ZA-DC-FM-01 Rev 4 Issued 01/07/12 Page 1 of 6

STANDARD FEE MATRIX




FORM # SERVICES DESCRIPTION APPLICABLE FEES ( in AED )
ZADC 01 LAND DEMARCATION
Setting out land demarcation points at site.
AED 1,200 up to 8 points and each additional point
AED 200
Re-demarcation
AED 1,200 up to 8 points and each additional point
AED 200
ZADC 02
SITE SERVICE
INFORMATION
All site services to the plot (IT, Sewerage
connections, Gate Level & Road Profile)
AED 500
ZADC 03
PRELIMINARY
DESIGN REVIEW
Reviewing the proposed design in
accordance with DTMFZA regulations and
providing suggestions / comments if any.
(Approval is valid for 6 months)
4th submission of preliminary or final
design
No Fees ( for 1
st
concept )



AED 0.05 per ft
2
(on Total relevant Built Up Area)
ZADC 04A
POST TENSION
REVIEW
Post tension Design Review
AED 5,000 (Up to 4
th
Submission)
AED 10,000 (from 5
th
Submission onwards)

ZADC 08

BUILDING PERMIT
Issuing of Final Building Permit to the
Appointed Contractor (Valid for 48 months)
AED 1.0 per ft
2
on Total Built-Up-Area (one time)
(Minimum AED 9,000)
Issuing of Interim Building Permit:
A: Foundation Permit
B: Substructure Permit
C: Podium Works Permit
D: Superstructure Permit

AED 0.1 per ft
2
on Total Built-Up-Area (one time)
AED 0.2 per ft
2
on Total Built-Up-Area (one time)
AED 0.2 per ft
2
on Total Built-Up-Area (one time)
AED 0.35 per ft
2
on Total Built-Up-Area (one time)
+ AED 20,000 for each type on the applicable fees +
Applicable Security Cheque
Issuing of Preliminary Building Permit for
the following activities:

- Shoring Permit

- Piling Permit



AED 0.05 on Total Built-Up-Area + Security Cheque
AED 50,000 (one time)
AED 0.1 on Total Built-Up-Area (ft
2
) + Security
Cheque AED 50,000 (one time)
- Hoarding Permit AED 2,000
- Mobilization Permit
(Valid for 6 months from issue date)
- Renewal of Mobilization Permit
(Valid for 6 months)
AED 5,000 + Security Cheque AED 50,000 (one
time)

AED 5,000 (each 6 months)
- Excavation Permit
(Valid for 6 months from issue date)
- Renewal of Excavation Permit
(Valid for 6 months)
AED 5,000 + Security Cheque AED 50,000 (one
time)

AED 5,000 (each 6 months)
- Mobilization & Excavation Permit for
Villas
(Valid for 6 months from issue date)

- Renewal of Mob. & Excavation Permit
for Villas
AED 1,000 per Villa + Security Cheque AED. 20,000
(one time)

AED 1,000 (each 6 months)
Note:
The final building permit fees will be calculated after deducting the fees which were paid
previously for the Interim & Preliminary Permit except for Mobilization & Excavation Permit.
Validity period of the permits will be calculated based on issuing of Building Permit (Final /
interim / Preliminary) for the main contractor excluding Mobilization & Excavation Permit.
Renewal of Final / Interim / Preliminary
Building Permit (Except Mobilization &
Excavation)
(AED 0.03 per ft
2
on Total Built-Up-Area) x (No. of
months requested for renewal)

(Minimum AED 900 & Maximum AED 6,000 per month)
*Re-issuance / duplicate copy of any
official Permit document (Except
Drawings)
AED 2,000 (each)

ZA-DC-FM-01 Rev 4 Issued 01/07/12 Page 2 of 6

STANDARD FEE MATRIX [Contd]



FORM # SERVICES DESCRIPTION APPLICABLE FEES ( in AED )



ZADC 08
BUILDING PERMIT
(Cont.)

Undated Security Cheque (one time)
applicable with the Building Permit
application (Final or Interim) and is valid
for the entire project period. Kindly note
that it will be released with the issuing of
the Building Completion Certificate &
clearance of site.

