Sunteți pe pagina 1din 73

UR SC

1 Sr. Section Engineer/P.Way WR 0 0


2 Sr. Section Engineer (Works) WR 2 0
3 Sr. Section Engineer Drawing (Civil) WR 2 0
4 Sr. Section Engineer Mechanical WR 2 5
5 Sr. Section Engineer Carriage & Wagon WR 8 1
6 Sr. Section Engineer Electrical/Electrical (GS) WR 2 0
7 Sr. Section Engineer Electrical (TRS) WR 0 0
8 Sr. Section Engineer (Signal) WR 14 2
9 Sr. Section Engineer (Telecommunication) WR 13 4
G.Total 43 12
10 Junior Engineer (P-Way) WR 3 0
11 Junior Engineer Drawing/Drawing & Design (Civil) WR 1 0
12 Junior Engineer Mechanical WR 35 11
13 Junior Engineer Carriage & Wagon (Open Line) WR 5 2
14 Junior Engineer (Electrical/TRS) WR 10 4
15 Junior Engineer Electrical/Electrical General WR 6 0
16 Junior Engineer (Signal) WR 14 2
17 Junior Engineer (Telecommunication) WR 12 4
18 Depot Material Superintendent WR 1 0
G.Total 87 23
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB AHMEDABAD
SI.NO Name of the Post
Railway/P
U
ST OBC Total Ex.SM VH OH HH
1 0 1 0 1 0 0
0 0 2 0 0 1 0
0 0 2 0 0 2 0
1 4 12 1 0 0 0
2 2 13 1 0 0 0
1 1 4 0 0 0 0
0 1 1 0 0 0 0
0 5 21 2 0 1 0
3 6 26 2 0 1 0
8 19 82 6 1 5 0
1 0 4 0 0 4 0
0 0 1 0 0 0 0
5 23 74 7 0 3 0
0 4 11 0 0 4 0
1 4 19 1 0 1 0
1 2 9 0 0 0 0
2 4 22 2 0 3 0
2 5 23 2 0 2 0
0 2 3 0 0 1 0
12 44 166 12 0 18 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB AHMEDABAD
SUMMARY OF POSTS UNDER
RRB AHMEDABAD
UR
1 Sr. Section Engineer/Dsl Mechanical NWR 2
2 Sr. Section Engineer Carriage & Wagon NWR 1
3 Sr. Section Engineer (Works) NWR 3
4 Sr. Section Engineer (Track Machine) NWR 3
5 Sr. Section Engineer (Telecommunication) NWR 0
6 Sr. Section Engineer (Signal) NWR 5
7 Sr. Section Engineer/P.Way NWR 5
8 Sr. Section Engineer Mechanical NWR 8
9 Sr.Section Engineer Electrical/Electrical (GS) NWR 5
10 Sr. Section Engineer/Dsl Electrical NWR 1
11 Chief Depot Material Superindent NWR 2
G.Total 35
12 Junior Engineer (P.Way) NWR 24
13 Junior Engineer (Works) NWR 5
14 Junior Engineer (Telecommunication) NWR 0
15 Junior Engineer (Signal) NWR 2
16 Junior Engineer Mechanical NWR 28
17 Junior Engineer Mechanical(MWT) NWR 2
18 Junior Engineer Electrical/Electrical General NWR 13
19 Junior Engineer (Drawing/Design/Design & Drawing)Electrical NWR 2
20
Junior Engineer (Drawing/Design/Drawing &
Design)Mechanical/Mechanical Design
NWR 1
21 Junior Engineer Carriage & Wagon (Open Line) NWR 4
22 Junior Engineer (Bridge) NWR 4
23 Depot Material Superindent NWR 4
NWR 12
WCR 9
25 Chemical Metallurgical Assistant NWR 19
26 Junior Engineer/Diesel Mechanical NWR 1
27 Junior Engineer/Diesel Electrical NWR 1
G.Total 131
24 Junior Engineer (Mechanical Workshop)
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB AJMER
SI.NO Name of the Post
Railway/P
U
SC ST OBC Total Ex.SM VH OH HH
2 0 0 4 0 0 0 0
1 1 0 3 0 0 0 0
0 0 1 4 0 0 0 0
0 0 2 5 0 0 0 0
0 0 2 2 0 0 0 0
0 1 1 7 0 0 0 0
2 3 6 16 1 0 0 0
5 2 6 21 1 0 0 0
4 2 6 17 2 0 0 0
0 0 1 2 0 0 0 0
0 0 1 3 0 0 0 0
14 9 26 84 4 0 0 0
7 7 17 55 6 0 0 0
3 3 6 17 0 0 0 0
2 0 2 4 0 0 0 0
0 1 1 4 0 0 0 0
4 4 10 46 4 0 1 0
0 0 0 2 0 0 0 0
3 3 4 23 1 0 0 0
1 0 1 4 0 0 0 0
0 0 5 6 0 0 0 0
2 1 1 8 0 0 0 0
1 1 3 9 0 0 0 0
1 0 0 5 0 0 0 0
4 3 3 22 2 0 1 0
1 1 0 11 0 0 0 0
0 0 0 19 2 0 0 0
1 1 0 3 0 0 0 0
0 0 1 2 0 0 0 0
30 25 54 240 15 0 2 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB AJMER
SUMMARY OF POSTS UNDER
RRB AJMER
UR
1 Sr. Section Engineer (Works) NCR 2
2 Sr. Section Engineer (Track Machine) NCR 4
3 Sr. Section Engineer (Telecommunication) NCR 3
4 Sr. Section Engineer (Signal) NCR 6
5 Sr. Section Engineer (P.Way) NCR 4
NCR 1
NR 14
NR 13
NCR 0
8 Sr. Senior Engineer (Drawing/Design/Drawing & Design) Electrical NCR 3
9 Sr. Section Engineer (Mechanical) Workshop NR 1
10 Sr. Section Engineer/Dsl Mechanical NR 0
11 Sr. Section Engineer/Dsl Electrical NR 0
12 Chief Depot Material Superindent NR 2
13 Sr. Section Engineer Electrical/RS NCR 5
14 Sr. Section Engineer Drawing (Civil) DLW 1
G.Total 59
15 Junior Engineer (Works) NCR 4
16 Junior Engineer (Track Machine) NCR 13
17 Junior Engineer (Telecommunication) NCR 24
18 Junior Engineer (Signal) NCR 34
19 Junior Engineer (P.Way) NCR 14
20 Junior Engineer Carriage & Wagon (Open Line) NR 17
NCR 3
NR 22
22 Junior Engineer (IT) DLW 4
23 Junior Engineer Electrical/TRD NCR 15
24 Junior Engineer (RS) NCR 10
25 Junior Engineer (Drawing/Design/Drawing & Design) Electrical NCR 3
26 Junior Engineer Drawing/Drawing & Design (Civil) NCR 7
