Purpose:
This method statement is made to describe the sequence of activities involved for removal of
Cladding / insulation , removal of tubing / instruments / gauges , demolition of lines PR2341
4!" , PR234242" , PR23#042" , PR244$1%" , &'2$011" , erection of ne( lines PR222)
#4"/4!"/44"/20"/2" , PR24!01%" , PR223342" , PR22%!2" , &'22221%" , &'22231" ,
*+221#%" , erection of ,i,e su,,orts , (elding , touchu, ,ainting , -&. / installation of
insulation / cladding0
Procedure 1
The follo(ing ste,s should be ta2en to e3ecute the mentioned tas20
PRE-SHUTDOWN PHASE
Identification & Color Coding of Piping to be replaced
The lines mar2ed on attached isometrics (ill be surve4ed at site / (ill be identified for mar2ing0
The follo(ing is the scheme
5or Redundant items 6ello(
5or Reuse items 'lue
5or Cut Points Red
7 tag mentioning the isometric no, P / 8& no / tiein no (ill be hanged on tiein ,oint0
Erection of Scaffolding
7fter identification scaffolding (ill be built on the location as sho(n in 9ob Card0 -o
*caffolding (ill be utili:ed unless it is tagged ;;*75. 5<R =*."0
Removal of Insulation
<nce the tagging is done / tiein ,oint is identified, insulation activit4 can be ,receded0
8nsulation (ill be removed onl4 after concurrence b4 PT5 / >+ o,eration0
Material Arrangement
7ll the material including ,i,e s,ool other hard(are alread4 identified on ?ob Card (ill
be collected in (arehouse0
@aterial related to s,ecific ?ob Card (ill be tagged for related Tie8n no0
The s,ecific material for a ,articular tiein (ill be issued to concerned su,ervisor /
material coordinator onl40
Prior to shutdo(n material (ill be shifted either near to location or in *hutdo(n Aillage0
*,ools (ill be tested in T*5 area under Test Pack # 0-PR-2!"#
UT & MPI
Page 2 of 10
=T / @P8 (ill be done at tiein T0%)0
SHUTDOWN PHASE
Pre-Reuisites
>+ <,eration (ill issue a ,ermit ,rior to an4 shutdo(n activit40
.nsure the isolation made b4 >+ / confirm it as ,er P/8&0
Removal of Instruments ! gauges " #emolition of $%-#&-'()$#
=nbolting the flange near no::le #% of 02B0%04 for gas test0
7fter clearance of gas test start cutting0
2PT%3)/2PT%3)/2T.%#0 CreusedD remove b4 instrument section0
Removal of 2P+%141 0
Removal of 2TE%#0/2TE%#2 0
@ar2 the cutting location on e3isting line &'2$011" as ,er isometric P1&'2$01&
Rev0000*h0 2/20
Cutting of *PF01 &'2$011" from &'2$011%" at T1044 as ,er isometric P1&'2$01&
Rev0000*h0 2/20
Gold the s,ool F 1 (ith manual hoisting and start cutting (ith grinder at ,oint 1/2 and
shifted the redundant material to (aste area as mentioned b4 >+0
#ismantling of *alve '+*,-. At T-/0'
Gold the 2HA%34 (ith crane unbolting the valve at T)!2 lift u, , lo(er do(n on the tailor
/ shifted the redundant material to (aste area as mentioned b4 >+0
#emolition of $,%! $%-PR'..(#

@ar2 the cutting location on e3isting line PR244$1%" as ,er isometric P1PR244$& Rev0000
*h0 2/20
&ismantle of *PF01/*PF02/*PF03 PR244$1%" as ,er isometric P1PR244$& Rev0000 *h0
2/20
Gold the s,ool F 1 Ca,,ro0 Et0!30 BgD included 1" valve (ith chain bloc2 and start cutting
(ith cold cutting @/C at ,oint 1 after cutting lift u, the s,ool , lo(er do(n on the ground
level / rig manuall4 to(ards Eest to clear location0 Then lift u, the s,ool (ith crane /
