Information Technology

Final Project Document

02/10/2014










2

Project Objectives
The main objective for this project is to build two networks that will manage and maintain
connection between employees, manage a database, and provide a entertainment service to guests.
The project consists of two networks in which the employees will have a physical network that will be
connected to a server. The clients will have a wireless network in which they can have the entertaining
service and the internet. The objectives for this project include:
Do a site map and analysis of the existing property.
Complete installation of network materials.
Complete configuration of wired network.
Complete configuration of the wireless network
Complete the verification process.
Seek approval of project.
Project Assumptions and Constraints
Assumptions
Database software should be working correctly once all the information is put in.

System communication should be working right after installed.

Wired network should be easy to set up.

Wireless network should be working in every unit.

Media server connection should work from every unit.

The backup server should be working after configured with the wired network.

The restoration server should be able to store data from the wired network and the wireless
network.
Constraints
Pulling wire might be difficult in some areas.
Configuration of connectivity might be difficult.
Building the media server might be complicated.
There could be some delays in making the database working properly and set up to the clients
standard.
3

The wireless network might not work in all the units.

Project Scope
Scope of the Project:
The project is intended to achieve communication of staff.

The project will achieve better organization of information.

The project will achieve implementing services to attract customers.

The project will achieve business improvements to be more efficient.

The project will achieve better services for the customers.

Items that are out of scope:
Customers will like the entertainment service.

Customers will appreciate the wireless network in the property.

Project does not include a service contract.

Project does not include a website.

Project does not include updates of software.

Project does not include upgrades of hardware.

Internet service provider.

Support for hardware.

Project Timeline:
1. Complete a analysis of property
Do a site map and technology analysis of the existing property.
Do a analysis of what material is needed for the project.
Do research of material needed and make an estimate cost.
Seek acceptance from the client.
1-3 Days

2. Complete installation of network materials
4

Install cabling of wired network.
Deliver materials to locations in the property.
Connect and configure wired network systems.
Install wireless access point
Install firewall hardware for wireless network.
Install firewall for wired network
Setup the media sever for clients entertainment
Install and configure RAID on servers.
Verify whole system and networks.
Seek client's completion approval.
1-2 Days

3. Complete configuration of wired network
Configure the router.
Configure the two switches.
Configure the firewall hardware.
Configure the database software.
Configure the server software.
Configure the backup service.
Configure the restoration service.
1-3 Days

4. Complete configuration of the wireless network.
Configure the wireless router
Configure the firewall to the wireless network.
Configure the media server on the wireless network
1 Day

5. Complete the verification process.
Verify the connections in the cable.
Verify the firewall hardware.
Verify each system that is running to standards.
Verify the database for any errors.
Verify the server for any errors.
Verify the backup server for assurance.
Verify the restoration hardware that its configured properly.
Verify the router.
Verify the wireless router.
Verify the two switches.
Verify the media server.
1 Day

6. Seek approval of project.
Walk with the owner and do an overview of what was done in the project.
Train the owner on the database software.
Complete project completion documentation.
1 Day

5



Project Budget

First Budget Prediction for the Project:

Wired Network and Wireless Network

Router $800.00
Switches $1000.00
Cable $500.00
Firewall $500.00
Database software $800.00
Server software $1000.00
Backup hardware and software $1200.00
Restoration hardware $800.00
Media server build $1000.00
Wireless router $500.00
Labor $15000.00
Total $23,100.00