27 Junior Engineer Drawing/Drawing & Designing/Signal (S&T) NCR 9
28 Depot Material Superindent DLW 4
29 Junior Engineer (Design) Civil DLW 2
G.Total 185
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB ALLAHABAD
SI.NO Name of the Post
Railway/P
U
6 Sr. Section Engineer Carriage & Wagon
7 Sr. Section Engineer Electrical (TRD)
21 Junior Engineer/Dsl Mechanical
SC ST OBC Total Ex.SM VH OH HH
0 0 0 2 0 0 0 0
0 2 1 7 1 0 0 0
1 1 1 6 1 0 0 0
1 1 2 10 1 0 0 0
2 1 0 7 0 0 0 0
2 1 5 9 0 0 0 0
2 0 5 21 1 0 0 0
4 2 6 25 2 0 0 0
0 1 2 3 0 0 0 0
1 0 1 5 0 0 0 0
2 1 4 8 0 0 0 0
0 1 1 2 0 0 0 0
1 0 0 1 0 0 0 0
1 0 1 4 0 0 0 0
0 0 2 7 0 0 0 0
0 0 0 1 0 0 0 0
17 11 31 118 6 0 0 0
1 1 1 7 0 0 0 0
2 0 8 23 1 0 0 0
6 5 7 42 4 0 1 0
9 5 14 62 5 0 1 0
3 4 3 24 2 0 0 0
6 1 8 32 3 0 0 0
0 0 1 4 0 0 0 0
6 2 7 37 3 0 1 0
1 1 2 8 1 0 0 0
4 1 8 28 3 0 1 0
4 2 5 21 2 0 1 0
3 1 6 13 1 0 0 0
1 2 7 17 2 0 0 0
1 2 2 14 1 0 0 0
7 2 6 19 2 0 0 0
0 0 0 2 0 0 0 0
54 29 85 353 30 0 5 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB ALLAHABAD
SUMMARY OF POSTS UNDER
RRB ALLAHABAD
UR SC
1 Sr. Section Engineer (Mechanical Workshop) SWR 11 2
2 Sr. Section Engineer/Dsl Mechanical SWR 2 1
3 Sr. Section Engineer/Dsl Electrical SWR 0 0
4 Sr. Section Engineer Electrical/Electrical (GS) SWR 4 1
5 Sr. Section Engineer Electrical (TRD) SWR 1 0
6 Sr. Section Engineer (Track Machine) SWR 8 2
7 Chief Depot Material Superindent SWR 1 0
G.Total 27 6
8 Junior Engineer (Mechanical Workshop) SWR 26 7
RWF 1 0
SWR 5 0
10 Junior Engineer (Electrical/TRS) SWR 1 0
11
Junior Engineer (Drawing/Design/Drawing & Design)
Electrical
RWF 0 1
RWF 1 0
SWR 3 1
13 Junior Engineer (IT) SWR 3 1
SWR 3 0
RWF 0 1
RWF 6 1
SWR 2 1
G.Total 51 13
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB BENGALURU
SI.NO Name of the Post
Railway/P
U
15 Chemical Metallurgical Assistant
9 Junior Engineer Electrical/Electrical General
12 Junior Engineer (Telecommunication)
14 Depot Material Superindent
ST OBC Total Ex.SM VH OH HH
1 3 17 2 0 0 0
0 0 3 0 0 0 0
0 1 1 0 0 0 0
1 4 10 1 0 0 0
0 0 1 0 0 0 0
1 4 15 2 0 0 0
0 1 2 0 0 0 0
3 13 49 5 0 0 0
3 11 47 5 0 2 0
0 0 1 0 0 0 0
0 2 7 0 0 1 0
0 2 3 0 0 0 0
0 0 1 0 0 0 0
0 0 1 0 0 0 0
1 3 8 0 0 1 0
0 2 6 1 0 0 0
0 1 4 0 0 0 0
0 1 2 0 0 1 0
0 4 11 1 0 0 0
1 1 5 0 0 0 0
5 27 96 7 0 5 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB BENGALURU
SUMMARY OF POSTS UNDER
RRB BENGALURU
UR SC ST
1 Sr. Section Engineer/P.Way WR 1 0 0
2 Sr. Section Engineer (Works) WR 2 1 0
WCR 1 0 0
WR 0 0 0
4
Sr. Section Engineer Carriage & Wagon (Open
Line)
WR 4 1 1
5 Sr. Section Engineer Mechanical WR 2 0 0
6 Sr. Section Engineer Electrical/Electrical (GS) WR 5 1 1
WCR 3 2 2
WR 4 1 1
WCR 2 1 2
WR 0 2 1
9 Sr. Section Engineer (Bridge) WCR 1 0 0
G.Total 25 9 8
10 Junior Engineer (P.Way) WR 4 3 0
11 Junior Engineer (Works) WR 4 1 1
12 Junior Engineer (Bridge) WCR 0 0 1
13 Junior Engineer Mechanical WR 1 1 1
14
Junior Engineer (Drawing/Design/Drawing &
Design) Mechanical/Mechanical Design
WR 2 0 0
15 Junior Engineer (Electrical) WR 5 1 1
16 Junior Engineer (Jig&Tools) WR 0 0 0
WCR 4 2 1
WR 1 0 0
18 Junior Engineer (Telecommunication) WR 1 2 1
19 Junior Engineer Drawing/Drawing & Design (Civil) WR 2 1 1
20 Junior Engineer Carriage & Wagon (Open Line) WR 4 0 0
G.Total 28 11 7
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB BHOPAL
SI.NO Name of the Post
Railway/P
U
17 Junior Engineer (Signal)
3
Sr. Section Engineer Drawing/Design/Drawing &
Design (Civil)
7 Sr. Section Engineer (Signal)
8 Sr. Section Engineer (Telecommunication)
OBC Total Ex.SM VH OH HH
0 1 0 0 0 0
1 4 0 0 0 0
0 1 0 0 0 0
1 1 0 0 0 0
2 8 0 0 0 0
0 2 0 0 0 0
2 9 1 0 0 0
2 9 0 0 0 0
2 8 1 0 0 0
1 6 0 0 0 0
1 4 0 0 0 0
0 1 0 0 0 0
12 54 2 0 0 0
0 7 0 0 0 0
2 8 1 0 0 0
0 1 0 0 0 0
3 6 0 0 0 0
1 3 0 0 0 0
4 11 1 0 0 0
2 2 0 0 0 0
3 10 0 0 0 0
0 1 0 0 0 0
1 5 0 0 0 0
4 8 0 0 0 0
2 6 0 0 0 0
22 68 2 0 0 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB BHOPAL
SUMMARY OF POSTS UNDER
RRB BHOPAL
UR SC
1 Sr. Section Engineer Electrical (TRD) ECoR 1 0
2 Sr. Section Engineer Electrical (TRS) ECoR 1 1
3 Sr. Section Engineer Electrical/Electrical (GS) ECoR 1 1
4 Sr. Section Engineer (P.Way) ECoR 5 1
5 Sr. Section Engineer (Works) ECoR 2 0
6 Sr. Section Engineer Estimator ECoR 1 0
7 Sr. Section Engineer (Track Machine) ECoR 3 1
8 Sr. Section Engineer Carriage & Wagon ECoR 1 0
9 Sr. Section Engineer Electrical Operations ECoR 1 0
10 Sr. Section Engineer (Mechanical) (Workshop) ECoR 1 0