lo(er do(n on tailor0
Gold the s,ool F2 Ca,,ro0 Et0401 BgD (ith chain bloc2 and start cutting (ith cold cutting
@/C at ,oint 2 after cutting lift u, the s,ool , lo(er do(n on the ground level / rig
manuall4 to(ards Eest to clear location0 Then lift u, the s,ool (ith crane / lo(er do(n on
tailor0
Gold the s,ool F3 Ca,,ro0 Et0100# BgD (ith chain bloc2 and start cutting (ith cold cutting
@/C at ,oint 3 after cutting lift u, the s,ool , lo(er do(n on the ground level / rig
manuall4 to(ards Eest to clear location0 Then lift u, the s,ool (ith crane / lo(er do(n on
tailor0
#emolition of '%- PR'-.$#
Page 3 of 10
Cutting of PR23412" from PR23414!" / unbolting from valve , manuall4 hoisting /
shifted the redundant material to (aste area as mentioned b4 >+0
#emolition of '%- #1'-((#
Cutting of &+23$$2" from PR23414!" / unbolting from valve , manuall4 hoisting /
shifted the redundant material to (aste area as mentioned b4 >+0
#emolition of '%- #1'-'(#
Cutting of &+232$2" from PR23414!" manuall4 hoisting / shifted the redundant material
to (aste area as mentioned b4 >+0
#ismantle 2f 3lange " Spacer SR!&P-),-)'( & 'M2*,4. at tie-in T/',
Gold the flange Cused for isolationD (ith chain bloc2 start unbolting , remove first *R/'P0%
02$ CreusedD care full4 , after that lo(er do(n the flange at ground level 0
Gold the 2@<A%#4 CreusedD (ith crane before unbolting of flange , after removal of flange
unbolting the other end of the valve , lift u, , lo(er do(n on tailor / shifted the redundant
material to (aste area as mentioned b4 >+0
#ismantle 2f 3lange " Spacer SR!&P-),-)'/ & 'M2*,') at tie-in T/.4
Gold the flange Cused for isolationD (ith chain bloc2 start unbolting , remove first *R/'P0%
02) CreusedD care full4 , after that lo(er do(n the flange at ground level 0
Gold the 2@<A%20 CreusedD (ith crane before unbolting of flange , after removal of flange
unbolting the other end of the valve , lift u, , lo(er do(n on tailor / shifted the redundant
material to (aste area as mentioned b4 >+0
#emolition of .'%-PR-'-.' from T-),/ to T-/.4
@ar2 the cutting location on e3isting line PR234242" as ,er isometric P1PR 2342&
Rev0010 *h0 3/30
'efore cutting of s,ool F1 at ,oints 2 / 1 C T0%)D , the e3isting line must be su,,orted b4
tem,orar4 su,,ort0
Gold the s,ool F 1 Ca,,ro0 Et020!0 BgD (ith crane and start cutting (ith cold cutting @/C
at ,oints 1 / 2 , lift u, the s,ool / lo(er do(n on tailor0
Gold the s,ool F 2 Ca,,ro0 Et02%$1 BgD (ith crane and start cutting (ith cold cutting @/C
at ,oint 3 , unbolting the dumm4 su,,ort from foundation , lift u, the s,ool / lo(er do(n
on tailor0
Gold the s,ool F3 Ca,,ro0 Et03)$% BgD (ith crane and start cutting (ith cold cutting @/C
at ,oint 4 from PR23#042", unbolting the su,,ort from foundation , lift u, the s,ool ,
lo(er do(n on tailor / shifted the redundant material to (aste area as mentioned b4 >+0
#emolition of .'%-PR-'-4) ! #ismantling 2f 525 S6AM C7EC8 *A6*E 9SP-',$4: from
T-/(0
@ar2 the cutting location on e3isting line PR23#042" as ,er isometric P1PR 23#0&
Rev0000 *h0 1/10
Page 4 of 10
Gold the s,ool F 1 Ca,,ro0 Et01)0! BgD (ith crane and start unbolting from *P2%1# , lift
u, the s,ool / lo(er do(n on tailor0
Gold the valve *P2%1# CreusedD (ith crane and start unbolting from *PF2 , lift u, the s,ool