AED 0.20 per ft
2
on Total Built Up Area at the time
of the Building Permit (Minimum 20,000 AED and
Maximum 250,000 AED). The Cheque to be
rounded off to the next AED 5,000.
Cancellation of a valid Building Permit. No refund.
Note: If work suspended (via form # ZADC 65) the main contractor shall inform Zoning Authority in
writing to put on hold the building permit validity period; upon resumption of work, the new Building
Permit will be issued and the validity of it will be the remaining period of the previous Building permit
excluding the suspended period.

*During suspended period, minimum fees AED 1,000/- per month shall be paid. This will be
calculated from the date of suspension of work till resumption of work and to be paid when the
works will be resumed. This is not applicable for the projects that are cancelled.

ZADC 10

STRUCTURAL
INSPECTION
Inspection of a structural member
- 1st Inspection Request on the same
structural member
- 2nd Inspection Request on the same
structural member
- 3rd Inspection Request on the same
structural member
No Fees.

No Fees.

AED 2,000
Request for structural inspection after
working hours & holidays
AED 2,000 per inspection request

FAST TRACK REVIEW
SUBMISSIONS

Final Design
(Review within 10 working days)
AED 5,000 for Villas

AED 20,000 for others
Preliminary Design
(Review within 2 working days)
AED 20,000
Design Revision
(Review within 10 working days)
AED 10,000
Post Tension Design Review
(Review within 5 working days)
AED 20,000
Any Building Permits (Preliminary, Interim
or Final)
(Review within 3 working days)
AED 10,000
General Fit Out
(Review within 2 working days)
AED 5,000
Re-design
(Review within 10 working days)
AED 20,000
Events (temporary structures)
(Review within 3 working days)
AED 5,000
The above fees are in addition to the respective permit fees (wherever applicable).

Note: The review date is excluding the date of submission.











ZA-DC-FM-01 Rev 4 Issued 01/07/12 Page 3 of 6
STANDARD FEE MATRIX [Contd]



FORM # SERVICES DESCRIPTION APPLICABLE FEES ( in AED )
ZADC 17
PRE-INSPECTION FOR
COMPLETION
CERTIFICATE
Contractor to submit for site inspection prior
to submission of final BCC to get the major
comments in advance.
AED 7,500
BUILDING COMPLETION
CERTIFICATE
Issuing of Building Completion Certificate.
- 1st Request
- 2nd Request
- 3rd Request onwards

No Fees.
No Fees.
AED 10,000
BUILDING COMPLETION
CERTIFICATE
(WITH COMMENTS)
Providing Building Completion Certificate
based on the undertaking letter from the
owner / Consultant / Contractor.
Security Cheque of AED 30,000
Undertaking letter to complete the works
within an agreed period as per our
completion inspection comments.
AED 5,000 per month
Any delay in completing the works shall incur a fine of AED 500 per day.
Upon completing the comments should submit for clearing the comments.
ZADC 18 ZONING EXCEPTION Review of Zoning Exception AED 3,000 per submission

ZADC 19

DESIGN REVISION
Reviewing the proposed design revision in
accordance with DTMFZA regulations and
providing suggestions / comments if any,
prior obtaining the Final Building Permit.
AED 1,000
Reviewing the proposed deign Revision in
accordance with DTMFZA and providing
suggestions / comments if any, after
obtaining the Final Building Permit.
AED 1,000
+ AED 1.0 per ft
2
(for any additional built up area) (If
Approved)
ZADC 20
CONSULTANT /
CONTRACTOR
REPLACEMENT
Requesting to replace the consultant /
contractor during project period
AED 5,000

ZADC 21
DEWATERING NOC
APPLICATION
Issuing the No Objection Certificate for
Dewatering route.
AED 1,000 + (AED 7.5 per Deep well or AED
0.25 per WellPoint / Day) (If discharge within
DTMFZA Jurisdiction)

ZADC 22
ROAD CLOSURE /
DIVERSION
Issuing permit for long term road / lane
closing.
(Valid for 3 months)
AED 5,000
ZADC 23 RE-DESIGN REVIEW
- Re-design of Structure / Architecture /
MEP after obtaining Final Design
Approval
- Re-design or renewal of design upon
expiry of Preliminary Design Approval
(Architectural)
AED 0.1 per ft
2
(on Total relevant Built Up Area)