G.Total 17 4
11 Junior Engineer (P.Way) ECoR 6 3
12 Junior Engineer Estimator/Sr. Estimator ECoR 2 2
13 Junior Engineer/Estimator (S&T) ECoR 1 0
14 Junior Engineer Drawing/Drawing & Design (Civil) ECoR 0 1
15 Junior Engineer (Works) ECoR 1 2
16 Junior Engineer Electrical (TRS) ECoR 2 2
17 Junior Engineer Electrical (TRD) ECoR 2 0
18 Junior Engineer (Mechanical Workshop) ECoR 4 1
19 Junior Engineer (Bridge) ECoR 2 1
20 Junior Engineer Carriage & Wagon (Open Line) ECoR 4 1
21 Depot Material Superintendent ECoR 1 0
G.Total 25 13
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB BHUBANESHWAR
SI.NO Name of the Post
Railway/P
U
ST OBC Total Ex.SM VH OH HH
0 1 2 0 0 0 0
1 0 3 0 0 0 0
0 0 2 0 0 0 0
1 0 7 1 0 0 0
0 3 5 1 0 0 0
0 0 1 0 0 0 0
0 2 6 1 0 0 0
1 1 3 0 0 0 0
0 1 2 0 0 0 0
0 1 2 0 0 0 0
3 9 33 3 0 0 0
2 5 16 2 0 0 0
2 4 10 1 0 0 0
0 0 1 0 0 0 0
0 3 4 0 0 0 0
2 4 9 1 0 0 0
0 2 6 1 0 0 0
0 1 3 0 0 0 0
1 2 8 1 0 0 0
1 3 7 1 0 0 0
1 1 7 1 0 0 0
0 2 3 0 0 0 0
9 27 74 8 0 0 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB BHUBANESHWAR
SUMMARY OF POSTS UNDER
RRB BHUBANESHWAR
UR SC ST
SECR 7 2 2
CR 2 0 0
2 Sr. Section Engineer (Bridge) SECR 1 0 0
3 Sr. Section Engineer (Works) SECR 2 0 0
SECR 13 3 1
CR 4 1 2
5 Sr. Section Engineer/Dsl Mechanical SECR 1 0 0
6 Sr. Section Engineer/Dsl Electrical SECR 1 1 0
7 Sr. Section Engineer/Dsl(A) SECR 1 0 0
8 Sr. Section Engineer Electrical/Electrical (GS) SECR 2 0 0
G.Total 34 7 5
SECR 26 8 4
CR 1 1 0
10 Junior Engineer (Works) SECR 1 0 0
11 Junior Engineer (Bridge) SECR 1 1 1
SECR 14 5 2
CR 5 1 0
13 Junior Engineer (Telecommunication) SECR 1 0 0
G.Total 49 16 7
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB BILASPUR
SI.NO Name of the Post
Railway/P
U
12 Junior Engineer Carriage & Wagon (Open line)
1 Sr. Section Engineer (P.Way)
4 Sr. Section Engineer Carriage & Wagon
9 Junior Engineer (P-Way)
OBC Total Ex.SM VH OH HH
4 15 2 0 0 0
0 2 0 0 0 0
0 1 0 0 0 0
3 5 1 0 0 0
9 26 3 0 0 0
1 8 1 0 0 0
3 4 0 0 0 0
2 4 0 0 0 0
1 2 0 0 0 0
1 3 0 0 0 0
24 70 7 0 0 0
14 52 5 0 2 0
0 2 0 0 0 0
0 1 0 0 0 0
1 4 0 0 0 0
7 28 3 0 0 0
2 8 2 0 0 0
0 1 0 0 0 0
24 96 10 0 2 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB BILASPUR
SUMMARY OF POSTS UNDER
RRB BILASPUR
UR SC ST
1 Junior Engineer (IT) NR 9 3 1
2 Junior Engineer Electrical (TRD) NR 2 0 3
3 Junior Engineer Electrical/ Electrical General NR 27 7 2
4 Junior Engineer (Works) NR 5 2 1
5 Junior Engineer (P.Way) NR 28 8 6
6
Junior Engineer Drawing/Drawing & Design
(Civil)
NR 4 1 0
7 Junior Engineer Carriage & Wagon (Open Line) NR 26 7 3
8 Junior Engineer Dsl/Mechanical NR 4 1 1
9 Junior Engineer Dsl/Electrical NR 4 1 0
10 Junior Engineer S&T Workshop NR 1 0 1
11 Junior Engineer (Signal) NR 3 1 0
12 Junior Engineer (Telecommunication) NR 7 2 1
13 Chemical Metallurgical Assistant NR 4 1 0
14 Depot Material Superintendent NR 4 1 1
G.Total 128 35 20
15 Sr. Section Engineer (Track Machine) NR 1 0 0
16 Sr. Section Engineer Electrical/Electrical (GS) NR 8 0 0
17 Sr. Section Engineer Electrical (TRD) NR 7 3 0
18 Sr. Section Engineer (Works) NR 1 0 0
19 Sr. Section Engineer (P.Way) NR 3 1 0
20 Sr. Section Engineer Carriage & Wagon NR 7 2 1
21 Sr.Section Engineer S&T Workshop NR 1 1 0
22 Sr. Section Engineer (Signal) NR 7 2 1
23 Sr. Section Engineer (Telecommunication) NR 5 1 1
24 Sr. Section Engineer (Printing Press) NR 2 1 0
25 Chief Depot Material Superintendent NR 3 1 1
G.Total 45 12 4
SENIOR SECTION ENGINEER
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB CHANDIGARH
JUNIOR ENGINEER
SI.NO Name of the Post
Railway/P
U
OBC Total Ex.SM VH OH HH
4 17 1 1 0 0
1 6 0 0 0 0
12 48 5 0 0 0
3 11 1 0 0 0
11 53 5 0 0 0
1 6 0 0 0 0
13 49 5 0 0 0
2 8 1 0 0 0
2 7 0 0 0 0
1 3 0 0 0 0
2 6 0 0 0 0
3 13 1 0 0 0
2 7 0 0 0 0
2 8 1 0 0 0
59 242 20 1 0 0
1 2 0 0 0 0
2 10 1 0 0 0
4 14 1 0 0 0
0 1 0 0 0 0
2 6 1 0 0 0
4 14 1 0 0 0
0 2 0 0 0 0
3 13 1 0 0 0
2 9 1 0 0 0
1 4 0 0 0 0
2 7 0 0 0 0
21 82 6 0 0 0
SENIOR SECTION ENGINEER
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB CHANDIGARH
JUNIOR ENGINEER
SENIOR SECTION ENGINEER
SUMMARY OF POSTS UNDER
RRB CHANDIGARH
JUNIOR ENGINEER
UR SC ST OBC
1 Sr. Section Engineer (P.Way) SR 13 5 1 13
ICF 1 1 0 1
SR 6 2 0 5
ICF 0 0 2 0
SR 13 4 3 9
4 Sr. Section Engineer Carriage & Wagon SR 3 1 1 2
5 Sr. Section Engineer/ Dsl Mechanical SR 1 1 1 1
6
Sr. Section Engineer J&T (Jig &
Tools)/(Drawing/Design & Drawing)
Mechanical
ICF 0 1 0 0
7
Sr. Section Engineer Electrical/Electrical
