Modernization Study September 11, 2014 Board Meeting 1 An Understanding of District Objectives Eastern
1. Historic / semi-historic context was not considered during the assessment to allow for full fidelity of costs determined. 2. Fieldhouse was not evaluated in the analysis.
Otto
1. Assessed in the context of a future use of an alternative and/or middle and elementary school. 2. Food service preparation was understood to remain in current status.
Sexton
1. Assessed in the context of current configuration and programmatic requirements. 2. Newly built track and fields were not assessed in the analysis.
The Lansing School District seeks to evaluate facilities to assess total probable costs for renovation and/or replacement of existing buildings. Eastern, Otto and Sexton were analyzed for deferred maintenance costs, programmatic opportunities and enhancements / impediments to current educational objectives. 2 Assessment Areas Building Components Involved in Assessment Basement Construction Floor Slab, Wall Condition, Settlement, Water Issue Conveying Elevator Condition, Other Conveying Electrical System Capacity, Electrical Service and Distribution, Branch Wiring, Lighting, EMS / Controls, Exit / Emergency Lights, Special Electrical System, System Capacity, Other Exterior Enclosure Wall Condition, Caulking, Cleaning & Pointing, Painting, Window Condition, Exterior Door Condition, Exterior Hardware Fire Protection Sprinkler Systems, Standpipes, Fire Pump, Fire Extinguishers, Fire Alarm Systems, Fire Pump Foundation Cracked Walls, Settlement, Deterioration, Drainage HVAC Fuel Energy Supply Systems, Heat Generation Systems, Heat Rejection / Cooling Systems Refrigeration, Terminal & Package Units, HVAC Instrumentation and Controls, HVAC Systems , T A B Interior Construction Ceilings, Doors, Hardware, Interior Doors, Interior Hardware, Interior Walls / Partitions Plumbing Plumbing Fixtures, Domestic Water Distribution, Back Flow Preventers, Sanitary Waste, Storm Water Drainage Roofing Drainage, Flashing, Roofing System Condition, Parapets Site Conditions Building Access, Sidewalk & Steps, Exterior Lighting, Rain Water Drainage, Utilities & Services Stairs Handrails, Stair Construction, Stair Finishes Superstructure Floor Structure, Roof Structure Technology Servers, Wireless, Modem Access 3 Cost Determination Components Soft Costs Architectural & Engineering Fees (5% of Hard Costs) Project Management Fee Reimbursables (5% of Soft Costs)
Hard Costs General Requirements Site / Civil (Parking Lot Replacement / Landscaping) Concrete Masonry (Tuck Pointing Brick, Correct Masonry Wall Issues, Tuck Pointing Limestone) General Renovation (Kitchen, Cafeteria, Renovation of 40,000 SF of New Classroom)
Doors & Windows (Full Window Replacement, Fire Doors to Meet Code, Retro-fit Doors) Conveying Systems (Elevator Upgrades) Fire Suppression Plumbing Heating Ventilation & AC Electrical Fee (1.75%) IT (Data Cabling, Infrastructure, Equipment) Owners Items Furniture, Fixtures & Equipment Security
Contingency Project Contingency 10%
4 Modernization Cost Summary Sexton Otto Eastern Square Feet 245,675 219,397 237,069 Soft Costs $ 1,929,127 $ 1,775,587 $ 1,979,029 Hard Costs $ 33,232,443 $ 30,704,740 $ 34,339,807 Owner's Costs $ 4,913,500 $ 4,387,940 $ 4,741,380 Contingency $ 4,007,507 $ 3,686,827 $ 4,106,022 Total Project Budget $ 44,082,577 $ 40,555,093 $ 45,166,237 1. All facilities require a baseline upgrade of infrastructure (plumbing, heating ventilation & AC), IT, programmatic configuration and doors and windows. 2. All facilities require upgrades for ADA compliance, security enhancements and fire code compliance. 3. Masonry repair is needed in all facilities (limestone/brick) and structural concerns are apparent. 4. Modernization cost estimates are determined without the inclusion of external factors and deterrents. 5 Sexton Summary Key Findings:
Programming: Most ideal floor-plan of all three buildings assessed. Condition: Limestone requires tuck pointing Critical Repairs: Entrance steps on McPherson Street are a hazard and must be repaired. Other: Roof will need replacement in 2-5 years, Full sprinkler system required in upgrade
Programming Capability Adequacy of Space Critical Repairs Overall Condition 6 Otto Summary Key Findings:
Programming: Not conducive to a modern education learning environment. Condition: Overall in deteriorating condition requiring significant enhancement Critical Repairs: South Side of Building appears to have structural issues due to water penetration Other: Roof will need replacement in 2-5 years, Full lighting enhancement required
Programming Capability Adequacy of Space Critical Repairs Overall Condition 7 Eastern Summary Key Findings:
Programming: Full programming evaluation required current classroom configuration not adequate Condition: 50% or more of the exterior brick needs to be tuck pointed Critical Repairs: There is a potential structural issue in the Northeast corner of the building that appears to be from water penetration Other: Windows were replaced in the 1970s and show signs of deterioration caulking is failing
Programming Capability Adequacy of Space Critical Repairs Overall Condition 8 Modernization vs. Replacement Sexton Otto Eastern Replacement Square Feet 245,675 219,397 237,069 250,000 Soft Costs $ 1,929,127 $ 1,775,587 $ 1,979,029 $ 2,231,250 Hard Costs $ 33,232,443 $ 30,704,740 $ 34,339,807 $ 51,975,125 Owner's Costs $ 4,913,500 $ 4,387,940 $ 4,741,380 $ 5,000,000 Contingency $ 4,007,507 $ 3,686,827 $ 4,106,022 $ 5,920,638 Total Project Budget $ 44,082,577 $ 40,555,093 $ 45,166,237 $ 65,127,013 Percent (%) of Total Replacement Cost 68% 62% 69% 100% 1. Replacement is defined as the new construction of a 250,000 SF education building with anticipated capacity of 1,500-2,000 students with the inclusion of the current and proposed curriculum requirements. 2. Replacement costs include, but not limited to, A&E fees, site work, owners items, permit fees and general hard and soft costs. 9 Key Considerations Renovation:
1. Transition and interim space costs during possible lengthy renovation timeline. 2. Historic / semi-historic considerations and impact
Replacement:
1. Site selection and acquisition, if applicable 2. Funding constraints / bond financing timeline
Other Concerns:
1. Possible structural and/or environmental issues not assessed in current analysis 2. Site identification or acquisition costs for replacement
Cost Determinations must be understood in the context of District programming and evaluated on an opportunistic and individual basis. 10 Recommendations and Next Steps 1. Assess the feasibility of a replacement school as renovation costs are near the recommended 70% threshold.
2. Identify and evaluate monetization / disposition strategies for Otto.
3. Analyze programming and space utilization at all three preexisting high schools (Eastern, Sexton & Everett) for possible consolidation or relocation strategies.
4. Identify portfolio-level strategies for cost-savings (consolidated food service preparation, maintenance repairs, bundling of capital projects, etc.)
5. Evaluate other revenue generating strategies to mitigate immediate maintenance and capital repair requirements (disposition, facilities management, consolidation, etc.)
COPYRIGHT JONES LANG LASALLE IP, INC. 2014 Thank you