/ lo(er do(n on tailor0
Gold the s,ool F 2 Ca,,ro0 Et02%$0 BgD (ith crane and start cutting (ith cold cutting @/C
at ,oint 1 , lift u, the s,ool , lo(er do(n on tailor 0
Gold the s,ool F 3 Ca,,ro0 Et02110 BgD (ith crane and start cutting (ith cold cutting @/C
at ,oint 2 from PR23414!" after clearance from ne( ,i,e *TR , lift u, the s,ool , lo(er
do(n on tailor and shifted the redundant material to (aste area as mentioned b4 >+0
#emolition of .0%-PR-'-.$ ! #ismantling 2f 3E-,-( from T-/$,
@ar2 the cutting location on e3isting line PR23414!" as ,er isometric P1PR 2341&
Rev0000 *h0 2/#0
Gold the s,ool F 1 Ca,,ro0 Et0400 BgD (ith crane and start cutting (ith cold cutting @/C at
,oint 1 on PR23414!" after clearance from above concrete *TR , lift u, the s,ool , lo(er
do(n on tailor 0
Gold the s,ool F 2 including 5.%3$ CreusedD (ith crane and start cutting (ith cold cutting
@/C at ,oint 2 on PR23414!" unbolting the su,,ort from foundation after clearance from
above concrete *TR , lift u, the s,ool , lo(er do(n on tailor 0
'efore cutting of s,ool F 3 from s,ool F 4 , s,ool F 4 must be su,,orted b4 tem,orar4
su,,ort0
Gold the s,ool F 3 Ca,,ro0 Et023!3 BgD (ith crane and start cutting (ith cold cutting @/C
at ,oint 3 on PR23414!" , unbolting the dumm4 su,,ort from foundation after clearance
from above concrete *TR , lift u, the s,ool , lo(er do(n on tailor0
Goo2 u, the *P F 4 Ca,,ro0 Et023!3 BgD (ith chain bloc2 on above concrete *TR0 start
unbolting , lift the s,ool u, insert 2 -<*0 load bearing (heel trolle4 under the s,ool for
facilitate the load , lo(er do(n the s,ool on trolle4 / move the trolle4 to(ard Eest
direction to rig s,ool outside the concrete *TR b4 means of manual hoisting0
Iift u, the *PF4 from trolle4 outside the clear area b4 crane / loaded on the tailor / shifted
the redundant material to (aste area as mentioned b4 >+0
#emolition of .0%-PR-'-.$ 3rom )' 8-),).
@ar2 the cutting location on e3isting line PR23414!" as ,er isometric P1PR 2341&
Rev0000 *h0 1/#0
Cutting of the s,ool F 1 Ca,,ro0 Et03000 BgD (ith cold cutting @/C at ,oint 1 on PR2341
4!" unbolting the su,,orts from foundation/unbolting of steel girder from concrete colums ,
after that 2-<*0 of 9ac2 (ill be used to lift u, the s,ool , clear from foundation , lo(er do(n
the s,ool on trolle4 / move the trolle4 to(ard Eest direction to rig s,ool outside the
shelter/concrete *TR b4 means of manual hoisting0
Iift u, the *PF1 from trolle4 outside the clear area b4 crane / loaded on the tailor0
Gold the s,ool F 2 Ca,,ro0 Et01!00 BgD (ith chain bloc2 from above girder and start cutting
(ith cold cutting @/C at ,oint 2 on PR23414!" unbolting the su,,ort from foundation ,
lo(er do(n the s,ool on trolle4 / move the trolle4 to(ard Eest direction to rig s,ool
outside the shelter/concrete *TR b4 means of manual hoisting0
Iift u, the *PF2 from trolle4 outside the clear area b4 crane / loaded on the tailor0
Gold the s,ool F 3 Ca,,ro0 Et01%$% BgD (ith chain bloc2 from above girder and start
unbolting from -<J0F#% / of su,,ort from foundation , lo(er do(n the s,ool on trolle4 /
Page # of 10
move the trolle4 to(ard Eest direction to rig s,ool outside the shelter/concrete *TR b4
means of manual hoisting0
