exe
===============================================
Default Project..................................................ROTANAR0
Projects:
ROTANA-R0.......................................................
.4 STAR HOTEL FOR QATAR AIRWAYS
Scheduling/Leveling Settings:
----------------------------General
------Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retaine
d Logic
Calculate start-to-start lag from ...............................Early S
tart
Define critical activities as Total Float less than or equal to .50
Compute Total Float As ..........................................Finish
Float
Calculate float based on finish date of .........................Each pr
oject
Calendar for scheduling Relationship Lag ........................Predece
ssor Activity Calendar
Advanced
-------Calculate multiple float paths...................................No
Statistics:
----------# Projects.......................................................1
# Activities.....................................................42
# Not Started....................................................42
# In Progress....................................................0
# Completed......................................................0
# Relationships..................................................64
# Activities with Constraint.....................................0
Errors:
------Warnings:
--------Activities without predecessors..................................1
Project:
ROTANA-R0
Activity:
A1000 Reciept
of Letter of Award
Activities without successors....................................5
Project:
ROTANA-R0
Activity:
A1200 Commence
ment of construction
Project:
ROTANA-R0
Activity:
A1210 Completi
on of structure
Project:
ROTANA-R0
on of External glazing / Roofing works
Project:
ROTANA-R0
ment of Testing & commisioning
Project:
ROTANA-R0
on of finishing works & handing over
Activity:
A1220
Completi
Activity:
A1230
Commence
Activity:
A1240
Completi
Out-of-sequence activities.......................................0
Activities with Actual Dates > Data Date.........................0
Milestone Activities with invalid relationships..................0
Scheduling/Leveling Results:
---------------------------# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................42
# Relationships with other projects..............................0
Data Date........................................................01-Jul08
Earliest Early Start Date........................................01-Jul08
Latest Early Finish Date.........................................31-Jan10
Exceptions:
----------Critical Activities..............................................32
Project:
ROTANA-R0
Activity:
A1000 Reciept
of Letter of Award
Project:
ROTANA-R0
Activity:
A1010 Mobilisa
tion & site set up
Project:
ROTANA-R0
Activity:
A1030 Excavati
on & pile head breaking
Project:
ROTANA-R0
Activity:
A1040 Pile cap
s / Column Foundations / Wall foundations
Project:
ROTANA-R0
Activity:
A1050 Foundati
on Grade slab
Project:
ROTANA-R0
Activity:
A1060 Ground S
lab
Project:
ROTANA-R0
Activity:
A1070 First fl
oor slab
Project:
ROTANA-R0
Activity:
A1080 2nd Floo
r slab
Project:
ROTANA-R0
Activity:
A1090 3rd Floo
r slab
Project:
ROTANA-R0
Activity:
A1100 4th Floo
r slab
Project:
ROTANA-R0
Activity:
A1110 5th Floo
r slab
Project:
ROTANA-R0
Activity:
A1120 6th Floo
r slab
Project:
ROTANA-R0
Activity:
A1130 7th Floo
r slab
Project:
ROTANA-R0
Activity:
A1140 Roof sla
b
Project:
ROTANA-R0
Activity:
A1150 Up. roof
core & slab
Project:
ROTANA-R0
Activity:
A1160 Blockwor
k & Plaster - Internal
Project:
ROTANA-R0
fixes - in masonry
Project:
ROTANA-R0
ishing / Flooring
Project:
ROTANA-R0
al steel columns / beams / struts
Project:
ROTANA-R0
& curtain wall fixing
Project:
ROTANA-R0
on of finishing works & handing over
Project:
ROTANA-R0
fixes
Project:
ROTANA-R0
l fixes
Project:
ROTANA-R0
Fit outs
Project:
ROTANA-R0
d ceilings
Project:
ROTANA-R0
testing works
Project:
ROTANA-R0
sting & commissioning
Project:
ROTANA-R0
Cleaning
Project:
ROTANA-R0
over
Project:
ROTANA-R0
carpets and final wall finishes
Project:
ROTANA-R0
pool & external works
Project:
ROTANA-R0
tion of lifts
Activity:
A1165
MEP 1st
Activity:
A1170
Wall fin
Activity:
A1180
Structur
Activity:
A1190
Glazing
Activity:
A1240
Completi
Activity:
A1270
MEP 2nd
Activity:
A1290
MEP Fina
Activity:
A1300
Install
Activity:
A1310
Suspende
Activity:
A1320
Initial
Activity:
A1330
Final te
Activity:
A1340
Snags &
Activity:
A1350
Handing
Activity:
A1360
Install
Activity:
A1370
Swimming
Activity:
A1400
Installa