(GS)
SR 22 3 4 5
8 Sr. Section Engineer (Track Machine) SR 2 0 1 1
9 Sr. Section Engineer/Dsl Electrical SR 1 0 1 0
G.Total 62 18 14 37
10 Junior Engineer (P.Way) SR 9 4 5 13
11 Junior Engineer (Works) ICF 1 0 0 1
12 Junior Engineer (Bridges) SR 4 1 0 2
ICF 5 5 0 4
SR 35 14 5 20
14
Junior Engineer Carriage & Wagon (Open
Line)
SR 10 3 4 6
15 Junior Engineer/Dsl Mechanical SR 7 1 1 2
SR 9 2 3 1
ICF 4 3 0 2
17
Junior Engineer Electrical/Electrical
General
SR 46 8 8 25
18 Junior Engineer Electrical (TRD) SR 0 0 1 7
19 Junior Engineer (Track Machine) SR 22 6 4 5
ICF 4 1 1 3
SR 5 2 1 3
ICF 7 2 1 2
SR 8 3 0 1
22 Junior Engineer/Dsl Electrical SR 6 2 2 3
23 Junior Engineer (Electrical) ICF 5 3 0 0
G.Total 187 60 36 100
13 Junior Engineer (Mechanical Workshop)
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB CHENNAI
SENIOR SECTION ENGINEER
SI.NO Name of the Post
Railway/P
U
2 Sr. Section Engineer (Works)
3
Sr. Section Engineer (Mechanical)
(Workshop)
JUNIOR ENGINEER
16
Junior Engineer
(Drawing/Design/Drawing & Design)
20 Depot Material Superindent
21 Chemical Metallurgical Assistant
Total Ex.SM VH OH HH
32 3 0 1 0
3 0 0 0 0
13 1 0 1 0
2 0 0 0 0
29 2 0 0 0
7 0 0 0 0
4 0 0 0 0
1 0 0 0 0
34 3 0 1 0
4 0 0 0 0
2 0 0 0 0
131 9 0 3 0
31 3 0 0 0
2 0 0 0 0
7 0 0 0 0
14 0 0 1 0
74 7 0 2 0
23 1 0 0 0
9 0 0 0 0
15 1 0 0 0
9 0 0 0 0
87 8 0 3 0
8 0 0 0 0
37 3 0 1 0
9 0 0 0 0
11 1 0 0 0
12 0 0 0 0
12 0 0 0 0
13 0 0 0 0
8 0 0 0 0
381 24 0 7 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB CHENNAI
SENIOR SECTION ENGINEER
JUNIOR ENGINEER
SUMMARY OF POSTS UNDER
RRB CHENNAI
SENIOR SECTION ENGINEER
JUNIOR ENGINEER
UR SC ST OBC
1 Section Engineer/Drawing NER 1 0 0 0
2
Sr. Section Engineer Electrical/Electrical
(GS)
NER 6 0 0 6
3 Sr. Section Engineer (Track Machine) NER 6 2 1 2
4 Sr. Section Engineer Carriage & Wagon NER 9 3 2 3
5 Sr. Section Engineer/Dsl Mechanical NER 2 1 0 1
6 Sr. Section Engineer (P.Way) NER 15 5 3 5
7
Sr. Section Engineer Electrical
Maintenance
RDSO 0 0 0 1
8 Chief Depot Material Superindent RDSO 1 0 0 0
9 Sr. Section Engineer (Design) Mechanical RDSO 2 0 0 0
10
Sr. Section Engineer (Research)
Instrumentation
RDSO 0 1 1 0
11 Sr. Section Engineer/Dsl Electrical NER 1 0 0 1
12 Sr. Section Engineer (Works) NER 4 1 0 2
13
Sr. Section Engineer (Research)
Engineering
RDSO 2 0 0 0
14
Sr. Section Engineer (Mechanical)
(Workshop)
RCF/RBL 5 1 1 3
15
Sr. Section
Engineer/Mechanical/Dy.Car/BG & MG
RDSO 1 0 0 0
G.Total 55 14 8 24
16 Junior Engineer Drawing NER 0 1 0 1
17
Junior Engineer Electrical/Electrical
General
NER 18 6 4 11
18 Junior Engineer (Track Machine) NER 10 2 2 3
19 Junior Engineer/Dsl Electrical NER 4 1 1 3
20
Junior Engineer Carriage & Wagon (Open
Line)
NER 15 8 4 8
21 Junior Engineer/Dsl Mechanical NER 3 1 0 4
22 Junior Engineer (P.Way) NER 33 10 6 15
23 Junior Engineer (Works) NER 7 1 1 2
24 Junior Engineer Electrical (TRD) NER 3 1 1 2
25 Junior Engineer (IT) RCF 3 1 0 1
26 Junior Engineer Mechanical RDSO 1 1 0 0
27 Junior Engineer (Research) Mechanical RDSO 1 0 0 2
28
Junior Engineer (Research)
Instrumentation
RDSO 2 2 2 3
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB GORAKHPUR
SI.NO Name of the Post
Railway/P
U
29 Depot Material Superindent RDSO 1 0 0 0
30 Junior Engineer (Design) Civil RDSO 13 4 0 1
31
Junior Engineer (Drawing/Design/Drawing
& Design) Mechanical/Mechanical Design
RDSO 3 1 2 6
32
Junior Engineer (Design) Carriage &
Wagon
RDSO 1 3 2 2
33
Junior Engineer (W/shop) Engine
Development
RDSO 0 0 0 1
34 Junior Engineer (Electrical) RDSO 0 0 0 1
35 Junior Engineer (Design) Electrical RDSO 4 0 1 3
36 Junior Engineer (Mechanical) (Workshop) RCF/RBL 19 6 3 10
37 Junior Engineer (Research) Engineering RDSO 6 0 0 0
G.Total 147 49 29 79
Total Ex.SM VH OH HH
1 0 0 0 0
12 0 0 0 0
11 0 0 0 0
17 0 0 0 0
4 0 0 0 0
28 0 0 0 0
1 0 0 0 0
1 0 0 0 0
2 0 0 0 0
2 0 0 0 0
2 0 0 0 0
7 0 0 0 0
2 0 0 0 0
10 1 0 0 0
1 0 0 0 0
101 1 0 0 0
2 0 0 0 0
39 0 0 0 0
17 0 0 0 0
9 0 0 0 0
35 0 0 0 0
8 0 0 0 0
64 0 0 0 0
11 0 0 0 0
7 0 0 0 0
5 1 0 0 0
2 0 0 0 0
3 0 0 0 0
9 1 0 0 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB GORAKHPUR
1 0 0 0 0
18 3 0 1 0
12 1 0 0 1
8 1 0 0 0
1 0 0 0 0
1 0 0 0 0
8 1 0 0 0
38 4 0 0 0
6 1 0 0 0
304 13 0 1 1
SUMMARY OF POSTS UNDER
RRB GORAKHPUR
UR SC ST
1 Sr. Section Engineer (P.Way) NFR 29 10 4
2 Sr. Section Engineer (Bridge) NFR 19 5 4
3 Sr. Section Engineer (Works) NFR 69 21 11
4 Sr. Section Engineer (Drawing) NFR 31 10 6
