim = Nominal primary current of the current transformers
= 8500 A
INMach = Nominal machine current
= 7638.54 A
Therefore, Nsec = 80 X (8500/7638.54)^2
= 100.0 C
If the temperature input is used, the trip times change if the coolant temperature deviates from the internal
reference temperature of 40 C. The following formula can be used to calculate the trip time:
(I/k.I
N
)
2
+ ((K 40 C)/ (k
2
N)) - (Ipre/k IN)
2
t = . ln
(I/k.I
N
)
2
+ ((K 40 C)/ (k
2
N)) - 1
where, = TIME CONSTANT
k = K-FACTOR
IN = Nominal device current
I = Actually flowing secondary current
Ipre = Previous load current
N = Temperature with nominal current IN
K = Coolant temperature input
The following trip times result for different ambient temperatures K with a supposed load current of
I = 1.5 IN
Ipre = 0
Thus Z
a
is decisive for the width of the power swing polygon
The K-FACTOR refers to the secondary nominal current. The following applies for the conversion
Page 4 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
123.7MW GAS TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
SPML-S10IRJ01-DD-EE-01-A
CHKD
DSGN VS
MN
(1.5/1.1)
2
+ ((40 C 40 C)/ (1.1
2
100 C)) - 0
with K = 40 C: t = 600 x ln
(1.5/1.1)
2
+ ((40 C 40 C)/ (1.1
2
100 C)) - 1
= 463 Sec
(1.5/1.1)
2
+ ((80 C 40 C)/ (1.1
2
100 C)) - 0
with K = 80 C: t = 600 x ln
(1.5/1.1)
2
+ ((80 C 40 C)/ (1.1
2
100 C)) - 1
= 366 Sec
(1.5/1.1)
2
+ ((0 C 40 C)/ (1.1
2
x 100 C)) - 0
with K = 0 C: t = 600 x ln
(1.5/1.1)
2
+ ((0 C 40 C)/ (1.1
2
x 100 C)) - 1
= 637 Sec
GTG MAIN-1 RELAY PANEAL (7UM62-GR1)
Differential Protection
I-DIFF> I/InO
T I-DIFF> sec
I-DIFF>> I/InO
T I-DIFF>> sec
SLOPE 1
BASE POINT 1 I/InO
SLOPE 2
BASE POINT 2 I/InO
I-ADD ON STAB. I/InO
S/E/F PROT.
U0> V
T S/E/F sec
100% SEF-PROTN.
R< SEF ALARM Ohm
R<< SEF TRIP Ohm
T SEF ALARM sec
T SEF TRIP sec
SEF I>> A
U20MIN V
I20MIN mA
PHI ISEF
SEF Rps Ohm
RI-PARALLEL Ohm
ROTOR E/F
RE< WARN kOhm
RE<< TRIP kOhm
T-WARN-RE< sec
T-TRIP-RE<< sec
2 3.0..30.0 kOhm 10.00
4 0.00..60.00 sec; 10.00
5 0.00..60.00 sec; 0.50
ROTOR EARTH FAULT PROTECTION (64R)
1
OFF,ON,Block relay for trip com-
mands
ON
3 1.0..5.0 kOhm 2.00
10 0700 Ohm 0
11 20700 Ohm;
8 540mA 10.00
9 -60
O
...60
O
0
o
6 0.021.50A 0.43
7 0.315.0V 1.0V
4
0.0060.00 sec;
10.00
5 0.0060.00 sec; 1.00
2 20700 Ohm 120
3 20700 Ohm 40
3 0.00..60.00 sec; 0
100-% STATOR EARTH FAULT PROTECTION WITH 20HZ VOLTAGE INJECTION (64G)
1
OFF,ON,Block relay for trip com-
mands
ON
95% STATOR EARTH FAULT PROTECTION (64G)
1
OFF,ON,Block relay for trip com-
mands
ON
2 2.0..125.0 V 6
9 0.00..10.00 I/InO 2.50
10 2.00..15.00 I/InO 4.00
7 0.00..2.00 I/InO 0.00
8 0.25..0.95 0.50
5 0.00..60.00 sec; 0.00
6 0.10..0.50 0.25
3 0.00..60.00 sec; 0.00
1
OFF,ON,Block relay for trip com-
mands
4 0.5..12.0 I/InO; 6.00
SI.NO FUNCTION SETTING RANGE RECOMMENDED SETTING
ON
2 0.05..2.00 I/InO 0.20
DIFFERENTIAL PROTECTION (87G)
Page 5 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
123.7MW GAS TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
SPML-S10IRJ01-DD-EE-01-A
CHKD
DSGN VS
MN
REVERSE POWER
P> REVERSE %
T-SV-OPEN sec
T-HOLD sec
Interturn protn
U Interturn V> V
T-U Interturn V> sec
Reset ratio %
INADVERT. EN.
I STAGE A
RELEASE U1< V
PICK UP T U1< sec
DROP OUT T U1< sec
UNBLANCED LOAD
I2> %
T WARN sec
FACTOR K sec
T COOL DOWN sec
I2>> %
T I2>> sec
UNDEREXCIT
T SHRT Uex< sec
EXCIT.VOLT.
Uexcit< V
Umin V
1/Xd CHAR.1
ANGLE 1
T CHAR. 1 sec
1/Xd CHAR.2
ANGLE 2
T CHAR. 2 sec
1/Xd CHAR.3
ANGLE 3
T CHAR. 3 sec
UNDERVOLTAGE
U< V
T U< sec
U<< V
T U<< sec
U< DOUT RATIO
2 3.030.0%
3
0.0060.00 sec;
20
5 0.00..60.00 sec; 0.50
6 1.01..1.20 1.05
3 0.00..60.00 sec; 3.00
4 10.0..125.0 V 88.0
UNDERVOLTAGE PROTECTION (27)
1
OFF,ON,Block relay for trip com-
mands
ON
2 10.0..125.0 V 99.0
13 50120
O
90
O
14
0.0060.00 sec;
0.30
11
0.0060.00 sec;
10.00
12 0.253.00 1.10
9 0.253.00 0.44
10 50120
O
90
O
7 50120
O
80
O
8
0.0060.00 sec;
10.00
5 10.0125.0V 25.0
6 0.253.00 0.49
3 ON,OFF OFF
4 0.508.00V 2.00
LOSS OF EXCITATION (40)
1
OFF,ON,Block relay for trip com-
mands
ON
2
0.0060.00 sec;
0.50
4 10100% 60
5
0.0060.00 sec;
3.00
2
2.0100.00 sec;
7.2
3 050000 sec 1250.0
5 0.00..60.00 sec; 1.00
NEGATIVE SEQUENCE (OR) UNBALANCED LOAD (46)
1
OFF,ON,Block relay for trip com-
mands
ON
3 10.0..125.0 V; 0 55
4 0.00..60.00 sec; 5.00
0.00..60.00 sec; 0.00
DEAD MACHINE PROTECTION (OR) INADVERTENT ENERGIZATION (50)
1
OFF,ON,Block relay for trip com-
mands
ON
GENERATOR INTERTURN FAULT PROTECTION (59N)
1 OFF/ON/Block relay ON
REVERSE POWER PROTECTION (32)
1
OFF,ON,Block relay for trip com-
mands
ON
2 30.00..-0.50 % -1.930
3 0.00..60.00 sec; 2.00
4
5.00
3 0.00 .. 60.00 sec; 0.50
2 0.1..20.0 A; 0.5
4 50 .. 95 % 80.00
2 0.3 .. 130.0 V
Page 6 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
123.7MW GAS TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
SPML-S10IRJ01-DD-EE-01-A
CHKD
DSGN VS
MN
O/C Ip
Ip A
TIME DIAL: TD
IEC CURVE
U< V
O/U FREQUENCY
f1 PICKUP (UNDER) Hz
T f1 sec
f2 PICKUP (UNDER) Hz
T f2 sec
f3 PICKUP (OVER) Hz
T f3 sec
f4 PICKUP (OVER) Hz
T f4 sec
THRESHOLD f4
Umin V
OVERVOLTAGE
U> V
T U> sec
U>> V
T U>> sec
U> DOUT RATIO
VALUES U>
OVEREXC. PROT.