Iift u, the *PF2 from trolle4 outside the clear area b4 crane / loaded on the tailor / shifted
the redundant material to (aste area as mentioned b4 >+0
Connect 5e; 6ine PR'''/-..%!4.% <it= )'-8,)(
*hifting of s,ool F 20 (ith crane on trolle4 at clear location near .ast side of 02A0%0! , rig
the trolle4 to(ards near 02B0%0$ , lift u, the s,ool (ith the hel, of chain bloc2 , insert
gas2et bolting the flanges of s,ool / no::le of 02B0%0$ as ,er isometric PR222) *h04/)
Rev001520
*imilarl4 installation of *P2%20 , fit u, of *P2%20 (ith *PF20 at 5E3# as ,er isometric
PR222) *h04/) Rev00152
5E3# (ill be golden 9oint0
*hifting of s,ool F 1) (ith crane on trolle4 at clear location near .ast side of 02A0%0! , rig
the trolle4 to(ards near *P2%20 , lift u, the s,ool (ith the hel, of 9ac2s/chain bloc2 , fit u,
of s,ool (ith *P2%20 at 5E24 as ,er isometric PR222) *h04/) Rev001520
5E24 (ill be golden 9oint0
&ranc= Connection ,% &alancing 6ine <it= 5e; 6ine PR'''/- ..%
.rection/fit u, of *PF01 (ith PR222)44" at 5E01 / bolting (ith no::le as ,er isometric
*+221#%"0
5E01 (ill be golden 9oint0
&ranc= Connection $>4%!$%!>(4% <it= 5e; 6ine #&''''-$,%
.rection / fit u, of s,ool 10#"/0$#" for 2IT%#2 / 2I+%142 on cou,ling (ith C&'22221%"
*h0 1/1 Rev000D at 5E01,02,03 / 04
Perform necessar4 -&. requirements of these 9oint , as 5E01,02,03 / 040
.rection/fit u, of *PF01 (ith ca, C1%"K1"D at 5E0# as ,er isometric &'2222 *h0 1/1
Rev0000
Perform necessar4 -&. requirements of these 9oint , as 5E0#0
&olting ! Connection $% #&'''- <it= 5e;! E?isting 6ine #&''''- $%! #&'()$-$% At T-$)..

.rection/fit u,/bolting of *PF01 (ith e3isting &'2$011" at 5E01 CT1044D / bolting (ith
&'22221"as ,er isometric &'22231" *h0 1/1 Rev0000
Perform necessar4 -&. requirements of these 9oint , as 5E010
&ranc= Connection >(4%! >4% <it= 5e; 6ine PR'''/-..%! 4.%
.rection / fit u, of s,ool 0$#"/ 0#" for 2P&T%3# CT)32D / 2PT%!0 / 2PT%40 CT)4!D /
2P+%142 on cou,ling (ith CPR222) *h0 4/) Rev00152D at 5E23,2#,2% / 2$
Perform necessar4 -&. requirements of these 9oint , as 5E23,2#,2% / 2$0
Connect 5e; 6ine PR'''/-4.%!.0% <it= PR'''/-4.%
*hifting of s,ool F 1! (ith crane on trolle4 at clear location near .ast side of 02A0%0! , rig
the trolle4 to(ards near s,ool F 1) , lift u, the s,ool (ith the hel, of chain bloc2 , fit u, of
*P F 1! (ith *PF 1) at 5E22 as ,er isometric PR222) *h03/) Rev0015#
Page % of 10
5E22 (ill be golden 9oint0
*hifting of s,ool F 1$ (ith crane on trolle4 at clear location near .ast side of 02A)302 , rig
the trolle4 to(ards near s,ool F 1! , lift u, the s,ool (ith the hel, of chain bloc2 , fit u, of
*P F 1$ (ith *PF 1! at 5E21 as ,er isometric PR222) *h03/) Rev0015#
5E21 (ill be golden 9oint0
.rection of 25.%3! CT)2$D (ith crane , fit u, of 25.%3! (ith *PF 1$ at 5E20 as ,er
isometric PR222) *h03/) Rev0015#0 7fter fit u, 25.%3! (ill be su,,orted b4 tem,orar4
su,,ort under other end for facilitated the load0
5E20 (ill be golden 9oint0
*hifting of s,ool F 1% (ith crane on trolle4 at clear location near .ast side of 02A0%0! , rig
the trolle4 to(ards 25.%3! , lift u, the s,ool (ith the hel, of chain bloc2 , fit u, of *P F 1%
(ith 25.%3! at 5E2) CT)2$D as ,er isometric PR222) *h03/) Rev0015#
5E22 (ill be golden 9oint0
.rection of s,ool F 1# (ith crane as ,er isometric PR222) *h03/) Rev0015#0
