Sunteți pe pagina 1din 2

Job Description/Person Specification

Refer to the Business Operating Procedure relating to the Competency Assurance System,
OP-10-01-015, for guidance on completion of this document
Job Title
!
Principal "ngineer #Piping$
Location
!
%& 'ide
Function/Department
!
"ngineering
Line Supervisor/Manager
!
( (a)is
Technical Authority
!
C *rie)e
Principal Purpose
!
1 !"AL#F#$AT#%&S ' ()P(*#(&$(
11 Minimum !ualifications
+,C or e-ui)alent in rele)ant su./ect
1+ Preferre, !ualifications
(egree in rele)ant Science or "ngineering discipline
Chartered "ngineer, 010ech" or 01Chem" #or "2perience commensurate
3ith$ "ngineering Council Registered "ngineer
1- (.perience
"2tensi)e e2pertise in piping design for thermal and nuclear po3er Pro/ects
Pro)iding ad)ice and solutions to Clients, 3ith 4no3ledge of industry codes
and practices engineering for nuclear licensed sites - Such as P"(, PSSR,
C(0, etc to support the ,uclear ,e3 Build Pro/ects Seismic and ", 15670
e2perience coupled 3ith RCC0 understanding PSA58Autopipe e2perience is
essential
+ /(0 $%MP(T(&$#(S
91 *ood technical 4no3ledge
99 *ood 4no3ledge of Codes, :egislation, Company standards and -uality
procedures
95 *ood commercial a3areness
96 *ood creati)e and inno)ati)e s4ills
95 *ood Super)isory8:eadership8Coaching
9; *ood effecti)e 3riting
9< *ood effecti)e communication
97 *ood team 3or4ing s4ills
Specific $ompetencies
#As defined .y company s4ills matri2 - refer to indi)idual Personal
(e)elopment Record$
- /(0 D"T#(S
51 Reporting to "-uipment = Piping Section 0anager, including 3ee4ly pro/ect
progress 8 status report
59 Produce >ull ?echnical Solutions to "ngineering "n-uiry Pac4ages Recei)ed
>rom Clients
55 Responsi.le for originating chec4ing and appro)ing #3here applica.le$ design
output including@ design calculations, design analysis, design re)ie3s, design
plans and ris4 assessments
56 "2ecute Pro/ect "ngineering acti)ities on contracts as re-uired, ensuring
deli)ery of engineering aspects of pro/ects to .udgets, and programme
timescales to the satisfaction the Clients
55 Production of functional and technical en-uiry specifications for purchased
e-uipment
5; Re)ie3 of supplier .id documentation and comparison to (PS specifications
5< Preparation of technical .id re)ie3s for e-uipment
57 :iaison 3ith other engineering sections to ensure the complete engineering
pac4age is achie)ed
5A :iaising and corresponding 3ith suppliers
510 Pro)ision of technical support to other sections and departments
511 Pro)ide Support to Site Construction and Commissioning ?eam
519 Address ?echnical Bueries recei)ed during 1nstallation and Commissioning
515 ")aluation and recording of ris4s
516 Carry out (esignerCs Ris4 Assessment on systems that ha)e undergone
changes
515 Pro)ide ?echnical *uidance and (e)elopment of Other Staff 3ithin the *roup
51; ?o pro)ide high le)el of support and e2pertise in )al)es
1 /(0 A$$%"&TA2#L#T#(S
61 Satisfactory completion and maintenance of DProfessional (e)elopment
RecordE #P(R$
69 Pro)iding efficient and cost effecti)e pipe design engineering support
65 Achie)ement of tas4s and targets set .y line manager
66 Achie)ement of tas4s and targets set .y function8.ranch heads
Line Manager 3ea, Approval Technical Authority Approval
&ame4 &ame4
Signature4 Signature4

S-ar putea să vă placă și