Sunteți pe pagina 1din 4

Education

2003-2008 B.Sc. Electrical Power and Machines engineering,


Alexandria University (Faculty of Engineering)

In the final year My Graduation Project Was:
"Decoupled active and reactive power control of
generators (double fed induction generators) in wind
farms




Experience


Sub-Led Instrument Engineer
8/ 2014
Daelim Industrial Company

1. KNPC FCC REVAMP, ST AND CT PROJ ECT at MAA Refinery
Technical Consultant: Foster Wheeler PMC

Designing and developing new control systems (DCS, IPS, FGS,)
Testing, maintaining and modifying existing systems.
Liaising with clients, suppliers, contractors and relevant authorities.
Providing advice and consultancy support.
Developing new business proposals.
Provide support to procurement of instrument items.
Review and checking of technical vendor submittals for installation
requirements.

Sr. Project Engineer
1/ 2011-7/ 2014
Honeywell Process Solutions (KSC)

2. Replacement of Existing ESD Systems with Associated
Accessories(Relay System To Microprocessor System)

The project scope is to replace 11 ABB August Systems by Safety
Managers. Due to the unavailability of remote I/Os in the Safety
Manager the number of SM that will be installed and engineered for this
refinery will be 33 and approximate number of I/Os is close to 10,000
hardwired I/Os.

The work for the first phase covers mark-up deviations between Shuaiba
refinery ESD logic diagrams and ESD ladder logic from existing ABB
August.
Participate in commissioning, SAT and start-up phases.

3. Upgrading of Existing Control System in FUP - CCR with Associated
Accessories

Honeywell scope covers replacing Honeywell TDC 2000 system in WS
from 1 to 5 with new Experion PKS DCS system with C300 Controllers and
SM shutdown controllers and in WS-6 Honeywell shall upgrade the
existing TPS Control panel to the latest Experion TPS platform Control
panel.
J ob title:
Date J oined
Company Name

Major projects


Accomplishments:











J ob title:
Date J oined
Company Name
Major projects



Project Scope:




Accomplishments:








Project Scope:




Linkedin Contact
Ibrahim Elsayed +965-66613860 +20-1000884108 Ebrahim.Alsayed@YAHOO.COM
Nationality: Egyptian Sex: Male Passport No.:A12752314
Marital Status: Married Born: 21/10/1986


Accomplishments:



























Project Scope:





Accomplishments:














Project Scope:






Accomplishments:




Five symmetrical work stations needed to be migrated.
1-DCS (Distributed Control System)

Including documentations work (FDS, DDS, FAT procedures, SAT
procedures).
Initiate the HMI Displays using ASM Standard.
Produce typicals for software implementation in control builder software.
Participate in configuration of Logic in control Builder software.

2-ESD (Emergency Shutdown System)

Including documentations work :
Detailed Site Survey Report
Bill of Materials (BOM)
System Drawings
Marshalling Cabinet Drawing GA &IA Layout
I/O assignment
Loop Drawings & Wiring Diagram
Factory Acceptance Test Procedure
Site Acceptance Test Procedure
Design of Function Logic Diagram (FLDs) for Emergency Shutdown
System (ESD) for the Plant.
Initiate Cause and Effect (C&E).
Logic implementation for the plant using Honeywell SMS.
Participate in FAT (Factory Acceptance Test) in Honeywell Netherland.
Assistance during start-up & commissioning at customer sites.

4. Government of Kuwait, Ministry of Electricity and water
Construction and maintenance of 9 Nos. fresh water towers and
annexed works at J aber Al-ahmed city

The scope of the project telemetry ,instrumentation and control (TIC)
works shall comprise the design ,manufacture ,programming and
configuration ,off site testing ,delivery to
site ,installation ,erection,testing,commissioning and setting work of
control system at J aber Al-ahmed WDC

Participate in Putting the full design for DCS&MCC Marshalling Cabinets
Participate in proposing all instrumentation
Put the full design for routing cables from the water tanks to Marshalling
cabinets in rack room
Including documentations work:
Detailed Site Survey Report
Bill of Materials (BOM)
Marshalling Cabinet Layout
I/O assignment
Loop Drawings & Wiring Diagram
Cable Schedule

5. KNPC FCC REVAMP, ST AND CT PROJ ECT at MAA Refinery
Technical Consultant: Foster Wheeler PMC

The new Upgrade system adds two System Cabinets and one Marshalling
Cabinet for one unit. New redundant ESD Safety Manger Controller & IO
modules for this project scope will be placed in the new system Cabinet
for the second unit and third unit.
This project is the first project to implement the FAR (Field Auxiliary
Room) in KNPC also the RUSIO also.