5 Sr. Section Engineer (Workshop) NFR 1 0 0
6 Sr. Section Engineer Carriage & Wagon NFR 8 2 1
7 Sr. Section Engineer/Dsl Mechanical NFR 3 3 1
8 Sr. Section Engineer/Dsl Electrical NFR 1 1 2
9
Sr. Section Engineer (Mechanical)
(Workshop)
NFR 10 4 1
10
Sr. Section Engineer Electrical/Electrical
(GS)
NFR 28 10 3
11 Sr. Section Engineer (Signal) NFR 8 1 1
12 Sr. Section Engineer (Telecommunication) NFR 6 1 0
13 Chief Depot Material Superindent NFR 3 0 1
G.Total 216 68 35
14 Junior Engineer (P.Way) NFR 33 8 2
15 Junior Engineer (Bridge) NFR 16 7 5
16 Junior Engineer (Works) NFR 41 13 6
17
Junior Engineer Drawing/Design & Drawing
(Civil)
NFR 28 10 4
18 Junior Engineer Plant NFR 1 0 0
19 Junior Engineer (Track Machine) NFR 14 4 2
20 Junior Engineer/Dsl Mechanical NFR 5 2 2
21
Junior Engineer Carriage & Wagon (Open
Line)
NFR 18 5 3
22 Junior Engineer/Dsl Electrical NFR 3 1 1
23 Junior Engineer/Workshop NFR 41 13 7
24 Junior Engineer Electrical/Electrical General NFR 19 5 3
25 Junior Engineer (Signal) NFR 15 6 2
26 Junior Engineer (Telecommunication) NFR 13 5 2
27 JE Drawing & Design/Drawing/Signal/S&T NFR 3 1 0
28 Depot Material Superindent NFR 3 1 0
29 Junior Engineer Engg. Workshop NFR 2 1 0
G.Total 255 82 39
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB GUWAHATI
SI.NO Name of the Post
Railway/P
U
OBC Total Ex.SM VH OH HH
16 59 6 0 0 0
10 38 5 0 0 0
37 138 14 0 0 0
17 64 6 0 0 0
0 1 0 0 0 0
3 14 1 0 0 0
2 9 0 0 0 2
1 5 0 0 0 0
8 23 2 0 0 0
14 55 4 0 0 0
6 16 1 0 0 0
3 10 1 0 0 0
1 5 1 0 1 0
118 437 41 0 1 2
18 61 7 0 0 0
11 39 4 0 0 0
24 84 8 0 1 2
15 57 5 0 2 2
0 1 0 0 0 0
8 28 2 0 0 0
3 12 1 0 0 0
11 37 4 0 1 1
1 6 0 0 0 0
24 85 9 0 4 0
10 37 4 0 0 0
8 31 1 0 0 0
7 27 2 0 1 0
1 5 1 0 0 0
2 6 1 0 1 0
1 4 1 0 0 0
144 520 50 0 10 5
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB GUWAHATI
SUMMARY OF POSTS UNDER
RRB GUWAHATI
1 Sr. Section Engineer J&T (Jig & Tools)/(Drawing/Design & Drawing) Mechanical
3 Sr. Section Engineer (Drawing/Design & Drawing) Electrical
5 Sr. Section Engineer (Telecommunication)
7 Sr. Section Engineer/Dsl Electrical
8 Sr. Section Engineer/Dsl Mechanical
9 Sr. Section Engineer Carriage & Wagon
10 Sr. Section Engineer (Works)
13 Junior Engineer (IT)
14 Junior Engineer (Electrical)
15 JE/(Drawing/Design/Drawing & Design) Electrical
20 Junior Engineer Carriage & Wagon (Open Line)
21 Junior Engineer Electrical (TRS)
22 Junior Engineer Electrical (TRD)
23 Junior Engineer/Dsl Mechanical
24 Junior Engineer/Dsl Electrical
25 Junior Engineer Drawing/Drawing & Design (Civil)
26 Junior Engineer (Design) Electrical
27 Junior Engineer (Works)
29 Junior Engineer (Mechanical) (Workshop)
30 Chemical Metallurgical Assistant
SUMMARY OF POSTS UNDER
RRB JAMMU & SRINAGAR
SI.NO Name of the Post
2 Sr. Section Engineer Mechanical
4 Sr. Section Engineer Electrical/Electrical (GS)
6 Sr. Section Engineer (Signal)
11 Chief Depot Material Superindent
12 Sr. Section Engineer (Mechanical) (Workshop)
16 Junior Engineer (Drawing/Design/Design & Drawing) Mechanical/Mechanical Design
28 Depot Material Superindent
17 Junior Engineer Mechanical
18 Junior Engineer (Telecommunication)
19 Junior Engineer (Signal)
NOTE:The qualification, age group, medical standard etc. of Chasing Inspector & DMS are equivalent and as such a common application for the post can be called by giving
UR SC ST OBC Total Ex.SM VH OH
DMW 1 0 1 0 2 0 0 0
NR 2 1 0 1 4 0 0 0
RCF 4 0 0 1 5 0 0 0
DMW 1 0 0 0 1 0 0 0
NR 8 3 2 0 13 1 0 0
RCF 0 1 0 0 1 0 0 0
NR (CORE) 1 0 0 0 1 0 0 0
NR 4 1 1 2 8 1 0 0
NR(CORE) 1 0 0 1 2 0 0 0
NR 2 2 0 2 6 0 0 0
NR 5 1 0 3 9 0 0 0
NR 6 3 1 2 12 1 0 0
RCF 1 0 0 0 1 0 0 0
DMW 0 0 0 1 1 0 0 0
RCF 3 1 0 2 6 0 0 0
DMW 0 0 2 0 2 0 0 0
RCF 7 1 1 1 10 1 0 0
G.Total 46 14 8 16 84 4 0 0
DMW 1 1 0 1 3 0 0 0
DMW 0 0 0 1 1 0 0 0
DMW 1 0 0 0 1 0 0 0
DMW 1 0 0 2 3 0 0 0
RCF 8 4 3 9 24 2 0 2
NR 10 3 2 4 19 2 0 0
RCF 19 5 6 2 32 4 0 7
NR 0 0 0 2 2 0 0 0
NR (CORE) 0 0 0 2 2 0 0 0
RCF 0 1 0 0 1 0 0 0
NR(CORE) 1 0 0 2 3 0 0 0
NR 0 1 0 0 1 0 0 0
NR 8 2 1 4 15 0 0 0
NR 6 2 1 4 13 1 0 0
NR 6 1 0 1 8 0 0 0
NR 8 2 1 4 15 0 0 0
NR 3 1 0 2 6 0 0 0
NR 3 1 0 0 4 0 0 0
RCF 2 0 0 2 4 0 0 1
RCF 1 0 1 1 3 0 0 0
RCF 2 0 0 0 2 0 0 0
DMW 3 3 0 2 8 0 0 0
DMW 12 3 1 4 20 2 0 0
RCF 8 2 1 5 16 1 0 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB JAMMU & SRINAGAR
Railway/PU
G.Total 103 32 17 54 206 12 0 10
NOTE:The qualification, age group, medical standard etc. of Chasing Inspector & DMS are equivalent and as such a common application for the post can be called by giving