U/f >
T U/f > sec
U/f >>
T U/f >> sec
IMPEDANCE PROT.
IMP I> A
U< SEAL-IN
U< V
T-SEAL-IN sec
T END sec
ZONE Z1 Ohms
T-Z1 sec
ZONE Z1B Ohms
T-Z1B sec
ZONE Z2 Ohms
ZONE2 T2 sec
POWER SWING
10 0.00..600.00 sec 1.00
9 40.00..65.00 Hz 52.5
2 0.10...20.00 A 6.00
5 0.00..60.00 sec; 1
IMPEDANCE PROTECTION (21)
1
OFF,ON,Block relay for trip com-
mands
ON
4 1.00..1.40 1.40
3 0.00..60.00 sec; 10
4
10 0.00..600.00 sec
5 0.10..60.00 sec 3.00
2.00
2 1.00..1.20 1.10
3 ON,OFF ON
4 10.0..125.0 V 88.00
6 0.00..60.00 sec; 2.00
7 0.05..130.00 Ohm 1.00
8 0.00..60.00 sec; 0.10
0.00..60.00 sec; 0.60
7
Voltage protection with UPhase-
Phase,Voltage protection with
UPhase-earth.
2 30.0..170.0 V 116.0
3 0.00..60.00 sec; 3.00
0.00..60.00 sec; 0.50
6 0.90..0.99 0.95
OVERFLUXING PROTECTION (99)
Voltage protection with U-
Phase-Phase
5
1
OFF,ON,Block relay for trip com-
mands
ON
13 ON,OFF OFF
11 0.05..65.00 Ohm 3.00
12
OVERVOLTAGE PROTECTION (59)
1
OFF,ON,Block relay for trip com-
mands
ON
30.0..170.0 V 121.0 4
49.0
11
Freq. prot. stage
automatic,Freq. prot. stage
overfreqency,Freq. prot. stage
underfreqency
Freq. prot. stage
automatic
12 10.0..125.0 V; 0 72.00
9 40.00..65.00 Hz 51.0
7 0.00..600.00 sec 2.00
5 40.00..65.00 Hz 47.5
0.00..600.00 sec 0
5 10.0..125.0 V
UNDER&OVER FREQUENCY (81)
1
OFF,ON,Block relay for trip com-
mands
ON
2 40.00..65.00 Hz
INVERSE TIME OVER CURRENT, WITH VOLTAGE CONTROL OR VOLTAGE RESTRAINT (51V)
1
OFF,ON,Block relay for trip com-
mands
0.10..4.00 A 1.0 2
88.00
3 0.50..15.00; 0.50
4
Normal Inverse,Very
Inverse,Extremely Inverse
Normal Inverse
ON
10 0.00..60.00 sec;
9 0.05..65.00 Ohm 3.00
Page 7 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
123.7MW GAS TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
SPML-S10IRJ01-DD-EE-01-A
CHKD
DSGN VS
MN
OUT-OF-STEP
I1> RELEASE %
I2< RELEASE %
Z
a Ohms
Z
b Ohms
Z
c Ohms
Z
d
-Z
c Ohms
PHI POLYGON
REP CHAR.1
REP CHAR.2
T-HOLDIG sec
T-SIGNAL sec
BREAKER FAILURE
TRIP INTERN
CIRCUIT BREAKER I> A
TRIP TIMER sec
Ther. OVER LOAD
K-FACTOR
TIME CONSTANT sec
ALARM %
I ALARM A
K-FACTOR
I MAX THERM A
T EMERGENCY sec
TEMP. RISE I C
TEMP. RISE I F
TEMP. INPUT
TEMP. SCAL. C
TEMP. SCAL. F
2 20400 % 120
11
GEN .POLE SLIPPING PROTECTION (OR) OUT-OF-STEP PROTECTION(78)
1
OFF,ON,Block relay for trip com-
mands
ON
0.2060.00 sec 20.00
12 0.020.15 sec 0.05
9 14 1
10 18
5 0.10130.00
4
1.00
7 0.00130.00 9.00
8 60.090.0
O
90.0
O
3 5100 % 20
4 0.20130.00 1.00
3.00
6 0.10130.00
BREAKER FAIL PROTECFTION 50BF
1 ON/OFF ON
2
OFF Start Breaker Failure with
Bin.Outp.12 Start Breaker
Start Breaker Failure with
CFC
3 0.04-2.00A 0.2
4 0.06-60sec 0.20
THERMAL OVERLOAD PROTECTION (49)
1
OFF / ON / Block relay for trip
commands / Alarm Only
Alarm only
2 0.10..4.00 1.1
3 30..32000 sec 600.00
4 70..100 % 90
5 0.50 .. 20.00 A 5.00
6 1.0..10.0 1.00
7 2.50 .. 40.00 A 13.48
8 10..15000 sec 100.00
9 40..200 C 100.00
10 104..392 F 212.00
11
Disabled / 4-20 mA / Field bus
/ Temp. of RTD 1
Disabled
12 40..300 C 100.00
13 104..572 F 212.00
Page 8 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
123.7MW GAS TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
SPML-S10IRJ01-DD-EE-01-A
CHKD
DSGN VS
MN
GTG MAIN-2 RELAY PANEAL (7UM62-GR2)
Differential Protection
I-DIFF> I/InO
T I-DIFF> sec
I-DIFF>> I/InO
T I-DIFF>> sec
SLOPE 1
BASE POINT 1 I/InO
SLOPE 2
BASE POINT 2 I/InO
I-ADD ON STAB. I/InO
IMPEDANCE PROT.
IMP I> A
U< SEAL-IN
U< V
T-SEAL-IN sec
T END sec
ZONE Z1 Ohms
T-Z1 sec
ZONE Z1B Ohms
T-Z1B sec
ZONE Z2 Ohms
ZONE2 T2 sec
POWER SWING
ROTOR E/F
RE< WARN kOhm
RE<< TRIP kOhm
T-WARN-RE< sec
T-TRIP-RE<< sec
OUT-OF-STEP
I1> RELEASE %
I2< RELEASE %
Z
a Ohms
Z
b Ohms
Z
c Ohms
Z
d
-Z
c Ohms
PHI POLYGON
REP CHAR.1
REP CHAR.2
T-HOLDIG sec
T-SIGNAL sec
ROTOR EARTH FAULT PROTECTION (64R)
1
5 0.00..60.00 sec;
12 0.020.15 sec 0.05
10 18 4
11 0.2060.00 sec 20.00
8 60.090.0
O
90.0
O
9 14 1
6 0.10130.00 1.00
7 0.00130.00 9.00
4 0.20130.00 1.00
5 0.10130.00 3.00
2 20400 % 120
3 5100 % 20
GEN .POLE SLIPPING PROTECTION (OR) OUT-OF-STEP PROTECTION(78)
1
OFF,ON,Block relay for trip com-
mands
ON
0.50
12 0.00..60.00 sec;
OFF,ON,Block relay for trip com-
mands
0.60
7
0.00..60.00 sec; 2.00
0.05..130.00 Ohm 1.00
ON
2 3.0..30.0 kOhm 10.00
11 0.05..65.00 Ohm 3.00
13 ON,OFF OFF
4 10.0..125.0 V 88.00
8 0.00..60.00 sec; 0.10
5 0.10..60.00 sec 3.00
6
2 0.10...20.00 A 6.00
3 ON,OFF ON
10 2.00..15.00 I/InO 4.00
IMPEDANCE PROTECTION (21)
1
OFF,ON,Block relay for trip com-
mands
ON
8 0.25..0.95 0.50
9 0.00..10.00 I/InO 2.50
6 0.10..0.50 0.25
7 0.00..2.00 I/InO 0.00
4 0.5..12.0 I/InO; 6.00
5 0.00..60.00 sec; 0.00
2 0.05..2.00 I/InO 0.20
3 0.00..60.00 sec; 0.00
SI.NO FUNCTION SETTING RANGE RECOMMENDED SETTING
DIFFERENTIAL PROTECTION (87G)
1
OFF,ON,Block relay for trip com-
mands
ON
4 0.00..60.00 sec; 10.00
3 1.0..5.0 kOhm 2.00
9 0.05..65.00 Ohm 3.00
10 0.00..60.00 sec;
Page 9 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
123.7MW GAS TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
SPML-S10IRJ01-DD-EE-01-A
CHKD
DSGN VS
MN
INADVERT. EN.