Including documentations work :
FDS & DDS (Functional and Detailed Design Specification)
Bill of Materials (BOM)
System Drawings









J ob title:
Date J oined
Company Name
Major projects

Project Scope:


Accomplishments:












J ob title:
Date J oined
Company Name
Major projects

Heat and Load Calculation
Marshalling Cabinet Layout
I/O assignment & Logic implementation using Honeywell SMS.
Loop Drawings & Wiring Diagram
FAT & SAT (Factory and Site Acceptance Test Procedure).
Design of Function Logic Diagram (FLDs) for Emergency
Shutdown System (ESD) for the Plant.
Initiate Cause and Effect (C&E).

Process Control & Automation Engineer
2/ 2010 -12/ 2010
KARAD SYSTEMS

1. Zueitina Oil Company, LPG Plant, Libya.

Part of team implementing control Logic and Emergency Shutdown strategy for
new Burner management system consisting of four heaters, including:

Design of Function Logic diagram for Burner Management System (BMS)
for Four Heaters including startup sequence and shut down sequence
using sequential control Module (SCM).
J unction Box Termination Detail, Marshalling cabinets and instrument
cable schedule.
Review Cause and Effect (C&E)
Logic implementation for the ESD (Emergency shutdown system) for the
plant using Honeywell FSC
Logic Implementation for Burner Management System (BMS) including
startup sequence, normal shutdown for the Four Heaters using Honeywell
Experion C-300.

Automation project Engineer
8/ 2008 -1/ 2010
ENCON-IS(SOULINTEC)

1. Air Liquide Egypt (Alexandria, Egypt)

Verification of pressure and ball, half control valves and check the
instrumentation
2. Alexandria for chemical terminal (ALXCT)

Installing and commissioning PLC system (S7-400(H)) and configuration
on all instrumentations such as level switches, level transmitters, flow
meters, temperature transmitters

3. Exxon Mobil(Alexandria)

Make migration in all PLC system to S7-300 and installing operational
panels

4. ALPHA FOAM

Migrate the system from S5 to S7 and make essential installations and
install OP 277
Develop the HMI application of the system using WINCC FELIXABLE
Certificates


Safety Manager Implementation course (SM-4551 & SM-4554).
ICDL(I nternational Computer Driving Licence) European Computer Driving
Licence Foundation, License EGY000234889
L1, Service Engineer, Fail Safe Controller (FSC)
L1, Service Engineer, Safety Manager System (SMS)
P&AS Safety Certified Engineer, Honeywell Process Solution, License 1257

Courses

Honeywell Courses:
- Server Engineering and Configuration
- Control Execution Environment Controller and ACE
- Server and Station Installation and Administration
- Graphics Design and Building
- Level Troubleshooting and Maintenance
- Comprehensive Honeywell Training on Fail Safe Controller (FSC)
MATLAB programming and simulations
SIEMENS PLC programming (Siemens s7-200,300 & 400) & SIEMENS
Operational Panels Programming
Safety Manager Implementation Course (SM-4551)
Safety Manager Online Modification (SM-4554)
Six Sigma Fundamentals
Personality
Self-motivate
Smart
Team Leader
Good Communication Skills
Can Work Under Pressure
Self- learning
Skills



Mother Language is Arabic
fluent in English
computer literacy
- professional MS Word and Power Point ,Access knowledge
- Very good Excel
- MATLAB programming and simulations
- PLC programming (Siemens s7-200,300 & 400) & SIEMENS
Operational Panels Programming
clean driving licence
Good experience in AutoCAD for electrical diagram
Instrumentation Knowledge
RLC Relay Logic Control.
Good Experience with Consultants Like Foster Wheeler
Process Control Fundamentals & Control Valve Basics.
Basics of Measurement principles (Flow, Level, Temperature, pressure,
etc...).
Experience of planning, project management and design.
Ability to multi-task in a demanding engineering environment.
Familiar with international Standards (DEP, IEC, I SA,)
Experience Field
Common Activities
- Detailed Site Survey Report
- Bill of Materials (BOM) Ordering (Cabinets, Modules .etc)
- FDS & DDS (Functional and Detailed Design Specification)
- Heat and Power Calculation
- Order the System Hardware System Drawings
- Marshalling Cabinet Design and its Implementation
- I/O assignment Creation
- Loop Drawings & Wiring Diagram & Cable Schedule
- Factory Acceptance Test Procedure
- Site Acceptance Test Procedure
- Initiate Cause and Effect (C&E) & Logic implementation
- Start-up & commissioning at customer sites
- AS Built drawings includes ( hardware , software & loop drawings )
- Clearing punch list and close out of project
Your Honor, I believe my skills qualify me to be an ideal candidate for the current open Vacancy in your
company.
I will follow up with you to discuss the possibility of an interview, In the meantime,
Please feel free to contact me.

S-ar putea să vă placă și