PUBLIC WORKS

ANALYSIS OF RATES
FOR
ROAD WORKS
GOVERNMENT OFTHE REPUBLIC OFTHE UNION OF MYANMAR
MINISTRY OF CONSTRUCTION
SECOND EDITION
JUNE 2013
Standard Datafor Working Out Rates Per Unit Quantity ofltems of work
Sr.
No.
1
2
3
Particulars of Materials and Labour
I . Road Work
Earth Work Excavation in Ordinary
Soil either in Embankment or in
Cutting with an initial lead of 30m
and lift of 1b5 m for 100 cum.
Head Worker
Digger
Workers for carrying
Sundries
water charges
contractor's profit and overheads
Unit
Man-Day
, ,
, ,
L.S.
L.S.
L.S.
Quantity
3.5
26.5
26.5
-
( Taxes , safety charges , management & etc.)
Remarks
Page 1
(Tasks = 3.80 cum for 1 digger.)
3.5
42.0
28.0
-
3.5
77.5
28.5
-
Earth Work Excavation in Soft
Lateritic, Gravelly or Kanker Soil
either in Embankment or in Cutting
with an initial lead of 30m and lift
of 1.5m for 100 cum.
Head worker
Digger
Workers for carrying
Sundries
water charges
contractor's profit and overheads
(Tasks = 2.40 cum for 1 digger.)
(Tasks = 1.29 cum for 1 digger.)
Man-Day
,,
,,
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
Earth Work Excavation in Average
Lateritic, Gravelly or Kanker Soil
either in ~mba nkme nt or in Cutting
with an initial lead of 30m and lift
of 1.5m for 100 cum.
Head Worker
Digger
Workers for carrying
Sundries
water charges
contractor's profit and overheads
Man-Day
,,
,,
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
Standard Datafor Working Out Rates Per Unit Quantity of Items of work
S r.
No.
4
5
6
Particulars of Materials and Labour
I . Road Work .... contd.
Earth Work in Excavation in Hard
Lateritic, Gravelly or Kanker Soil
either in Embankment or in Cutting
with an initial lead of 30m and lift
of 1.5 m for 100 cum.
Head Worker
Digger
Workers for carrying
Sundries
water charges
contractor's profit and overheads
Remarks
Page 2
(Tasks = 0.93 cum for 1 digger.)
Unit
Man-Day
77
, ,
L.S.
L.S.
L.S.
35.5
159.0
9.0
9.0
4 8
160.5
176.5
194.5
9.0
17.5
17.5
-
Quantity
3.5
106
3 5
-
( Taxes , safety charges , management & etc.)
Excavation in Soft Rock including
Carriage of Stone for 15 m for
100 cum.
Miner
Workers for'carrying
Smith
Bellow boy
Sundries
water charges
contractor's profit and overheads
Man-Day
, ,
, 9
) ?
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
Excavation in Hard Rock by blasting
including removing Stones for 100 cum.
Blasting powder
Charcoal
Miners +
Workers
Blacksmith
Bellow boy
Hammer man
Sundries
water charges
contractor's profit and overheads
kg
kg
Man-Day
, ,
, ,
9 ,
,,
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
Standard Data for Working Out Rates Per Unit Quantity ofItems of Work
Quantity
35.5
176.5
35.5
141.5
-
35.5
141.5
-
35.5
70.5
247.5
-
Unit
Man-Day
),
L.S.
L.S.
, L.S.
Sr.
No.
7
Remarks
Page 3
Particulars of Materials and Labour
I . Road Work .... contd.
Collection of Soling Stones (Local) at
the Quarry Site for 100 cum.
Hammer man
Workers (collection and stacking)
Sundries
water charges
contractor's profit and overheads
8
9
10
( Taxes , safety charges , management & etc.)
I
Collection of Soling Stones (Kanker) at
the Quarry Site for 100 cum.
Hammer man
Workers (collection and stacking)
Sundries
water charges
contractor's profit and overheads
Man-Day
),
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
Collection of Soling Stones (Lateritic
/
Boulders) at the Quarry Site for
100 cum.
Hammer man
Workers
Sundries
water charges
contractor's profit and overheads
Man-Day
,,
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
I
Breaking Crushed Rock from Boulders
(38mm to 50mm) at Quarry Site for 100 cum.
Hammer man
Workers for getting out boulder (Male)
Workers for breaking
Sundries
water charges
contractor's profit and overheads
Man-Day
, ,
,)
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
' Standard Datafor Working Out Rates Per Unit Quantity ofltems of Work
I
Sr.
No.
1 1
12
13
Particulars of Materials arid Labour
I . Road Work .... contd.
Collection and Conversion of Blasted
Quantity
35.5
70.5
-
53.0
106.0
70.5
35.5
-
Unit
Remarks
Page 4
Debris to 150mm to 225mm Soling Stones at
Quarry Site for 100 cum.
Labour
Hammer man
Workers for collecting and stacking
Sundries
water charges
contractor's profit and overheads
Man-Day
,,
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
Collection and Conversion of Blasted
Debris to Crushed Rock at Quarry Site
for 100 cum.
Labour
Hammer man
Workers for collecting and boxing
Sundries ,
water charges
contractor's profit and overheads
Man-Day
, y
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
I
Breaking Crushed Rock (50mm-100mm) from
Boulders at Quarry Site including
Boxing for 100 cum.
Labour
Hammer man
Workers for boxing
Sundries .
water charges
contractor's profit and overheads
Man-Day
, ,
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
Standard Datafor Working Out Rates Per Unit Quantity ofltems of Work
Particulars of Materials and Labour
Vo.
I . Road Work .... contd.
14 Breaking apd Boxing 38mm to 50mm
Remarks
l ~ r e a k i n ~ and Boxing 12.5mm to 19mm
50mm to lOOmm Crushed Rock at Quarry Site
lchippings from 38mm to 50mm Crushed I
for 100 cum.
Labour
Workers for breaking and boxing
Sundries
water charges
contractor's profit and overheads
Man-Daj
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
I
Rock at Quarry Site for 100 cum.
Labour
Workers for breaking and boxing,
etc.
Sundries
water charges
contractor's profit and overheads
I
17 Collection of Kanker or Laterite
Gravel at Quarry Site for 100 cum.
Labour
Workers for digging, boxing, etc.
Sundries
water charges
contractor's profit and overheads
Man-Day
L.S.
L.S.
L.S.
16 Breaking '6.25mm to 19mm Chippings from
50mm to lOOmm Crushed Rock at Quarry Site j
Man-Day
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
I
100 cum.
Labour
Workers for..breaking and boxing
Sundries
water charges
contractor's profit and overheads
rom
176.5
530.0
-
Man-Day
L.S.
L.S.
L.S.
)( Taxes , safety charges , management & etc.)
( Taxes , safety charges , management & etc.)
I
Standard Dat afor Working Out Rates Per Unit Quantity ofIterns of Work
Standard Dat afor Working Out Rates Per Unit Quantity ofltems ojWork
- -
Sr.
No.
2 1
22
23
Particulars of Materials and Labour
I . Road Work .... contd.
Unit
48
160.6
176.5
9
9
35.5
388.5
48
160.6
1 76.5
9
9
35.5
565.5
212
Quantity
Extraction of 19mm to 25.4mm Gauge Crushed
Remarks
Page 7
Rock including Blasting and Breaking
to size at Quarry Site for 100 cum.
Blasting powder
Charcoal
Miners
Blacksmith
Bellows boy
Hammer man
Workers for breaking and stacking
water charges
contractor's profit and overheads
kg
kg
Man-Day
Man-Day
,,
, ,
9,
L.S.
L.S.
( Taxes , safety charges , management & etc.)
Extraction of 6.25mm to 19mm Gauge
I
Crushed Rock including Blasting and
Breaking to size at Quarry Site for
I
100 cum.
Blasting powder
Charcoal
Miners
Blacksmith
Bellows boy
Hammer man
Workers for breaking and stacking
water charges
contractor's profit and overheads
kg
kg
Man-Day
Man-Day
,,
,,
) ,
L.S.
L.S.
( Taxes , safety charges , management & etc.)
Collection of Boulders from River Bed
for Soling within 400 m for 100 cum.
Workers for collection and stacking
water charges
contractor's profit and overheads
Man-Day
L.S.
L.S.
( Taxes , safety charges , management & etc.)
Standard Datafor Working Out Rates Per Unit Quantity ofltems of work
- - -
Sr.
No.
24
25
26
27
Quantity
106
141.5
141.5
212.0
-
35,336
176.5
-
35.2
70.5
-
Particulars of Materials and Labour
I . Road Work .. ..contd.
Breaking 38mm to 50mm River
Shingles within 400 m for 100 cum.
Workers for collection
Workers for breaking and stacking
Sundries
water charges
Remarks
Page 8
Unit
Man-Day
Man-Day
L.S.
L.S.
contractor's profit and overheads I L.S.
( Taxes , safety charges , management & etc.)
Collection of River Shingle Chippings
12.5mm to 19mm within 400 m for
100 cum.
Workers for collection
Workers for breaking and stacking, etc.
Sundries
water charges
contractor's profit and overheads
No.
Man-Day
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
Breaking Brick into 38mm to 50mm
Aggregate for 100 cum.
Bricks
Workers for breaking and stacking
Sundries
Particulars of Materials and Labour
water charges
contractor's profit and overheads
No.
Man-Day
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
Collection qf Sand within 2km for
100 cum.
Trolargyi
Workers for loading and unloading
Sundries
water charges
contractor's profit and overheads
Day
Man-Day
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
Standard DataJor Working Out Rates Per Unit Quantity oofltems of wor k
S r.
No.
28
29
30
Particulars of Materials and Labour
I . Road Work .... contd.
Collection of Gravel within 2km for
100 cum.
Trolargyi
Workers for digging, carrying, loading
and unloading
Sundries
Unit
No.
Man-Day
L.S.
Quantity
35.2
14 1.5
water charges L.S.
contractor's profit and overheads 1 L.S.
( Taxes , safety charges , management & etc.)
Compaction of Crushed Rock with
Roller including Sand Blinding 114mm
Remarks
Page 9
112
1.3
112
5 .
-
112
1.7
0.7
1.2
1
12.5
-
for 100 sqm.
Roller charges
Sand for blinding (12.5mm Thick Sand)
Head Worker
Workers
Sundries
water chargis
contractor's profit and overheads
Roller Efficiency
3-Wheeled Roller 230sq.rn/hr
230x4h~920sq. m
No. of passes=920/100=9.2
(50% Left)
(Add Metal 35% and 15% Sand)
0.05mx 1 00m2=5m3
(Metal (5cumx35%)=1.75cum.)
(Sand 15% of 5cum=0.75cum)
230~4hrs=920sqm.
No. of Passes=920/100=9.2
Day
cum
Man-Day
,,
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
I
Scarifying Old Crushed Rock Road 50mm
deep, 3.6m wide, Screening, Respreading
and Rolling including Sand Blinding.
for 100 sqm.
Roller charges
Addition of Metal
Addition of Sand
Sand for blinding (25% of dug out metal:
Head work&
Workers
Sundries
water charges
contractor's profit and overheads
Day
cum
cum
cum
Man-Day
7 ,
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
Standard Datafor Working Out Rates Per Unit Quantity ofltems of wor k
Sr.
No.
3 1
32
Particulars of Materials and Labour
I . Road Work .... contd.
Bitumen Surface Dressing (lSt Seal)
Unit Quantity
Blinded with 6mm to l9mm Chippings.
for 1000 sqm. .
Bitumen at 1.36kg/sqm
Transport and handling charges
Carriage to site
12.5rnm to 19mm chipping at site
Diesel for SC-3000
Wood
Labour for brushing old surface,
spraying, spreading, etc.
Rolling charges
Diesel for Roller
Wire and bristle brushes
Miscellaneous camber board, etc.
water charges
contractor's profit and overheads
Remarks
Page 10
(Use SC-3000)
1.5
1.5
1.5
22.1
330.5
1.5
65
3
240
-
-
1.4
1.4
1.4
14.7
296
1.4
55
3
240
-
-
Ton
Ton
Ton
cum
litre
Ton
Man-Day
Day
litre
L.S.
L.S.
L.S.
L.S.
(Diesel (20%)+Bitumen (80%)
Bitumen=1.54Ton,
Diesel=330.50Litre
(S.G. of Bitumen = 1.06,
10lbs.=l gal.)(l.36kg/sqm.)
13% wastage.
3-Wheelled Roller---I 0 Li t r eh
Bitumen lTon=Wood 1Ton
Roller Efficiency
3-Wheeled Roller 230sqm/hr
Work one-334m2 per day.
Diesel for Roller=l Ox8hrsx3
days=240 Litre.
23Ox8x3=5520sqm.
