2003-2008 B.Sc. Electrical Power and Machines engineering,
Alexandria University (Faculty of Engineering)
In the final year My Graduation Project Was: "Decoupled active and reactive power control of generators (double fed induction generators) in wind farms
Experience
Sub-Led Instrument Engineer 8/ 2014 Daelim Industrial Company
1. KNPC FCC REVAMP, ST AND CT PROJ ECT at MAA Refinery Technical Consultant: Foster Wheeler PMC
Designing and developing new control systems (DCS, IPS, FGS,) Testing, maintaining and modifying existing systems. Liaising with clients, suppliers, contractors and relevant authorities. Providing advice and consultancy support. Developing new business proposals. Provide support to procurement of instrument items. Review and checking of technical vendor submittals for installation requirements.
Sr. Project Engineer 1/ 2011-7/ 2014 Honeywell Process Solutions (KSC)
2. Replacement of Existing ESD Systems with Associated Accessories(Relay System To Microprocessor System)
The project scope is to replace 11 ABB August Systems by Safety Managers. Due to the unavailability of remote I/Os in the Safety Manager the number of SM that will be installed and engineered for this refinery will be 33 and approximate number of I/Os is close to 10,000 hardwired I/Os.
The work for the first phase covers mark-up deviations between Shuaiba refinery ESD logic diagrams and ESD ladder logic from existing ABB August. Participate in commissioning, SAT and start-up phases.
3. Upgrading of Existing Control System in FUP - CCR with Associated Accessories
Honeywell scope covers replacing Honeywell TDC 2000 system in WS from 1 to 5 with new Experion PKS DCS system with C300 Controllers and SM shutdown controllers and in WS-6 Honeywell shall upgrade the existing TPS Control panel to the latest Experion TPS platform Control panel. J ob title: Date J oined Company Name
Major projects
Accomplishments:
J ob title: Date J oined Company Name Major projects
Project Scope:
Accomplishments:
Project Scope:
Linkedin Contact Ibrahim Elsayed +965-66613860 +20-1000884108 Ebrahim.Alsayed@YAHOO.COM Nationality: Egyptian Sex: Male Passport No.:A12752314 Marital Status: Married Born: 21/10/1986
Accomplishments:
Project Scope:
Accomplishments:
Project Scope:
Accomplishments:
Five symmetrical work stations needed to be migrated. 1-DCS (Distributed Control System)
Including documentations work (FDS, DDS, FAT procedures, SAT procedures). Initiate the HMI Displays using ASM Standard. Produce typicals for software implementation in control builder software. Participate in configuration of Logic in control Builder software.
2-ESD (Emergency Shutdown System)
Including documentations work : Detailed Site Survey Report Bill of Materials (BOM) System Drawings Marshalling Cabinet Drawing GA &IA Layout I/O assignment Loop Drawings & Wiring Diagram Factory Acceptance Test Procedure Site Acceptance Test Procedure Design of Function Logic Diagram (FLDs) for Emergency Shutdown System (ESD) for the Plant. Initiate Cause and Effect (C&E). Logic implementation for the plant using Honeywell SMS. Participate in FAT (Factory Acceptance Test) in Honeywell Netherland. Assistance during start-up & commissioning at customer sites.
4. Government of Kuwait, Ministry of Electricity and water Construction and maintenance of 9 Nos. fresh water towers and annexed works at J aber Al-ahmed city
The scope of the project telemetry ,instrumentation and control (TIC) works shall comprise the design ,manufacture ,programming and configuration ,off site testing ,delivery to site ,installation ,erection,testing,commissioning and setting work of control system at J aber Al-ahmed WDC
Participate in Putting the full design for DCS&MCC Marshalling Cabinets Participate in proposing all instrumentation Put the full design for routing cables from the water tanks to Marshalling cabinets in rack room Including documentations work: Detailed Site Survey Report Bill of Materials (BOM) Marshalling Cabinet Layout I/O assignment Loop Drawings & Wiring Diagram Cable Schedule
5. KNPC FCC REVAMP, ST AND CT PROJ ECT at MAA Refinery Technical Consultant: Foster Wheeler PMC
The new Upgrade system adds two System Cabinets and one Marshalling Cabinet for one unit. New redundant ESD Safety Manger Controller & IO modules for this project scope will be placed in the new system Cabinet for the second unit and third unit. This project is the first project to implement the FAR (Field Auxiliary Room) in KNPC also the RUSIO also.
