IHC Offshore Wind
IHC Offshore Wind
6
IHC Offshore Wind
Business Units in the wind
Consultancy & Engineering
Vuyk Engineering Rotterdam B.V.
Engineering & Fabrication
IHC Engineering Business Ltd
IHC Offshore Systems B.V.
Installation & Handling
IHC Hydrohammer B.V.
IHC Handling Systems B.V.
IHC Sea Steel Ltd
Other services
From other IHC BUs
Yards
IHC Merwede Offshore & Marine
Marine operations & Vessel design
Offshore handling systems, Subsea trenching tools,
Control systems
IHC Offshore Wind
Business Units in the wind
Consultancy & Engineering
Vuyk Engineering Rotterdam B.V.
Engineering & Fabrication
IHC Engineering Business Ltd
IHC Offshore Systems B.V.
Installation & Handling
IHC Hydrohammer B.V.
IHC Handling Systems B.V.
IHC Sea Steel Ltd
Other services
From other IHC BUs
Yards
IHC Merwede Offshore & Marine
8
Engineering: Concept, Basic & Detail
Production: Project Management, Procurement, Fabrication
Integration & Installation systems on vessels
Commissioning & Testing
IHC Offshore Wind
Business Units in the wind
Consultancy & Engineering
Vuyk Engineering Rotterdam B.V.
Engineering & Fabrication
IHC Engineering Business Ltd
IHC Offshore Systems B.V.
Installation & Handling
IHC Hydrohammer B.V.
IHC Handling Systems B.V.
IHC Sea Steel Ltd
Other services
From other IHC BUs
Yards
IHC Merwede Offshore & Marine
9
IHC Offshore Wind
Business Units in the wind
Consultancy & Engineering
Vuyk Engineering Rotterdam B.V.
Engineering & Fabrication
IHC Engineering Business Ltd
IHC Offshore Systems B.V.
Installation & Handling
IHC Hydrohammer B.V.
IHC Handling Systems B.V.
IHC Sea Steel Ltd
Other services
From other IHC BUs
Yards
IHC Merwede Offshore & Marine
10
IHC Offshore Wind
Installation & Handling
IHC Handling Systems B.V.
Monopile sealing plug
11
IHC Offshore Wind
Business Units in the wind
Consultancy & Engineering
Vuyk Engineering Rotterdam B.V.
Engineering & Fabrication
IHC Engineering Business Ltd
IHC Offshore Systems B.V.
Installation & Handling
IHC Hydrohammer B.V.
IHC Handling Systems B.V.
IHC Sea Steel Ltd
Other services
From other IHC BUs
Yards
IHC Merwede Offshore & Marine
12
IHC Offshore Wind
Concept development
A number of developed concepts by IHC BUs:
Fully assembled turbines on a jack-up vessel
Jacket installation system
Blade installation tool 3 blades
Monopile installation
Floating vessel - fully assembled turbine installation
Patent pending
Concepts to be further developed
in cooperation with the industry
!"# "$%&'()**+& EFGF
- LsLabllshed ln 1984
- 73 employees ( 2010)
- LocaLlons,
- 1he neLherlands, Maln offlce and workshop
- Slngapore, Cfflce and workshop
- uSA Cfflce
- Chlna & uubal uealers and servlce polnLs
- Pammer S30 - S2300 k!