(Use SC-3000)
Diesel (20%)+Bitumen (80%)
Bitumen=1.38Ton,
Diesel=296Litre.
S.G. of Bitumen = 1.06,
I kg.=l Litre.) 13% wastage
Bitumen 1 Ton=Wood lTon
230~8~3=5520sqrn.
No. of Passes=5520/1000=5.52
Work Done-334sqm per day.
Diesel for Roller= 1 Ox8hrsx3
days=240 Litre.
( Taxes , safety charges , management & etc.)
Bitumen Surface Dressing (2nd Seal)
Blinded with 6.25mm to 12.5mm Chippings
for 1000 sqm .
Bitumen at 1.22kglsqm
Railway Freight on above
Carriage to site
Grit (Chipping) 6.25mm to 12.5mm
Diesel for SC-3000
Wood
Labour for brushing old surface,
spraying, spreading, etc.
Rolling charges
Diesel for Roller
Wire and bristle brushes
Miscellaneous camber board, etc.
Ton
Ton
Ton
cum
litre
Ton
Man-Day
Day
litre
L.S.
L.S.
Standard Datafor Working Out Rates Per Unit Quantity ofltems of Work
13% wastage.
Sr.
No.
33
1 3% wastage.
13% wastage.
Particulars of Materials and Labour
I . Road Work . . . .contd.
water charges
contractor's profit and overheads
Unit
L.S.
L.S.
Quantity
( Taxes , safety charges , management &
Bitumen for sand at 4kg/m3
Topping Course.
12.5mrn to 19mm chipping at 1.52
cum per 100 sqm
6.25mm to 12.5mm chipping at 1.52
cum.per 100 sqm
Bitumen at 64.08 kg per cum.
Wearing Course.
6.25mm to 12.5mm chipping at 1.37
cum. Pero! sqm
3.12mm to 6.25mm chipping at 1.37
cum. Pero! sqm
Bitumen at 1.22 kg/m2
Sand for final coat at 0.61m3per % sqm
Railway Freight for Bitumen
Carriage to site
Wood fuel
Labour for spreading, spraying, etc.
Roller charges, M. coat
Roller charges, Topping course
Roller charges, W. coat
Wire and bristle brushes
Miscellaneous, tools and plant, camber
board, etc.
water charges
contractor's profit and overheads
( Taxes , safety charges , management &
Remarks
Page 11
0.1
8
8
1.2
7
7
1.4
6.1
5.5
5.5
4.7
170
4.5
1
4.5
-
-
1.2
266.7
1.2
1.2
1.2
1 6
10
etc.)
Ton
cum.
cum.
Ton
cum.
cum.
Ton
cum.
Ton
Ton
cum.
Man-Day
Day
Day
Day
L.S.
L.S.
L.S.
L.S.
etc.)
(Use SC-3000)
Diesel (20%)+Bitumen (80%)
Biturnen=1.243Ton, Diesel=
266.75Litre
S.G. of Bitumen = 1.06,
1 Olbs.=lgal.) 13% wastage
230x8~1 =l840sqm.
No. of Passes= 1 8401 1000=1.84 (Say 2)
Diesel for Roller=l Ox8hrsxl/2
days=40 Litre.
I
Seal Coat with Coarse Sand for 1000 sqm.
Bitumen (1.1 kg/m2)
Diesel for SC-3000
Freight on bitumen
Carriage on bitumen
Wood for heating bitumen
Labour for spraying
Coarse Sand for blinding
Ton
litre
, ,
),
cum.
Man-Day
cum.
Standard Datafor Working Out Rates Per Unit Quantity of Items of Work
Sr.
No.
Particulars of Materials and Labour
I . Road Work .... contd.
Labour for spreading sand
Roller charges
Diesel for Roller
Hire for boiler for heating bitumen
Incidental charges such as brushes,
pouring can, oil, etc.
water charges
contractor's profit and overheads
( Taxes , safety charges , management & etc.)
Unit
Man-Day
Day
litre
Day
L.S.
L.S.
L.S.
Quantity
7
112
40
112
-
Remarks
Page 12
Standard Datafor Working Out Rates Per Unit Quantity of Items of Work
Sr.
No.
1
(a)
Particulars of Materials and Labour
I . Road Work .... contd.
ROAD WORK (BY MACHINE)
Unit Quantity
Earth Work in Excavation by Machine
for 30m average haul for level I
Remarks
Page 13
L.S
1 .O
1 .O
L.S
1.0
1 .O
7.3
7.9
184
2.7
0.4
0.6
0.2
-
142
2.1
0.3
0.5
0.2
Excavation for 1000 cum.(Ordinary
Labour (Dozer)
Workers foi'track cleaning, etc.
Operator
Fitter
or
Labour (Excavator)
Workers for track' cleaning, etc.
Operator
Fitter
Machine (Dozer)
Bull dozer (D-7) (25 Litrelhr.)
(136 m3/hr)
or
Machine (Excavator)
Exacavator (CAT-320) (1 8 Litreh. )
(127 m3/hr)
P.0.L for Operation(Dozer)
H.S.D.
Engine Oil (1.5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.285%)
Sundries
or
P.0.L for Operation(Exacavator)
H.S.D.
Engine Oil (1.5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.285%)
(a) For 1 : 10 up grade dozing
allow 25% increase over level
excavation.
(b) For 1 : 10 down grade
dozing allow 25% deduction
over level excavation.
Soil)
Man-Day
2 >
9 ,
Man-Day
>,
>9
Hour
Hour
litre
litre
litre
litre
kg
L.S.
litre
litre
litre
litre
kg
Standard Datafor Working Out Rates Per Unit Quantity of Items of wor k
Sr.
No.
1
. (b)
Particulars of Materials and Labour
I . Road Work .... contd.
Sundries
water charges
contractor's profit and overheads
Unit
L.S.
L.S.
L.S.
( Taxes , safety charges , management & etc.)
I
Earth Work in Excavation by Machine
for 30m average haul for level 1 I I
Quantity
-
Excavation for 1000 cum.(Gravelly Soil
Labour (Dozer)
Workers for track cleaning, etc.
Operator '
Fitter
or
Labour (Excavator)
Workers for track cleaning, etc.
Operator
Fitter
Machine (Dozer)
Bull dozer (D-7) (25 Litrelhr.)
(136 m3/hr)
or
Machine (Excavator)
Exacavator (CAT-320) (1 8 Litrelhr.)
(127 m3/hr)
P.0.L for Operation(Dozer)
H.S.D.
Engine Oil (1.5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.285%)
Sundries
Remarks
Page 14
Job Efficiency and Fuel
Consumption are as shown in
Appendix A.
or Granular
No
, ,
, ,
No
, ,
-.
Hour
Hour
litre
litre
litre
litre
kg
L.S.
Soil)
L. S
1.0
1 .O
L.S
1 .O
1 .O
8.8
9.5
220
3.3
0.5
0.7
0.3
(a) For 1 : 10 up grade dozing
allow 25% increase over level
excavation.
(b) For 1 : 10 down grade
dozing allow 25% deduction
over level excavation.
Standard Datafor Working Out Rates Per Unit Quantity of Items of work
Life-1 8.3m
,, - 120 days.
Sr.
No.
2
Particulars of Materials and Labour
I . Road Work .... contd.
P.0.L for Operation(Excavator)
H.S.D.
Engine Oil (1.5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.285%)
Sundries
water charges
contractor's profit and overheads
Unit
litre
litre
litre
litre
kg
1,.S.
L.S.
L.S.
3.5
17.5
17.5
35.0
282.5
36x116
35xl112C
Quantity
170
2.5
0.4
0.6
0.2
-
( Taxes , safety charges , management & etc.)
I
Remarks
Page 15
Job Efficiency and Fuel
Consumption are as shown in
Appendix A.
Blasting Hard Rock including removing
debris for 100 cum at quarry site
(Drilling by Manual Labour)
Labour
Miner
Driller
Drill helper
Worker
Tools
Hand drill
Drill bit (1 0' boring)
Hammer (6.36kg)
Man-Day
,,
,,
, ,
Hour
,,
,,
Standard Data for Working Out Rates Per Unit Quantity of Items of Work
Life-60m boring.
Sr.
No.
3
Particulars of Materials and Labour
I . Road Work .... contd.
For Operation
Explosives
Safety fuse
Detonator
Sundries ,
Unit
kg
m
Nos.
L.S.
5.0
3.5
5.0
5.0
35.5
24.0
107.7
160.6
3.2
70.7
282.7
282.7
35x1120
-
Quantity
24
107.7
70.7
-
water charges L.S.
contractor's profit and overheads I L.S.
( Taxes , safety charges , management & etc.)
I
Blasting Hard Rock including removing
Remarks
Page 16
debris for 100 cum at quarry site using
Pneumatic Drill
Lobour
Operator for air compressor
Miner
Driller ,
Helper
Worker for removing debris
For Operation
Explosives
Safety fuse
H.S.D.
Engine Oil
Detonator
Tools and Machine
Air compressor
Pneumatic drill
Drill bit (3m boring)
Sundries
water charges
contractor's profit and overheads
( Taxes , safety charges , management &
Man-Day
,)
, ,
,,
,,
kg.
m
litre
li tre
No.
Hour
Hour
No.
L.S.
L.S.
L.S.
etc.)
Standard Data for Working Out Rates Per Unit Quantity ofItems of wor k
Sr.
No.
4
Particulars of Materials and Labour
I . Road Work .... contd.
Crushing of 100 cum of boulders to
Unit
7
99
3.5
3.5
100
1 12.5
1.6
0.1
0.1
-
144.5
2.2
0.1
1.2
-
Quantity
different sizes of rocks by stone crusher
Labour
Head workers
Workers
Operator ,
Night durwan
Materials
150mm to 225mm boulders
Machine
Stone crusher
14 to 1 8 Tlhr. (9 to 16 Litrelhr.)
For Operation
H.S.D. ( 14 Tlhr)
Engine Oil
Grease
Rosin
Sundries
For Operation
H.S.D. (18 T/hr)
Engine Oil
Grease
Rosin
Sundries
Note
Different sizes of out turned road metals
depends on the size and adjustment of
crushing jaws.
(5 & 6 circle)
water charges
contractor's profit and overheads
( Taxes , safety charges , management &
Remarks
Page 17
Man-Day
, >
,,
,)
cum
litre
litre
kg
kg
L.S.
litre
litre
kg
kg
L.S.
L.S.
L.S.
etc.)
Standard Datafor Working Out Rates Per Unit Quantity ofltems of Work
., Standard Data for Working Out Rates Per Unit Quantity of Items ofwork
Sr.
No.
6
Particulars of Materials and Labour
I . Road Work .... contd.
Construction of Subgrade using
Remarks
Page 19
Unit
Transported Soil 0.3 m(compacted)thickness
Materials
Transported Soil
P.O.L. for Operation
Diesel
Engine Oil (1.5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.285%)
Machines
Compactor
Grader
Smooth-wheel Roller ( 8 - 10 Tons)
Water Bowzer ( Within 8 km)
Water Pump
Labour
Head Worker
Workers
Operator
Helper
water charges
contractor's profit and overheads
( Taxes , safety charges , management &
Quantity
cum
litre
litre
litre
litre
kg
Hr.
Hr.
Hr.
Hr.
Hr.
Man-Day
Man-Day
Man-Day
Man-Day
L.S.
L.S.
etc.)
for1000 sqm.
405
246
3.7
0.5
0.8
0.3
2.7
5.1
4.3
4.8
2.2
1
4
2
2
Compaction Allowance=35%
1 OOOsqm x0.3x1.35 =405 rn3
Standard Data for Working Out Rates Per Unit Quantity ofltems of Work
Sr.
No.
7
8
particular,^ of Materials and Labour
I . Road Work .... contd.
Unit Quantity
Remarks
Page 20
Regrading and Compacting Constructed Subgrade to comply with the Specified
Camber and Gradient before laying
POL for Operation
Diesel
Engine Oil (1.5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.285%)
Machines
Grader
Smooth-wheeled Roller
Water Bowzer
Water Pump
Labour
Head Worker
Labour
Operator
Helper
water charges
contractor's profit and overheads
Sub-base
litre
litre
litre
litre
kg
Hr
Hr
Hr
Hr
Man-Day
Man-Day
Man-Day
Man-Day
L.S.
L.S.
Course For
850
12.7
1.9
2.9
1.1
13.9
43.5
14.2
6.4
10
30
10
5
( Taxes , safety charges , management & etc.)
I
Construction of Sub-base 150mm (compacted)
using 50mmx100mm down crushed rock.
10000 sqm.
Subgrade Preparation
One Roller can compact
230 sqm per Hr by consuming
10 litre of diesel.
150
26.7
8.9
0.5
1.4
1000 sqm
Materials
50mmx100rnrn Crushed Rock
25mmx50mm Crushed Rock
19mm Chipping
9.5rnm Chipping
Coarse Sand
Compaction Allowance=25%
1000m2
1000x1 Opasses/230=43.48 hrs.