6

Second Budget Report without changes

Dan Robertson Project helper
To help the manager with project and
make sure that work is met by quality
standards. 16.00 $ 48 768.00 $
Total 3,488.00 $
Name of product From what source purchased Model Warranty Yes/No Quantity Cost Total
Cisco Router Newegg.com CISCO1921-SEC/K9 Yes 1 913.99 $ 913.99 $
Cisco Switch Newegg.com SRW2008-K9-NA Yes 1 218.00 $ 218.00 $
Cisco Firewall Newegg.com WSA S170 Yes 1 2,164.99 $ 2,164.99 $
Cisco Wireless Router Newegg.com 819HG Yes 1 1,616.99 $ 1,616.99 $
Cable Newegg.com CY-CAT6-1K(CM)-ST-BL No 6 110.28 $ 661.68 $
Restoration Hardware Newegg.com ARC-8050 Yes 1 1,449.99 $ 1,449.99 $
Database Software Microsoft store N/A Yes 1 60.00 $ 60.00 $
Backup Hardware WesternDigital.com WDBWWD0160KBK Yes 1 1,079.99 $ 1,079.99 $
Backup Software Newegg.com GDSTS2014-102 Yes 2 199.95 $ 399.90 $
Media Server Build WesternDigital.com WDBABZ0020BBK Yes 51 259.99 $ 13,259.49 $
PC Computer system Dell.com OptiPlex 3011 Yes 10 849.00 $ 8,490.00 $
Total 30,315.02 $
Estimated Material and Equipment Cost

New Propose Modified Budget:
The changes that are made is that the Western digital devices (Highlighted in yellow) for the
media server is the new item: WD My Cloud EX4 16TB: 4-Bay Personal Cloud Storage WDBWWD0160KBK-
NESN. This item replaced the old previous item and the new total has been modified to meet the new budget
needs for the project.

Project Name Date
San Diego Luxury Appartment
rentals 1/6/2014
Individual name Role in project Responsibilities Paid per hour Hours Total paid
Claudia Gocan Manager of project
To manage the project, deal with
troubleshooting, intallation,
configuring, verification of project. 40.00 $ 68 2,720.00 $
Dan Robertson Project helper
To help the manager with project and
make sure that work is met by quality
standards. 16.00 $ 48 768.00 $
Total 3,488.00 $
Name of product From what source purchased Model Warranty Yes/No Quantity Cost Total
Cisco Router Newegg.com CISCO1921-SEC/K9 Yes 1 913.99 $ 913.99 $
Cisco Switch Newegg.com SRW2008-K9-NA Yes 1 218.00 $ 218.00 $
Cisco Firewall Newegg.com WSA S170 Yes 1 2,164.99 $ 2,164.99 $
Cisco Wireless Router Newegg.com 819HG Yes 1 1,616.99 $ 1,616.99 $
Cable Newegg.com CY-CAT6-1K(CM)-ST-BL No 6 110.28 $ 661.68 $
Restoration Hardware Newegg.com ARC-8050 Yes 1 1,449.99 $ 1,449.99 $
Database Software Microsoft store N/A Yes 1 60.00 $ 60.00 $
Backup Hardware WesternDigital.com WDBWWD0160KBK Yes 1 1,079.99 $ 1,079.99 $
Backup Software Newegg.com GDSTS2014-102 Yes 2 199.95 $ 399.90 $
Media Server Build newegg.com WDBWWD0160KBK-NESN Yes 5 1,149.99 $ 5,749.95 $
PC Computer system Dell.com OptiPlex 3011 Yes 10 849.00 $ 8,490.00 $
Total 22,805.48 $
Estimated Labor Costs
Estimated Material and Equipment Cost
Labor calculations
7

Project Risks




Risk Grading Key:


Risk Comments
I rated the risk of the materials not being delivered on time a low risk but a high level of
seriousness because it will influence the deadline for the project and it will delay some services
for the customer.
I rated the risk of the equipment being shipped being damaged while shipping a low risk but a
high level of seriousness because if the equipment is damaged it won't work properly and the
warranty might be invalid if not returned on time. This will also delay some deliverables from
happening due to the waiting of new equipment being shipped.
I rated the risk of the equipment not working properly a low risk but a high serious level because
it will cause other equipment not to work and will slow down the configuring process for me
when it will be time to configure the system.
Risk Assessment
Risk Likelihood Seriousness Grade Change
Materials not being delivered on
time
Low High B
Increase/

New
Equipment being damage while
shipping
Low High B Increase
Equipment not working properly Low High B Increase
Grade
E Extreme
A High/High
B High/Medium or Medium/High
C High/Low or Medium/Medium
D Medium/Low
N Low/Low
8

