Sunteți pe pagina 1din 56

1

China China China China Energy Energy Energy Energy Engineering Engineering Engineering Engineering Group Group Group Group
Co.,Ltd-Shanxi Co.,Ltd-Shanxi Co.,Ltd-Shanxi Co.,Ltd-Shanxi No.4 No.4 No.4 No.4 Electric Electric Electric Electric Power Power Power Power
Construction Construction Construction Construction Company Company Company Company
Qualification Qualification Qualification Qualification and and and and Performance Performance Performance Performance
2
Table Table Table Table of of of of CCCContents ontents ontents ontents
....Company Company Company Company introduction introduction introduction introduction
.Qualification .Qualification .Qualification .Qualification Certificate Certificate Certificate Certificate
1. Qualification Certificate of Overseas Project Contracting of the People s Republic
of China
2. Business License for Enterprise Legal Person
3. Qualification Certificate of Construction Enterprise
4. Permit for Production Safety
5. Peoples Republic of China Organization Code
6. Quality, environmental and occupational health system certification
7. Tax Registration Certificate
8. Qualification grade certification of electric power construction project civil
laboratory
9. Qualification grade certification of electric power construction project metal
laboratory
10. Installation, alternation, repair and maintenance license of special equipment
(boiler, pressure piping and lifting machinery)
11. Permit for electric facilities installation (maintenance, commissioning)
12. Installing civil nuclear pressure equipment license.
.... Coal Coal Coal Coal Fired Fired Fired Fired Power Power Power Power Plant Plant Plant Plant Construction Construction Construction Construction Performance Performance Performance Performance Table Table Table Table
1. 600MW units
2. 300 MW units
3. Below 200 MW units
.Project .Project .Project .Project honors honors honors honors
3
IIIIntroduction ntroduction ntroduction ntroduction on on on on China China China China Energy Energy Energy Energy Engineering Engineering Engineering Engineering Group Group Group Group Co., Co., Co., Co., Ltd-Shanxi Ltd-Shanxi Ltd-Shanxi Ltd-Shanxi No.4 No.4 No.4 No.4 Electric Electric Electric Electric
Power Power Power Power Construction Construction Construction Construction Company Company Company Company
China Energy Engineering Group Co., Ltd-Shanxi No.4 Electric Power
Construction Company (hereinafter referred to as "CEEC-S4EPC") is a
professional company which provides integrated schemes on location surveying
design ,whole set equipment procurement supply ,equipment fabrication
supervision ,construction installation, commissioning ,operation and maintenance
in the areas of thermal power, nuclear power ,fuel gas, hydroelectric power, wind
power ,bioelectrogenesis, photovoltaic ,power transmission and transformation
4
project and industrial equipment installation ;also is a company which has
execution capabilities on EPCO,EPC,BOT and DB project .
Shanxi No.4 Electric Power Construction Company is a company with
EPC first-class qualification of electric power project; electric power facilities
installation (maintenance) first-class permit and commissioning third-class
permit ; special equipment installation ,reform and maintenance permit
(boiler ,lifting machineries and pressure piping ); installing civil nuclear pressure
equipment license; qualification of building construction EPC second-class,
earthwork construction (first class), steel structure construction (first class), top
building construction (first class) and environment protection construction (first
class) issued by related authorities of government in China .
The company also has civil & metal laboratory of country-level and weld
training center of first class in Chinas electric power industry. The company also
achieved Qualification Certificate of Overseas Project Contracting of the Peoples
Republic of China.
Since its establishment in 1988, our company is rooted in coal energy base
Shanxi ,which has the biggest scale and longest history .Until now ,total
capabilities we constructed are 13440MW .Our company has excellent
performance in 600 MW units ,300MW units and below 300 MW coal fired
power plant .The projects we constructed have received China Project
Construction LuBan Awardnational high quality project , national thermal
power large unit (600MW class) competition championthe first prize , China
high quality project of the unit, thermal power generating reliability gold medal
unit , Shanxi construction project high quality prize Fenshui Cup, first
session civil engineering prizeTaihang Cup of Shanxi Province etc. In addition,
our company has rich experiences and advanced technology in constructing CFB
units.
5
At present , our company has created best construction performance of
300MW units in CFB area because of its continuous operation reaching 193 days
since it was transferred.The company has been adhering to constructing long-term
stability operation units. Many constructed units have operated continuously after
it was put into operation and created good economic interests to customers.In the
field of power transmission and transformation, besides 110KV, 220KV, 500KV
substations, our company also constructed first class project in the world--1000kv
Jindongnan - Nanyang - Jingmen UHV AC pilot demonstration project.