43.48x10=434.8 Litre.
Wastage
50mmx 100mm and
25mmx50mm=10%
cum
cum
cum
cum
cum
Standard Data for Working Out Rates Per Unit Quantity of Items of Work
Particulars of Materials and Labour
I . Road Work .... contd.
P.O.L. for Operation
Diesel
Engine Oil (1.5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.285%)
Machines
Smooth-wheel Roller
Labour
Head Worker
Workers
Operator
water charges
contractor's profit and overheads
( Taxes , safety charges , management &
Unit
Hrs.
Man-Daj
Man-Daj
Man-Daj
L.S.
L.S.
etc.)
Construction of 150mm (compacted)thickness Granular
Using Gravel+Soil(3:1 or 4:3) for 1000 sqm Pavement
Materials
1. River Shingle or Chaung Gravel or Hill Gravel (max. Sin
\ *
River Shingle or Chaung Gravel or Hill 4 cum 1 140.6
Sandy Soil I cum 1 46.9
2. River Shingle or Chaung Gravel or Hill Gravel (max. Siz
I I
kiver Shingle or Chaung Gravel or Hill q cum 1 107.1
Gravelly Soil
POL for Operation
Diesel
cum
litre
Remarks
Page 2 1
$ub-base Course
Size Percentage Passing
1 ") : Gravelly Soil (4:3)
Compaction Allowance=25%
1000 rn2x0.1~rn=150 rn3
1 50m3x1 .25=187.5 m3
Standard Data for Working Out Rates Per Unit Quantity ofltems ofwork
Sr.
No.
10
Particulars of Materials and Labour
I . Road Work .... contd.
Engine Oil (1 -5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.285%)
Machines
Loader
Tipper ( 12 m3/ trip, within 8 km)
Grader
Vibratory Roller
Pneumatic-tyred Roller
Smooth-wheel Roller
Water ~ o wz e r (Within 8 krn Lead )
Water Pump
Labour
Head Worker
Workers
Operator
Helper
water charges
contractor's profit and overheads
( Taxes , safety charges , management &
Unit
litre
litre
litre
kg
Hrs
Hrs
Hrs
Hrs
Hrs
Hrs
H r s
H r s
Man-Day
Man-Day
Man-Day
Man-Day
L.S.
L.S.
etc.)
I
Construction of 150mm (compacted) Granular Base Course
Quantity
29.8
4.5
6.7
2.6
4
10.4
6.9
52.2
52.2
4.3
4.5
2
2
7
17
3
Remarks
Page 22
1000x 12 passes/230=52.17 hrs.
52.17x15=782.55 L
Using Crushed Rock+Gravel+Sand+Soil ( 3:5:1:2 ) for 1000 sqm Pavement
Materials
Crushed Rock ( max. Size 1 ")
River Shingle or Chaung Gravel
( max. Size 1 " ) Sand
Sandy Soil
cum
cum
cum
cum
5 1.1
85.2
17
34.1
1000m2x0. 15m=150 m3
- Size Percentape Passing
2" 100%
1" -
318" 30-65%
2.36mm 15-40
0.425mm 8-20
0.075mm 2-8
Standard Datajor Working Out Rates Per Unit Quantity of Items of wor k
Sr.
No.
11
Particulars of Materials and Labour
I . Road Work .. ..contd.
POL for Operation
Diesel
Engine Oil (1.5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.285%)
Machines
Loader
Tipper ( 12 p3/ trip, within 8 km)
Grader
Vibratory Roller
Pneumatic-tyred Roller
Smooth-wheel Roller
Water Bowzer (Within 8 km Lead )
Water Pump
Labour
Head Workers
Workers
Operator
Helper
water charges
contractor's profit and overheads
( Taxes , safety charges , management &
Unit
litre
litre
litre
litre
kg
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Man-Day
Man-Day
Man-Day
Man-Day
L.S.
L.S.
etc.)
Construction of Base Course
150mm (compacted)thickness using 75mm down Crushed
Quantity
1986
29.8
4.5
6.7
2.6
4
10.4
6.9
52.2
52.2
4.3
4.5
2
2.5
7
17.5
3.5
Remarks
Page 23
Rock (1000 sqmx0.15m=150 cum)
Materials
37.5mm down Crushed Rock (48%)
25mmx50mm Crushed Rock (42%)
19mm Chipping (5%)
9.5 mm chipping 25% of 5%
Coarse Sand 75% of 5%
90
78.7
9.4
2.3
7
cum
cum
cum
cum
cum
Compaction Allowance = 25%
1000sqmx0.15m=1 50m3
1 OOOx1 Opasses/230=43.48 hrs.
43.48 x10=434.8 Litre-435 Litre
Standard Data for Working Out Rates Per Unit Quantity ofltems of Work
Sr.
No.
12
Particulars of Materials and Labour
I . Road Work .... contd.
P.O.L. for Operation
Diesel
Engine Oil (1.5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.285%)
Machines .
Smooth-wheel Roller
Labour
Head Worker
Workers
Operator
water charges
contractor's profit and overheads
Unit
litre
litre
litre
litre
kg
Hrs.
Man-Day
Man-Day
Man-Day
L.S.
L.S.
Quantity
435
6.5
1
1.5
0.6
43.5
7
82
6
( Taxes , safety charges , management & etc.)
I
Remarks
Page 24
69.0
4.1
13.9
6.2
0.6
34.8
348
5.2
0.8
1.2
0.4
L.S
Laying of 37.5 mm to 50mm crushed
75 mm compacted thickness
( For 1,000 sqm)
Materials
25mmx50mm Crushed Rock (73.6%)
12.5rnm Crushed Rock (4.4%)
9.5mm xl9mrn Chipping (14.8%)
9.5mm Chipping (6.6%)
Coarse Sand (0.6%)
Machine
Roller (8 Passes)
P.0.L For Operation
H.S.D
Engine Oil 0.5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.285%)
Sundries
-&
Compaction Allowance = 25%
1 000m2x0.075m=75m3
25% Compaction = 93.75m3
1 000m2x8 passes/230=34.78hr
34.78 hrxlO litrelb347.8 Litre-
348 Litre
rock for
cum
cum
cum
cum
cum
Hrs
litre
litre
litre
litre
kg
Standard Datafor Working Out Rates Per Unit Quantity of Items of work
S r.
No.
13
Particulars of Materials and Labour
I . Road Work .... contd.
Labour
Head Worker
Workers
Operator
water charges
contractor's profit and overheads
Unit
Man-Day
77
77
L.S.
I L.S.
Quantity
2.5
3 2
4
( Taxes , safety charges , management & etc.)
Hot Bitumen 37.5mm depth Grouting
(Semi-Grout) over Crushed Rock
Remarks
Page 25
2.5
38.5
2
3.7
19.2
17.4
2 x 1 L/z
1
1.5
174
2.6
0.4
0.6
0.2
-
surface with 6.25mm to 19mm Chipping
for 1000 sqm.
Labour
Head worker
Workers
Operator
Materials
Bitumen (3 .26kg/m2)
Chippings
Machine
Roller (4 passes)
Bitumen heater (to be discarded)
~hermomet i r
For Operation
Wood
H.S.D (10LIhr.)
Engine Oil (1.5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.285%)
Sundries
water charges
contractor's profit and overheads
( Taxes , safety charges , management &
Based on 75mm compacted
thickness.
1 3% wastage.
1 000m2x4 passes/230=17.39 hr
Whenever roller is required
over night one night dunvan
per night is allowed in the
consolidation work.
Bitumen 1 Ton=Wood 0.4 Ton
Man-Day
77
77
Ton
cum
Hrs
Nos
Nos
Ton
litre
litre
litre
litre
kg
L. S
L.S.
L.S.
etc.)
Standard Data for Working Out Rates Per Unit Quantity ofltems of Work
13% wastage.
Sr.
No.
14
15
Particulars of Materials and Labour
I . Road Work .... contd.
Hot Bitumen 50mm depth Grouting
(Semi-Grout) over Crushed Rock
Unit Quantity
2.5
3 8
2
4.3
19.7
17.4
2 x 1 '/z
2 x 1
1.7
1 74
2.6
0.4
0.6
0.2
Surface
Remarks
Page 26
Based on 100rnm compacted
thickness.
Whenever roller is required
over night one night durwan
per night is allowed in the
consolidation work.
Bitumen 1 Ton=Wood 0.4 Ton
(Semi-Grout) for 1000 sqm.
Labour
Head workers
Workers
Operator
surface with 6.25mm to 19mm Chipping
for 1000 sqm.
Labour
Head worker
Workers
Operator
Materials
Bitumen (3. 8kg/m2)
Chippings ( 40. I 1 sqml Ton)
Machine '*
Roller (4 passes)
Bitumen heater (to be discarded)
Thermometer
For Operation
Wood
H.S.D (10 Litreh. )
Engine Oil (1.5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.285%)
Sundries
water chargds
contractor's profit and overheads
( Taxes , safety charges , management &
Man-Day
9 7
9 9
Ton
cum
Hrs
Nos
Nos
Ton
litre
litre
litre
litre
kg
L.S
L.S.
L.S.
etc.)
Man-Day
Man-Day
Man-Day
I
Hot Bitumen Surface Dressing (Seal) With
3.2mm - 12.5mm Chipping over the Grouting
2.5
34
2.5
Standard Datafor Working Out Rates Per Unit Quantity ofltems of work
(13% Wastage)
Sr.
No.
16
Particulars of Materials and Labour
I . Road Work .... contd.
Materials
Bitumen (1 .2kg/rn2)
Chippings
Fire Wood
Machines -
Roller (230sqrn/hr.)(4 Passes)
Thermometer
Bitumen Heater
For Operation
Diesel for Roller
Engine Oil (1.5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.285%)
Cotton waste for cleaning etc.
Sundries
water charges
contractor's profit and overheads
( Taxes , safety charges , management &
Unit
Ton
cum
Ton
Hrs
Nos
Nos
litre
),
),
litre
kg
L.S.
L.S.
L.S.
L.S.
etc.)
Quantity
1.4
12.7
0.6
17.4
2 x 1
2 x 1 !4
174
2.6
0.4
0.6
0.2
-
Hot Bitumen Surface Dressing over
Remarks
Page 27
2.5
34
2.5
1.5
19.2
18
Crushed Rock Surface with 6.25mm to
Chipping for 1000 sqm)
(First Seal)
Labour
Head workers
Workers
Operator
Materials
Bitumen (1 .36kg/m2)
Chippings
Machines
Roller (230sqm/hr)(4 Passes)
(S.G. of Bitumen = 1.06,
1 Olbs= 1 gal)
13% wastage. (Bitumen)
3 -Wheel Roller---1 Olitrelhr
Roller Efficiency
3-Wheel Roller =230 sqm/hr
Diesel for Roller=lOx8hrsx2.25
days=180 litre.
230x8x2.25=4 140sqm
19mm
Man-Day
Man-Day
Man-Day
Ton
cum
Hrs
Standard Data for Working OutRates Per Unit Quantity ofltems of Work
Sr.
No.
17
Particulars of Materials and Labour
I . Road Work .... contd.
Diesel for Roller
Thermometer
Bitumen Heater
For Operation
Fire Wood
Engine Oil (1.5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.285%)
Cotton waste for cleaning etc.
Sundries
water charges
contractor's profit and overheads
Unit
litre
Nos
Nos
Ton
litre
litre
litre
kg
L.S.
y y
L.S.
L.S.
( Taxes , safety charges , management & etc.)
Hot Bitumen Surface Dressing over
Crushed ~ 6 . c k Surface (After First Sea1)with 6mm to 12mm
Quantity
180
2 x 1
2 ~ 1 %
0.6
2.7
0.4
0.6
0.2
-
-
Remarks
Page 28
Bitumen lTon= Fire Wood 0.4 Ton
Chipping for 1000 sqm.
(Second Seal)
Labour
Head workers
Workers
Operator
Materials
Bitumen ( I . 1 kg/m2)
Chippings
Machines
Roller (2 ~&s es )
Thermometer
Bitumen Heater
For Operation
Fire Wood
Diesel for Roller
Man-Day
77
y y
Ton
cum
H r s
Nos
Nos
Ton
litre
2.5
3 4
2.5
1.2
9.6
8.7
2 x 1
2 ~ 1 %
0.5
87
1 3%wastage
1000 m2x2 pass1230 = 8.695 hr
Bitumen 1 Ton= Firewood OATon
Standard Datafor Working Out Rates Per Unit Quantity ofltems ofwork
(1 3% Wastage)
Sr.
No.
18
Particulars of Materials and Labour
I . Road Work .... contd.
Engine Oil (1.5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.285%)
Sundries
water charges
Remarks
Page 29
Unit
litre
litre
litre
kg
L.S.