AED 0.05 per ft
2
(on Total relevant Built Up Area)


ZADC 24
ADVERTISING PERMIT
APPLICATION
Hoarding, Building Wraps, Fence
Hoarding, Lamp Post, Muppie, Unipole,
Mini Unipole, Unipole (3 Sided), Wall
Mounted Hoarding, Roundabout
Branding, Lake Branding, Bridge
Banner, Digital Billboard/Screen, Roof
Top Sign, New Medium
Building Signage
Portable Flag, Flags
Logo/ Shop Sign (Electrical), Window
Graphics (Shops)
Logo/ Shop Sign, Leasing Banner
AED 5,000 per year






AED 2,500 per year
AED 1,500 per year
AED 1,000 per year

AED 500 per year


ZA-DC-FM-01 Rev 4 Issued 01/07/12 Page 4 of 6

STANDARD FEE MATRIX [Contd]



FORM # SERVICES DESCRIPTION APPLICABLE FEES ( in AED )
ZADC 26
TEMPORARY SITE
ACCOMMODATION
APPLICATION
Issuing of Temporary Site Accommodation
Permit.

AED 1 per ft
2
(Minimum payable AED 5,000)
For the first year + Security Cheque AED 50,000)

Renewal fees is AED 0.15 per ft
2
per year
ZADC 26
TEMPORARY SITE
ACCOMMODATION
COMPLETION
CERTIFICATE
Issuing of Completion Certificate for
Temporary Site Accommodation.
- 1st Request
- 2nd Request
- 3rd Request onwards


No Fees
No Fees
AED 5,000

ZADC 27


TEMPORARY SITE
CANTEEN
APPLICATION
Issuing of Temporary Site Canteen Permit. AED 5,000 (per year)


ZADC 27


TEMPORARY SITE
CANTEEN
COMPLETION
CERTIFICATE
Issuing of Completion Certificate for
Temporary Site Canteen.
- 1st Request
- 2nd Request
- 3rd Request onwards


No Fees
No Fees
AED 5,000

ZADC 28
TEMPORARY
CONSTRUCTION
PERMIT
Issuing of permit for temporary construction
works
AED 5,000
ZADC 38
FIT-OUT PERMIT
REQUEST
General Fit-out Works:
- Reviewing the proposed Fit-out design
and issuing no objection carry out fit out
works
AED 0.90 per ft2 (Minimum AED 3,000)
(Maximum AED 100,000) + Undated security
Cheque AED. 20,000.

(Valid for 6 months)
Minor Fit-out Works AED 1,500
Renewal of General Fit-out Approval
AED 0.25 per ft
2
(Maximum AED 15,000) for each
month
Cancellation of valid Fit out permit No refund
Note: If Fit-out work suspended (via form # ZADC 65) Fit Out Contractor should inform Zoning Authority
in writing, to freeze the Fit-out permit, upon resumption of the fit-out works, remaining period will be
permitted.
ZADC 47 DEMOLITION PERMIT
Issuing of permit for demolishing existing
building
AED 1,000 (per unit per floor)
ZADC 52
INFRASTRUCTURE
DESIGN REVIEW
Roads & Utilities Design Review
- 5 million ft
2

- > 5 million ft
2
and 15 million ft
2

- > 15 million ft
2
and 30 million ft
2

- > 30 million ft
2
and 50 million ft
2

- > 50 million ft
2
and 70 million ft
2

- > 70 million ft
2
and 100 million ft
2

- > 100 million ft
2


AED 20,000
AED 35,000
AED 45,000
AED 60,000
AED 85,000
AED 115,000
AED 160,000
Grading Design Review
- 5 million ft
2

- > 5 million ft
2
and 15 million ft
2

- > 15 million ft
2
and 30 million ft
2

- > 30 million ft
2
and 50 million ft
2

- > 50 million ft
2
and 70 million ft
2

- > 70 million ft
2
and 100 million ft
2

- > 100 million ft
2


AED 8,000
AED 11,500
AED 15,000
AED 20,000
AED 25,000
AED 28,000
AED 35,000




ZA-DC-FM-01 Rev 4 Issued 01/07/12 Page 5 of 6

STANDARD FEE MATRIX [Contd]