Our company has set up resident commercial institutions in Indonesia and
other countries and also set up good relationships with many well-known
international companies .Our company also undertook works of project
management ,civil supervision ,equipment fabrication supervision ,parts of
materials supply ,equipment installation and commissioning for Keban Agung
2*135MW units Coal Fired Power Plant.
China Energy Engineering Group Co., Ltd is a large-size energy
construction group approved by the State Council and directly managed by
State-owned Assets Supervision and Administration Commission of the State
Council. China Energy Engineering Group Co., Ltd manages several subsidiaries
like China Gezhouba Group Corporation, China Power Engineering Consulting
Group Corporation, Electric Power Planning & Engineering Institute, China
Energy Equipment Co., Ltd and also electric power survey and design,
construction, equipment manufacturing enterprises located in 15 provinces. China
Energy Engineering Group Co., Ltd is a key and large enterprise with a
professional business chain integrated with planning, surveying, designing,
constructing, EPC, project management, equipment fabrication, investment and
operation and also is a driving force in China and worlds energy construction .
24
Coal Coal Coal Coal Fired Fired Fired Fired Power Power Power Power Plant Plant Plant Plant Construction Construction Construction Construction Performance Performance Performance Performance Table Table Table Table
600MW 600MW 600MW 600MW units units units units ::::
No. Project name Sponsor Construction
Scale
Start and finish
time
1
Shanxi luneng Hequ Power
Plant Phase I Project
Shandong Luneng
Development Group Co.,Ltd
2*600MW 2002.072005.01
2
Shanxi Luneng Hequ Power
Plant Phase II Project
Shandong Luneng
Development Group Co.,Ltd
2*660MW 2008.102011.8
3 Shanxi Yangcheng Power
Plant Phase II Project
China Datang Group
Corporation
2*600MW 2005.05---2007.09
4 Shanxi International Electric
Power Huaguang Generating
Plant (Shanxi Liulin Power
Plant Phase II Project)
Shanxi International Electric
Power Group Co.,Ltd
2*600MW 2005.09---2007.12
5
Shanxi Zhangshan Power
Plant Phase II Project
Beijing Jingneng
International Energy Co.,Ltd
2*600MW 2006.05---2008.05
6 Shanxi Huozhou Power Plant
Phase I Project
State Electric Group
Corporation
2*600MW 2009.10---2012.04
7 Shanxi Zuoquan Power Plant
Phase I Project
Huaneng International
Electric Co.,Ltd
2*660MW 2010.082012.1
25
300MW 300MW 300MW 300MW units units units units
No
.
Project name Sponsor Constructio
n Scale
Start and finish time
1 The 5th Project of Taiyuan No.1
heat Power Plant
Former State Electric
Power Company
2*300MW 1987.11---1992.12
2 The 6th Project of Taiyuan No.1
heat Power Plant
Former State Electric
Power Company
2*300MW 1996.5---2001.10
3 Shanxi Yangcheng Power Plant
Phase I Project
North China Electric Power
Group
6*350MW 1998.03---2002.07
4 Shanxi Zhaoguang Power Plant
Phase I Project
Shanxi International Electric
Power Group Co.,Ltd
2*300MW 2003.11---2005.07
5 North Combined Power Linhe
Power Plant
Project
China Huaneng Group
Corporation ,North United
Electric Power Co.,Ltd
2*300MW 2004.08---2007.04
6 Chongqing Hechuan
Shuanghuai Power Plant
Project
China Power Investment
Corporation
2*300MW 2004.12---2006.11
7 The 6th Poject of Taiyuan No.2
heat Power Plant
China Datang Group
Corporation
2*300MW 2005.07---2007.04
8 The Project of Inner Mongolia
Menxi Power Plant
Inner Mongolia Electric
Power Group Co.,Ltd
2*300MW 2006.04---2007.12
9 Shanxi Pingshuo Gangue
Power Station Phase II
Project
Shanxi Pingshuo Coal
Gangue Generating Co.,Ltd
2*300MW 2007.03---2009.06
10 Shanxi Ruiguang Heat Power
Plant Project
Shanxi International Electric
Power Group Co.,Ltd
2*300MW 2007.12---2011.12
11 Jinghai Gangue Power Station
Project
Beijing Jingmei Group
Co. ,Ltd
2*330MW 2008.04---2010.10
12 Shanxi Houma Extension Electric
Power Plant
China Electric Power
Investment Group
Corporation
2*300MW 2009.04---
13 Guodian Changzhi Power Plant
1
st
phase Project
China Guodian Corporation 2*300MW 2009.08---2011.11
14 Shanxi Youyu Coal Gangue Power
Plant Project
Beijing Energy Investment
GroupCo.,Ltd
2*300MW 2010.04---2011.12
15 Shanyin Yuguang Coal Gangue
Power Plant Project
Shanxi International Energy
Group Co.,Ltd
2*300MW 2010.04---2012.05
26
16 Shanxi Hongguang Liansheng
Coal Gangue Power Plant
Project
Shanxi International Electric
Power Group Co.,Ltd
2*300MW 2010.06---2012.12
17 Gansu Jinchang heat Power
Plant 1
st
phase Project
Gansu Electric Investment
Corporation
2*330MW 2012.05
18 Inner Mongolia Kangbashi Heat
Power Plant
Beijing Jingneng
International Energy
Engineering Co.,Ltd;
2*350MW 2011.08---
19 Inner Mongolia Beijiao heat
Power Plant Phase I Project
Inner Mongolia Beijiao
Heat Electric Co.,Ltd
4*330MW 2012.10---
20 Inner Mongolia Junzheng Power
Plant
Inner Mongolia Junzheng
Energy Chemical Industry
Co.,Ltd
2*350MW 2013.1---
27
Below Below Below Below 300MW 300MW 300MW 300MW units units units units
No
.