L.S.
(Use SC-3000)
Diesel (20%)+Bitumen (80%)
Bitumen=] .356Ton, Diesek174Litre.
Quantity
1.3
0.2
0.3
0.1
-
2.5
34
2.5
1.4
12.7
0.5
17.4
2 x 1
2x 1 '/2
174
2.6
0.4
0.6
0.2
-
-
contractor's profit and overheads I L.S.
( Taxes , safety charges , management & etc.)
Hot Bitumen Surface Dressing over
Crushed Rock Surface with 6mm to
Chipping for 1000 sqm)
(Seal Coat)
Labour
Head workers
Workers *
Operator
Materials
Bitumen (1.2 kg/m2)
Chippings
Fire Wood
Machines
Roller (230 m2/hr)(4 Passes)
Thermometer
Bitumen Heater
For Operation
Diesel for Roller
Engine Oil 61.5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.285%)
Cotton waste for cleaning etc.
Sundries
water charges
contractor's profit and overheads
( Taxes , safety charges , management &
12mm
Man-Day
Man-Day
Man-Day
Ton
cum
Ton
Hrs
Nos
Nos
litre
litre
litre
litre
kg
L.S.
L.S.
L.S.
L.S.
etc.)
Standard Data for Working Out RatesPer Unit Quantity of Items of work
. -
Sr. Remarks
Particulars of Materials and Labour Unit Quantity
No. Page 30
I . Road Work .... contd.
19 Prime Coat with Coarse Sand for
1000 sqm.
Labour
Head workek
Workers
Materials
Bitumen (0.93 kg/m2)
Diesel for SC-70
Sand
For Operation
Firewood
Sundries
water charges
contractor's profit and overheads
( Taxes , safety charges , management
Must be modified with cutback or emulsion
Use SC-70 for Prime Coat
50% Diesel+SO%Bitumen
Bitumen=1.05 Ton, DieseP929Litre
Man-Day 2
9 ) 13.5
Ton 1 .O
litre 929
cum 4.8
Ton 0.4 (Bitumen 1 Ton=Fire Wood 0.4 Ton)
L.S. -
L.S.
L.S.
& etc.)
I
1 3% wastage.
20 Tack Coat for 1000 sqm. Must be modified with cutback or emulsion
Use SC-70 for Tack Coat
50% Diesel+SO%Bitumen
Bitumen=0.9Ton, Diesel=796Litre.
Labour
Head workers Man-Day 2
Workers ,, 13.5
Materials
Bitumen (0.80 kg/m2) Ton 0.9
Diesel for SC-70 litre 796
For operatidn
Fire Wood Ton 0.4 (Bitumen 1 Ton=Fire Wood 0.4 Ton)
Sundries L.S.
Thennometer Nos 1
water charges L.S.
contractor's profit and overheads L.S.
( Taxes , safety charges , management & etc.)
I
13% wastage.
Standard Data for Working Out Rates Per Unit Quantity of Items of Work
13% wastage.
Sr.
No.
2 1
22
Particulars of Materials and Labour
I . Road Work .... contd.
Laying 37.5mm thick (Compacted)
Premix Carpet including Prime Coat
(1000 sqm)
Labour
Head workers
Workers
Operators for mixer
Roller driver
Tipper driver
Materials
Bitumen 8011 00
H.S.D (10 Litreh.)
Chips 12mm to 19mm
Machines
0.113 cum Capacity mixer (millers)
Roller
159 1 Litre bitumen heater
Tipper
Sundries
water charges
contractor's profit and overheads
( Taxes , safety charges , management &
Unit
Man-Day
,,
,,
9,
97
Ton
litre
cum
24 hrs. 8
99
,,
99
L.S.
L.S.
L.S.
etc.)
Quantity
4
72
4
1.5
1.5
3.8
154.5
38.5
3 Nos.
1 No.
3 Nos.
1 No.
-
I
Scarifying old Crushed Rock Road 50mm
deep 3.6m wide including Screening, I
Respreading and Rolling for 1000 sqm.
Remarks
Page 3 1
Whenever a roller is required
over night, one night druwan
per night is allowed in the
consolidation work.
4
40
4
-
4.3
65.2
Labour
Head workers
Workers
Working expenses of roller
Sundries
Operation
Roller
Diesel for Roller
1 000m2x0.05m=50m3
Dozer (Medium)
1 OOcurn/hr., 20 Litrekr.
501100 = 0.5 hr.
Roller (SAKIA)
230sqm/hr., 15 Litrefhr.
1000/230 = 4.348 hr.
Man-Day
99
Days
L.S.
Hr.
litre
Standard Datafor Working Out Rates Per Unit Quantity of Items of wor k
Sr.
No.
23
Particulars of Materials and Labour
I . Road Work .... contd.
Dozer
Diesel for Dozer
water chargCs
contractor's profit and overheads
Unit
Hr.
litre
L.S.
L.S.
2.7
126.3
138.9
123.6
185.4
2 7
3
409
Quantity
0.5
10
( Taxes , safety charges , management & etc.)
I
Remarks
Page 32
Patching Pot Holes 38mm depth with
For (1000 sqm)
Materials
Bitumen
9.5mm- 1 9mm Chipping
Tyre Debris
Diesel for Cuback
Diesel for Trolargyia
Machines
Trolargyi
Labour
Head Worker
Worker
water charges
contractor's profit and overheads
Premix
Ton
cum
cum
litre
litre
Day
Man-Day
Man-Day
L.S.
L.S.
( Taxes , safety charges , management & etc.)
Standard Data for Working Out Rates Per Unit Quantity of Items of Work
Sr.
No.
1.
1
2
3
--
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
AC Overlay ( With C/R + Lime )
Unit
Percentage Passing
20mm 100
14mm 80- 100
5 m 54-72
2.36- 42-58
1.18mm 34-48
0.6mm 26-38
0.3mm 18-28
0.15mm 12-20
0.075mm 6-12
Thickness = 40-50mm
Design Criterion
Traffic c1.5 1.5-10 >I(
(C.N.S.A.)
I
Marshall 784 1344 156E
Stability (60C) (kg)
Densitv of Asphalt Concrete =
2403 kn/m3
Min. Flow (mm) 2 2 2
Compaction 2x50 2x75 2x7:
Level
Air Voids (%) 3-5 3-5 3-5
Note:
C.N.S.A.=Cumulative No. of Std.
Axles
Quatit
53 mm Thick Compacted AC overlay work 900 sqm.
Remarks
Page 33
(AC 123 100kg)
Road Construction
Materials By Weight
19mm down C/R - 9.5 %
13.2mm down C/R - 9.5 %
9.5mm down C/R - 36.0 %
River Sand - 16.5 %
Quarry Dust - 18.0%
Lime Powdqr 5.0%(23 kg/bag)
Bitumen - 5.5 %
Thermometer
cum
cum
cum
cum
cum
kg
kg
Nos
9
9
3 4
17
16
7684
677 1
5
1
1
1
2970
414
51 8
180
1
1
1
8
18
1
20
3
5 5
22
6
1
300
5
Production (AC 123 100 kg) Machines/Trucks
Mixing Plant (China Made Nobile Plant:
Decanter
Loader
Fuels (Mixing Plant)
Diesel (Main Burner)
Diesel (Bitumen Burner, Engine running,
cleaning & others)
Decanter
Diesel Oil
Loader
Diesel Oil '
Labour Charges
Timer
Foreman
Loader Operator
Mixing Plant Operator
Hard Labour (Plant)
Labour Head
Labour (Decanter)
Grease
Thermo
Engine Oil
Hydraulic Oil
Hauling ( 123 1 00 kg) MachinesITrucks
Tippers 5 Nos
Fuel (Diesel Oil)
Tipper (5 Nos. x 4 trips x 15 Lit)
Labour Charges
Tipper Driver
Day
Day
Day
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Lb
litre
litre
litre
Day
litre
Man-Day
Standard Dat afor Working Out Rates Per Unit Quantity ofItems of wor k
Sr.
No.
4
5
6
Particular2 of Materials and Labour
( In Details )
I . Road Work .... contd.
Compacting AC Mix ( 123 100kg)
MachinesITruck
Paver (Blow-knox)
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Water Bowzer
Truck used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Fuels
Paver (Blow-knox)
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Water Bowzer
Trucks used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Cleaning utensils
Labour Charges ( 1 23 1 00kd
Paver Operator
Roller Operator (2 Nos.)
Pneumatic Tyred Roller Operator (2 Nos
Hand Sprayer Operator
Skilled Labour
Labour
Truck Driver (2 Nos.)
Cleaning. (900 sqm)
Labour Head
Labour
Tack-Coating (900 sqm)
Labour Head
Labour
Unit
Day
Day
Day
Day
Day
Day
Day
Day
Day
litre
litre
litre
litre
litre
litre
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Quantity
1
1
1
1
1
1
1
1
1
180
80
8 0
128
128
3 6
2 3
68
2 3
14
3
2
2
2
20
10
2
1
25
1
3
Remarks
Page 34
Standard Dat afor Working Out Rates Per Unit Quantity ofltems of wor k
Standard Data for Working Out Rates Per Unit Quantity of Items of Work
Sr.
No.
2.
1
2
3
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
AC Overlay ( With CIR + Cement )
Unit
Size Percentage Passing
20mm 100
14mm 80-1 00
5mm 54-72
2.36mm 42-58
1.18mm 34-48
0.6mm 26-3 8
0.3mm 18-28
0.15mm 12-20
0.075mm 6- 12
Quantity
53 mm Thick Compacted AC overlay work (900 sqm)
Remarks
Page 36
(AC 123 100 kg)
Road Construction
Materials BY Weight
19mm down CIR - 9.5 %
13.2mm down C/R - 9.5 %
9.5 mm down C/R - 36.0 %
River Sand - 16.5 %
Quarry Dust - 18.0 %
Cement - 2.0 % (50 kglbag)
Bitumen- 5.5 %
Thermometer
cum
cum
cum
cum
cum
kg
kg
Nos
9
9
3 4
20
16
2462
677 1
5
1
1
1
2970
414
518
180
1
1
1
8
18
1
20
3
55
22
6
1
300
5
Production (AC 123 100 kg) MachinesITrucks
Mixing Plant (China Made Mobile Plant:
Decanter
Loader
Fuels (Mixidg Plant)
Diesel (Main Burner)
Diesel(Bitumen Burner, Engine running :
cleaning & others )
Decanter
Diesel Oil
Loader
Diesel Oil
Labour Charges
Timer
Foreman
Loader Operator
Mixing Plant Operator
Hard Labour (Plant)
Labour Head
Labour (Decanter)
Grease
Therrno
Engine Oil
Hydraulic Oil
Hauling (123 100 kg) MachinesITrucks
Tippers 5 Nos
Fuel (Diesel Oil)
Tipper (5 Nos. x 4 trips x 15 Lit)
Labour Charges
Tipper Driver
Day
Day
Day
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Lb
litre
litre
litre
Day
litre
Man-Day
Standard Data for Working Out Rates Per Unit Quantity of Items of Work
Sr.
No.
4
5
6
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
Compacting AC Mix (1 23 100 kgJ
MachinesITruck
Paver (Blow-knox)
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Water Bowier
Truck used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Fuels
Paver (Blow-knox)
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Water Bowzer
Trucks used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Cleaning utensils
Labour Charges (1 23 100 kg)
Paver Operator
Roller Operator (2 Nos.)
Pneumatic Tyred Roller Operator (2 Nos
Hand Sprayer Operator
Skilled Labour
Labour
Truck Driver (2 Nos.)
Cleaning (900 m2)
Labour Head
Labour
Tack-Coating (900 m2)
Labour Head
Labour
Unit
Day
Day
Day
Day
Day
Day
Day
Day
Day
litre
litre
litre
litre
litre
litre
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Quantity
1
1
1
1
1
1
1
1
1
180
8 0
80
128
128
36
23
68
23
14
3
2
2
2
20
10
2
1
25
1
3
Remarks
Page 37
Standard Datafor Working Out Rates Per Unit Quantity of Items ofwork
-
Sr.
No
-
3
1
2
3
-
Standard Datafor Working Out Rates Per Unit Quantity ofItems of Work
Particulars of Materials and Labour
( In Details )
I . Road Work . . ..contd.