HH
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
PWD
SUMMARY OF POSTS UNDER
RRB JAMMU & SRINAGAR
1
NOTE:The qualification, age group, medical standard etc. of Chasing Inspector & DMS are equivalent and as such a common application for the post can be called by giving
UR SC ST OBC Total Ex.SM VH
ER 4 0 1 1 6 0 0
SER 5 2 1 3 11 0 0
SE 25 7 4 11 47 5 0
MR 1 0 0 1 2 0 0
3 Sr. Section Engineer (Bridge) SER 5 2 1 2 10 1 0
SER 1 0 0 0 1 0 0
MR 3 1 1 2 7 1 0
CLW 0 0 0 1 1 0 0
5 Sr. Section Engineer (Estimator) SER 0 1 0 0 1 0 0
6 Sr. Section Engineer (Engg. Workshop) SER 1 0 0 1 2 0 0
SER 8 2 1 3 14 1 0
MR 0 0 1 3 4 0 0
8
Sr. Section Engineer (Drawing/Design & Drawing)
Electrical
ER 0 0 1 0 1 0 0
SER 17 4 2 6 29 3 0
ER 8 2 1 5 16 2 0
10 Sr. Section Engineer(Mechanical) (Workshop) SER 2 1 1 1 5 0 0
ER 3 0 0 2 5 1 0
SER 1 0 0 1 2 0 0
CLW 1 0 0 0 1 0 0
SER 4 1 0 2 7 1 0
ER 4 2 0 1 7 0 0
13 Senior Section Engineer Drawing/S&T ER 2 1 0 1 4 0 0
ER 3 2 1 3 9 1 0
CLW 2 0 1 1 4 0 0
G.Total 100 28 17 51 196 16 0
15 Junior Engineer (Track Machine) ER 1 1 0 1 3 0 0
SER 11 3 2 5 21 2 0
MR 0 1 0 2 3 0 0
17 Junior Engineer (Bridge) SER 3 1 0 2 6 1 0
SER 1 0 0 5 6 0 0
MR 5 2 2 0 9 1 0
SER 4 1 0 1 6 0 0
MR 2 1 0 1 4 0 0
SER 6 1 1 2 10 1 0
MR 11 3 2 6 22 2 0
ER 4 2 2 4 12 1 0
MR 0 1 0 1 2 0 0
CLW 19 6 3 10 38 0 0
SER 13 5 3 5 26 3 0
ER 3 0 0 0 3 0 0
23 Junior Engineer Carriage & Wagon (Open Line) SER 16 7 4 17 44 4 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB KOLKATA
SI.NO Name of the Post Railway/PU
1 Sr. Section Engineer (Track Machine)
2 Sr. Section Engineer (P.Way)
4 Sr. Section Engineer (Works)
7 Sr. Section Engineer Electrical/Electrical (GS)
9 Sr. Section Engineer Carriage & Wagon
11
Sr. Section Engineer J&T(Jig & Tools) (Drawing/Design
& Drawing) Mechanical
12 Sr. Section Engineer (Signal)
14 Chief Depot Material Superindent
16 Junior Engineer(P.Way)
18 Junior Engineer (Works)
19 Junior Engineer Drawing/Drawing & Design (Civil)
20 Junior Engineer Electrical/Electrical General
21
Junior Engineer (Drawing/Design/Drawing & Design)
Electrical
22 Junior Engineer (Mechanical) (Workshop)
24 Junior Engineer/Dsl Mechanical SER 5 1 2 3 11 1 0
25 Junior Engineer/Dsl Electrical SER 9 1 1 1 12 1 0
26
Junior Engineer Drawing/Design &
Drawing/Signal/S&T
ER 6 1 1 7 15 2 0
SER 6 0 1 1 8 1 0
ER 7 3 1 4 15 1 0
28 Junior Engineer (Telecommunication) MR 0 1 0 0 1 0 0
ER 2 0 0 2 4 0 0
CLW 1 0 0 1 2 0 0
30 Junior Engineer J&T (Jig & Tools) CLW 4 1 0 1 6 1 0
31 Junior Engineer Engg. Workshop SER 3 1 0 1 5 0 0
ER 7 2 4 4 17 2 0
SER 19 9 7 0 35 4 0
MR 0 0 0 1 1 0 0
G.Total 168 55 36 88 347 28 0
ABBREVIATION - E-Eastern Railway, SE-South Eastern Railway, MR-Metro Railway/Kolkata &
32 Chemical Metallurgical Assistant
27 Junior Engineer (Signal)
29 Depot Material Superindent
OH HH
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
PWD
SUMMARY OF POSTS UNDER
RRB KOLKATA
0 0
0 0
0 1
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
ABBREVIATION - E-Eastern Railway, SE-South Eastern Railway, MR-Metro Railway/Kolkata &
UR SC
1 Sr. Section Engineer (Pway) SER 2 0
2 Sr. Section Engineer (Works) SER 1 0
3 Sr. Section Engineer Drawing (Civil) SER 1 0
4 Sr. Section Engineer (Signal) SER 3 1
5 Sr. Section Engineer Carriage & Wagon SER 0 0
6 Sr. Section Engineer Electrical/Electrical (GS) SER 1 0
7 Sr. Section Engineer Estimator SER 1 0
G.Total 9 1
8 Junior Engineer (P.Way) SER 7 1
9 Junior Engineer (Works) SER 2 1
10 Junior Engineer Estimator/Sr. Estimator SER 2 1
11 Junior Engineer Carriage & Wagon (Open Line) SER 4 2
12 Junior Engineer Electrical/Electrical General SER 6 1
13 Junior Engineer/Dsl Mechanical SER 0 1
14 Junior Engineer/Dsl Electrical SER 0 1
15 Junior Engineer Electrical (TRD) SER 0 1
G.Total 21 9
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB MALDA
SI.NO Name of the Post
Railway/P
U
ST OBC Total Ex.SM VH OH HH
0 1 3 0 0 0 0
0 1 2 0 0 0 0
0 0 1 0 0 0 0
1 1 6 1 0 0 0
0 2 2 0 0 0 0
0 0 1 0 0 0 0
0 0 1 0 0 0 0
1 5 16 1 0 0 0
0 3 11 0 0 0 0
1 1 5 0 0 0 0
1 1 5 0 0 0 0
2 5 13 0 0 0 0
2 3 12 1 0 0 0
0 1 2 0 0 0 0
0 1 2 0 0 0 0
1 0 2 0 0 0 0
7 15 52 1 0 0 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB MALDA
SUMMARY OF POSTS UNDER
RRB MALDA
UR SC
1 Sr. Section Engineer/P-Way CR 4 1
2 Sr. Section Engineer Drawing (Civil) WR 1 0
3 Sr. Section Engineer (Mechanical Workshop) CR 6 0
4 Sr. Section Engineer Mechanical WR 9 0