Project name Sponsor Construction
Scale
Start and finish time
1 Huaneng Yushe Power Plant 1
st
phase Project
Former State Electric
Power Company
2*100MW 1992.10---1994.12
2 Fujian Nanping Paper-making
Factory Power Station Project
Nanping Paper-making
Factory
1*25MW 1996.02---1997.10
3 Xinjiang Hami Second Power
Plant Phase III Project
China Huadian Corporation 2*125MW 2001.09---2004.04
4
The 5
th
Project
of Taiyuan No.2 heat Power
Plant
Former State Electric
Power Company
1*200MW 2001.09---2003.06
5 State-owned Five-Four-One
Power Plant Technical Project
Five-Four-One Factory 1*27.5MW 2002.05---2005.01
6 Shanxi Yuci Heat Power Plant
Phase I Project
Shanxi Hengneng Heat
Electric Co.,Ltd
2*25MW 2003.07---2006.01
7 Shanxi Pingshuo Coal Gangue
Power Plant Phase 1
st
Project
Shanxi International Electric
Power Group Co.,Ltd
2*50MW 2003.10---2005.01
8 Shanxi Zhongyang Steel Co.,Ltd
-Coal Gauge Heat Power Plant
Shanxi Zhongyang Steel
Plant
2*135MW 2007.06---2010.09
9
Indonesian Keban Agung
Coal Fired Power Plant Project
PTPE 2*135MW 201107---
28
600MW 600MW 600MW 600MWunits units units units
1. 1. 1. 1.The The The The 1st 1st 1st 1st extension extension extension extension project project project project of of of of Shanxi Shanxi Shanxi Shanxi Luneng Luneng Luneng Luneng Hequ Hequ Hequ Hequ Power Power Power Power Plant Plant Plant Plant
The 1
st
extension project 2600MW units of Luneng Hequ Power Plant is
located in Hequ County, Xinzhou City, Shanxi Province. It is sponsored by Shandong
Luneng Development Group Co.,Ltd ,Shanxi Jinneng Group Co.,Ltd and Shanxi
International Electric Power Company .It started in August,2002. BTG epuipments
were supplied by Harbin Boiler Manufacture, Dongfang Steam Turbine Manufacture,
Dongfang Electrical Machinery Manufacture. It was put into operation in
January,2005. The construction and installation works of Unit 2 in the first phase
2600MW units project of Shanxi Luneng Hequ Power Generation Co., Ltd.
contracted by our company was awarded Special-class Award in National Coal-fired
Unit (600 MW level) Competition, National excellent welding works, Gold medal
unit for national power generation reliability in 2006 and Customer satisfaction
project of construction industry in Shanxi Province.
29
2. 2. 2. 2.The The The The second second second second extension extension extension extension project project project project of of of of Shanxi Shanxi Shanxi Shanxi Luneng Luneng Luneng Luneng Hequ Hequ Hequ Hequ Power Power Power Power Plant Plant Plant Plant
The second extension project 2600MW units of Luneng Hequ Power Plant is
located in Hequ County, Xinzhou City, Shanxi Province. It is sponsored by Shandong
Luneng Development Group Co.,Ltd ,Shanxi Jinneng Group Co.,Ltd and Shanxi
International Electric Power Company .It started in June,2008. BTG equipments were
supplied by Harbin Boiler Manufacture, Dongfang Steam Turbine Manufacture,
Dongfang Electrical Machinery Manufacture. It was put into operation in August
2011. This project is our company s milestone of building 600MW supercritical units
.