AC Regulation Course
37.5 mm Thick Compacted AC Regula
(AC 123 100 kg)
Materials Requirements By Weight
%" down C/R - 9.5 %
318" down C/R - 40.0 %
Quarry Dust - 20.0 %
River Sand - 22.5 %
Lime Powder - 3.0 %
Bitumen - 5.0 %
Production (AC 123 100 kg) Machinesn
Mixing Plant (China Made Mobile Plan1
Decanter
Loader
Fuels (Mixing Plant)
Diesel (Main Burner)
Diesel(Bitumen Burner, Engine running
cleaning & others )
Decanter
Diesel Oil
Loader
Diesel Oil
Labour Charges
Timer
Foreman
Loader Operator
Mixing Plant Operator
Hard Labour (Plant)
Labour Head
Labour (Decanter)
Grease
Therrno
Engine Oil
Hydraulic Oil
Hauling (1 23 100 kg) MachinesITrucks
Tippers 5 Nos
Fuel (Diesel Oil)
Tipper (5 Nos, x 4 trips x 15 Lit)
Labour Charges
Tipper Driver
Unit
ion (1 200
cum
cum
cum
cum
kg
kg
Man-Daj
Man-Daj
Man-Daj
Man-Daj
Man-Daj
Man-Daj
Man-Da!
Lb
litre
litre
litre
Remarks
Page 39
Percentage Passing
Standard Datafor Working Out Rates Per Unit Quantity ofltems of wor k
Sr.
No.
4
5
6
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
Compacting AC Mix (1 23 100 kg)
MachinesITruck
Paver (Blow-knox)
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Water Bowzer
Truck used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Fuels
Paver (Blow-knox)
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Water Bowzer
Trucks used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Cleaning utensils
Labour Charges (1 23 100 kg)
Paver Operator
Roller Operator (2 Nos.)
Pneumatic Tyred Roller Operator (2 Nos
Hand Sprayer Operator
Skilled Labour
Labour
Truck Driver (2 Nos.)
Cleaning (1200 sqm)
Labour Head
Labour
Tack-Coating (1200 sqm)
Labour Head
Labour
Unit
Day
Day
Day
Day
Day
Day
Day
Day
Day
litre
litre
litre
litre
litre
litre
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Quantity
1
1
1
1
1
1
1
1
1
180
100
100
157
157
36
23
68
23
14
3
2
2
2
20
10
4
1
33
1
3
Remarks
Page 40
One Roller can compact 235 m2
per hr by consumption 16 Lit of
diesel.
Standard Data for Working Out Rates Per Unit Quantity of Items of Work
Sr.
No.
7
8
9
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
Vertical Cutting (650 m)
Labour Head
Labour
Straight Edging (325 m)
Labour "
water charges
contractor's profit and overheads
( Taxes , safety charges , management & etc.)
Unit
Man-Day
Man-Day
Man-Day
L.S.
L.S.
Quantity
1
53
10
Remarks
Page 4 1
' Standard Data for Working Out Rates Per Unit Quantity of Items of Work
Sr.
No.
4
1
2
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
AC Black Base
Remarks
Page 42
Unit
75 mm Thick Compacted AC Black Base Construction
Quantity
(AC 123 100 kg)
Materials Requirements By Weight
l "downC/ R- 24.0 %
314" down C/R - 10.0 %
!hl' down CIR - 5.0 %
318" down C/R - 10.0 %
Quarry Dust - 22.0 %
River Sand - 21.5 %
Lime Powder - 3.0 %
Bitumen - 4.5 %
Themometer
cum
cum
cum
cum
cum
cum
kg
kg
Nos
23
9
5
9
19
22
4616
5540
5
1
1
1
2970
414
5 18
180
1
1
1
8
18
1
20
3
55
22
6
Production (AC 123 100 kg) MachinesITrucks
Mixing Plant (China Made Mobile Plant:
Decanter
Loader
Fuels (Mixing Plant)
Diesel (Main Burner)
Diesel(Bitumen Burner, Engine running :
cleaning & others )
Decanter
Diesel Oil
Loader
Diesel Oil
Labour Charges
Timer
Foreman
Loader Operator
Mixing Plant Operator
Hard Labour (Plant)
Labour Head
Labour ( De d e r )
Grease
Thermo
Engine Oil
Hydraulic Oil
Day
Day
Day
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Lb
litre
litre
litre
Standard Data for Working Out Rates Per Unit Quantity of Items of Work
Sr.
No.
3
4
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
Hauling (1 23 100 kg) MachinesITrucks
Tippers 5 Nos
Fuel (Diesel Oil)
Tipper (5 Nos. x 4 trips x 15 Lit)
Labour Charges
Tipper Driver
Compacting AC Mix (1 23 100 kg)
~ a c h i n e s l ~ k c k
Paver (Blow-knox)
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Water Bowzer
Truck used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Fuels
Paver (Blow-knox)
Steel Roller (Bomag) (3 Passes)
Steel Roller (Sakai) (3 Passes)
Tyred Roller (Bomag) (16 Passes)
Tyred Roller (Sakai) (16 Passes)
Water Bowzer
Trucks used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Cleaning utensils
Labour Charges (1 23 100 kg)
Paver Operator
Roller Operator (2 Nos.)
Pneumatic Tyred Roller Operator (2 Nos
Hand Sprayer Operator
Skilled Labour
Labour
Truck Driver (2 Nos.)
Unit
Day
litre
Man-Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
litre
litre
litre
litre
litre
litre
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Quantity
1
3 00
5
1
1
1
1
1
1
1
1
1
1 44
80
80
128
128
3 6
23
68
23
14
3
2
2
2
20
10
4
Remarks
Page 43
Standard Datafor Working Out Rates Per Unit Quantity ofltems ofwork
Standard Data for Working Out Rates Per Unit Quantity ofItems of Work
By Weight
9.5 %
9.5 %
36.0 %
16.5 %
18.0%
5.0%(23 kgitons)
5.5 %
Sr.
No.
1.
1
2
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
AC Overlay ( With C/R + Lime )
Unit Quantity
- Size Percentage Passing
20mm 100
14mm 80- 100
5mm 54-72
2.36mm 42-58
1.18mm 34-48
0.6mm 26-38
0.3mm 18-28
0.15mm 12-20
0.075mm 6-12
Thickness = 40-50mm
Design Criterion
Traffic <1.5 1.5-10 >10
(C.N.S.A.)
Marshall 784 1344 1568
Stability (60C) (kg.)
Density of Asphalt
Concrete=2403 kdm3
as sum in^ mixing plant efficiency
as 75% 8 hr working capacity
61090.9 kg(kg) per hr.Oty of
asphalt=8x 61 090.9kgx75/100=
369300k~lday
Min. Flow (mm) 2 2 2
Compaction 2x50 2x75 2x75
Level
Air Voids (%) 3-5 3-5 3-5
Note:
C.N.S.A.=Cumulative No.
of Std. Axles
53 mm Thick Compacted AC overlay work (2700 cum)
Remarks
Page 45
(AC 369300 kg)
Road Construction
Materials
19 mm down C/R -
13.2 mm down C/R -
9.5 mm down CIR -
River Sand -
Quarry Dust -
Lime Powder
Bitumen-
Thermometer
Grading Envelop For Asphalt Concrete
cum
cum
cum
CUM
cum
kg
kg
Nos
27
27
104
5 0
47
23081
20312
10
1
1
1
3888
2525
2142
338
2
2
2
16
36
2
40
6.5
120
48
13
Production (AC 369300 kg) MachinesITrucks
Mixing Plant (Newzeland Drum Mix Ty1
Decanter
Loader
Fuels (Mixing Plant)
Diesel (Main Burner)
Hot Burner, Generator ,Cleaning ,Lab&
Decanter
Diesel Oil
Loader
Diesel Oil
Labour Charges
Timer
Foreman
Loader Operator
Mixing Pl qt Operator
Hard Labour (Plant)
Labour Head
Labour (Decanter)
Grease
Thermo
Engine Oil
Hydraulic Oil
Day
Day
Day
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Lb
litre
litre
litre
Standard Data for Working Out Rates Per Unit Quantity of Items ojWork
Sr.
No.
3
4
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
Hauling (369300 kg) MachinesITrucks
Tippers 15 Nos
Fuel (Diesel Oil)
Tipper (1 5 Nos. x 5 trips x 18 Lit)
Labour Charges
Tipper Driver
Compacting AC Mix (369300 kg)
MachinesITruck
Paver (Blow-knox)
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Water Bowzer
Truck used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Fuels
Paver (Blow-knox)
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Tyred Roller (Bomag)
Water Bowzer
Trucks used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Cleaning utensils
Labour Charges (369300 kg')
Paver Operator
Roller Operator (2 Nos.)
Pneumatic Tyred Roller Operator (2 Nos
Hand Sprayer Operator
Skilled Labour
Labour
Truck Driver (2 Nos.)
Unit
Day
litre
Man-Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
litre
litre
litre
litre
litre
litre
litre
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Quantity
1
810
20
1
1
1
1
1
1
1
1
1
1
270
170
170
272
272
272
108
6 8
270
90
54
3
4
4
2
40
20
2
Remarks
Page 46
Standard Datafor Working Out Rates Per Unit Quantity ofltems of Work
Sr.
No.
5
6
7
8
9
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
Cleaning (2700 sqm)
Labour Head
Labour
Tack-Coating (2700 sqm)
Labour Head
Labour
Vertical Cutting (1 462 m)
Labour Head
Labour
Straight Edging (73 1 m)
Labour
water charges
contractor's profit and overheads
( Taxes , safety charges , management &
Unit
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
L.S.
L.S.
etc.)
Quantity
1
50
1
12
1
80
16
Remarks
Page 47
Standard Datafor Working Out Rates Per Unit Quantity of Items of wor k
Sr.
No.
2.
1
2
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
AC Overlay ( With C/R + Cement )
Unit
Percentage Passing
20mm 100
14mm 80-1 00
5mm 54-72
2.36mm 42-58
1.18mm 34-48
0.6mm 26-3 8
0.3mm 18-28
0.15mm 12-20
0.075mm 6-12
Thickness = 40-50mm
Design Criterion
Thickness = 40-50mm
Design Criterion
Traffic c1.5 1.5-10 >10
(C.N.S.A.)
Marshall 784 1344 1568
Stability (60C) (kg.)
Density of Asphalt Concrete =
2407.5kg/m3 Assuming mixing
plant efficiency as 75% 8 hr
working capacity 61090.9 kg
Javg) per hr.Oty of asphalt = 8x
6 1090. 9~ 7511 00 =369300kddav.
Min. Flow (mm) 2 2 2
Compaction 2x50 2x75 2x75
Level
Air Voids (%) 3-5 3-5 3-5
Note:
C.N.S.A.=Cumulative No. of
Std. Axles
Quantity
53 mm Thick Compacted AC overlay work (2700 sqm)
Remarks
Page 48
Grading Envelop For
Asphalt Concrete
(AC 369300 kg)
Road Construction
Materials By Weight
19 mm down C/R - 9.5 %
1 3.2mm down CIR - 9.5 %
9.5 mm down C/R - 36.0 %
River Sand - 19.5 %
Quarry Dust - 18.0 %
Cement - 2.0%(50kg/bag)
Bitumen - 5.5 %
Thermometer
cum
cum
cum
cum
cum
kg
kg
Nos
27
27
104
59
47
7386
20312
10
1
1
1
3888
2525
2142
338
2
2
2
16
36
2
40
6.5
120
4 8
13
Production (AC 369300kg) MachinesITrucks
Mixing Plant (Newzeland Drum Mix Tyl
Decanter
Loader
Fuels (Mixing Plant)
Diesel (Main Burner)
Hot Burner, Generator ,Cleaning ,Lab,G
Decanter
Diesel Oil ..
Loader
Diesel Oil
Labour Charges
Timer
Foreman
Loader Operator
Mixing Plant Operator
Hard Labour (Plant)
Labour Head
Labour (Decanter)
Grease
Thermo
Engine Oil
Hydraulic Oil
Day
Day
Day
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Lb
litre
litre
litre
StandardDatafor Working Out Rates Per Unit Quantity of Items ofwork
Sr.
No.
3
4
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
Hauling (369300kg) Machines/Trucks
Tippers 20 Nos
Fuel (Diesel Oil)
Tipper (20 Nos. x 5 trips x 18 Lit)
Labour Charges
Tipper Driver
Compacting AC Mix (369300 kg)
MachinesITruck
Paver (Blow-knox)
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Tyred Roller (Sakai)
Water Bowzer
Truck used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Fuels
Paver (Blow-knox)
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Tyred Roller (Bomag)
Water Bowzer
Trucks used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Cleaning utensils
Labour Charges (369300 kg)
Paver Operator
Roller Operator (2 Nos.)
Pneumatic Tyred Roller Operator (3 Nos
Hand Sprayer Operator
Skilled Labour
Labour
Truck Driver (2 Nos.)
Unit
Day
litre
Man-Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
litre
litre
litre
litre
litre
litre
litre
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Quantity
1
8 10
20
1
1
1
1
1
1
1
1
1
1
270
170
170
272
272
272
108
68
270
90
54
3
4
4
2
40
20
2
Remarks
Page 49
One Roller can compact 235 m2
per hr by consumption 16 Lit
of diesel.