5 Sr. Section Engineer/Loco CR 4 1
CR 14 3
WR 17 3
7 Sr. Section Engineer Electrical (TRS) WR 4 0
8
Sr. Section Engineer (Drawing/Design & Drawing)
Electrical
CR 4 1
CR 8 4
WR 1 1
10 Sr. Section Engineer (Telecommunication) WR 0 1
11 Sr. Section Engineer (Printing Press) CR 3 1
12 Sr. Section Engineer (Track Machine) CR 3 1
13 Chief Depot Material Superindent WR 0 0
G.Total 78 17
CR 28 8
WR 3 0
15 Junior Engineer (Bridge) CR 2 1
16 Junior Engineer Drawing/Design & Drawing (Civil) WR 10 3
17 Junior Engineer (Mechanical Workshop) CR 35 11
18 Junior Engineer Mechanical WR 6 0
CR 20 8
WR 17 0
20
Junior Engineer (Drawing/Design/Drawing & Design)
Mechanical/Mechanical Design
WR 1 0
CR 32 1
WR 32 4
22 Junior Engineer Electrical (TRS) WR 4 0
23
Junior Engineer (Drawing/Design/Drawing & Design)
Electrical
CR 17 5
SCR 1 0
WR 4 1
25 Junior Engineer Loco CR 12 4
CR 12 3
WR 10 0
27 Junior Engineer (Track Machine) CR 1 2
28 Junior Engineer (Printing Press) CR 6 1
29 Depot Material Superindent WR 2 0
CR 16 3
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB MUMBAI
SI.NO Name of the Post
Railway/P
U
6 Sr. Section Engineer Electrical/Electrical (GS)
9 Sr. Section Engineer Carriage & Wagon
14 Junior Engineer(P.Way)
26 Junior Engineer (IT)
30 Chemical Metallurgical Assistant
19 Junior Engineer Carriage & Wagon (Open Line)
21 Junior Engineer Electrical/Electrical General
24 Junior Engineer (Signal)
WR 15 2
G.Total 286 57
30 Chemical Metallurgical Assistant
ST OBC Total Ex.SM VH OH HH
1 4 10 1 0 0 0
0 0 1 0 0 0 0
1 6 13 1 0 0 0
3 5 17 1 0 3 0
0 0 5 0 0 0 0
2 5 24 2 0 0 0
2 9 31 2 0 2 1
0 1 5 0 0 0 0
1 3 9 1 0 0 0
1 7 20 2 0 0 0
1 1 4 0 0 1 0
0 0 1 0 0 0 0
0 1 5 1 0 0 0
0 1 5 0 0 0 0
0 1 1 0 0 0 0
12 44 151 11 0 6 1
7 13 56 6 0 0 0
0 0 3 0 0 0 0
0 1 4 0 0 0 0
2 5 20 2 0 5 0
5 17 68 7 0 2 0
1 5 11 1 0 5 0
3 11 42 4 0 1 0
0 0 17 1 0 0 0
0 0 1 0 0 0 0
4 14 51 5 0 2 0
4 10 50 5 0 4 2
0 1 5 0 0 0 0
1 7 30 2 0 0 1
1 1 3 0 0 0 0
1 2 8 1 0 0 0
3 8 27 2 0 1 0
1 7 23 2 0 1 0
0 5 15 1 0 0 0
1 2 6 0 0 0 0
1 3 11 1 0 0 0
0 1 3 0 0 1 0
2 7 28 3 0 0 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB MUMBAI
2 1 20 2 0 0 0
39 121 502 45 0 22 3
SUMMARY OF POSTS UNDER
RRB MUMBAI
UR
1 Sr.Section Engineer Carriage & Wagon ECR 1
2 Sr.Section Engineer/P.Way ECR 1
3 Sr.Section Engineer (Bridge) ECR 2
4 Sr.Section Engineer (Drawing/Design & Drawing) Electrical ECR 4
G.Total 8
5 Junior Engineer Carriage & Wagon (Open Line) ECR 5
6 Junior Engineer/Dsl Mechanical ECR 3
7 Junior Engineer (Signal) ECR 3
8 Junior Engineer (Telecommunication) ECR 3
9 Junior Engineer Drawing/Drawing & Design (Civil) ECR 1
10 Junior Engineer (Works) ECR 3
G.Total 18
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB MUZAFFARPUR
SI.NO Name of the Post
Railway/P
U
SC ST OBC Total Ex.SM VH OH HH
0 0 1 2 0 0 0 0
0 0 1 2 0 0 0 0
1 0 1 4 0 0 0 0
1 1 2 8 1 0 0 0
2 1 15 16 1 0 0 0
1 1 3 10 1 0 0 0
1 1 1 6 1 0 0 0
1 0 1 5 1 0 0 0
1 1 1 6 1 0 0 0
0 0 1 2 0 0 0 0
1 0 2 6 1 0 0 0
5 3 9 35 5 0 0 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB MUZAFFARPUR
SUMMARY OF POSTS UNDER
RRB MUZAFFARPUR
UR SC ST
1 Sr.Section Engineer (P.Way) ECR 12 2 6
2 Sr. Section Engineer Carriage & Wagon ECR 7 2 1
3 Sr. Section Engineer Mechanical ECR 2 1 0
4 Sr. Section Engineer/Melt RWP 2 0 0
G.Total 23 5 7
5 Junior Engineer Carriage & Wagon (Open Line) ECR 11 3 2
6 Junior Engineer Mechanical ECR 3 1 0
7 Junior Engineer/Melt RWP 1 0 0
G.Total 15 4 2
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB PATNA
SI.NO Name of the Post
Railway/P
U
OBC Total Ex.SM VH OH HH
4 24 2 0 0 0
3 13 1 0 0 0
1 4 0 0 0 0
1 3 0 0 0 0
9 44 43 0 0 0
6 22 2 0 0 0
1 5 1 0 0 0
1 2 0 0 0 0
8 29 3 0 0 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB PATNA
SUMMARY OF POSTS UNDER
RRB PATNA
UR SC ST
SER 3 1 1
ECR 0 1 3
2 Sr. Section Engineer (Works) SER 4 1 1
3 Sr. Section Engineer Drawing (Civil) SER 1 0 0
4 Sr. Section Engineer Estimator SER 1 0 0
SER 3 1 0
ECR 1 0 0
6 Sr. Section Engineer Electrical/Electrical (GS) SER 8 2 1
7 Sr. Section Engineer (Signal) SER 2 1 1
8 Chief Depot Material Superintendent SER 1 1 1
G.Total 24 8 8
ECR 25 0 0
SER 2 1 0
10 Junior Engineer (Works) SER 1 0 0
11
Junior Engineer Drawing/Design/Drawing &
Design (Civil)
SER 3 1 0
12 Junior Engineer Estimator/Sr. Estimator SER 1 0 0
13 Junior Engineer Carriage & Wagon (Open Line) SER 37 11 5
14 Junior Engineer Mechanical ECR 21 6 3
15 Junior Engineer/Dsl Mechanical SER 9 3 1
16 Junior Engineer/Dsl Electrical SER 4 2 1