I STAGE A
RELEASE U1< V
PICK UP T U1< sec
DROP OUT T U1< sec
UNBLANCED LOAD
I2> %
T WARN sec
FACTOR K sec
T COOL DOWN sec
I2>> %
T I2>> sec
UNDEREXCIT
T SHRT Uex< sec
EXCIT.VOLT.
Uexcit< V
Umin V
1/Xd CHAR.1
ANGLE 1
T CHAR. 1 sec
1/Xd CHAR.2
ANGLE 2
T CHAR. 2 sec
1/Xd CHAR.3
ANGLE 3
T CHAR. 3 sec
UNDERVOLTAGE
U< V
T U< sec
U<< V
T U<< sec
U< DOUT RATIO
O/C Ip
Ip A
TIME DIAL: TD
IEC CURVE
U< V
NEGATIVE SEQUENCE (OR) UNBALANCED LOAD (46)
1
OFF,ON,Block relay for trip com-
mands
ON
5
0.0060.00 sec;
3.00
0.0060.00 sec;
20
2
2.0100.00 sec;
7.2
3
3 0.50..15.00; 0.50
INVERSE TIME OVER CURRENT, WITH VOLTAGE CONTROL OR VOLTAGE RESTRAINT (51V)
1
OFF,ON,Block relay for trip com-
mands
ON
2 0.10..4.00 A 1.0
4 Normal Inverse
5 10.0..125.0 V 88.00
Normal Inverse,Very
Inverse,Extremely Inverse
5 0.00..60.00 sec; 0.50
6 1.01..1.20 1.05
3 0.00..60.00 sec; 3.00
4 10.0..125.0 V 88.0
UNDERVOLTAGE PROTECTION (27)
1
OFF,ON,Block relay for trip com-
mands
ON
2 10.0..125.0 V 99.0
13 50120
O
90
O
14
0.0060.00 sec;
0.30
11
0.0060.00 sec;
10.00
12 0.253.00 1.10
9 0.253.00 0.44
10 50120
O
90
O
7 50120
O
80
O
8
0.0060.00 sec;
10.00
5 10.0125.0V 25.0
6 0.253.00 0.49
3 ON,OFF OFF
4 0.508.00V 2.00
LOSS OF EXCITATION (40)
1
OFF,ON,Block relay for trip com-
mands
ON
2
0.0060.00 sec;
0.50
4 10100% 60
2 3.030.0%
3
050000 sec 1250.0
4 0.00..60.00 sec; 5.00
5 0.00..60.00 sec; 1.00
2 0.1..20.0 A; 0.5
3 10.0..125.0 V; 0 55
DEAD MACHINE PROTECTION (OR) INADVERTENT ENERGIZATION (50)
1
OFF,ON,Block relay for trip com-
mands
ON
Page 10 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
123.7MW GAS TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
SPML-S10IRJ01-DD-EE-01-A
CHKD
DSGN VS
MN
O/U FREQUENCY
f1 PICKUP (UNDER) Hz
T f1 sec
f2 PICKUP (UNDER) Hz
T f2 sec
f3 PICKUP (OVER) Hz
T f3 sec
f4 PICKUP (OVER) Hz
T f4 sec
THRESHOLD f4
Umin V
OVERVOLTAGE
U> V
T U> sec
U>> V
T U>> sec
U> DOUT RATIO
VALUES U>
OVEREXC. PROT.
U/f >
T U/f > sec
U/f >>
T U/f >> sec
REVERSE POWER
P> REVERSE %
T-SV-OPEN sec
T-HOLD sec
Interturn protn
U Interturn V> V
T-U Interturn V> sec
Reset ratio %
BREAKER FAILURE
TRIP INTERN
CIRCUIT BREAKER I> A
TRIP TIMER sec
9 40.00..65.00 Hz 52.5
10 0.00..600.00 sec 1.00
2 30.00..-0.50 % -1.930
4 0.00..60.00 sec; 0.00
3 0.00..60.00 sec; 2.00
REVERSE POWER PROTECTION (32)
1
OFF,ON,Block relay for trip com-
mands
ON
6 0.90..0.99 0.95
7
Voltage protection with UPhase-
Phase,Voltage protection with
UPhase-earth.
Voltage protection with U-
Phase-Phase
4 30.0..170.0 V 121.0
5 0.00..60.00 sec; 0.50
3 0.00..60.00 sec; 3.00
12 10.0..125.0 V; 0 72.00
10 0.00..600.00 sec 2.00
11
Freq. prot. stage
automatic,Freq. prot. stage
overfreqency,Freq. prot. stage
underfreqency
Freq. prot. stage
automatic
9 40.00..65.00 Hz 51.0
7 0.00..600.00 sec 2.00
4 0.00..600.00 sec 0
5 40.00..65.00 Hz 47.5
UNDER&OVER FREQUENCY (81)
1
OFF,ON,Block relay for trip com-
mands
ON
1.00..1.40 1.40
2 1.00..1.20 1.10
5 0.00..60.00 sec; 1
3 0.00..60.00 sec; 10
4
OVERFLUXING PROTECTION (99)
1
OFF,ON,Block relay for trip com-
mands
ON
2 40.00..65.00 Hz 49.0
OVERVOLTAGE PROTECTION (59)
1
OFF,ON,Block relay for trip com-
mands
ON
2 30.0..170.0 V 116.0
BREAKER FAIL PROTECFTION 50BF
1 ON/OFF ON
2
OFF Start Breaker Failure with
Bin.Outp.12 Start Breaker
Start Breaker Failure with
CFC
3 0.04-2.00A 0.2
4 0.06-60sec 0.20
GENERATOR INTERTURN FAULT PROTECTION (59N)
3 0.00 .. 60.00 sec; 0.50
1 OFF/ON/Block relay ON
4 50 .. 95 % 80.00
2 0.3 .. 130.0 V 5.00
Page 11 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
123.7MW GAS TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
SPML-S10IRJ01-DD-EE-01-A
CHKD
DSGN VS
MN
Ther. OVER LOAD
K-FACTOR
TIME CONSTANT sec
ALARM %
I ALARM A
K-FACTOR
I MAX THERM A
T EMERGENCY sec
TEMP. RISE I C
TEMP. RISE I F
TEMP. INPUT
TEMP. SCAL. C
TEMP. SCAL. F
Rated frequency
PHASE SEQ
Scheme
ATEX100
factor R SEF
Temp unit
UN Generator KV
SN Generator MVA
Starpoint S1
Starpoint S2
STRPNT OBJ S1
IN PRI-1 SIDE-1 A
IN SEC-1 SIDE-1 A
CT ANGLE W0
FACTOR IEE1
STR PNT OBJ S2
IN PRI-1 SIDE-2 A
IN SEC-1 SIDE-2 A
FACTOR IEE2
GRD TERM. IEE2
UNOM PRIMARY KV
UNOM SECONDARY V
UE CONNECTION
FACTOR UE
UPH/UDELTA
T MIN TRIP CMD SEC
Note:
1) Address 0152 is set to Disable Since the System Scheme Configuration is Unit transformer connected.