The risk assessment for this project is important to understand the evaluation and apply any necessary
means to help protect the company. The risks that follow this project are as follows:

Vulnerabilities
1. Database software can be invalid

4. Backup power supply can fail

2. Backup recovery set up can fail

5. Configuration for router can fail

3. Firewall can not be working properly

6. Configuration for security on systems can fail


Threats
1. Viruses can infect the computer system

5. Media server can be attacked the network

2. Malware can infect the database software

6. Thieves can sneak in when the business is not
busy and try to get the wireless security code or
manipulate the customer data or network

3. Email virus can infect the employee system
network.

7. Employee can accidently deleting database file

4. War drivers try to access the wireless network

8. The firewall and the network can get attacked
with simultaneous attacks



1. Fire damaging the equipment

8. Network blackout
2. Flooding or water accessing the IT room

9. System failure or slowdown

3. Employee theft of data

10. Data manipulation

4. Customer theft of data

11. Hardware failure

5. Employee network being hacked

12. Hardware theft
6. Media server being hacked

13. Configuration failure

7. Breach into IT room

14. Final system failure

9


Project Impact
Impacts of Implementation on the Business

The impact of the changes on the project will be projected as follows:
The project manager can have a delay in training the employees.
The manger can have a delay in finishing the installation and configuration of the media
part of the project.
The configuration of the new item proposed can have a unexpected integration problem
and can delay the configuration process.

Risk Likelihood and impact
Threat Rating Rating base on Frequency and Time
Low Possible to occur less than once a year
Medium Possible to occur once a year
High Possible to occur more than once a month
Threat
Rating
Risk Impact on
organizational data
integrity
Risk impact on
public trust
Risk impact on company
value
1. Fire damaging the
equipment
Low Impact would be
that departments
and service would
be closed.
The public can
withdraw doing
business
The company will need to
assess the damage and
rebuild the damaged area to
add new value to property.
2. Flooding or water
accessing the IT room
Low Impact would be
that data would be
lost due to
equipment damage
The public can
withdraw from
doing business
The company will need to
assess the damage and
assemble a plan to rebuild
the IT room.
10

3. Employee theft of
data

Low Impact would be
that employee
would have
customer data
Public trust would
go down in
showing that
company can't
secure their data
The company value will be
negative in which data has
been taken and it will be a
part of its company history
4. Customer theft of
data
Low Impact will be that
the data can be
sold or used as
money theft
The public trust
would be down in
which customers
won't come
The company has to do a
refourm of security and
include customer as possible
threats of theft
5. Employee network
being hacked

Medium Impact will be that
data can be
compromised and
used in negative
way
The public will
have a negative
response and not
trust the company
The value will be affected
and have vulnerabilities to
future attacks.
6. Media server being
hacked

Medium Impact will be that
the company will
have to reinvest
into media
The public won't
be apart of this
theft
The value will decrease in
which it will delay services
for customers
7. Breach into IT room

Medium Impact will be that
data can be
retrieved or
equipment can be
damaged
The public can
withdraw from
business
The value will decrease in
which services will be
delayed
8. Network blackout Medium Impact will be data
loss
The public won't
know
The value can decrease due
to data loss
9. System failure or
slowdown
High Impact data in
which access will be
delayed
The public can
have negative
impact if it's not
improved
The value can decrease if the
problem persists
10. Data manipulation Low Impact on data in
which data can be
misunderstood
The public can
misunderstand
and cause
negative impact
The company value will
decrease and needs to take
measures for prevention
11. Hardware failure Medium Impact on data in
which data will not
The public can
withdraw from
The company value will
decrease and must get
11


Roles and Responsibilities of the Project Team Members
Team member role: Sponsor
o Team member Name: John Roberts
Team member Responsibilities: Responsible for approvals of objectives,
project charter, and plan, announce changes, confirm goals and
objectives.

Team member role: Project Manager
o Team member Name: Claudia Gocan
Team member responsibilities: Develop the project plan, identify project
deliverables, identify risks and develop risk management plan, direct
team members under the manager to do tasks, scope control, change
management, maintain documentation, and communicate to all
members of the project.

