Notes :
(1) The contractor submitting the tender shall see that the ratting schedule "A" are filled
(2) The contractor while submitting the tender shall provides his own arrangements at
his own cost for loading unloading and transporting and safety to site of work for .
(3) Material not shown in schedule "A" but available with the department will be issued on
request of the contractor (for using in this contract only) at prevailing market rates or
(4) All surplus material supplied by the department as mentioned in Schedule "A"
should be handed over by the contractor at the store directed free of cost.
(5) The material mentioned in Schedule "A" shall have to be checked for their correctness
and soundness by the contractor before taking delivery of the material from the
department store.
(6) Clause of 12-A of the "B" form shall be applicable in case of materials to be issue free
of cost to the contractor for in work The rate of free of cost materials are indicated by
Dept. and in case of non return of surplus materials the recovery shall be at double the
issue rate.