2) In Thermal Overload Protection Only Alarm Stage is Enabled as per the protection scheme
3) Machines in Unit transformer connection the evaluation of the displacement voltage is sufficient
for 95% Stator Earth Fault Protection (64G)
POWER SYSTEM DATA
1
50 Hz
60 Hz
50 HZ
2
L1 L2 L3
L1 L3 L2
L1 L2 L3
3
Direct connected to busbar
Unit transformer connected
Unit transformer
connected
4
YES
NO
NO
5 1.0..200.0 27.00
6
Degree Celsius
Degree Fahrenheit
DEGREE CELCIUS
7 0.40..800.00 Kv 11
8 0.20..5000.00 MVA 145.53
9
Isolated
Solid Earthed
ISOLATED
10
Isolated
Solid Earthed
ISOLATED
POWER SYSTEM DATA
15
YES
NO
YES
30 0.01..32.00 sec 0.15
16 1..100000 A 8500
1A
5A
5
18 -5.00..5.00 0
19 1.0..100000.0 300
17
20
YES
NO
YES
21 1..100000 A 8500
22
1A
5A
5
23 1.0..100000.0 1
29 1.00..3.00 1.732
26 100..125 V 110
27
UE connected to neutral
transformer
UE connected to broken
delta winding
not connected
UE connected to any VT
UE connected to Rotor
UE connected to Loading
Resistor
UE connected to Loading
Resistor
28 1.0..2500.0 72.17
24
Terminal Q7
Terminal Q8
Q7
25 0.10..400.00 kV 11
THERMAL OVERLOAD PROTECTION (49)
1
OFF / ON / Block relay for trip
commands / Alarm Only
Alarm only
2 0.10..4.00 1.1
3 30..32000 sec 600.00
4 70..100 % 90
5 0.50 .. 20.00 A 5.00
6 1.0..10.0 1.00
212.00
7 2.50 .. 40.00 A 13.48
8 10..15000 sec 100.00
Disabled / 4-20 mA / Field bus
/ Temp. of RTD 1
Disabled
12 40..300 C 100.00
9 40..200 C 100.00
10 104..392 F
13 104..572 F 212.00
11
Page 12 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH SPML-S10IRJ01-DD-EE-01-A
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
59.7MW STEAM TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
Relay Details
Relay Type 7UM62
Make SIEMENS
Rated current 5A
GENERATOR DETAILS:
Rated Active Power = 59.7 MW
Rated Apparent Power = 70.2 MVA
Rated Voltage (U
Nmach
) = 11 kV 11000 V
Rated Current (I
Nmach
) = 3686.51 A
Power Factor = 0.85 lag
Rated Frequency = 50 Hz
X"d (Sub Transient Reactance) = 0.118 P.U
X'd (Transient Reactance) = 0.187 P.U
Xd (Direct Axis Reactance) = 1.925 P.U
Neutral Grounding Transformer Primary = 11000 V 6351
Neutral Grounding Transformer Secondary = 220 V
NGT Secondary Reactor Value = 0.424 Ohms 300 A
Neutral Grounding Transformer Capacity = 25 KVA
Negative Sequence Capability I
2S
= 0.08 8.00 %
I2^2t = 8 Sec.
GENERATOR PT DETAILS:
PT Primary (U
N VT prim
) = 11000 V
PT Secondary = 110 V
PTR = 100
GENERATOR CT DETAILS:
CT Primary (I
N CT prim
) = 4000 A
CT Secondary (I
N CT Sec
) = 5 A
CTR = 800
GENERATOR TRANSFORMER DETAILS:
Rated Capacity = 60 MVA
HV Voltage Rating = 230000 V 230 kV
LV Voltage Rating = 11000 V 11 kV
% Impedance = 12.50 % 0.125
GENERATOR TRANSFORMER CT DETAILS:
HV Side CT Primary = 500 A
HV Side CT Secondary = 1 A
HV Side Neutral CT Primary = 250 A
HV Side Neutral CT Secondary = 1 A
NEUTRAL GROUNDING TRANSFORMER
HV Side = 11000 V (11000/3)
LV Side = 220 V
Neutral CT Primary = 400 A
Neutral CT Secondary = 5 A
Load Resistance = 0.424
Rprimary = 36.6
Full Load Current = 3686.51 A
CT Secondary Current = 3686.51x(5/4000) A
= 4.61 A
95% STATOR EARTH FAULT PROTECTION (64G)
For machines in Unit transformer connection the evaluation of the displacement voltage is sufficient.
Displacement Voltage:
Max Open Delta Voltage = 110.00 V
With 5% of setting = 5.5 V
With 110% of margin setting = 6.05 V
U0> = 6 V
VS
MN
DSGN
CHKD
Page 13 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH SPML-S10IRJ01-DD-EE-01-A
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
59.7MW STEAM TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
VS
MN
DSGN
CHKD
100-% STATOR EARTH FAULT PROTECTION WITH 20HZ VOLTAGE INJECTION (64G)
THE FACTOR R SEF =
2
Transf
x(
Divider
/
MinCT
)
for
Transf
=
Neutral Transf
= (U
Nprim
/3)/(U
Nsec
)
= (11000/1.732)/(220)
= 28.87
The transformation ratio of the miniature CT is 400/5A

Divider
= 5/2
= 2.5

MinCT
= 400/5
= 80
= (28.87^2)x(2.5/80)
THE FACTOR R SEF = 26.043
If for the Trip stage R<< a generator-side fault resistance of 1000 is chosen
A resistance of R<< SEF TRIP = (1000/26.043)
= 38.4
= 40
If for the Alarm stage R< a generator-side fault resistance of 3000 is chosen
A resistance of R< SEF ALARM = (3000/26.043)
= 115.19
= 120
THE EARTH CURRENT STAGE, SEF I>> = 0.2*(U
Nsec
/RL)*(1/
Min CT
)
= 0.2x((11000/3)/36.6)x((1/400/5))
= 0.434 A
IMPEDANCE PROTECTION (21)
Maximunm load current setting:
Rated current of Generator = 3686.51 A
Max current at 95% voltage = 3881 A
As this relay should not pickup for overload,120% safty factor is considered
IMP I> = 3 A
Generator Transformer back-up impedance protection setting:
Generator Transformer Impedance at 11000V base = (11000x11000x0.125)/(60x1000000)
= 0.252 Ohms
Generator Transformer Impedance x 0.8 = (0.252x0.8)
= 0.202 Ohms
Secondary Impedance = 0.202x(CTR/VTR)
= 0.202x(800/100)
ZONE Z1 = 2.000 Ohms
Line back-up impedance protection setting:
Line positive sequence impedance/Km = 0.075 Ohms
Line Voltage = 230000 V
Line Length = 210.000 km
= (0.075x210)
= 15.724 Ohms
System Impedance on 22000V base = (Imp. On 220000V base)x (11000x11000)/(230000x230000)
= 0.036 Ohms
Total Impedance = (Line Imp. + Transformer Imp.)x 1.1
= (0.036+0.252)x1.1
= 0.317 Ohms
Total Secondary Impedance = 0.317x(CTR/VTR)
ZONE Z2 = 3.000 Ohms
Page 14 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH SPML-S10IRJ01-DD-EE-01-A
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
59.7MW STEAM TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
VS
MN
DSGN
CHKD
LOSS OF EXCITATION (40)
1/X
dsec
= (1/X
dmach
)x(I
Nmach
/U
Nmach
)x(U
N VT prim/
I
N CT prim
)
= (1/1.925)x(3686.51/11000)x(11000/4000)
= 0.479
CHAR 1
= 0.510
CHAR 2
1/X
dsec in
CHAR 2 is set to about 0.9 of CHAR 1 = 0.460
CHAR 3 is for dynsmic stability of the machine and is set between 1/X
d
and 1/X
d
'
1/X
d'sec
= (1/X
d'mach
)x(I
Nmach
/U
Nmach
)x(U
N VT prim/
I
N CT prim
)
= 4.928
CHAR 3
NEGATIVE SEQUENCE (OR) UNBALANCED LOAD (46)
pickup thershold Pickup Setting I2> = (I
2 max prim
/I
N machine
)x(I
N machine
/I
N CT prim
)
max. perm.(I
2 max prim
/I
N machine
) in permanent operation in
our machine
= 8.00 %
= (8)x(3686.51/4000)
I2 = 7 %
Negative Sequence Factor K, Ksec = K
primary
x(I
N Machine
/I
N CT prim
)
2
K
primary = 8 sec.
