NO 1 2 3 4 5 NO 1 2 3 Pipeline (PL) 4 Fractionation Plant (SG) CONTRACTORS : A.Fractionation Plant 1 PT. Nusa Indah Lestari 2 PT Patra Teknik Preparing landscape project 3 Daily Housekeeping Housekeeping 4
4 PT Indoturbin PM Engine washing 5 CSO Support Operation team 6 PKL fieldwork practice Fractionation Plant Contractors : a. Extraction Plant b. Pipeline c. Fractionation Plant NO
NO 1 Safety Induction 2 JSA & Risk Assessment 5 at Fractionation & 2 at extraction 3 Safety Talk / Toolbox meeting 5 at Fractionation & 2 at extraction 4 Work Permit : 4.1. Cold Work Permit 5 at Fractionation & 2 at extraction 4.2. Hot Work Permit 4.3. Excavation 4.5. Radiography 4.6. Site Entry & Leaving 4.7. Gate Pass PT Patra Teknik for loading material 4.8. Over Time (OT) 4.9. Others : 5 Inspection/Audit 6 Others : 6.1. Prepared By : Checked By : Acknowledge : HSE Adm HSE Supervisor General Manager 7 7 7 4.4. Confined space 1 D. OTHERS : TYPE/ITEMS TOTAL REMAKRS TOTAL EQUIPMENT 13 96 12 96
12 12 96 192 1 Total Hours Remarks Total Total Hours Remarks Equipment Operating Today NO TYPE EQUIPMENT Fractionation Plant PIPE LINE Extraction Plant Summary Total Hours Total Total Hours Remarks Total Nearmiss 1 B.12. Others 0 C. EQUIPMENT OPERATING TODAY : MTI (Medical Treatment Incase) 0 B.10. Fire 0 First Aid 0 B.11 Enviromental 0 LTI (Lost Time injury) 0 B.8. Construction Vehicle 0 RCW (Restrictied Work Case) 0 B.9. Support Vehicle 0 B. ACCIDENT/INCIDENT Fatalities 0 B.7. Equipment 0 1 11-Mar-14 Near Miss at Extraction Plant ( forklift menabrak drainase didepan warehouse) Need Special Driver for Forklift and has been certificated Maintenance, Warehouse, HSE, HRD Follow Up, Investigated and Continuous Improvement DATE HAZARD CORRECTIVE ACTION PERSON INCHARGE STATUS REMARKS TOTAL 725,872 2,416 728,288
A. Hazard Finding of Unsafe Action/Condition & Corrective Action Plan : 1,216 - 1,216 236,186 376 236,562 8,182,286.00 Extraction Plant 194,600 928 195,528 195,648 792 196,440 - MAN HOURS PSG Jakarta 7,453,998 43,152 232 43,384 55,070 88 55,158 TOTAL OPERATION Cut Off SSNP PREVIUOS (HOURS) TODAY (HOURS) COMMULATIVE (HOURS) OPERATION PERIOD TOTAL 302 232 1016 0 1168 2416 0 88 0 376 464 ACCUMULATE TOTAL TODAY 29 127 0 146 Total Worker Contractor 11 0 47 58 0 48 4 0 4 0 32 0 0 32 6 0 6 0 48 0 B.Extraction Plant 1 0 1 0 8 0 0 8 40 40 Shelter Panel Hot Oil Heater PT. Diqo Teknindo Perkasa 5 5 0 0 0 272 2 2 0 0 0 16 16 0 48 48 Cutting Grass 34 34 0 0 0 272 6 6 0 0 244 232 928 0 792 1952 0 0 0 792 792 Total Worker PSG 29 116 0 99 0 0 0 0 99 99 0 0 0 928 0 0 928 Extraction Plant (PMB) 116 116 232 0 0 0 232 PL HOURS SG HOURS TOTAL HOURS REMARKS PSG Jakarta 29 29 MAN POWER JKT PMB PIPELINE SG TOTAL WORKER JKT HOURS PBM HOURS Monitoring activities all contractors for Land scaping project, Cutting Grass , & House keeping Fractionation Plant Handling ID IMKP refinery RU III for shift Driver PT Perta Samtan Gas Fractionation Plant Preparation of emergency safety drill scenario Fractionation Plant ACTIVITY REMARKS 01:00 02:00 03:00 04:00 05:00 06:00 19:00 20:00 21:00 22:00 23:00 24:00 17:00 18:00 Cloudy 11:00 12:00 13:00 14:00 15:00 16:00 OPERATION PERIOD WEATHER CONDITION REMARKS WEATHER 01 May 2013 - 10-Apr-14 Time 07:00 08.00 09:00 10:00 DAILY REPORT HSE F-HSE-PSGAS REV : 00 TITLE : OPERATION PT.PERTA - SAMTAN GAS 0 Thursday, April 10, 2014