30
3. 3. 3. 3.The The The The second second second second phase phase phase phase project project project project of of of of Yangcheng Yangcheng Yangcheng Yangcheng Power Power Power Power Plant Plant Plant Plant
The second phase project 2600MW units of Yangcheng Power Plant is sponsored
by China Datang Yangcheng Power Generation Co., Ltd.,Jiangsu Assess Management
Group Co.,Ltd and Shanxi International Electric Power Company .It started in
May ,2005. BTG equipments were supplied by Dongfang Boiler Manufacture, Harbin
Steam Turbine Manufacture, and Harbin Electrical Machinery Manufacture. It was
put into operation in September 2007. No.1 unit of the 2nd extension project
2600MW units of Datang Yangcheng Power Plant has operated continuously and
stably for 132 days after test run for 168 hours on 20th ,Sept,2007.The second phase
2600MW project of Yangcheng Power Plant was awarded the honorable title of The
unit of putting into operation after reaching the standards, the Third Prize in
National Coal-fired Unit (600 MW level) Competition (2008) Up-to-standard site
for safety and civilized construction and 2008 Customer satisfaction project of
construction industry in Shanxi Province etc.
31
4. 4. 4. 4.The The The The first first first first stage stage stage stage project project project project of of of of Shanxi Shanxi Shanxi Shanxi International International International International Huaguang Huaguang Huaguang Huaguang Power Power Power Power Plant Plant Plant Plant
The 2600MW units of Shanxi Internationnal Electricity (Liulin) Huaguang
Power Plant is located in Angou Village, Mucun Town, Liulin County, Shanxi
Province. The project adopts EP C mode. It is sponsored by Shanxi International
Electric Power Generation Co., Ltd, China Huaneng Group and Shanxi Coking Coal
Group Co.Ltd. It started in September,2005. BTG equipments were supplied by
Shanghai Boiler Co., Ltd, Shanghai Steam Turbine Co., Ltd, and Shanghai Steam
Turbine & Generator Co., Ltd. It was put into operation in December, 2007. No.1 unit
of the 1st stage project 2600MW units of Shanxi Internationnal Electricity Huaguang
Power Plant has operated continuously and stably for 145 days after test run for 168
hours on 30th ,Dec,2007. It was awarded Customer satisfaction project of
construction industry in Shanxi Province.
32
5. 5. 5. 5.The The The The second second second second extension extension extension extension project project project project of of of of Shanxi Shanxi Shanxi Shanxi Zhangshan Zhangshan Zhangshan Zhangshan Power Power Power Power Plant Plant Plant Plant
The second extension project 2600MW units of Shanxi Zhangshan Power Plant
is located in Zhangshan Road, North Suburb, Changzhi City, Shanxi Province. It is
sponsored by Shanxi Zhangshan Power Generation Co., Ltd. It started in May, 2006.
BTG equipments were supplied by Shanghai Boiler Co., Ltd. Shanghai Steam Turbine
Co. Ltd, Shanghai Steam Turbine & Generator Co., Ltd. It was put into operation in
May2008. It was awarded Customer satisfaction project of construction industry in
Shanxi Province.
33
6. 6. 6. 6.Shanxi Shanxi Shanxi Shanxi Huozhou Huozhou Huozhou Huozhou Power Power Power PowerPlant Plant Plant Plant Phase Phase Phase Phase IIII Project Project Project Project
Shanxi Huozhou Power Plant Phase I Project is located in Xinzhi County ,Huozhou
City ,Shanxi Province with Net Dependable Capacity2 x 600 MW and is invested by State
Electric Power Group. BTG equipments were supplied by Dongfang Boiler Co.,Ltd ,Dongfang
SteamTurbine Co., Ltd,and Dongfang Electrical Machinery Co., Ltd.
34
7. 7. 7. 7.The The The The first-stage first-stage first-stage first-stage project project project projectof of of of Huaneng Huaneng Huaneng Huaneng Shanxi Shanxi Shanxi Shanxi Zuoquan Zuoquan Zuoquan ZuoquanPower Power Power PowerPlant Plant Plant Plant
Huaneng Shanxi Zuoquan Power Plant first-stage project has Net Dependable
Capacity (NDC) 2 x 600 MW. It is located in Zuoquan county, Shanxi province. It is sponsored
by Huaneng International Electric Power Co. Ltd and Shanxi International Electric Power Co.,
Ltd. It started in March, 2010. BTG equipments were supplied by Dongfang Boiler Co., Ltd,
Dongfang Steam Turbine Co., Ltd, Dongfang Electrical Machinery Co., Ltd. It was put into
operation in January l , 2012.