= 8x(3686.51/4000)
FACTOR K = 7 sec.
Time for Cool Down, t
cooldown = K
primary
/(I
2 perm
/I
N
)
2
= 1250 sec.
GEN .POLE SLIPPING PROTECTION (OR) OUT-OF-STEP PROTECTION(78)
Z
b = (X'
d
)x(kV
2
/MVA)x(CTR/VTR)
Per unit Impedance (pu) = kV
2
/MVA
= 11^2/70.24
= 1.723 Ohms
= 1.723x (CTR/PTR)
= 13.800 Ohms
= 13.8x0.187
Z
b = 3 Ohms
Z
C = 0.85 x X
SC
X
SC = X
SC
prim x (kV
2
/MVA) x (CTR/VTR)
= kV
2
/MVA
= 11^2/60
= 2.017 Ohms
= 2.017x (CTR/PTR)
= 16.200 Ohms
= 2.025
Z
C = 0.85x2.025
= 2.000 Ohms
The reciprocal of secondary per unit synchronous direct
reactance is,
Muliplied by a safety factor of about 1.05, the setting value
1/X
dsec
is,
The power swing rectance of the machine must be considered, which is approximately the transient reactance
Z
b
=X'
d
Thus Z
C
is set to 85% of the transformer impedance X
SC
.
value1/xd CHAR. 3 situated approximately between the synchronous direct reactance xd and the transient
reactance xd'. However, it should be greater than 1.
Page 15 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH SPML-S10IRJ01-DD-EE-01-A
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
59.7MW STEAM TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
VS
MN
DSGN
CHKD
Z
a = 0.289 x Z
tot
Z
tot = Z
b
+ Z
C
= 5.000
Z
a = 1.00 Ohms
The covered system reactance should be 10,so
Z
d = 10 Ohms
Z
d
-Zc = 8.00 Ohms
factor UE = 72.17
EXCITOR CB TIME DELAY 200 ms
THERMAL OVERLOAD PROTECTION (49)
K-FACTOR:
Imax prim = 115% X In
mach
= 1.15 X 3686.51
= 4239.48 A
IN
CT prim = 4000 A
K-FACTOR = Imax
prim
/ IN
CT

prim
= 1.1
TIME CONSTANT ():
Set Default Value as = 600 Sec
Q ALARM ( trip):
Q ALARM ( trip) issues thermal warning prior to tripping & is given in % of the tripping temperature level.
= 1/(K-FACTOR)
2
= 1/(1.1)^2
= 90.0 %
I ALARM:
This level is set in secondary amperes, and should be set equal to, or slightly less than, the permissible
continuous current K-FACTOR IN sec.
= IN sec
= 5 A
K-FACTOR:
Set Default Value as = 1
I MAX THERM.: = 3 X Nominal generator current
= 3 X In
mach
X (IN
CT Sec
/IN
CT Prim
)
= 3 X 3686.51 X (5/4000)
= 13.82 A
T EMERGENCY:
Set Default Value as = 100 Sec
TEMP. RISE I :
Nsec = N
Mach
x (INprim/INmach)
2
where, Nsec = Machine temperature with nominal secondary current
NMach = Machine temperature with nominal machine current
= 84.5 C (Considered for Calculation)
Inprim = Nominal primary current of the current transformers
= 4000 A
INMach = Nominal machine current
= 3686.51 A
Therefore, Nsec = 84.5 X (4000/3686.51)^2
= 100.0 C
If the temperature input is used, the trip times change if the coolant temperature deviates from the internal
reference temperature of 40 C. The following formula can be used to calculate the trip time:
(I/k.I
N
)
2
+ ((K 40 C)/ (k
2
N)) - (Ipre/k IN)
2
t = . ln
(I/k.I
N
)
2
+ ((K 40 C)/ (k
2
N)) - 1
where, = TIME CONSTANT
k = K-FACTOR
IN = Nominal device current
Thus Z
a
is decisive for the width of the power swing polygon
The K-FACTOR refers to the secondary nominal current. The following applies for the conversion
Page 16 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH SPML-S10IRJ01-DD-EE-01-A
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
59.7MW STEAM TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
VS
MN
DSGN
CHKD
I = Actually flowing secondary current
Ipre = Previous load current
N = Temperature with nominal current IN
K = Coolant temperature input
The following trip times result for different ambient temperatures K with a supposed load current of
I = 1.5 IN
Ipre = 0
(1.5/1.1)
2
+ ((40 C 40 C)/ (1.1
2
100 C)) - 0
with K = 40 C: t = 600 x ln
(1.5/1.1)
2
+ ((40 C 40 C)/ (1.1
2
100 C)) - 1
= 463 Sec
(1.5/1.1)
2
+ ((80 C 40 C)/ (1.1
2
100 C)) - 0
with K = 80 C: t = 600 x ln
(1.5/1.1)
2
+ ((80 C 40 C)/ (1.1
2
100 C)) - 1
= 366 Sec
(1.5/1.1)
2
+ ((0 C 40 C)/ (1.1
2
x 100 C)) - 0
with K = 0 C: t = 600 x ln
(1.5/1.1)
2
+ ((0 C 40 C)/ (1.1
2
x 100 C)) - 1
= 637 Sec
STG MAIN-1 RELAY PANEAL (7UM62-GR1)
Differential Protection
I-DIFF> I/InO
T I-DIFF> sec
I-DIFF>> I/InO
T I-DIFF>> sec
SLOPE 1
BASE POINT 1 I/InO
SLOPE 2
BASE POINT 2 I/InO
I-ADD ON STAB. I/InO
S/E/F PROT.
U0> V
T S/E/F sec
100% SEF-PROTN.
R< SEF ALARM Ohm
R<< SEF TRIP Ohm
T SEF ALARM sec
T SEF TRIP sec
SEF I>> A
U20MIN V
I20MIN mA
PHI ISEF
SEF Rps Ohm
RI-PARALLEL Ohm
SI.NO FUNCTION SETTING RANGE RECOMMENDED SETTING
DIFFERENTIAL PROTECTION (87G)
1
OFF,ON,Block relay for trip com-
mands
ON
2 0.05..2.00 I/InO 0.20
3 0.00..60.00 sec; 0.00
4 0.5..12.0 I/InO; 8.00
5 0.00..60.00 sec; 0.00
6 0.10..0.50 0.25
7 0.00..2.00 I/InO 0.00
8 0.25..0.95 0.50
9 0.00..10.00 I/InO 2.50
10 2.00..15.00 I/InO 4.00
95% STATOR EARTH FAULT PROTECTION (64G)
1
OFF,ON,Block relay for trip com-
mands
ON
2 2.0..125.0 V 6
3 0.00..60.00 sec; 0
100-% STATOR EARTH FAULT PROTECTION WITH 20HZ VOLTAGE INJECTION (64G)
1
OFF,ON,Block relay for trip com-
mands
ON
2 20700 Ohm 120
3 20700 Ohm 40
4
0.0060.00 sec;
10.00
5 0.0060.00 sec; 1.00
6 0.021.50A 0.43
7 0.315.0V 1.00
8 540mA 10.00
9 -60
O
...60
O
0
o
10 0700 Ohm 0
11 20700 Ohm;
Page 17 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH SPML-S10IRJ01-DD-EE-01-A
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
59.7MW STEAM TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
VS
MN
DSGN
CHKD
ROTOR E/F
RE< WARN kOhm
RE<< TRIP kOhm
T-WARN-RE< sec
T-TRIP-RE<< sec
REVERSE POWER
P> REVERSE %
T-SV-OPEN sec
T-HOLD sec
Interturn protn
U Interturn V> V
T-U Interturn V> sec
Reset ratio %
INADVERT. EN.