17 Junior Engineer Electrical/Electrical General SER 25 7 3
18 Junior Engineer (Signal) SER 4 1 1
G.Total 132 32 14
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB RANCHI
SI.NO Name of the Post
Railway/P
U
1 Sr. Section Engineer/P.Way
5 Sr. Section Engineer Carriage & Wagon
9 Junior Engineer/P.Way
OBC Total Ex.SM VH OH HH
2 7 1 0 0 0
0 4 0 0 0 0
2 8 1 0 0 0
0 1 0 0 0 0
0 1 0 0 0 0
1 5 0 0 0 0
1 2 0 0 0 0
3 14 1 0 0 0
1 5 1 0 0 0
0 3 0 0 0 0
10 50 4 0 0 0
0 25 3 0 0 0
1 4 1 0 0 0
0 1 0 0 0 0
3 7 0 0 0 0
1 2 0 0 0 0
19 72 7 0 0 0
11 41 4 0 0 0
5 18 2 0 0 0
3 10 1 0 0 0
12 47 5 0 0 0
0 6 1 0 0 0
55 233 24 0 0 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB RANCHI
SUMMARY OF POSTS UNDER
RRB RANCHI
UR SC ST
1 Sr. Section Engineer/P.Way ECoR 3 0 0
2
Sr. Section Engineer Drawing/Design & Drawing
(Civil)
SCR 4 2 0
3 Sr. Section Engineer Electrical (TRD) SCR 2 0 0
4 Sr. Section Engineer Electrical (TRS) ECoR 3 0 0
5
Sr.Section Engineer (Drawing/Design & Drawing)
Electrical
SCR 1 0 0
6 Sr. Section Engineer Electrical/Electrical (GS) SCR 1 0 0
7 Sr. Section Engineer (Track Machine) SCR 3 0 1
8 Chief Depot Material Superindent SCR 3 1 1
G.Total 20 3 2
9 Junior Engineer/P.Way ECoR 2 0 1
10 Junior Engineer (Bridge) SCR 1 0 0
11 Junior Engineer (Works) ECoR 0 1 0
12 Junior Engineer Drawing/Design & Drawing (Civil) SCR 14 10 3
SCR 4 0 0
ECoR 2 0 0
14 Junior Engineer Carriage & Wagon (Open Line) ECoR 7 3 1
15 Junior Engineer Electrical/Electrical General SCR 8 1 0
SCR 8 3 2
ECoR 3 2 0
SCR 12 4 4
ECoR 0 1 1
18 Junior Engineer (Signal) SCR 2 1 0
SCR 7 2 1
ECoR 0 0 1
20 JE (Drawing/Design/Drawing & Design) Electrical SCR 2 1 0
21 Junior Engineer (IT) SCR 9 1 1
22 Depot Material Superindent SCR 4 2 0
G.Total 85 32 15
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB SECUNDERABAD
SI.NO Name of the Post
Railway/P
U
19 Junior Engineer (Telecommunication)
13 Junior Engineer/Dsl Mechanical
16 Junior Engineer Electrical (TRD)
17 Junior Engineer Electrical (TRS)
OBC Total Ex.SM VH OH HH
0 3 0 0 0 0
3 9 1 0 0 0
0 2 0 0 0 0
0 3 0 0 0 0
0 1 0 0 0 0
0 1 0 0 0 0
3 7 0 0 0 0
2 7 0 0 0 0
8 33 1 0 0 0
0 3 0 0 0 0
0 1 0 0 0 0
0 1 0 0 0 0
3 30 1 0 0 1
2 6 0 0 0 0
0 2 0 0 0 0
3 14 1 0 0 0
6 15 0 0 0 0
7 20 1 0 0 0
1 6 0 0 0 0
2 22 2 0 0 0
1 3 0 0 0 0
2 5 0 0 0 0
4 14 1 0 0 0
0 1 0 0 0 0
1 4 0 0 0 0
5 16 0 0 0 0
5 11 0 0 0 0
42 174 6 0 0 1
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB SECUNDERABAD
SUMMARY OF POSTS UNDER
RRB SECUNDERABAD
UR SC ST
1 Senior Section Engineer/P.Way NFR 1 1 0
2 Senior Section Engineer (Works) NFR 1 0 0
3
Senior Section Engineer Drawing/Design &
Drawing (Civil)
NFR 0 0 0
4 Senior Section Engineer Carriage & Wagon NFR 1 0 0
5 Senior Section Engineer (Signal) NFR 2 0 0
6 Senior Section Engineer (Printing Press) NFR 2 0 0
G.Total 7 1 0
7 Junior Engineer (P.Way) NFR 12 2 2
8 Junior Engineer (Works) NFR 2 0 0
9 Junior Engineer (Bridge) NFR 1 0 0
10
Junior Engineer Drawing/Drawing & Design
(Civil)
NFR 0 0 0
11 Junior Engineer Carriage & Wagon (Open Line) NFR 8 2 1
12 Junior Engineer/Dsl Mechanical NFR 10 3 2
13 Junior Engineer/Dsl Electrical NFR 5 2 2
14 Junior Engineer/Electrical General NFR 2 2 0
15 Junior Engineer (Signal) NFR 2 1 0
16
Junior Engineer Drawing/Drawing &
Design/Signal/S&T
NFR 1 0 0
17 Junior Engineer (Printing Press) NFR 4 1 0
18 Depot Material Superindent NFR 0 0 0
G.Total 77 13 7
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB SILIGURI
SI.NO Name of the Post
Railway/P
U
OBC Total Ex.SM VH OH HH
4 6 0 0 0 0
0 1 0 0 0 0
1 1 0 0 0 0
1 2 0 0 0 0
0 2 0 0 0 0
1 3 0 0 0 0
7 15 0 0 0 0
6 22 2 0 0 0
2 4 0 0 0 0
0 1 0 0 0 0
1 1 0 0 0 0
4 15 1 0 1 0
6 21 2 0 1 0
3 12 1 0 0 0
2 6 1 0 0 0
1 4 0 0 0 0
0 1 0 0 0 0
2 7 1 0 0 0
1 1 0 0 0 0
28 95 8 0 2 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB SILIGURI
SUMMARY OF POSTS UNDER
RRB SILIGURI
UR SC ST
1 Sr.Section Engineer/Dsl Mech SR 1 0 0
G.Total 1 0 0
2 Junior/Engineer Carriage & Wagon SR 14 6 2
3 Junior Engineer Diesel Mechanical SR 1 1 0
4 Junior Engineer Diesel Electrical SR 1 1 0
5 Junior Engineer/Electrical SR 2 1 0
G.Total 18 9 2
Community Wise Break-Up
SUMMARY OF POSTS UNDER
RRB THIRUVANANTHAPURAM
SI.NO Name of the Post
Railway/P
U
OBC Total Ex.SM VH OH HH
1 2 0 0 0 0
1 2 0 0 0 0
7 29 2 0 0 0
1 3 0 0 0 0
1 3 0 0 0 0
1 4 0 0 0 0
10 39 2 0 0 0
Community Wise Break-Up PWD
SUMMARY OF POSTS UNDER
RRB THIRUVANANTHAPURAM
SUMMARY OF POSTS UNDER
RRB THIRUVANANTHAPURAM

S-ar putea să vă placă și