35
300MW 300MW 300MW 300MW units units units units
1. 1. 1. 1. The The The The 5555
th th th th
extension extension extension extension project project project project of of of of Taiyuan Taiyuan Taiyuan Taiyuan No.1 No.1 No.1 No.1 heat heat heat heat Power Power Power Power Plant Plant Plant Plant
The engineering of the 5
th
extension project of Taiyuan No.1 heat Power Plant It
is located in Jinsheng Township, Nanjiao district, Taiyuan province. The project has
Net Dependable Capacity (NDC) 2 x 300 MW, which has the largest single capacity
in generating sets in Shanxi province. It started in November, 1987. BTG
epuipments were supplied by Lafak Boiler Manufacture in Poland, Sichuan Dongfang
Steam Turbine Manufacture, Dongfang Electrical Machinery Manufacture and it was
put into operation in December, 1991.
36
2. 2. 2. 2.The The The The 6666
th th th th
extension extension extension extension project project project project of of of of Taiyuan Taiyuan Taiyuan Taiyuan No.1 No.1 No.1 No.1 heat heat heat heat Power Power Power Power Plant Plant Plant Plant
The engineering of the 6
th
extension project 2300MW units of Taiyuan No.1
heat Power Plant It is located in Jinsheng Township, Nanjiao district, in Taiyuan
province. The project has Net Dependable Capacity (NDC) 2 x 300 MW. It started in
May, 1996. The project is sponsored by North China Electric Power Company, Shanxi
Local Electric Power Company and Shanxi Electric Power Company.BTG
epuipments were supplied by Dongfang Boiler Manufacture, Dongfang Steam
Turbine Manufacture, Dongfang Electrical Machinery Manufacture. It was put into
operation in January,2001. It was awarded national excellent welding project by
China Project Construction Welding Association in November, 2000.It was awarded
thermal power high quality project by State Power Corporation in February,
2001.No.13,14 unit won China Project Construction LuBan Awardnational high
quality project in December, 2001.It was awarded national consumer satisfaction
project by China Association Of Construction Enterprise Management in April,
2002.
37
3. 3. 3. 3. The The The The first first first first stage stage stage stage of of of of Shanxi Shanxi Shanxi Shanxi Yangcheng Yangcheng Yangcheng Yangcheng Power Power Power Power Plant Plant Plant Plant
The Yangcheng Power Plant has Net Dependable Capacity (NDC) 6350MW
units. It is located in Beiliu town,Yangcheng county ,Jincheng city ,Shanxi
Province .It is sponsored by North China electric power company ,Jiangsu investment
company ,Jiangsu electric power company, Shanxi Local electric power company and
America AES generating co. ,ltd .The project adopts EPC mode . It started in August,
1997. BTG epuipments were supplied by Foster Wheeler in USA, Siemens in
Germany. It was put into operation in July, 2002. No.3 unit was named transfer of
production of standard production unit of infrastructure by State Power Corporation
in August, 2002. No.3 unit of the first-stage project 6350MW in Yangcheng Power
Plant undertaken by our company has created best performance because of its
continuous operation reaching 506 days since it was transferred. The basis of No.6
steam turbine was awarded Electric power construction engineering high quality
project of Shanxi Province by Electric Power Construction Engineering Quality
Inspection Station Of Shanxi Province in April, 200 az1.No.3 unit was awarded
national thermal power import large unit (300MW class) competition the first
prize in August, 2007.
38
4444.... The The The The 1111
st st st st
extension extension extension extension project project project project of of of of Shanxi Shanxi Shanxi Shanxi Zhaoguang Zhaoguang Zhaoguang Zhaoguang Power Power Power Power Plant Plant Plant Plant
The 1
st
extension project of Shanxi Zhaoguang Power Plant is sponsored by
Shanxi International Electric Power Co., Ltd, Beijing International Electric Power
Development and Investment and Shanxi Electric Power Company .The project has
Net Dependable Capacity (NDC) 2 x 300MW. It is located in North Sizhuang Street,
Huozhou city, Shanxi province. BTG equipments were supplied by Shanghai Boiler
Co., Ltd, Shanghai Steam Turbine Co. Ltd, and Shanghai Steam Turbine & Generator
Co. Ltd. It started in August, 2003. It was put into operation in July, 2005.
