Sunteți pe pagina 1din 1

Ser. Disc. Description SECL Mst.

Mst.
Audit
Remark Document No. 1 2 Status
JRU 01
7.1 STR Structural Design Basis V V (with Mustang) JRU - 01 - ST - BOD - 0001
7.2 STR Functional Specifications of Mooring & Fender System V (with Mustang) JRU - 01 - ST - FSS - 0001
7.3 STR Load-out, Transportation and Installation Design Basis V JRU - 01 - ST - BOD - 0002 O O
'11.12.6'11.12.8
'11.12.7'11.12.9
7.4 STR Weight Control Procedure V JRU - 01 - ST - PRO - 0001 O O '11.12.3'11.12.7
7.5 STR Inplace Analysis Report - Jetty Structure V V (with Mustang) JRU - 01 - ST - RPT - 0001
7.6 STR Structural Analysis Report - Mooring & Breasting Dolphins V V (with Mustang) JRU - 01 - ST - RPT - 0002
7.7 STR Structural Analysis Report - Bridges V JRU - 01 - ST - RPT - 0003 new
7.8 STR Mooring & Fender System Loads Analysis V JRU - 01 - ST - RPT - 0004
7.9 STR Pile Design Report V JRU - 01 - ST - RPT - 0005 Soil specialist
7.10 STR Seismic Analysis Report V V JRU - 01 - ST - RPT - 0006
7.11 STR Lifting Analysis Report V JRU - 01 - ST - RPT - 0007 O O new
7.12 STR Transportation Analysis Report V JRU - 01 - ST - RPT - 0008 O O '11.12.3'11.12.7
7.13 STR On-Bottom Analysis Report V JRU - 01 - ST - RPT - 0009 O O '11.12.3'11.12.9
7.14 STR Pile Installation and Drivability AnalysisReport V JRU - 01 - ST - RPT - 0010 Soil specialist
7.15 STR Weight Control Report V JRU - 01 - ST - RPT - 0011 O O '11.12.3'11.12.7
7.16 STR Basic Structural Drawings V V (with the Well) JRU - 01 - ST -
7.17 STR Riser & Clamp Structural Drawings V JRU - 01 - ST -
7.18 STR Mooring & Fender System Arrangement V (with ) JRU - 01 - ST -
7.19 STR Installation Scheme V JRU - 01 - ST -
7.20 STR
Berthing and disembarking procedures, tug requirements, manuvering, and
clearance zones
V JRU - 01 - ST - PRO - 0002 from Mustang
DEL STR Passing Ship Assesment V V JRU - 01 - GE - RPT - 0001
DEL STR RAO(Respose Ampulitue Operation)s for FSRU and LNG carrier V JRU - 01 - ST - RPT -
Mooring&Fender sys.
Load Analysis
DEL STR Primary motion and acceleration tables of the manway and landing equipment V JRU - 01 - ST - RPT - 012
Mustang item

20 18 2 4
03
8.1 PL Pipeline Design Basis(Philosophy) V JRU - 03 - PL - BOD - 0001
8.2 PL Free Span Analysis Report V JRU - 03 - PL - RPT - 0001
8.3 PL Route Selection Report V JRU - 03 - PL - RPT - 0002
8.4 PL Shore Approach Design Report V JRU - 03 - PL - RPT - 0003
8.5 PL Pre-Commitioning Philosophy V JRU - 03 - PL - PHI - 0001
8.6 PL External Corrosion Protection Design Report V JRU - 03 - PL - RPT - 0004
8.7 PL Pipeline Wall Thickness and Materials Grade Selection Report V JRU - 03 - PL - RPT - 0005
8.8 PL Surge Analysis Report V JRU - 03 - PL - RPT - 0006
8.9 PL Pipeline onbottom stability analysis report V JRU - 03 - PL - RPT - 0007
9 9 0 0
29 27 2 4
- Drawing List
- Drawing Number'g
.
7. Structure
8. Offshore Pipeline
TOTAL