Standard Data for Working Out Rates Per Unit Quantity ofItems of Work
Standard Dat a for Working Out Rates Per Unit Quantity of Items of Work
Sr.
No.
3
1
2
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
AC Regulation Course
Unit
Percentage Passing
14mm 100
5mm 62-80
2.36mm 44-60
1.18rnm 36-50
0.6mm 28-40
0.3mm 20-30
0.15rnm 12-20
0.075mm 6-12
Thickness = 40-50mm
Design Criterion
Traffic <1.5 1.5-10 >10
{C.N.S.A.)
Marshall 784 1344 1568
Stability (60C) (kg.)
Density of Asphalt Concrete=
2403 kdm3 Assuming mixing
plant efficiency as 75% 8 hr
working cavacitv 61 090.9kg(avg)
per hr.Oty of as~halt=8x6 1090. 9~
7511 00=3693OOkddav.
Min. Flow (mm) 2 2 2
Compaction 2x50 2x75 2x75
Level
Air Voids (%) 3-5 3-5 3-5
Note:
C.N.S.A.=Cumulative No.
of Std. Axles
Quantity
37.5 mm Thick Compacted AC Regulation (3600 sqm)
Remarks
Page 5 1
Grading Envelop For Asphalt
Concrete
(AC 369300 kg)
Materials Requirements By Weight
13.2 mm down C/R - 9.5 %
9.5 rnrn down C/R - 40.0 %
Quarry Dust - 20.0 %
River Sand - 22.5 %
Lime Powder - 3.0 %
Bitumen - 5.0 %
Thermometer
cum
cum
cum
cum
kg
kg
Nos
27
115
52
69
13849
18465
10
1
1
1
3888
2525
2142
338
2
2
2
16
36
2
40
6.5
120
48
13
Production (AC369300 kg) MachinesITrucks
Mixing Plant (Newzeland Drum Mix T ~ I
Decanter
Loader
Fuels (Mixing Plant)
Diesel (Main Burner)
Hot Burner, Generator ,Cleaning ,Lab,Gi
Decanter
Diesel Oil
Loader
Diesel Oil
Labour Charges
Timer
Foreman
Loader Operator
Mixing Plan,t Operator
Hard Labour (Plant)
Labour Head
Labour (Decanter)
Grease
Thermo
Engine Oil
Hydraulic Oil
Day
Day
Day
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Lb
litre
litre
litre
' Standard Datafor Working Out Rates Per Unit Quantity of Items of Work
Sr.
No.
3
4
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
Hauling (369300 kg) MachinesITrucks
Tippers 20 Nos
Fuel (Diesel Oil)
Tipper (20 Nos. x 5 trips x 18 Lit)
Labour Charges
Tipper Driver
Compacting AC Mix (369300 kg)
MachinesITruck
Paver (Blow-knox)
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Tyred Roller (Sakai)
Water Bowzer
Truck used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Fuels
Paver (Blow-knox)
Steel ~ o l l e r ' i ~ o ma ~ )
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Tyred Roller (Sakai)
Water Bowzer
Trucks used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Cleaning utensils
Labour Charges (369300 kg)
Paver Operator
Roller Operator (2 Nos.)
Pneumatic Tyred Roller Operator (3 Nos
Hand Sprayer Operator
Skilled Labour
Labour
Truck Driver (2 Nos.)
Unit
Day
litre
Man-Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
litre
litre
litre
litre
litre
litre
litre
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Quantity
1
8 10
20
1
1
1
1
1
1
1
1
1
1
3 24
200
200
3 10
3 10
3 10
108
68
3 60
90
5 4
3
4
4
2
53
27
4
Remarks
Page 52
One Roller can compact 235 m2
per hr by consumption 16 Lit of
diesel.
Standard Data for Working Out Rates Per Unit Quantity ojltems ojWork
Standard Datafor Working Out Rates Per Unit Quantity ofltems of wor k
Sr.
No.
4
1
2
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
AC Black Base
Unit
Thickness = 40-50mm
Design Criterion
Traffic <1.5 1.5-10 >10
(C.N.S.A.)
Marshall 784 1344 1568
Stability (60C) (kg.)
Density of Asphalt Concrete =
2403 kp/m3 Assuming mixing
plant efficiency as 75% 8 hr
working capacitv 6 1090.9kg (avk
per hr.Qty ofasphalt=8x61090.9x
751100 = 369300kglday.
Min. Flow (mm) 2 2 2
Compaction 2x50 2x75 2x75
Level
Air Voids (%) 3-5 3-5 3-5
Note:
C.N.S.A.=Cumulative No. of
Std. Axles
Quantity
75 mmThick Compacted AC Black Base Construction
Remarks
Page 54
(AC 369300 kg)
Materials Requirements Bv Weight
26.5 mm down C/R - 24.0 %
19 mm down C/R - 10.0 %
13.2 mm down C/R - 5.0 %
9.5mm down C/R - 10.0 %
Quarry Dust - 22.0 %
River Sand - 21.5 %
Lime Powder - 3.0 %
Bitumen - ' 4.5 %
Thermometer
litre
litre
litre
litre
litre
litre
kg
kg
Nos
69
2 7
14
2 7
5 7
65
13849
16619
10
1
1
1
3888
2525
2142
338
2
2
2
16
36
2
40
6.5
120
4 8
13
Production (AC 369300 kg) MachinesITrucks
Mixing Plant (Newzeland Drum Mix Tyl
Decanter
Loader
Fuels (Mixing Plant)
Diesel (Main Burnner)
Hot Burnner , Generator ,Cleaning ,Lab,(
Decanter
Diesel Oil
Loader
Diesel Oil
Labour Charges
Timer
Foreman
Loader Operator
Mixing Plant Operator
Hard Labour (Plant)
Labour Head
Labour (Decanter)
Grease .'
Therrno
Engine Oil
Hydraulic Oil
Day
Day
Day
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Lb
litre
litre
litre
Standard Data for Working Out Rates Per Unit Quantity of Items of Work
Sr.
No.
3
4
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
Hauling (369300 kg) MachinesITrucks
Tippers 20 Nos
Fuel (Diesel Oil)
Tipper (20 NOS. x 5 trips x 18 Lit)
Labour Charges
Tipper Driver
Compacting AC Mix (369300 k&
MachinesITruck
Paver (Blow-knox)
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Tyred Roller (Sakai)
Water Bowzer
Truck used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Fuels
Paver (Blow-knox)
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Tyred Roller (Sakai)
Water Bowzer
Trucks used at work site
~ a n d - ~ ~ r a ~ e r (Hunter)
Truck used for towing hand sprayer
Cleaning utensils
Labour Charges (369300 kg)
Paver Operator
Roller Operator (2 Nos.)
Pneumatic Tyred Roller Operator (2 Nos
Hand Sprayer Operator
Skilled Labour
Labour
Truck Driver (2 Nos.)
Unit
Day
litre
Man-Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
litre
litre
litre
litre
litre
litre
litre
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Quantity
1
8 10
20
1
1
1
1
1
1
1
1
1
1
2 16
140
140
224
224
224
108
6 8
184
90
54
3
4
4
2
27
14
4
Remarks
Page 55
One Roller can compact 235 m2
per hr by consumption 16 Lit of
diesel.
Standard Data for Working Out Rates Per Unit Quantity of Items of Work
Sr.
No.
1.
1
2
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
AC Overlay ( With C/R + Lime )
Unit Quantity
53 mrn Thick Compacted AC overlay work (1800
Remarks
Page 57
Grading Envelop For Asphalt
Concrete
s ~ m )
18
18
68
33
3 1
12310
13541
10
1
1
1
5940
459
1040
180
1
1
1
12
27
1
30
5.5
102.5
4 1
11
(AC 246200 kg)
Road Construction
Materials BY Weight
19 mmdownC1R- 9.5 %
13.2 mm down C/R - 9.5 %
9.5 mm down C/R - 36.0 %
River Sand - 16.5 %
Quarry Dust - 18.0%
Lime Powder 5.0%(23 kgltons)
Bitumen - 5.5 %
Thermometer
Size Percentape Passing
2Omm 100
14mm 80- 100
5mm 54-72
2.36mm 42-58
1.18mm 34-48
0.6mm 26-3 8
0.3mm 18-28
0.15mm 12-20
0.075rnrn 6-12
Thickness = 40-50mm
Design Criterion
Traffic 4 . 5 1.5-10 >10
[C.N.S.A.)
Marshall 784 1344 1568
Stability (60C) (kg.)
Density of Asphalt Concrete =
2403 kn/m3 Assuming mixing
plant efficiency as 75% 8 hr
working capacity 40727.27 kg
Javg)per hr.0ty of asphalt =8x
40727.27kgx75/100=
246200 ton/dav.
Min. Flow (mm) 2 2 2
Compaction 2x50 2x75 2x75
Level
Air Voids (%) 3-5 3-5 3-5
Note:
C.N.S.A.=Cumulative No. of Std.
Axles
cum
cum
cum
cum
cum
kg
kg
Nos
Production (AC 246200 kg) MachinesITrucks
Mixing Plant (Japan Nigata Plant)
Decanter
Loader
Fuels (Mixing Plant)
Diesel (Main Burner)
Diesel (Engine running cleaning &
others)
Decanter
Diesel Oil
Loader
Diesel Oil
Labour Charges
Timer
Foreman
Loader Operator
Mixing Plant Operator
Hard Labour (Plant)
Labour Head
Labour (Decanter)
Grease '
Therrno
Engine Oil
Hydraulic Oil
Day
Day
Day
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Lb
litre
litre
litre
Standard Datafor Working Out Rates Per Unit Quantity ofItems of wor k
r . 1 Particulars of Materials and Labour
Labour Charges
Tipper Driver
Jo.
3
( In Details )
I . Road Work . ... contd.
Hauling (246200 kg) MachinesITrucks
Tippers 10 NOS
Fuel (Diesel Oil)
Tipper ( I 0 Nos. x 3 trips x 18 Lit)
Steel Roller (Bomag)
Steel Roller (Sakai)
4
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Compacting AC Mix (246200 kg)
MachinesITruck
Paver (Blow-knox)
Water Bowzer
Truck used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Fuels
Paver
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Water Bowzer
Trucks used'at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Cleaning utensils
Labour Charges (246200 kg)
Paver Operator
Roller Operator (2 Nos.)
Unit
Day
litre
Quantity
1
540
Man-Day 10
litre
litre
Man-Day
Man-Day
l ~r uc k Driver (2 Nos.) I ~ a n - ~ a ~ l 2
4 5
27
3
2
Pneumatic Tyred Roller Operator (2 Nos
Hand Sprayer Operator
Skilled Labour
Labour
Remarks
Page 58
Man-Day
Man-Day
Man-Day
Man-Day
2
2
30
15
Standard Data for Working Out Rates Per Unit Quantity of Items of wor k
Sr.
No.
5
6
7
8
9
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
Cleaning (246200 kg)
Labour Head
Labour
Tack-Coating (1 800 sqm)
Labour Head
Labour
Vertical Cutting (984 m)
Labour Head
Labour
Straight Edging (492 m)
Labour
water charges
contractor's profit and overheads
( Taxes , safety charges , management &
Remarks
Page 59
Unit
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
L.S.
L.S.
etc.)
Quantity
1
38
1
7
1
60
12
Standard Datafor Working Out Rates Per Unit Quantity ofltems ofwork
Sr.
No.
2.
1
2
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
AC Overlay ( With C/R + Cement )
Unit
Percentage Passing
20mm 100
14mm 80- 100
5mm 54-72
2.36mm 42-58
1.18rnm 34-48
0.6rnm 26-38
0.3mm 18-28
0.15mm 12-20
0.075mm 6-12
Thickness = 40-50mm
Design Criterion
Thickness = 40-50mm
Design Criterion
Traffic 4 . 5 1.5-10 >10
{C.N.S.A.)
Marshall 784 1344 1568
Stability (60C) (kg.)
Density of Asphalt Concrete =
2403k~m3~ssumi na mixing plan1
efficiency as 75% 8 hr working
capacity 488727 kg(avg)per hr.
Qty of asphalt=8~488727~75/100
=246200kdday.Min.Flow~mm)
222
Compaction 2x50 2x75 2x75
Level
Air Voids (%) 3-5 3-5 3-5
Note:
C.N.S.A.=Cumulative No. of Std.