I STAGE A
RELEASE U1< V
PICK UP T U1< sec
DROP OUT T U1< sec
UNBLANCED LOAD
I2> %
T WARN sec
FACTOR K sec
T COOL DOWN sec
I2>> %
T I2>> sec
UNDEREXCIT
T SHRT Uex< sec
EXCIT.VOLT.
Uexcit< V
Umin V
1/Xd CHAR.1
ANGLE 1
T CHAR. 1 sec
1/Xd CHAR.2
ANGLE 2
T CHAR. 2 sec
1/Xd CHAR.3
ANGLE 3
T CHAR. 3 sec
3 0.00 .. 60.00 sec; 0.50
4 50 .. 95 % 80.00
GENERATOR INTERTURN FAULT PROTECTION (59N)
1 OFF/ON/Block relay ON
2 0.3 .. 130.0 V 5.00
5
0.0060.00 sec;
3.00
2.0100.00 sec;
7
3 050000 sec 1250.0
4 10100% 60
5 0.00..60.00 sec; 0.50
NEGATIVE SEQUENCE (OR) UNBALANCED LOAD (46)
1
OFF,ON,Block relay for trip com-
mands
ON
REVERSE POWER PROTECTION (32)
1
OFF,ON,Block relay for trip com-
mands
3 1.0..5.0 kOhm 2.00
4 0.00..60.00 sec; 10.00
ROTOR EARTH FAULT PROTECTION (64R)
1
OFF,ON,Block relay for trip com-
mands
ON
2 3.0..30.0 kOhm 10.00
3 0.00..60.00 sec; 2.00
3
0.0060.00 sec;
20
2
4 0.00..60.00 sec; 0.00
ON
2 30.00..-0.50 % -1.930
DEAD MACHINE PROTECTION (OR) INADVERTENT ENERGIZATION (50)
1
OFF,ON,Block relay for trip com-
mands
ON
2 0.1..20.0 A; 0.5
3 10.0..125.0 V; 0 55
4 0.00..60.00 sec; 5.00
5 0.00..60.00 sec; 1.00
2 3.030.0% 7.0
LOSS OF EXCITATION (40)
1
OFF,ON,Block relay for trip com-
mands
ON
2
0.0060.00 sec;
0.50
3 ON,OFF OFF
4 0.508.00V 2.00
5 10.0125.0V 25.0
6 0.253.00 0.510
7 50120
O
80
O
8
0.0060.00 sec;
10.00
9 0.253.00 0.460
10 50120
O
90
O
11
0.0060.00 sec;
10.00
12 0.253.00 1.10
13 50120
O
90
O
14
0.0060.00 sec;
0.30
Page 18 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH SPML-S10IRJ01-DD-EE-01-A
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
59.7MW STEAM TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
VS
MN
DSGN
CHKD
UNDERVOLTAGE
U< V
T U< sec
U<< V
T U<< sec
U< DOUT RATIO
O/C Ip
Ip A
TIME DIAL: TD
IEC CURVE
U< V
O/U FREQUENCY
f1 PICKUP (UNDER) Hz
T f1 sec
f2 PICKUP (UNDER) Hz
T f2 sec
f3 PICKUP (OVER) Hz
T f3 sec
f4 PICKUP (OVER) Hz
T f4 sec
THRESHOLD f4
Umin V
OVERVOLTAGE
U> V
T U> sec
U>> V
T U>> sec
U> DOUT RATIO
VALUES U>
OVEREXC. PROT.
U/f >
T U/f > sec
U/f >>
T U/f >> sec
FORWARD POWER
Pf< %
T-Pf< sec
Pf> %
T-Pf> sec
MEAS. METHOD
47.5 40.00..65.00 Hz 5
9 40.00..65.00 Hz
12 10.0..125.0 V; 0 72.00
OVERVOLTAGE PROTECTION (59)
1
OFF,ON,Block relay for trip com-
mands
ON
10 0.00..600.00 sec 2.00
11
Freq. prot. stage automatic,Freq.
prot. stage overfreqency,Freq.
prot. stage underfreqency
Freq. prot. stage
automatic
10 0.00..600.00 sec 2.00
52.5
9 40.00..65.00 Hz 51.0
7 0.00..600.00 sec 2.00
4 0.00..600.00 sec 0
2 40.00..65.00 Hz 49.0
UNDER&OVER FREQUENCY (81)
1
OFF,ON,Block relay for trip com-
mands
ON
3 0.50..15.00; 0.50
2 0.10..4.00 A 1.0
5 0.00..60.00 sec; 0.50
2 30.0..170.0 V 116.0
3 0.00..60.00 sec; 3.00
4 30.0..170.0 V 121.0
6 0.90..0.99 0.95
7
Voltage protection with UPhase-
Phase,Voltage protection with
UPhase-earth.
Voltage protection
with U-Phase-Phase
Method accurate Method fast Method accurate
OVERFLUXING PROTECTION (99)
UNDERVOLTAGE PROTECTION (27)
1
OFF,ON,Block relay for trip com-
mands
ON
2 10.0..125.0 V 99.0
1.01..1.20 1.05
3 0.00..60.00 sec; 3.00
4 10.0..125.0 V 88.0
1
OFF,ON,Block relay for trip com-
mands
ON
2 1.00..1.20 1.10
3 0.00..60.00 sec; 10
4 1.00..1.40 1.40
5 0.00..60.00 sec; 1
0.00..60.00 sec; 2
6
3 0.00..60.00 sec; 10
4 1.0..120.0 % 5
5
LOW FORWARD POWER PROTECTION (37)
1
OFF,ON,Block relay for trip com-
mands
ON
2 0.5..120.0 % 5
INVERSE TIME OVER CURRENT, WITH VOLTAGE CONTROL OR VOLTAGE RESTRAINT (51V)
1
OFF,ON,Block relay for trip com-
mands
ON
5 0.00..60.00 sec; 0.50
6
4
Normal Inverse,Very
Inverse,Extremely Inverse
Normal Inverse
5 10.0..125.0 V 88.00
Page 19 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH SPML-S10IRJ01-DD-EE-01-A
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
59.7MW STEAM TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
VS
MN
DSGN
CHKD
IMPEDANCE PROT.