39
5. 5. 5. 5.The The The The first first first first stage stage stage stage of of of of Inner Inner Inner Inner Mongolia Mongolia Mongolia Mongolia Linhe Linhe Linhe Linhe Power Power Power Power Plant Plant Plant Plant
The project of heating supply units of Inner Mongolia Linhe Power Plant has Net
Dependable Capacity (NDC) 2 x 300 MW. It is sponsored by Beifang Combined
Electric Power Co., Ltd.and located in Bayannur Zone, Lihe City, Inner Mongolia.It
started in August,2004. BTG equipments were supplied by Dongfang Boiler Co., Ltd,
Dongfang Steam Turbine Co., Ltd, Dongfang Electrical Machinery Co., Ltd. It was
put into operation in April, 2007. It has the position of the First Place of 300
MW-Level in Inner Mongolia and receives Customer Satisfaction Award for
construction & installation works of Unit 1.
40
6. 6. 6. 6.The The The The first first first first stage stage stage stage project project project project of of of of Chongqin Chongqin Chongqin Chongqin Shuanghuai Shuanghuai Shuanghuai Shuanghuai Power Power Power Power Plant Plant Plant Plant
The first stage project of Chongqin Shuanghuai Power Plant has Net Dependable
Capacity (NDC) 2 x 300 MW. It is sponspored by Chongqin Hechuan Power
Generation Co., Ltd.It started in December, 2004. BTG equipments were supplied by
Dongfang Boiler Co., Ltd, Dongfang Steam Turbine Co., Ltd, Dongfang Electrical
Machinery Co., Ltd. It was put into operation in April, 2007. It was named standard
and operation unit by China Energy Investment Corporation in October, 2008.
41
7. 7. 7. 7. The The The The 6666
th th th th
extension extension extension extension project project project project of of of of Taiyuan Taiyuan Taiyuan Taiyuan No.2 No.2 No.2 No.2 heat heat heat heat power power power power plant plant plant plant
The engineering of the 6
th
extension project of Taiyuan No.2 heat power plant :
The project has Net Dependable Capacity (NDC) 2 x 300 MW and adopts air cooling
technology .It is located in No.5, Xiliu Road, Taiyuan City, Shanxi Province. It is
sponsored by Datang Taiyuan No.2 Thermal Power Plant. It started in July, 2005.
BTG equipments were supplied by Sichuan Dongfang Boiler Co., Ltd, Shanghai
Steam Turbine Co., Ltd, and Shanghai Steam Turbine & Generator Co., Ltd. It was
put into operation in April, 2007. Its 240 meter chimney is awarded Fenshui Cup
Quality Award for construction works in Shanxi Province in 2008.
42
8888 ....The The The The project project project project of of of of Inner Inner Inner Inner Mongolia Mongolia Mongolia Mongolia Menxi Menxi Menxi Menxi Power Power Power Power Plant: Plant: Plant: Plant:
The project has Net Dependable Capacity (NDC) 2 x 300 MW. Unit 2 in Mengxi
2300MW (circulating fluidized bed boiler) air cooling units is contracted by S4EPC.
It is located in Mengxi Hi-tech Garden, Erdos City, and Inner Mongolia. It is
sponsored by Mengxi Power Plant of Beifang Combined Electric Power Co., Ltd. It
started in April, 2006. BTG equipments were supplied by Shanghai Boiler Co., Ltd,
Shanghai Steam Turbine Co., Ltd, and Shanghai Steam Turbine & Generator Co., Ltd.
It was put into operation in December, 2007.
43
9. 9. 9. 9.The The The The 2222
nd nd nd nd
extension extension extension extension project project project project of of of of Shanxi Shanxi Shanxi Shanxi Pingshuo Pingshuo Pingshuo Pingshuo Coal Coal Coal Coal Gangue Gangue Gangue Gangue Power Power Power Power Plant Plant Plant Plant
The CFB engineering of the 2
nd
extension project 2300MW units of Shanxi
Pingshuo coal gangue Power Plant is sponsored by Shanxi Pingshuo coal gangue
Power Generation Co., Ltd. It is located in Pinglu District, Shuozhou City, Shanxi
Province .It started in March, 2007. BTG equipments were supplied by Shanghai
Boiler Co., Ltd. Shanghai Steam Turbine Co. Ltd, and Shanghai Steam Turbine &
Generator Co., Ltd. It was put into operation in June, 2009. No.4 unit of the 2nd
extension project 2300MW units of Shanxi Pingshuo Coal gangue Power Generation
Co., Ltd has operated continuously for 193 days after it was put into operation.