- Sales and 8enLal pro[ecLs
- llnanclal Lurnover Lu8 33 mllllon
Onshore
sheets profiles cast in situ concrete
Civil Works
Harbour works Bridges Jetties
Oil & Gas
Oil & Gas related
Mostly offshore
Deepwater
conductors jackets anchors/templates
Special application products
Rock breaking Pile Toe Drive Horizontal driving
H.3.09
!"# $#%&''&'%((((())
RAM
AnvlL
lLL
S - 30
S - 40
S - 70
S - 90
S - 120
S - 150
S - 200
S - 280
S - 500
S - 600
S - 800
S - 1200
S - 1400
S - 1800
S - 2000
S - 2300
H.3.09
S-30: 30kJ = 1,5 t (ram) = 3,8 t (weight)
S-2300: 2300kJ = 115 t (ram) = 240 t (weight)
#&'77 6+?>.'0 !"# "$%&'()**+&
:)*
63++/+
50/.3
H.3+
6'*+ =)?>7 '0 7.I+7 J ='&?+7 J 7C++%
S1200 Pydrohammer drlvlng a sLeel plle:
- 8am m= 60 Lons
- 8am ls llfLed up ln 1s over 1m drop helghL
- 8am acceleraLes aL 2g down ln 0,3 s Lo max speed
- 8am speed aL anvll v = 6,33 m/s = 22,8 km/h
- Lnergy L = x m*v
2
= 1200 knm
- Cycle raLe ls 40 blows/mln aL full energy
- ConLacL Llme (energy Lransfer) of ram and anvll 4,3 ms
- Speed of shock wave ln plle = 3200 m/s or 18720 km/h
!"# "KL:D"5881:
- :5-1L M N!O1-!#
- PQQR 1O1:SK 5- 5OK E5--1:
- DO1H!1#1 :58
- TD:S1L 6-11U :58 V 5OG!U
- 6-11U-D6-11U -:5O6T1:
- 6"D:- 6-:DN1
- H!6-DO 5##W8WU5-1:6
- 5##1U1:5-!DO PQQR
- #UD61L "5881: "DW6!OS
6!OSU1 5#-!OS
"KL:5WU!# "5881:
- :5-1L M HD-1O-!5U
- :1LW#1L 1O1:SK DO E5--1: H!U16
- 8WU-!HU1 H!1#1 :58
- #56- 6-11U H:DLW#-6
- "5881: #W6"!DO -:5O6T1:
- UDOS 6-:DN1
- EU5LL1: 5##W8WU5-1:6
- 5##1U1:5-!DO QXQR
- DH1O "5881: "DW6!OS
8).0 L.==+&+0?+7 "$%&)A3.? ")**+&7
Renewable energies
Oil & Gas related
Mostly offshore
Deepwater
mono piles jackets/tripods anchors
H.3.09 'C>.'07 T'A0%)>.'07 >$C+7
Mono-piles: installed piles incl. metmasts
2000-2009
269
719
IHC Hydrohammer
8'0'C.3+7 -&)?2 :+?'&%
Mono-piles: installed MW's
2000-2009
667
2148
IHC Hydrohammer
:+0+;)<3+7
- lPC Pydrohammer lnsLalled 70 of drlven plles ln Lurope
- lPC Pydrohammer wlll supply plllng equlpmenL Lo all Chlnese Cffshore ro[ecLs:
8ln PAl, SPL ?AnC, uCnC 1Al and uA lLnC
- lPC Pydrohammer has Lhe largesL Pammer ln Lhe renLal fleeL and world and
worklng on Lhe WALnL? 2 CWl pro[ecL. Pammer slze 2000 k!
- lPC Pydrohammer has Lhe largesL Sleeve ln Lhe renLal fleeL and world and
worklng on Lhe WALnL? 2 CWl pro[ecL. ulameLer 3,3 meLer
- lPC Pydrohammer supplled plllng equlpmenL Lo Lhe largesL CWl pro[ecL under
consLrucLlon:
C8LA1L8 CA88A8u (140 Mono lles) lasL year
LCnuCn A88A? 177 (Mono lles) Lhls year
- lPC Pydrohammer works close LogeLher wlLh
oLher lPC buslness unlLs ln Lhe CWl markeL
Lo provlde a wlde range of servlces
- S1200 Pammer
- lles: 7x 3100
- ConLracLor: CL Wlnd Lnergy
- Cwner/ueveloper: AlrLrlclLy & CL Wlnd Lnergy
- Area: lreland (LasL CoasL)
- lnsLallaLlon vessel: !umplng !ack
- 1urblne: CL 3.6 MW
- WaLer uepLh: 23 meLer
5:NUDY E5ON6 XQQZ
E5::DY XQQ[
- S1200 Pammer
- lles: 30x 4730
- ConLracLor: Ml
- Cwner/ueveloper: uong Lnergy
- Area: unlLed klngdom (WesL CoasL)
- lnsLallaLlon vessel: 8esoluLlon
- 1urblne: vesLas v90 (3 MW)
- WaLer uepLh: 13 meLer
E1UY!OL XQQ\
- S1200 Pammer