IMP I> A
U< SEAL-IN
U< V
T-SEAL-IN sec
T END sec
ZONE Z1 Ohms
T-Z1 sec
ZONE Z1B Ohms
T-Z1B sec
ZONE Z2 Ohms
ZONE2 T2 sec
POWER SWING
OUT-OF-STEP
I1> RELEASE %
I2< RELEASE %
Z
a Ohms
Z
b Ohms
Z
c Ohms
Z
d
-Z
c Ohms
PHI POLYGON
REP CHAR.1
REP CHAR.2
T-HOLDIG sec
T-SIGNAL sec
BREAKER FAILURE
TRIP INTERN
CIRCUIT BREAKER I> A
TRIP TIMER sec
Ther. OVER LOAD
K-FACTOR
TIME CONSTANT sec
ALARM %
I ALARM A
K-FACTOR
I MAX THERM A
T EMERGENCY sec
TEMP. RISE I C
TEMP. RISE I F
TEMP. INPUT
TEMP. SCAL. C
TEMP. SCAL. F 13 104..572 F 212.00
11
Disabled / 4-20 mA / Field bus /
Temp. of RTD 1
Disabled
12 40..300 C 100.00
9 40..200 C 100.00
10 104..392 F 212.00
7 2.50 .. 40.00 A 13.82
8 10..15000 sec 100.00
5 0.50 .. 20.00 A 5.00
6 1.0..10.0 1.00
3 30..32000 sec 600.00
4 70..100 % 90
THERMAL OVERLOAD PROTECTION (49)
1
OFF / ON / Block relay for trip
commands / Alarm Only
Alarm only
2 0.10..4.00 1.1
11 0.2060.00 sec 20.00
12 0.020.15 sec 0.05
9 14 1
10 18 4
7 0.00130.00 8.00
8 60.090.0
O
90.0
O
5 0.10130.00 3.00
6 0.10130.00 2.00
13 ON,OFF OFF
GEN .POLE SLIPPING PROTECTION (OR) OUT-OF-STEP PROTECTION(78)
1
OFF,ON,Block relay for trip com-
mands
ON
11 0.05..65.00 Ohm 3.00
12 0.00..60.00 sec; 0.60
IMPEDANCE PROTECTION (21)
1
OFF,ON,Block relay for trip com-
mands
ON
2 0.10...20.00 A 3.00
3 ON,OFF ON
4 10.0..125.0 V 88.00
5 0.10..60.00 sec 3.00
6 0.00..60.00 sec; 2.00
7 0.05..130.00 Ohm 2.00
8 0.00..60.00 sec; 0.10
2 20400 % 120
3 5100 % 20
4 0.20130.00 1.00
BREAKER FAIL PROTECFTION 50BF
1 ON/OFF ON
2
OFF Start Breaker Failure with
Bin.Outp.12 Start Breaker Failure
Start Breaker Failure
with CFC
3 0.04-2.00A 0.2
4 0.06-60sec 0.20
10 0.00..60.00 sec;
9 0.05..65.00 Ohm 3.00
Page 20 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH SPML-S10IRJ01-DD-EE-01-A
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
59.7MW STEAM TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
VS
MN
DSGN
CHKD
STG MAIN-2 RELAY PANEAL (7UM62-GR2)
Differential Protection
I-DIFF> I/InO
T I-DIFF> sec
I-DIFF>> I/InO
T I-DIFF>> sec
SLOPE 1
BASE POINT 1 I/InO
SLOPE 2
BASE POINT 2 I/InO
I-ADD ON STAB. I/InO
S/E/F PROT.
U0> V
T S/E/F sec
100% SEF-PROTN.
R< SEF ALARM Ohm
R<< SEF TRIP Ohm
T SEF ALARM sec
T SEF TRIP sec
SEF I>> A
U20MIN V
I20MIN mA
PHI ISEF
SEF Rps Ohm
RI-PARALLEL Ohm
IMPEDANCE PROT.
IMP I> A
U< SEAL-IN
U< V
T-SEAL-IN sec
T END sec
ZONE Z1 Ohms
T-Z1 sec
ZONE Z1B Ohms
T-Z1B sec
ZONE Z2 Ohms
ZONE2 T2 sec
POWER SWING
10 0700 Ohm 0
11 20700 Ohm; 20.00
8 540mA 10.00
9 -60
O
...60
O
0
o
6 0.021.50A 0.43
7 0.315.0V 1.00
4
0.0060.00 sec;
10.00
5 0.0060.00 sec; 1.00
2 20700 Ohm 120
3 20700 Ohm 40
3 0.00..60.00 sec; 0
100-% STATOR EARTH FAULT PROTECTION WITH 20HZ VOLTAGE INJECTION (64G)
1
OFF,ON,Block relay for trip com-
mands
ON
95% STATOR EARTH FAULT PROTECTION (64G)
1
OFF,ON,Block relay for trip com-
mands
ON
2 2.0..125.0 V 6
SI.NO FUNCTION SETTING RANGE RECOMMENDED SETTING
DIFFERENTIAL PROTECTION (87G)
1
OFF,ON,Block relay for trip com-
mands
ON
2 0.05..2.00 I/InO 0.20
3 0.00..60.00 sec; 0.00
4 0.5..12.0 I/InO; 8.00
5 0.00..60.00 sec; 0.00
6 0.10..0.50 0.25
7 0.00..2.00 I/InO 0.00
8 0.25..0.95 0.50
IMPEDANCE PROTECTION (21)
1
OFF,ON,Block relay for trip com-
mands
ON
9 0.00..10.00 I/InO 2.50
10 2.00..15.00 I/InO 4.00
2 0.10...20.00 A 3.00
3 ON,OFF ON
4 10.0..125.0 V 88.00
5 0.10..60.00 sec 3.00
6 0.00..60.00 sec; 2.00
7 0.05..130.00 Ohm 2.00
8 0.00..60.00 sec; 0.10
11 0.05..65.00 Ohm 3.00
9 0.05..65.00 Ohm 3.00
10
12 0.00..60.00 sec; 0.60
13 ON,OFF OFF
0.00..60.00 sec;
Page 21 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH SPML-S10IRJ01-DD-EE-01-A
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
59.7MW STEAM TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
VS
MN
DSGN
CHKD
ROTOR E/F
RE< WARN kOhm
RE<< TRIP kOhm
T-WARN-RE< sec
T-TRIP-RE<< sec
OUT-OF-STEP
I1> RELEASE %
I2< RELEASE %
Z
a Ohms
Z
b Ohms
Z
c Ohms
Z
d
-Z
c Ohms
PHI POLYGON
REP CHAR.1
REP CHAR.2
T-HOLDIG sec
T-SIGNAL sec
INADVERT. EN.
I STAGE A
RELEASE U1< V
PICK UP T U1< sec
DROP OUT T U1< sec
UNBLANCED LOAD
I2> %
T WARN sec
FACTOR K sec
T COOL DOWN sec
UNDEREXCIT
T SHRT Uex< sec
EXCIT.VOLT.
Uexcit< V
Umin V
1/Xd CHAR.1
ANGLE 1
T CHAR. 1 sec
1/Xd CHAR.2
ANGLE 2
T CHAR. 2 sec
1/Xd CHAR.3
ANGLE 3
T CHAR. 3 sec
5 0.00..60.00 sec; 0.50
GEN .POLE SLIPPING PROTECTION (OR) OUT-OF-STEP PROTECTION(78)
1
OFF,ON,Block relay for trip com-
mands
3 1.0..5.0 kOhm 2.00
4 0.00..60.00 sec; 10.00
ON
ROTOR EARTH FAULT PROTECTION (64R)
1
OFF,ON,Block relay for trip com-
mands
ON
2 3.0..30.0 kOhm 10.00
2 20400 % 120
3 5100 % 20
4 0.20130.00 1.00
5 0.10130.00 3.00
6 0.10130.00 2.00
7 0.00130.00 8.00
8 60.090.0
O
90.0
O
9 14 1
10 18 4
11 0.2060.00 sec 20.00
12 0.020.15 sec 0.05
DEAD MACHINE PROTECTION (OR) INADVERTENT ENERGIZATION (50)
1
OFF,ON,Block relay for trip com-
mands
ON
2 0.1..20.0 A; 0.5
3 10.0..125.0 V; 0 55
4 0.00..60.00 sec; 5.00
5 0.00..60.00 sec; 1.00
NEGATIVE SEQUENCE (OR) UNBALANCED LOAD (46)
1
OFF,ON,Block relay for trip com-
mands
ON
2 3.030.0% 7.000
3
0.0060.00 sec;
20
4
2.0100.00 sec;
7.000
5 050000 sec 1250.0
LOSS OF EXCITATION (40)
1
OFF,ON,Block relay for trip com-
mands
ON
2
0.0060.00 sec;
0.50
3 ON,OFF ON
4 0.508.00V 2.00
5 10.0125.0V 25.0
6 0.253.00 0.510
7 50120
O
80
O
8
0.0060.00 sec;
10.00
9 0.253.00 0.460
10 50120
O
90
O
11
0.0060.00 sec;
10.00
12 0.253.00 1.10
13 50120
O
90
O
14
0.0060.00 sec;
0.30
Page 22 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH SPML-S10IRJ01-DD-EE-01-A
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
59.7MW STEAM TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
VS
MN
DSGN
CHKD
UNDERVOLTAGE
U< V
T U< sec
U<< V
T U<< sec
U< DOUT RATIO
O/C Ip
Ip A
TIME DIAL: TD
IEC CURVE
U< V
O/U FREQUENCY
f1 PICKUP (UNDER) Hz
T f1 sec
f2 PICKUP (UNDER) Hz
T f2 sec
f3 PICKUP (OVER) Hz
T f3 sec
f4 PICKUP (OVER) Hz
T f4 sec
THRESHOLD f4
Umin V
OVERVOLTAGE
U> V
T U> sec
U> DOUT RATIO
VALUES U>
OVEREXC. PROT.