Including documentations work : FDS & DDS (Functional and Detailed Design Specification) Bill of Materials (BOM) System Drawings
J ob title: Date J oined Company Name Major projects
Project Scope:
Accomplishments:
J ob title: Date J oined Company Name Major projects
Heat and Load Calculation Marshalling Cabinet Layout I/O assignment & Logic implementation using Honeywell SMS. Loop Drawings & Wiring Diagram FAT & SAT (Factory and Site Acceptance Test Procedure). Design of Function Logic Diagram (FLDs) for Emergency Shutdown System (ESD) for the Plant. Initiate Cause and Effect (C&E).
Process Control & Automation Engineer 2/ 2010 -12/ 2010 KARAD SYSTEMS
1. Zueitina Oil Company, LPG Plant, Libya.
Part of team implementing control Logic and Emergency Shutdown strategy for new Burner management system consisting of four heaters, including:
Design of Function Logic diagram for Burner Management System (BMS) for Four Heaters including startup sequence and shut down sequence using sequential control Module (SCM). J unction Box Termination Detail, Marshalling cabinets and instrument cable schedule. Review Cause and Effect (C&E) Logic implementation for the ESD (Emergency shutdown system) for the plant using Honeywell FSC Logic Implementation for Burner Management System (BMS) including startup sequence, normal shutdown for the Four Heaters using Honeywell Experion C-300.
Verification of pressure and ball, half control valves and check the instrumentation 2. Alexandria for chemical terminal (ALXCT)
Installing and commissioning PLC system (S7-400(H)) and configuration on all instrumentations such as level switches, level transmitters, flow meters, temperature transmitters
3. Exxon Mobil(Alexandria)
Make migration in all PLC system to S7-300 and installing operational panels
4. ALPHA FOAM
Migrate the system from S5 to S7 and make essential installations and install OP 277 Develop the HMI application of the system using WINCC FELIXABLE Certificates
Safety Manager Implementation course (SM-4551 & SM-4554). ICDL(I nternational Computer Driving Licence) European Computer Driving Licence Foundation, License EGY000234889 L1, Service Engineer, Fail Safe Controller (FSC) L1, Service Engineer, Safety Manager System (SMS) P&AS Safety Certified Engineer, Honeywell Process Solution, License 1257
Courses
Honeywell Courses: - Server Engineering and Configuration - Control Execution Environment Controller and ACE - Server and Station Installation and Administration - Graphics Design and Building - Level Troubleshooting and Maintenance - Comprehensive Honeywell Training on Fail Safe Controller (FSC) MATLAB programming and simulations SIEMENS PLC programming (Siemens s7-200,300 & 400) & SIEMENS Operational Panels Programming Safety Manager Implementation Course (SM-4551) Safety Manager Online Modification (SM-4554) Six Sigma Fundamentals Personality Self-motivate Smart Team Leader Good Communication Skills Can Work Under Pressure Self- learning Skills
Mother Language is Arabic fluent in English computer literacy - professional MS Word and Power Point ,Access knowledge - Very good Excel - MATLAB programming and simulations - PLC programming (Siemens s7-200,300 & 400) & SIEMENS Operational Panels Programming clean driving licence Good experience in AutoCAD for electrical diagram Instrumentation Knowledge RLC Relay Logic Control. Good Experience with Consultants Like Foster Wheeler Process Control Fundamentals & Control Valve Basics. Basics of Measurement principles (Flow, Level, Temperature, pressure, etc...). Experience of planning, project management and design. Ability to multi-task in a demanding engineering environment. Familiar with international Standards (DEP, IEC, I SA,) Experience Field Common Activities - Detailed Site Survey Report - Bill of Materials (BOM) Ordering (Cabinets, Modules .etc) - FDS & DDS (Functional and Detailed Design Specification) - Heat and Power Calculation - Order the System Hardware System Drawings - Marshalling Cabinet Design and its Implementation - I/O assignment Creation - Loop Drawings & Wiring Diagram & Cable Schedule - Factory Acceptance Test Procedure - Site Acceptance Test Procedure - Initiate Cause and Effect (C&E) & Logic implementation - Start-up & commissioning at customer sites - AS Built drawings includes ( hardware , software & loop drawings ) - Clearing punch list and close out of project Your Honor, I believe my skills qualify me to be an ideal candidate for the current open Vacancy in your company. I will follow up with you to discuss the possibility of an interview, In the meantime, Please feel free to contact me.