0 evaluări0% au considerat acest document util (0 voturi)
73 vizualizări22 pagini
This is a step by step guide for implementing 5S methodology in an organisation from scratch. Manual talks about what is waste, types of waste, detection of waste, about 5S methodology and its implementation. It contains all tools and techniques needed for implementing 5S.
This is a step by step guide for implementing 5S methodology in an organisation from scratch. Manual talks about what is waste, types of waste, detection of waste, about 5S methodology and its implementation. It contains all tools and techniques needed for implementing 5S.
This is a step by step guide for implementing 5S methodology in an organisation from scratch. Manual talks about what is waste, types of waste, detection of waste, about 5S methodology and its implementation. It contains all tools and techniques needed for implementing 5S.
For assistance call: Amandeep Singh Gujral(Industrial Engineer) amandeepsgujral93@gmail.com +91-78375-43000
What is Waste? Any resource or activity which adds no value to the output is waste. Anything which leads to error, defect and injury is considered waste.
3 Major Categories of Waste Mura-Unevenness Muri-Overburdening Muda-7 types of waste. Types of Waste There are 7 types of waste:
Transport Inventory Motion Waiting Over processing Over production Rework Detection of Waste To start with the process of waste reduction we have to make waste detectable. Waste cannot be seen, it can only be detected by carefully looking for errors, defects and injuries generated by the system. Detect non-value adding activities, which are also waste. 5S Process Flow Diagram 5S implementation is first step to making waste detectable. For instance, you cannot see what is wrong when piles of inventory are hiding it. 5S not only makes waste detectable but also eradicates waste at macroscopic level. It is a continuous and never ending process. Sustain is the most important step of 5S implementation. If you ignore the sustain step, you will end up doing all the four steps again and again. Implementation of 5S As said earlier, 5S is a continuous and never ending process. For organization, that is planning to adopt the methodology of 5S should follow a step by step approach. Project No: Date: Approved by: Define Objective: Define Current Condition To implement 5S in ___________________ area. Walk through the plant and list the various types of waste you see. Take the help of pictures to descried them. E.g. piles of inventory, tools scattered across workplace, etc. Project Plan Team Phase Start date: End date: Role Name Dept. Sort Leader Straignten Member Shine Member Standardize Member Sustain Member
Project Charter Sort Sort the stuff into three broad categories. Take the help of tags. Dispose the never used category by Sending to department which uses them. Selling it to junk yard. Sort-Tags Use these tags to sort the stuff. Item: Item: Item: How to Dispose: Frequency of use: Sending to other department /week Dept.: /month Selling to Junk Yard /year Final Decision: Never Used Ocassionally Used Frequently Used Keep/Discard Straighten Principles: There's a place for everything and everything in its place. Frequently used stuff should be promptly available. Occasionally used items should be kept at relatively remote locations. Label all items so they are easily manageable.
5S Map It is a floor plan depicting the top view of the work area. It is used to identify Where to locate equipment and machines. Where storages are needed. Travel path for movement of humans and material.
Note: Keep in mind the principles of motion economy before construction 5S Map. 5S Map 5S Map/Work Place Layout Sheet Date
Area
Scale
Name
Labels Inventory Item Code Inventory Item Name Economic Order Quantity Minimum allowable stock Kanban Card Tool ID Tool Name Tool Specificattions Tool Location Tool Info Equipment No. Equipment Name Equipment Specifications Equipment Maintainance Std. Equipment Info Shine Principles: Everything in workspace is "like new" Equipment, work surfaces, and storage areas are clean Garbage and recyclables are collected and disposed regularly Whole work place is cleaned and maintained regularly
RSC Sheet Regular Shine Check Sheet RSC Sheet Name (Equipment/Area): Responsibility: Date: Y/N Auditor Comments 01-10-2014 02-10-2014 03-10-2014 04-10-2014 05-10-2014 06-10-2014 07-10-2014 08-10-2014 09-10-2014 10-10-2014 11-10-2014 12-10-2014 13-10-2014 14-10-2014 15-10-2014 16-10-2014 17-10-2014 18-10-2014 19-10-2014 20-10-2014 21-10-2014 22-10-2014 23-10-2014 24-10-2014 25-10-2014 26-10-2014 27-10-2014 28-10-2014 29-10-2014 30-10-2014 31-10-2014 Standardize Principles: Development of standards for maintaining and organizing the work place. Display the 5S standards throughout the workplace. Train the staff about the 5S methodology.
5S Poster Sustain Ensure that the above 4Ss are implemented and followed properly. Everyone is aware of the standardized maintenance and work procedures and practices them daily. Time and resources should be allocated to the 5S activities. Conduct 5S audit for evaluation. 5S Audit 5S Maturity Calculate your organization's maturity level using the above matrix. The levels of all the 5Ss should be in sync with each other. Thank You References: Toyota way http://leanman.hubpages.com/hub/Seven-Wastes http://yalindanisman.wordpress.com/2012/06/08/mura- muri-ve-muda/ http://www.tpfeurope.com/cms/view/44