Team member role: Team Member
o Team member name: Joe Pal
Team member responsibilities: Assist project manager in tasks,
understand work to be completed, inform the project manager of any
issues, scope changes, and risk and quality concerns.

Team member role: Customer
be accessible business replacement hardware
12. Hardware theft Low Impact will be data
loss
The public won't
know
The value can decrease due
to data loss
13. Configuration failure Medium Impact on data in
which data will not
be accessible
The public can
withdraw from
business
The company value will
decrease and must get
replacement hardware
14. Final system failure Medium Impact on data in
which data will not
be accessible
The public can
withdraw from
business
The value can decrease if the
problem persists
12

o Team member name: Bob Dole
Team member responsibilities: Partner with the sponsor and the project
manager to create the project charter, partner with the project manager
to manage timeline, work plan, testing, resoruces, training and
documentation of procedures, sign off on deliverables.

Team member role: Subject Matter Expert
o Team member name: Ted Gore
Team member responsibilities: Maintain up-to-date experience and
knowledge on the subject matter and to provide advice on what is
critical to the performance of the project task.

Reporting and Communication Plan

For each member of this project there will be a reporting and communication plan in which are
procedures for each member to follow in order to maintain up-to-date communication with
each other.

The communication plan includes:
If there is a need for communication, the member should first contact the person on
site.
If the person is not on site, the member should text message the person.
If the person is not responding to the message within 15 minutes they should email the
person to get the message.
All members that are involved in the project have a talk and go device that is instant message. They
are required to use it when necessary to contact someone.









13


Order of Operation on Objectives an Deliverables





14



Project Success Metrics and Measures
Metrics
o Measures

Install cabling of wired network.
o Tested every cable for the wired network to have connectivity for the
network.
Deliver materials to locations in the property.
o The materials were delivered securely in the right IT room and data
closets throughout the property.
Install wireless access point router.
o Installed the router and success of startup and operation.
Install firewall hardware for wireless network.
o Installed firewall on the rack and started successfully.
Install firewall for wired network.
o Installed firewall for wired network and started successfully.
Setup the media sever for clients entertainment
o Started setup for media server and success of operation.
Install and configure RAID on servers.
o Installed the RAID servers and show success of operation.
Connect and configure wired network systems.
o Connected all the cables to the network and tested for quality. Test
approved
Verify whole system and networks.
o All devices are tested and observed for errors and problems. Test
approved.
Seek client's completion approval.
o Developed a document and setup a walk through to get approval of phase
1 and to start phase 2.
Configure the router.
o Start configuring the router with network commands and test for success.
Configure the two switches.
o Start configuring the swtich with network commands and test for
success.
Configure the firewall hardware.
o Start to configure the firewall hardware with security commands and test
of success.
Configure the database software.
o Start to configure the database software and run basic operations, setup
and configurations then test for success.
Configure the server software.
o Start to configure the server software and setup the server for the
business to hold the files and other media for the business and test for
success.
Configure the backup service.
15

o Start to configure the backup service and test for success of file backup.
Configure the restoration service
o Start to configure the RAID restoration system and setup and test for
success.
Test and seek approval
o Started to test the systems to observe operations. Develop a approval
document form the client to begin training.

Project Lessons Learned

The lessens learned in relation to the objectives is that my team accomplished
all of the objectives without any major problems.

My team and I were able to meet all the clients timeline requirements and was
able to make everything working.

In the configureation part of the project, my team ran into minor problems with
commands not working, but was able to do research and fix the problem to
operating status.

My team and I had a hold back of 4 hours due to the change in the media
entertainment server. The media server that is installed now is new on the
market and I have no experience with it. It is now up and running for all the
guests.

The routers for the different networks worked great and had no major
problems.

The database software was installed and was working great for the front clerks
to get aware of the program before the training session.

The wireless router had some issues with the wireless connection getting to all
of the property, but with the approval of the owner we added some wireless
range extenders throughout the property to meet the wireless network
objective.





16

Network Topology



Property Layout


17











































18