44
10 10 10 10.... The The The The first first first first stage stage stage stage project project project project of of of of Shanxi Shanxi Shanxi Shanxi Ruiguing Ruiguing Ruiguing Ruiguing Power Power Power Power Plant Plant Plant Plant
The first stage project of Shanxi Ruiguing Power Plant is sponsored by Shanxi
International Electric Power Co., Ltd. The project has Net Dependable Capacity
(NDC) 2300MW .It is located in Dongshagou village ,Wujinshan town , Yuci city,
Shanxi province .It started in November, 2007. BTG equipments were supplied by
Shanghai Boiler Co., Ltd. Shanghai Steam Turbine Co. Ltd, and Shanghai Steam
Turbine & Generator Co., Ltd. It was put into operation in December, 2012.
45
11. 11. 11. 11.Jinghai Jinghai Jinghai Jinghai Gangue Gangue Gangue Gangue Power Power Power Power Plant Plant Plant Plant
2300MW coal-fired air cooling units project of Jinghai Gangue Power Plant
(circulating fluidized bed boiler) is located in West Zhuozishan Street, Wuhai City,
Inner Mongolia. It is sponsored by Inner Mongolia Jinghai Gangue Power Generation
Co., Ltd. It started in April, 2004. BTG equipments were supplied by Orient group
Co., Ltd. It was put into operation in September, 2010.
46
12. 12. 12. 12.Shanxi Shanxi Shanxi Shanxi Houma Houma Houma Houma Heat Heat Heat Heat Extension Extension Extension Extension Electric Electric Electric Electric Power Power Power Power Project Project Project Project
2300MW coal-fired air cooling and heat supplying units project of Shanxi Houma
Power Plant is located in Zhangshao Village ,Houma City, Shanxi Province. It is
sponsored by China Electric Power Investment Group Co.,Ltd and Shanxi Zhangze
Electric Power Co.,Ltd.It started in April, 2009. The Project Now is in construction .
47
13 13 13 13.... The The The The first first first first stage stage stage stage project project project project of of of of State State State State Grid Grid Grid Grid Shanxi Shanxi Shanxi Shanxi Changzhi Changzhi Changzhi Changzhi Power Power Power Power Plant Plant Plant Plant
The first stage project of State Grid Shanxi Changzhi Power Plant is sponsored by
State Grid North China Electric Power Co., Ltd and Hebei Construction Energy and
Investment Co.,Ltd. The project has Net Dependable Capacity (NDC) 2300MW .It is
located in North Yangbao village, Houbeizhuang town, Changzhi city, Shanxi
province .It started in April, 2009. BTG equipments were supplied by Orient Boiler
group Co., Ltd. It was put into operation in October, 2011.
48
14 14 14 14.... The The The The project project project project of of of of Shanxi Shanxi Shanxi Shanxi Youyu Youyu Youyu Youyu coal coal coal coal gangue gangue gangue gangue Power Power Power Power Plant Plant Plant Plant
The project of Shanxi Youyu coal gangue Power Plant is sponsored by Beijing
Energy Investment Co., Ltd and Gemeng International Energy Co.,Ltd. The project
has Net Dependable Capacity (NDC) 2300MW .It is located in Yejia village ,Youyu
county ,Shuozhou city, Shanxi province .It started in November, 2009. BTG
equipments were supplied by Shanghai Boiler Co., Ltd. and Beijing Beizhong Steam
Turbine Generator Co., Ltd. It was put into operation in December, 2011.
49
15. 15. 15. 15.Shanyin Shanyin Shanyin Shanyin Yuguang Yuguang Yuguang Yuguang Coal Coal Coal Coal Gangue Gangue Gangue Gangue Power Power Power Power Plant Plant Plant Plant Project Project Project Project
Shanyin Yuguang Coal Gangue Power Plant Project is located in Beizhouzhuang
Village ,Shanyin County ,Shanxi Province with Net Dependable Capacity
2*300MW.This project is sponsored by Shanxi International Energy Group Co.,Ltd
and Shanxi Jinhaiyang Energy Group Co.,Ltd. BTG were supplied by Shanghai
Electric Group Co.,Ltd.