.rection of s,ool F 11 (ith crane as ,er isometric PR222) *h0)/) Rev001520
.rection/ fit u, of 25.%3$ (ith s,ool F 11 at 5E13 CT)1%D / PR222)4! Cerected in
P*&D at 5E03 CT)1%D (ith crane as ,er isometric PR222) *h0)/) , 2/) Rev00152/01510
5E13 / 5E03 (ill be golden 9oint0
Connection .'%- PR''-- <it= . '%
.rection/fit u, of s,ool (ith PR222)42" (ith crane at 5E01 as ,er isometric PR223342"
*h01/2 Rev002530
5E01 (ill be golden 9oint0
Connection '%- PR'',0 <it= '3E,-( At T-$).-

.rection/fit u, of 2" s,ool (ith 25.%3$ at 5E01CT043D as ,er isometric PR22%!2"
*h01/1 Rev0000
5E01 (ill be golden 9oint0
Connection $,%- PR'.0) <it= e?isting PR'-..-')% 9T-$).):
.rection/fit u, of *PF01 (ith PR234420" CT1040D (ith crane at 5E01 as ,er isometric
PR24!01%" *h01/3 Rev002510
5E01 (ill be golden 9oint0
.rection/fit u, of *PF0$ (ith *PF01 (ith crane at 5E02 as ,er isometric PR24!01%"
*h01/3 Rev002510
5E02 (ill be golden 9oint0
.rection/fit u, of *PF02 (ith *PF0$ (ith crane at 5E0$ as ,er isometric PR24!01%"
*h01/3 Rev002510
5E 0$ (ill be golden 9oint0
.rection/fit u, of *PF03 one end (ith *PF02 at 5E03 / other end (ith *PF04 C.rect in
P*&D at 5E04 as ,er isometric PR24!01%" *h01/3 , 2/3 Rev002510
5E03 / 04 (ill be golden 9oint0
&ranc= Connection $,% <it= 5e; 6ine PR'''/- .0%
Page $ of 10
.rection/fit u, of *PF0% (ith PR222)4!" (ith crane at 5E0% / bolting (ith valve as ,er
isometric PR24!01%" *h03/3 Rev000520
5E0% (ill be golden 9oint0
&ranc= Connection ')% <it= 5e; 6ine PR'''/- .0%
.rection/fit u, of *PF2# (ith PR222)4!" (ith crane at 5E2! as ,er isometric PR222)
20" *h0$/) Rev001530
5E2! (ill be golden 9oint0
.rection/fit u, of *PF21 (ith *PF2# (ith crane at 5E3% as ,er isometric PR222)20"
*h0$/) Rev001530
5E3% (ill be golden 9oint0
.rection/bolting of *PF22 one end (ith *PF21 / after insertion of R<PR1!0324" as ,er
isometric PR222)20" *h0$/) Rev001530
Connection $% *ent <it= PR'''/- .0%

.rection/fit u, of 1"vent (ith cou,ling at 5E1$,1! as ,er isometric PR222)4!" *h0 3/)
Rev0015#0
Perform necessar4 -&. requirements of these 9oint , as 5E1$,1!0
Connection $% *ent <it= PR'''/- ')%

.rection/fit u, of 1"vent (ith cou,ling at 5E33 as ,er isometric PR222)20" *h0 $/)
Rev001530
Perform necessar4 -&. requirements of these 9oint , as 5E330
&ranc= Connection '% <it= 5e; 6ine PR'''/- .0%
.rection/fit u, of *PF13 (ith PR222)4!" (ith crane at 5E1# as ,er isometric PR222)2"
*h0!/) Rev001520
5E1# (ill be golden 9oint0
.rection/fit u, of *PF14 (ith PR222)4!" (ith crane at 5E1% as ,er isometric PR222)2"
*h0!/) Rev001520
5E1% (ill be golden 9oint0
Connection '52S> $% *ent <it= PR'''/- '%

.rection/fit u, of 1"vent (ith cou,ling at 5E2) , 30 , 31 / 32 as ,er isometric PR222)2"
*h0 !/) Rev001520
Perform necessar4 -&. requirements of these 9oint , as 5E2) , 30 , 31 / 320
&ranc= Connection '% <it= 5e; 6ine PR'''/- .0%
.rection/fit u, of *PF12 (ith PR222)4!" at 5E14 as ,er isometric PR222)4!" *h0)/)
Rev001520
5E14 (ill be golden 9oint0
Page ! of 10
<elding
7ll (elding (or2 (ill be according to a,,roved EP* and '3103 and onl4 qualified (elders
(ill be em,lo4ed0
The (elding (or2 location (ill be shielded against (ind0
The (eld surface (ill be cleaned (ith (ire brush or grinding ,rior to (elding o,erations to