Axles
Quantity
53 mm Thick Compacted AC overlay work (1800 ssm)
Remarks
Page 60
Grading Envelop For Asphalt
Concrete
(AC 246200 kg)
Road Construction
Materials By Weight
19 mm downC/R - 9.5 %
1 3.2 mm down CIR - 9.5 %
9.5mm down C/R - 36.0 %
River Sand - 19.5 %
Quarry Dust - 18.0 %
Cement - 2.0 % (50kghag)
Bitumen - 5.5 %
Thermometer
cum
cum
cum
cum
cum
kg
kg
Nos
18
18
68
39
3 1
4924
13541
10
1
1
1
5940
459
1040
180
1
1
1
12
27
1
30
5.5
102.5
4 1
11
Production (AC 246200 kg) MachinesITrucks
Mixing Plant (Japan Nigata Plant)
Decanter
Loader
Fuels (Mixing Plant)
Diesel (Main Burner)
Diesel (Engine running cleaning &
others)
Decanter
Diesel Oil
Loader
Diesel Oil
Labour Charges
Timer
Foreman
Loader Operator
Mixing Plant Operator
Hard Labour (Plant)
Labour Head
Labour (Decanter)
Grease
Thenno
Engine Oil
Hydraulic Oil
Day
Day
Day
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Lb
litre
litre
litre
Standard Datafor Working Out Rates Per Unit Quantity ofltems of Work
Sr.
No.
3
4
Particular3 of Materials and Labour
( In Details )
I . Road Work .... contd.
Haulinp (246200 kg) MachinesITrucks
Tippers 10 Nos
Fuel (Diesel Oil)
Tipper (1 0 Nos. x 3 trips x 18 Lit)
Labour Charges
Tipper Driver
Compacting AC Mix (246200 kg)
MachinesITruck
Paver (Bloy-knox)
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Water Bowzer
Truck used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Fuels
Paver
Steel Roller (Bomag)
Steel Roller ,(Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Water Bowzer
Trucks used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Cleaning utensils
Labour Charges (246200 kg)
Paver Operator
Roller Operator (2 Nos.)
Pneumatic Tyred Roller Operator (2 Nos
Hand Sprayer Operator
Skilled Labour
Labour
Truck Driver (2 Nos.)
Unit
Day
litre
Man-Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
litre
litre
litre
litre
litre
litre
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Quantity
1
540
10
1
1
1
1
1
1
1
1
1
216
120
120
192
192
54
45
135
45
27
3
4
4
2
30
15
2
Remarks
Page 61
Standard Data for Working Out Rates Per Unit Quantity of Items ofwork
Sr.
No.
5
6
7
8
9
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
Cleaning (1 800 sqm)
Labour Head
Labour
Tack-Coatinn (1 800 sclm)
Labour Head
Labour
Vertical Cutting (984 m)
Labour Head
Labour
Straight Edging (492 m)
Labour
water charges
contractor's profit and overheads
( Taxes , safety charges , management &
Unit
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
L.S.
L.S.
etc.)
Quantity
1
38
1
7
1
60
12
Remarks
Page 62
Standard Data for Working Out Rates Per Unit Quantity ofltems of Work
Sr.
No.
3
1
2
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
AC Regulation Course
Unit Quantity
37.5mm Thick Compacted AC Regulation (2400
Remarks
Page 63
Grading Envelop For Asphalt
Concrete
scm)
18
76
34
45
9233
12310
10
1
1
1
5940
459
1040
180
1
1
1
12
27
1
30
5.5
102.5
4 1
11
(AC 246200 kg)
Materials Requirements By Weight
%I1 down C/R - 9.5 %
318" down C/R - 40.0 %
Quarry Dust - 20.0 %
River Sand - 22.5 %
Lime Powder - 3.0 %
Bitumen - 5.0 %
Thermometer
Percentage Passing
14mm 100
5mm 62-80
2.36mm 44-60
1.18mm 36-50
0.6mm 28-40
0.3mm 20-30
0.15mm 12-20
0.075mm 6-12
Thickness = 40-50mm
Design Criterion
Traffic <1.5 1.5-10>10
(C.N.S.A.)
Marshall 784 1344 1568
Stability (60C) (kg.)
Density of Asphalt Concrete=
2403kglm3~ssuming mixing plan1
efficiency as 75% 8 hr working
capacity 40727.27 kg (avg) per
hr.Qty of asphalt= 8 x 40727.27~
7511 00=246200 kdday.Min.
Flow(mm) 2 2 2
Compaction 2x50 2x75 2x75
Level
Air Voids (%) 3-5 3-5 3-5
Note:
C.N.S.A.=Cumulative No.of
Std.Axles
cum
cum
cum
cum
kg
kg
Nos
Production (AC 246200 kg) MachinesITrucks
Mixing Plant (Japan Nigata Plant)
Decanter
Loader
Fuels ( ~ i x i n g Plant)
Diesel (Main Burner)
Diesel (Engine running cleaning &
others)
Decanter
Diesel Oil
Loader
Diesel Oil
Labour Charges
Timer
Foreman
Loader Operator
Mixing Plant Operator
Hard Labour (Plant)
Labour Head
Labour (Decanter)
Grease
Thermo
Engine Oil
Hydraulic Oil
Day
Day
Day
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Lb
litre
litre
litre
Standard Data for Working Out Rates Per Unit Quantity ofltems of Work
Sr.
No.
3
4
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
Hauling (246200 kg) MachinesITrucks
Tippers 10 Nos
Fuel (Diesel Oil)
Tipper (1 0 Nos. x 3 trips x 18 Lit)
Labour Charges
Tipper Driver
Compacting AC Mix (246200 kg)
MachinesITruck
Paver (Blow-knox)
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Water Bowzer
Truck used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Fuels
Paver
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Water Bowzer
Trucks used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Cleaning utensils
Labour Charges (246200 kg) -
Paver Operator
Roller Operator (2 Nos.)
Pneumatic Tyred Roller Operator (2 Nos
Hand Sprayer Operator
Skilled Labour
Labour
Truck Driver (2 Nos.)
Unit
Day
litre
Person
Day
Day
Day
Day
Day
Day
Day
Day
Day
litre
litre
litre
litre
litre
litre
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Quantity
1
540
10
1
1
1
1
1
1
1
1
1
288
160
160
256
256
54
45
202
45
27
3
4
4
2
30
15
2
Remarks
Page 64
One Roller can compact 235 m2
per hr by consumption 16 Lit of
diesel.
Standard Datafor Working Out Rates Per Unit Quantity of Items of work
Sr.
No.
5
6
7
8
9
4
1
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
Cleaning (2400 sqm)
Labour Head
Labour
Tack-Coating (2400 sqm)
Labour Head
Labour
Vertical Cutting (1 300 m)
Labour Head
Labour
Straight ~ d h i n ~ (650 ml
Labour
water charges
contractor's profit and overheads
( Taxes , safety charges , management &
Unit
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
L.S.
L.S.
etc.)
AC Black Base
75 rnrn Thick Compacted AC Black Base Construction
Quantity
1
50
1
7
1
80
14
(AC 246200 kg)
Materials Requirements By Weight
1" down C& - 24.0 %
314" down C/R - 10.0 %
%" down C/R - 5.0 %
318" down C/R - 10.0 %
Quarry Dust - 22.0 %
River Sand - 21.5 %
Lime Powder - 3.0 %
Bitumen - 4.5 %
Thermometer
Remarks
Page 65
cum
cum
cum
cum
cum
cum
kg
kg
Nos
46
19
9
19
3 8
3 8
9233
11079
10
StandardData for Working Out Rates Per Unit Quantity ofItems of Work
Sr.
No.
2
3
Particulars of Materials and Labour
( In Details )
I . Road Work . ... contd.
Unit Quantity
Production (AC 246200 kg) Machines/Trucks
Mixing Plant (Japan Nigata Plant)
Decanter
Loader
Fuels (Mixing Plant)
Diesel (Main Burner)
Diesel (~ng%e running cleaning &
others)
Decanter
Diesel Oil
Loader
Diesel Oil
Labour Charges
-
Timer
Foreman
Loader Operator
Mixing Plant Operator
Hard Labour (Plant)
Labour Head
Labour (Decanter)
Grease
Thermo
Engine Oil
Hydraulic Oil
t
Hauling (246200 kg) MachinesITrucks
Tippers 10 Nos
Fuel (Diesel Oil)
Tipper (1 0 Nos. x 3 trips x 18 Lit)
Labour Charges
Tipper Driver
Remarks
Page 66
1
1
1
5940
459
1040
180
1
1
1
12
27
1
30
5.5
102.5
4 1
11
1
540
10
Day
Day
Day
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Lb
litre
litre
litre
Day
litre
Man-Day
Thickness = 40-50mm
Design Criterion
Traffic <1.5 1.5-10 >10
[C.N.S.A.)
Marshall 784 1344 1568
Stability (60C) (kg.)
Density of Asphalt Concrete =
2403 kg/m3 Assuming mixing
plant efficiency as 75% 8 hr
working capacity 40727.27(avg)
per hr.Oty of asphalt=8x40727.27
x75/100=246200 kdday.
Min.Flow (mm) 2 2 2
Compaction 2x50 2x75 2x75
Level
Air Voids (%) 3-5 3-5 3-5
Note:
C.N.S.A.=Cumulative No. of
Std. Axles
Standard Data for Working Out Rates Per Unit Quantity of Items of Work
Sr.
No.
4
5
6
7
Particulars of Materials and Labour
( In Details )
I . Road Work . ... contd.
Compacting AC Mix (246200 kg)
MachineslTiuck
Paver (Blow-knox)
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Roller (Sakai)
Water Bowzer
Truck used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Fuels
Paver
Steel Roller (Bomag)
Steel Roller (Sakai)
Tyred Roller (Bomag)
Tyred Rollei (Sakai)
Water Bowzer
Trucks used at work site
Hand-Sprayer (Hunter)
Truck used for towing hand sprayer
Cleaning utensils
Labour Charges (246200 kg0
Paver Operator
Roller Operator (2 Nos.)
Pneumatic Tyred Roller Operator (2 Nos
Hand Sprayer Operator
Skilled Labour
Labour
Truck Driver (2 Nos.)
Cleaning (1200 sqm)
Labour Head
Labour
Tack-Coating ( 1200 sum)
Labour Head
Labour
Vertical Cuttinp (668 m)
Labour Head
Labour
Unit
Day
Day
Day
Day
Day
Day
Day
Day
Day
litre
litre
litre
litre
litre
litre
litre
litre
litre
litre
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Quantity
1
1
1
1
1
1
1
1
1
180
120
120
192
192
54
45
90
45
27
3
4
4
2
30
15
2
1
20
1
3
1
30
Remarks
Page 67
One Roller can compact 235 mL
per hr by consumption 16 Lit of
diesel.
Standard Data for Working Out Rates Per Unit Quantity ofltems of Work
Earth Works = 3,
Cement Mixing = 9.5
Sr.
No.
8
9
1
2
Quantity
6
Particulars of Materials and Labour
( In Details )
I . Road Work .... contd.
Strai~ht Edging (334 m)
Labour
water charges
contractor's profit and overheads
Remarks
Page 68
Cement Stablized 0.2 m (compacted)thickness
Materials
Transported' Soil
Cement
P.O.L. for Operation
Diesel
Engine Oil (1.5%)
Gear Oil (0.225%)
Hydraulic Oil (0.3375%)
Grease (0.28 5%)
Machines
Excavator
Tipper (Within 5km)
Grader
Dozer
Vibratory Roller
Tyred Roller
Water Bowzer
Water Pump
Labour
Head Worker
Workers
Operator
Helper
water charges
contractor's profit and overheads
( Taxes , safety charges , management &
Unit
Man-Day
L.S.
L.S.
( Taxes , safety charges , management & etc.)
Concrete Work
See Airfield Work
Construction of Subgrade using
cum
kg
litre
litre
litre
litre
kg
Hr.
Hr.
Hr.
Hr.
Hr.
Hr.
Hr.
Hr.
Man-Day
Man-Day
Man-Day
Man-Day
L.S.
L.S.
etc.)
for1000
270
28850
579.4
8.7
1.3
1.9
0.8
2.1
4.7
2.8
2
8.7
8.7
12.7
8.1
1
12.5
6
6
sqm.
Standard Data for Working Out Rates Per Unit Quantity of Items of Work
Sr I
Particulars of Materals and Labour
No.
Unit
1.Road Work.. . . ..Contd.
Surveying
Location Survey
:For 100 m)
rhick Jungle
:a) alignment clearing (2.5 m)
width
Labour
surveying
surveyor
note keeper
labour
Materials
GPS, Compass, Handlevel
paint
5 cm nail
brush
30 meter tape
8cm x5cm x60cm jungle wood
(Mountainous)
8cm x5cm x60cm jungle wood
(Levelling)
bamboo
Miscellaneous
Light Jungle
:a) alignment clearing (2.5 m)
width
labour
:b) surveying
surveyor
note keeper
labour
Materials
GPS, Compass, Handlevel
paint
5 cm nail
brush
30 meter tape
8cm x5cm x60cm jungle wood
(Mountainous)
8cm x5cm x60cm jungle wood
(Levelling)
bamboo
Miscellaneous
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
C:\Users\user\Desktop\EiEi Aung\Ei (7-5-13)\22-5-13 YELLOW Book\Yellow Book (Road work,earth work)MON Sheet 2
- -
Standard Datafor Working Out Rates Per Unit Quantity ofItems of Work
C:\Users\user\Desktop\EiEi Aung\Ei (7-5-13)K2-5-13 YELLOW Book\Yellow Book (Road workearth work)MON Sheet 2
#
Sr
No.