- lles: 36x 4072
- ConLracLor: van Cord
- Cwner/ueveloper: 8elwlnd
- Area: 8elglum
- lnsLallaLlon vessel: Svanen
- 1urblne: vesLas v90 (3 MW)
- WaLer uepLh: 1337 meLer
- S1200 & S1800 Pammer
- lles: 140x 3100
- ConLracLor: Seaway Peavy LlfLlng
- Cwner/ueveloper: nower
- Area: unlLed klngdom (LasL CoasL)
- lnsLallaLlon vessel: PLv SLanlslav ?udln
- 1urblne: Slemens 3,6 MW
- WaLer uepLh: 437 meLer
S:15-1: S5EE5:L 4 XQQ\JXQPQ
Mono lles
- S1400 Pammer
- lles: 30x 4700
- ConLracLor: CeoSea n/v
- Cwner/ueveloper: uong Lnergy
- Area: unlLed klngdom (WesL CoasL)
- lnsLallaLlon vessel: CollaLh
- 1urblne: Slemens 3,6 MW
- WaLer uepLh: 1923 meLer
SubsLaLlon !ackeL
- S300
- ConLracLor: vSl
Y5UO1K ! XQPQ
].)097A :A%'09 XQPQ
- S800 Pammer
- LqulpmenL prepared for 3100 mm Mono lles
- !olnL venLure beLween:
- ro[ecL: SepLember/CcLober 2010
- ZMC manufacLured Mono lles and 1ranslLlon
leces for CreaLer Cabberd ln Lurope
].)097A :A%'09 XQPQ
Sleeve:
Anvil 4300
Sleeve:
Anvil 4300
+ Anvil Ring
Sleeve:
Anvil 5500
+ Anvil Ring
Sleeve:
Anvil 5500 +
Cone shaped follower
Sleeve:
Synchronical
pile driving
Pile diameter:
<4300m
Pile diameter:
Up to 5200mm
Pile diameter:
Up to 6500mm
Pile diameter:
6500-7500mm
Pile diameter:
>7500mm
Hydrohammer:
S-800 / S-1400
Hydrohammer:
S-800 / S-2000
Hydrohammer:
S-1400 / S-2000
Hydrohammer:
S-2000 or bigger
Hydrohammer:
S-2000 or bigger
M1
M2
M3
!"#$% &'( ) '*+
=0
=0
=0
=0
=0
=0
=0
,-.%/- 0.#-/
^8X J 8P_ `` P ^8X J 8P_ a P [M2 / M1] >> 1
,-.%/- 0.#-/
,-.%/- 0.#-/
!OTUW1O#1 DT 6!b1 DT 5OG!U
6!OSU1 6DU!L 5OG!U
ulC" ueslgn Lo reduce welghL
Plgh energy Lransfer efflclency
STANDARD FLAT NEW UFO
1O1:SK -:5O6T1:
Solid forged anvil/ram
noise in air = noise under water ?
18 dB(A) reduction can bring us to acceptable levels
Noise reduction:
Forward actions underwater sound mitigation methods
1 Scale testing in IHC basin, double walled vacuum shell
Completed at IHC yard October 2009, noise reduction 20-40dB
2 Open water test with live hammer
Completed March 2010
3 Full size shell
FEED started January 2010
Design drawings completed April 2010.
NRS around the pile, water depth 6m
60
80
100
120
140
160
180
3
1
,
3
1
2
3
3
0
0
2
0
0
0
8
0
0
0
lrequency [Pz]
d
8

(
l
l
n
)

1

zonder beschermlng = 163.6


d8(lln)
reducLle scherm = 140.3
d8(lln)
reducLle bellen blnnen = 137.3
d8(lln)
achLergrond =124.4
d8(lln)
Open water test: Noise Reduction Screen
Forward actions underwater sound mitigation methods
1 Scale testing in IHC basin, double walled vacuum shell
Completed at IHC yard October 2009, noise reduction 20dB
2 Open water test with live hammer
Double wall air bubbles March 2010 27 dB(lin)
Single wall air bubbles July 2010 20 dB(lin)
3 Full size shell
Full sized NRS Started January 2010
Design drawings completed April 2010.
4 Upcoming projects
Runder Tisch August 2011
Flow RWE September 2011
5 Handling NMS
Handling Concepts NMS Joined forces IHC Merwede
Handling Concepts NMS Joined forces IHC Merwede
NMS Pre-piling Frame
Our market position
well founded !
www.ihchydrohammer.com
Thank you for your attention