give a surface free from rust, scale or mill coating0
'et(een each la4er of (elding an4 crac2s, ,ores or (elding s,atters (ill be removed b4
grinding the surface before a,,lication of ne3t la4er0
The a,,earance of finished (elds (ill conform to 7*@. '3103 code / EP* and (ill
e3clude an4 under cuts, s,atters, and crac2s0
Install Pressure 1auge ' P1 ,$.'>
8nstall Pressure +auge 2 P+ %142 as ,er isometric dra(ing PR222) *h04/) Rev001520
Pressure +auge 2 P+ %142 has been tested in Eor2sho,0
'olt Pressure +auge 2 P+ %1420
Install T=ermo <ell ' T< ,$..>
8nstall Thermo Eell 2 TE %144 as ,er isometric dra(ing PR222) *h04/) Rev001520
'olt Thermo Eell 2 TE %1440
Install 6evel 1auge ' 61 ,$.'>
8nstall Pressure +auge 2 P+ %142 as ,er isometric dra(ing &'2222 *h01/1 Rev0000
'olt Pressure +auge 2 P+ %1420
Install Spectacle &lind S&-),-$))-
8nstall/bolting *'0%1003 as ,er isometric &'22231" *h01/1 Rev000
Install '%*alves !Spectacle &lind S&-),-$))'
8nstall/bolting 2"valves/*'0%1002 as ,er isometric PR222)2" *h0!/) Rev00152
Install $,% SR- &P-),-$))0
8nstall/bolting *R'P0%100! as ,er isometric PR24!01%" *h02/3 Rev000510
Install Motor 2perating *alve '-M2*,4. At T-/', & SR!&P-),-)'(
8nstall @otor <,erating Aalve 2@<A%#4 7t T)2% (ith crane as ,er isometric dra(ing
PR222)4!" *h0)/) Rev000520
8nstall *R/'P0%02$ / then 'olt @otor <,erating Aalve 2@<A%20 7t T)2% 0
Install 5on-Slam c=ec@ valve SP-$,$) At T-$)4-
Page ) of 10
8nstall Aalve *P1%101 7t T10#3 (ith crane as ,er isometric dra(ing PR222)4!" *h03/)
Rev0015#0
'olt -on*lam chec2 valve *P1%10 7t T10#3 0
Install R2-PR-$0)--'.%
8nstall R<PR1!0324" (ith crane as ,er isometric dra(ing PR222)4!" *h0$/) Rev001530
'olt the flanges after insertion of R<PR1!0324" 0
Pipe Support Installation
Pre fabricated ,i,e su,,ort as mentioned on the isometric dra(ings / ,i,ing la4out
dra(ings (ill be installed at indicated ,ositions0
Pi,e su,,ort installation (ill follo( the ,i,e isometric installation0
5ote 3or &olted Connections
5or flanged connection, the surfaces in contact (ith gas2ets (ill be chec2ed before
assembl4 and all traces of dirt o3ides / grease (ill be removed0
The flanges (ill not be 9oined together (ithout the insertion of gas2ets0
Pro9ection of stud bolts (ill be equal on both sides0
5#E
22 -<*0 +olden ?oint mentioned above (ill be ins,ected according to code / s,ecific
-&. schedule agreed (ith >+0
Touc= Up Painting
&uring erection of *,ools care (ill be ta2en for damage of ,aint on ne( lines0
7fter (elding of ,i,e s,ool touch u, ,ainting (ill be ,erformed as ,er s,ecified ,ainting
s4stem C% /1D in ?ob card0
Insulation
8nsulation (ill be done after obtaining ,ainting clearance / acce,tance0
8nsulation (ill be installed as ,er line list s,ecification s4stem C4C , 4&D0
Per$%t Re&u%re$ents
*caffolding .rection Cold Eor2 Permit
Removal of Cladding / 8nsulation Cold Eor2 Permit
Page 10 of 10
Cutting /+rinding/Eelding of *,ool Cold Eor2 /Got Eor2 C<,en 5lameD Permit, Aehicle .ntr4
-&. RT Certificat
Touch u, Painting , insulation ,Cladding Cold Eor2 Permit
Attac'$ents
?*7 ?ob *afet4 7nal4sis
8sometrics 7s ,er ?<' C7R&
Pre Prepared ( Su)$%tted *+ Re,%e-ed *+ Appro,ed *+
DES.ON En/%neer%n/ .T01 2atar 3as
-ame / *ignature1
Garoon *hah
-ame / *ignature1 -ame / *ignature1
&ate1 &ate1 &ate1