FORM # SERVICES
DESCRIPTION APPLICABLE FEES ( in AED )
ZADC 52
INFRASTRUCTURE
DESIGN REVIEW
(Cont.)
Structure Design Review
- Roadway Bridge: No. of Spans 3
- Roadway Bridge: No. of Spans > 3
- Pedestrian Bridge
- Culvert: No. of Cells 2
- Culvert: No. of Cells > 2
- Tunnel
- Irrigation Tank
- Substation

AED 25,000
AED 35,000
AED 15,000
AED 15,000
AED 25,000
AED 28,000
AED 15,000
AED 15,000
ZADC 55
SEWERAGE
CONNECTION
INSPECTION
Inspection of Sewerage Connection AED 1,500 per connection
ZADC 56
TRAFFIC IMPACT
STUDY REVIEW
Peak Hour Generated Trips:
- Between 100 - 350
- Between 351 1000
- Between 1001 - 3000
- Between 3001 - 10000

AED 1,600
AED 2,600
AED 4,600
AED 6,500
ZADC 58
PERMIT TO WORK
WITHIN R.O.W.
Program for working within ROW
(Execution Period)
- > 1 month < 2 months
- > 2 months < 3 months
- > 3 months < 6 months
- > 6 months < 9 months
- > 9 months < 12 months


AED 2,000
AED 5,000
AED 8,000
AED 10,000
AED 15,000
ZADC 59
INFRASTRUCTURE
MODIFICATION
Types of Infrastructure Modification:
- Modification of roads, pavement
marking & signs and parking affected
by building works.
- Modification of roads profiles or
grading plan of roundabout affected
by building works.
- Modification of building accesses.
- Construction of drop off area within
the ROW.
- Modification of existing sewerage
manhole for house connection.
- Relocation of existing services from a
building plot.
- Building landscaping encroachment to
the ROW.

AED 4,500

AED 7,500


AED 15,000
AED 5,500

AED 3,000

AED 7,500

AED 4,500
- Installation of buildings earth pits
within the ROW.
- Protection or rectification of utilities
affected by building works.
- Relocation / lowering / raising of
existing utility line / manhole /
chamber to avoid clashes with
building works.
- Water feature partially encroaching
the ROW.
- Temporary relocation and
reinstatement of existing utilities to
allow shoring construction.
AED 3,000

AED 4,500

AED 4,500



AED 3,000

AED 3,000

ZADC 60
INFRASTRUCTURE
WORK COMPLETION
CERTIFICATE
Issuing of Infrastructure Work Completion
Certificate.
- 1st Request
- 2nd Request
- 3rd Request onwards


No Fees
No Fees
AED 10,000



ZA-DC-FM-01 Rev 4 Issued 01/07/12 Page 6 of 6


STANDARD FEE MATRIX [Contd]


FORM # SERVICES
DESCRIPTION APPLICABLE FEES ( in AED )
ZADC 62
CONSULTANTS /
CONTRACTORS
REGISTRATION
Consultants / Contractors Registration
To be renewed on the expiry of the trade license
from DED (AED 250 each time / year)
ZADC 67
REQUEST FOR
DUPLICATE DRAWING
Issuing a Duplicate copy of approved
drawing (scanned) on CD
AED 2 per sheet
Minimum AED 100
ZADC 69
BUILDING
MODIFICATIONS /
ADDITIONS
Additions / alterations after obtaining
Completion Certificate
AED 1,500
+ AED 1.0 per ft
2
for the total additional / relevant
Built Up Area
ZADC 85 EVENTS
- Small scale events of area less than
500 sq. ft. National Day Events,
Government Sponsored events and
other non Commercial events

- Standard Fees (within 7 working days)

AED 500 + Structural Fees AED 1,000 (if
applicable)


AED 1.0 per ft
2
of relevant area (Minimum AED
500, Maximum AED 5,000 + Structural fees of
AED 1,000 if applicable).
Any new additional area or extension of the
existing facilities other than the originally
approved ones.
AED 1.0 per ft
2
(Minimum AED 500, Maximum
AED 5,000 + Structural fees of AED 1,000 if
applicable).

STRUCTURAL
GUIDELINES
Issuing of Structural Guidelines book

AED 100