2
2-1
2-2
Unit
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
litre
g
no
no
no
no
no
no
L.S
Man-Day
Particulars of Materals and Labour
1.Road Work... ... Contd.
Detail Survey
(For 100 m)
Thick Jungle
(a) alignment clearing (2.5 m)
width
Labour
(b) alignment setting
surveyor
note keeper
Labour
(c> Levelling along alignment &
detail survey
surveyor
note keeper
labour
(d) Levelling for cross-section &
detail survey
surveyor
note keeper
labour
Materials
Total station, Theodolite, Level, RDS
paint
5 cm nail
brush
30 meter tape
8cm x5cm x60cm jungle wood
(Mountainous)
8cm x5cm x60cm jungle wood
(Levelling)
bamboo
24crnx22.5cmx60cm concrete
block
Miscellaneous
Light Jungle
(a) alignment clearing (2.5 m)
width
labour
Quantity
0.7
0.2
0.2
0.1
0.2
0.2
0.7
0.2
0.2
0.9
0.2
15
1
1
2
2
3
1
0.5
Remarks
Page 70
used for 8 krn
used for 8 krn
Standard Dat afor Working Out Rates Per Unit Quantity ofltems of Work
C:\Users\user\Desktop\EiEi Aung\Ei (7-5-13)\22-5-13 YELLOW Book\Yellow Book (Road work,earth work)MON Sheet 2
Sr
No.
2-2
Particulars of Materals and Labour
1.Road Work. .. . . .Contd.
(b) alignment setting
surveyor
note keeper
labour
(c) Levelling along alignment &
detail survey
surveyor
note keeper
labour
(4 Levelling for cross-section &
detail survey
surveyor
note keeper
labour
Materials
Total station, Theodolite, Level, RDS
paint
5 cm nail
brush
30 meter tape
8cm x5cm x60cm jungle wood
(Mountainous)
8cm x5cm x60cm jungle wood
(Levelling)
bamboo
24cmx22.5cmx60cm concrete
block
Miscellaneous
Note: alignment jungle clearing width 2.5
clearing width 1.5 meter & 30 meter Long alignment left side &
right side.
Unit
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
litre
g
no
no
no
L.S
meter &
Quantity
0.2
0.2
1.1
0.2
0.2
0.7
0.2
0.2
0.9
0.2
15
1
1
2
Cross-Section
Remarks
Page 71
used for 8 km
used for 8 km
Jungle
-
Sr
No.
-
Standard Datafor Working Out Rates Per Unit Quantity of Items of Work
Particulars of Materals and Labour
1.Road Work.. . . . .Contd.
Topographic
(For 1 hectar)
Thick Clearing
(a> Jungle clearing
Labour
to locate boundary
surveyor
note keeper
labour
to locate traverse Line in
field area.
surveyor
note keeper
labour
Levelling survey in field area
surveyor
note keeper
labour
Materials
Total station, Theodolite, Level, RDS
paint
5 cm nail
brush
30 meter tape
8cm x5cm x60cm jungle wood
(Mountainous)
8cm x5cm x60cm jungle wood
(Levelling)
bamboo
24cmx22.5cmx60cm concrete
block
Miscellaneous
Light Jungle
(a) Jungle clearing
labour
Unit
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Quantity
Remarks
Page 72
used for 10 hecto
used for 10 hecto
C:\Users\user\Desktop\EiEi Aung\Ei (7-5-13)\22-5-13 YELLOW Book\Yellow Book (Road work,earth work)MON Sheet 2
Standard Data for Working Out Rates Per Unit Quantity of Items of Work
Sr I
Particulars of Maternls and Labour
No.
to locate traverse Line in field
area.
surveyor
note keeper
labour
3-2
Levelling survey in field area.
surveyor
note keeper
labour
1.Road Work ...... Contd.
(b) to locate boundary
surveyor
note keeper
labour
Materials
Total station, Theodolite, Level, RDS
paint
5 cm nail
brush
30 meter tape
8cm x5cm x60cm jungle wood
(Mountainous)
8cm x5cm x60cm jungle wood
(Levelling)
bamboo
24cmx22.5cmx60cm concrete
block
Miscellaneous
4
Materials
Total station, Theodolite, Level, RDS
Bridge Location & approach road
(Up to 1500 m)
4-1
Concrete Pillar(l.5mxl.5mxl.2m)
3 Lines for bridge loacation
surveyor
note keeper
labour
Unit Quantity
+
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
Man-Day
liter
g
no
Man-Day
Man-Day
Man-Day
no
C:\Users\user\Desktop\EiEi Aung\Ei (7-5-1 3)\22-5-13 YELLOW Book\Yellow Book (Road work,earth work)MON Sheet 2
Remarks
Page 73
used for 10 hecto:
#
used for 10 hecto:
Standard Data for Working Out Rates Per Unit Quantity ofltems of Work
C:\Users\user\Desktop\EiEi Aung\Ei (7-5-13)\22-5-13 YELLOW Book\Yellow Book (Road work,earth work)MON Sheet 2
Sr
No.
4-2
Particulars of Materals and Labour
Road Work. ..... Contd.
River/ chaung bed level
(sounding) for 3 line.
surveyor
note keeper
labour
Materials
Total station, Theodolite, Level, RDS
8cm x5cm x60cm jungle wood
10 cm nail
bamboo
paint
concrete pillar
(24cmx22.5cmx60cm)
Unit
Man-Day
Man-Day
Man-Day
no
g
no
litre
no
Quantity
3
3
18
6
0.1
6
0.1
6
Remarks
Page 74
Specification of Fuel Consumption and Job Efficiency for Machines and Vehicles
Appendix A
Engine
I power I ~ u a n t i ~ Production Particulars Remarks
CAT- D7G
KOMATSU D85ESS 2A
For Gravelly Soil &
Granular Soil added
20% for each d c
KOMATSU D85ESS- 2
MI(2) D22(1)
BULLDOZER(SMALL)(Ordinarv Soil)
CAT D3B, D4
KOMATSU - D4 1 .D37 1 83
BULLDOZER(MEDIUM)(Ordinarv Soil)
l ~ o r Gravelly Soil &
141
225
Cat-D6C,D6D,DSM,CATY- 105
KOMATSU - D53A-17
KOMATSU - D60A, D63E
KOMATSU GALEO D61 EX-1 5
KOMATSU GALEO D6 PX- 15
Granular Soil added r
70m3/hr I
20% for each mlc
22
27
105
EXCAVATOR(0rdinat-v Soil)
CAT-320(B,C),Kobelco Mark V
KOMATSU PC-200,PC-220
HITACHI ZX- 230,EX-200
Surnitomo SH200,Daewoo DH-08
JCB Backhole Loader
Johndeer Backhoe 3 10 SG
MI(2) E290(1)
MI(2) E3 5(M)
Kobelco SK 200
127m3/hr I For Gravelly Soil &
Granular Soil added
20% for each d c
MOTOR SCRAPER
WABCO- 1 1 1 A 1 105 1 20
WHEEL LOADER(LARGE1
CAT- 966C,CHINA -ZL 40B
SINOMAC ZL 50D
FURUKAWA FL 230-2
Kawasaki 8075
WHEEL LOADERMEDIUM)
CAT -938F,HITACHI - LX 120-3
KAWASAKI KSS 652
KOMATSU -WA 320
WHEEL LOADER(SMALL1
KOMATSU -WA 200 1 82 1 13
140m3/hr
MOTOR GRADER
CAT- 12E, 120G, 120H
MITSUBISHI MG - 430,43 1 ,LG2H
KOMATSU - GD 500,GD 61 1A
Liugone CLG 414 Motor Grader
Kmatsu GD 663A
Standard Calculation i
medium size machine
CrttinglLevelling for
average (0.3 m)
thickness
No
10
11
12
13
14
15
16
17
18
19
20
2 1
Quantity
Litthr
24
20
15
15
18
13
10
6
10
10
13
10
1
7
16
9
6
36
27
13
29
18
16
Particulars
SOIL COMPACTOR
CAT-8 15F,KOMATSU - WF 22A
DYNAPAC - CT 260, CT 25
MI 2(C-14)
VIBRATORY ROLLER
SAKAI -SV9 1 T, Bomag(B W-2 12D)
Ingersollrand SD 100D
DYNAPAC CA-252
SAKAI -SV 500T
SAKAI -SV 520DF
ROAD ROLLER(3 WHEEL)
SHANGHAI, SKODA 3 S 1 10
LUOYANG 3Y 10 x 12,MM2 R10112
WATANBE , DYNAPAC CS-12
SAKAI KD 7610B,TS-150
MRR 2125 (25 Ton)
Sakai R2H-2k
ROAD ROLLER(TANDEM1
LUOYANG VIBRATING ROLLER
JOHN MOLLER -TR 6V
STATIC ROAD ROLLER(25-Ton)
Bomag BW141 AD2
Sakai HV5 1 ST (Two Wheel)
FARM TRACTOR
ZWE
STONE CRUSHER (20 TPH)
NAKAYAMA PKV 3E-2
GOODWIN
STONE CRUSHER (10 TON)
KYC PJT - 2H
ELEC: GENT: SET(350 KVA)
DENYO, PATBOW,AIRMAN
CAT-3406T,DEUTZ,LEROY SOMER
ELEC: GENT: SET(15O kVA)
CAT -3208 DITA
PERIM
ELEC: GENT: SET(75 kVA)
CHINA, PUMP
FLAT
AIR COMPRESSOR(655 CFM)
AIR COMPRESSOR(370 CFM)
DENY0
AIR MAN
Engine
Power
kW
165
105
9 8
94
105
84
60
5 6
84
60
105
5 2
8
52
98
5 2
270
139
89
120
78
60
Production
4 1 8m2/hr
3 70m2/hr
230m2/hr
23 0rn2/hr
240m2/hr
200m2/hr
230m2/hr
205m2/hr
2 1 0m2/hr
23 0m2/hr
250m2/hr
250m2/hr
20m2/hr
70m3/hr
18 TPH
14 TPH
9 TPH
250-400KVA
75 KVA
80 KVA
Remarks
thickness is (0.2 m)
Compaction for
average (0.15m)
thickness
I
W/O Vibration
No
22
23
24
25
26
27
28
29
30
3 1
32
33
34
35
36
Particulars
AIR COMPRESSOR(390 CFM)
DENY0
AIR COMPRESSOR(130 CFM)
DENY0
BROOMWADE
TYRE ROAD ROLLER
Bomag(BW24R),Sakai(TS 150)
Sakai TS 200
CRAWLER CRANE(80 TON)
SUMITOMO SC 800
Kabelco BMs 800
CRAWLER CRANE(5O TON)
KATO NK 500 EV,CHINA QUY 50A
KOBELECO 7055, BM 500
HITACHI KH-150-3,KH- 180-3
LINKBELT LS 7811 08
MOBILE CRANE(25 TON)
TADANO TR 250,KATO NK 250 EV
KOMATSU LW 250
BORE PILE CRANE
CASAGRANDE - C 600, C 800
BORE PILE DRILLING RIG
SOIL MEC RT 3 ST
CASAGRANDE - RM 2 1
WELDING MACHINE
DENY0 DCI -500
CONCRETE PUMP
CIFA PUMP TRUCK
MITSUBISHI PUMP TRUCK
Z - CRAFT (SaLaKa-010)
Z - CRAFT (DUWON)
TUG BOAT(T- 2 & 3)
TUG BOAT(T- 4)
CONCRETE PAVER (GP 2600)
AC Paver
Niigata NFW 220 BIIV-DM
TEXTURING MACHINE
Engine
Power
kW
8 0
60
94
6 8
191
155
120
408
139
134
60
274
169
2x165
- - -
2x1 13
- - >
2x172
- . .
2x90
- -
173
44
5 6
Quantity
Li t hr
16
7
16
11
3 1
27
22
45
22
27
11
3 1
29
40
36
45
3 1
3 1
18
9
Production
235m2kr
1 70m2/hr
2m dept hh
@1200mrndia
94m3/hr
Remarks
I
No
37
38
39
40
Particulars
SOIL MEC POWER PACK
j2V 200 S)
MINI BORED PILE
BURNER
AUXILIARY ENGINE
Production
41 CLEANING
42 Metong Asphalt Distributor
Engine
Power
kW
270
75
-
Quantity
Litthr
3 1
11
18
6
94
Distributor
Remarks
45 lithime
18 I
Using at the site
-
Using combination
wi t h Bitumen