U/f >
T U/f > sec
U/f >>
T U/f >> sec
FORWARD POWER
Pf< %
T-Pf< sec
Pf> %
T-Pf> sec
MEAS. METHOD
0.00..600.00 sec 1.00
12 10.0..125.0 V; 0 72.00
6 Method accurate Method fast Method accurate
2.00
11
Freq. prot. stage automatic,Freq.
prot. stage overfreqency,Freq.
prot. stage underfreqency
Freq. prot. stage
automatic
9 40.00..65.00 Hz 52.5
10
10 0.00..600.00 sec
9 40.00..65.00 Hz 51.0
7 0.00..600.00 sec 2.00
4 0.00..600.00 sec 0
5 40.00..65.00 Hz 47.5
2 40.00..65.00 Hz 49.0
UNDER&OVER FREQUENCY (81)
1
OFF,ON,Block relay for trip com-
mands
ON
UNDERVOLTAGE PROTECTION (27)
1
OFF,ON,Block relay for trip com-
mands
ON
2 10.0..125.0 V 99.0
3 0.00..60.00 sec; 3.00
4 10.0..125.0 V 88.0
5 0.00..60.00 sec; 0.50
6 1.01..1.20 1.05
OVERVOLTAGE PROTECTION (59)
1
OFF,ON,Block relay for trip com-
mands
ON
2 30.0..170.0 V 116.0
3 0.00..60.00 sec; 3.00
4 0.90..0.99 0.95
5
Voltage protection with UPhase-
Phase,Voltage protection with
UPhase-earth.
Voltage protection
with U-Phase-Phase
OVERFLUXING PROTECTION (99)
1
OFF,ON,Block relay for trip com-
mands
ON
5 0.00..60.00 sec; 1
2 1.00..1.20 1.10
3 0.00..60.00 sec; 10
INVERSE TIME OVER CURRENT, WITH VOLTAGE CONTROL OR VOLTAGE RESTRAINT (51V)
1
OFF,ON,Block relay for trip com-
mands
ON
2 0.10..4.00 A 1.0
3 0.50..15.00; 0.50
4
Normal Inverse,Very
Inverse,Extremely Inverse
Normal Inverse
5 10.0..125.0 V 88.00
LOW FORWARD POWER PROTECTION (37)
1
OFF,ON,Block relay for trip com-
mands
ON
4 1.00..1.40 1.40
2 0.5..120.0 % 5
3 0.00..60.00 sec; 10
4 1.0..120.0 % 5
5 0.00..60.00 sec; 2
Page 23 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH SPML-S10IRJ01-DD-EE-01-A
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
59.7MW STEAM TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
VS
MN
DSGN
CHKD
REVERSE POWER
P> REVERSE %
T-SV-OPEN sec
T-HOLD sec
Interturn protn
U Interturn V> V
T-U Interturn V> sec
Reset ratio %
BREAKER FAILURE
TRIP INTERN
CIRCUIT BREAKER I> A
TRIP TIMER sec
Ther. OVER LOAD
K-FACTOR
TIME CONSTANT sec
ALARM %
I ALARM A
K-FACTOR
I MAX THERM A
T EMERGENCY sec
TEMP. RISE I C
TEMP. RISE I F
TEMP. INPUT
TEMP. SCAL. C
TEMP. SCAL. F
12 40..300 C 100.00
13 104..572 F 212.00
4 0.00..60.00 sec; 0.00
2 30.00..-0.50 % -1.930
3 0.00..60.00 sec; 2.00
REVERSE POWER PROTECTION (32)
1
OFF,ON,Block relay for trip com-
mands
ON
BREAKER FAIL PROTECFTION 50BF
1 ON/OFF ON
2
OFF Start Breaker Failure with
Bin.Outp.12 Start Breaker Failure
Start Breaker Failure
with CFC
3 0.04-2.00A 0.2
4 0.06-60sec 0.20
GENERATOR INTERTURN FAULT PROTECTION (59N)
1 OFF/ON/Block relay ON
2 0.3 .. 130.0 V 5.00
3 0.00 .. 60.00 sec; 0.50
4 50 .. 95 % 80.00
THERMAL OVERLOAD PROTECTION (49)
1
OFF / ON / Block relay for trip
commands / Alarm Only
Alarm Only
2 0.10..4.00 1.1
3 30..32000 sec 600.00
4 70..100 % 90
5 0.50 .. 20.00 A 5.00
6 1.0..10.0 1.00
7 2.50 .. 40.00 A 13.82
8 10..15000 sec 100.00
9 40..200 C 100.00
10 104..392 F 212.00
11
Disabled / 4-20 mA / Field bus /
Temp. of RTD 1
Temp. of RTD 1
Page 24 of 25
PROJECT: 160 MW CCPP, STAGE-III, RAMGARH SPML-S10IRJ01-DD-EE-01-A
TITLE: RELAY SETTING CALCULATION AND COORDINATION FOR GTG,STG & UAT.
CLIENT : RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LIMITED
59.7MW STEAM TURBINE GENERATOR PROTECTIONS RELAY TYPE : 7UM62
VS
MN
DSGN
CHKD
Rated frequency
PHASE SEQ
Scheme
ATEX100
factor R SEF
Temp unit
UN Generator KV
SN Generator MVA
Starpoint S1
Starpoint S2
STRPNT OBJ S1
IN PRI-1 SIDE-1 A
IN SEC-1 SIDE-1 A
CT ANGLE W0
FACTOR IEE1
STR PNT OBJ S2
IN PRI-1 SIDE-2 A
IN SEC-1 SIDE-2 A
FACTOR IEE2
GRD TERM. IEE2
UNOM PRIMARY KV
UNOM SECONDARY V
UE CONNECTION
FACTOR UE
UPH/UDELTA
T MIN TRIP CMD SEC
T MIN TRIP CMD SEC
% of diff lockout V1& V2 %
time SEC
Note:
1) Address 0152 is set to Disable Since the System Scheme Configuration is Unit transformer connected.
2) In Thermal Overload Protection Only Alarm Stage is Enabled as per the protection scheme
3) Machines in Unit transformer connection the evaluation of the displacement voltage is sufficient
for 95% Stator Earth Fault Protection (64G)
2
L1 L2 L3
L1 L3 L2
L1 L2 L3
POWER SYSTEM DATA
1
50 Hz
60 Hz
50 HZ
3
Direct connected to busbar
Unit transformer connected
Unit transformer
connected
4
YES
NO
NO
5 1.0..200.0 26.04
6
Degree Celsius
Degree Fahrenheit
DEGREE CELCIUS
7 0.40..800.00 Kv 11
8 0.20..5000.00 MVA 70.24
9
Isolated
Solid Earthed
ISOLATED
10
Isolated
Solid Earthed
ISOLATED
15
YES
NO
YES
16 1..100000 A 4000
17
1A
5A
5
18 -5.00..5.00 0
19 1.0..100000.0 300
20
YES
NO
YES
21 1..100000 A 4000
22
1A
5A
5
23 1.0..100000.0 1
UE connected to
Loading
Resistor
24
Terminal Q7
Terminal Q8
Q7
25 0.10..400.00 kV 11
1.0..2500.0 72.17
29 1.00..3.00 1.732
26 100..125 V 110
27
UE connected to neutral
transformer
UE connected to broken
delta winding
not connected
UE connected to any VT
UE connected to Rotor
UE connected to Loading
Resistor
0.01..32.00 sec 0.15
28
1 2, 4, 6, 8, 8, 10 4
30
Check synchronisation SKE11
2 0.25, 0.5, 0.75, 1, 1.5 0.5
31 0.01..32.00 sec 1.15
Page 25 of 25