50
16. 16. 16. 16.Shanxi Shanxi Shanxi Shanxi Hongguang Hongguang Hongguang Hongguang Liansheng Liansheng Liansheng Liansheng Coal Coal Coal Coal Gangue Gangue Gangue Gangue Power Power Power Power Plant Plant Plant Plant Project Project Project Project
Shanxi Honguang Liansheng Coal Gangue Power Plant Project is located in
Xuecun Village ,Liulin County,Shanxi Province with Net Dependable Capacity 2*300
MW.The project is sponsored by Shanxi International Electric Power Group Co.,Ltd
and Liansheng Group. The project started in June ,2010 and finished in Dec.,2012.
51
15. 15. 15. 15.Gansu Gansu Gansu Gansu Jinchang Jinchang Jinchang Jinchang heat heat heat heat Power Power Power Power Plant Plant Plant Plant 1111
st st st st
phase phase phase phase Project Project Project Project
18.Inner 18.Inner 18.Inner 18.Inner Mongolia Mongolia Mongolia Mongolia Kangbashi Kangbashi Kangbashi Kangbashi Heat Heat Heat Heat Power Power Power Power Plant Plant Plant Plant
19. 19. 19. 19.Inner Inner Inner Inner Mongolia Mongolia Mongolia Mongolia Beijiao Beijiao Beijiao Beijiao heat heat heat heat Power Power Power Power Plant Plant Plant Plant Phase Phase Phase Phase IIII Project Project Project Project
20.Inner 20.Inner 20.Inner 20.Inner Mongolia Mongolia Mongolia Mongolia Junzheng Junzheng Junzheng Junzheng Power Power Power Power Plant Plant Plant Plant
The above four projects now are in construction .
52
Below Below Below Below 333300MW 00MW 00MW 00MWunits units units units
1. 1. 1. 1. The The The The first first first first project project project project of of of of Shanxi Shanxi Shanxi Shanxi Huaneng Huaneng Huaneng Huaneng Yushe Yushe Yushe Yushe power power power power plant plant plant plant
The project is located in Yushe County, Jinzhong Shanxi. It has Net Dependable
Capacity (NDC) 2 x 100 MW. It is sponsored by Shanxi province Heneng Power
Generation Company. BTG equipments were supplied by three major factories in
harbin. It was awarded High Quality Project of the Whole Units in Oct. 1996.
.Fujian .Fujian .Fujian .Fujian Nanping Nanping Nanping Nanping Paper-making Paper-making Paper-making Paper-making Factory Factory Factory Factory Power Power Power Power Station Station Station Station Project Project Project Project
The project is located in west area of Nanping Paper Mill. It has Net
Dependable Capacity (NDC) 2 x 25 MW and adopts extraction Steam technology.
Equipments were supplied by Nanping Paper Mill.
53
3. 3. 3. 3.The The The The 5th 5th 5th 5th Extension Extension Extension Extension Technical Technical Technical Technical and and and and Improving Improving Improving Improving Project Project Project Project of of of of Taiyuan Taiyuan Taiyuan Taiyuan No.2 No.2 No.2 No.2
Heat Heat Heat Heat Power Power Power Power Plant Plant Plant Plant
The project is located in Taiyuan Shanxi. It has Net Dependable Capacity
(NDC) 1200MW unit. It was our companys first project of 200MW unit
construction by competitive bidding. It is sponsored by Taiyuan No.2 Heat Power
Plant.BTG equipments were supplied by Dongfang Boiler Manufacture ,Dongfang
Steam Turbine Manufacture and Dongfang Electrical Machinery Manufacture.It was
awarded Excellent Project of Shanxi Province by Construction Engineering Quality
Inspection Station of Shanxi province in Aug. 2004, National Excellent Welding
Project by China Project Construction Welding Association in Aug.2004, Shanxi
Construction Project High Quality Prize Fenshui Cup in 2004 by Shanxi
Construction Industry Association in Jan.2005. the air-cooling tower and chimney
project was awarded First Session Civil Engineering Prize Taihang Cup of Shanxi
Province by Shanxi Civil Construction Association in Dec.2005.
The The The The TTTThird hird hird hird PPPProject roject roject roject of of of of Xinjiang Xinjiang Xinjiang Xinjiang Hami Hami Hami Hami No.2 No.2 No.2 No.2 PPPPlant lant lant lant
The project is located in Hami county, Xinjiang. It has Net Dependable
Capacity (NDC) 2125MW. BTG equipments were supplied by Shanghai Steam
Turbine Manufacture, Shanghai Electrical Machinery Plant and Shanghai Boiler
Manufacture.
54
5555.... The The The The First First First First Project Project Project Project of of of of Shanxi Shanxi Shanxi Shanxi Pingshuo Pingshuo Pingshuo Pingshuo Coal Coal Coal Coal Gangue Gangue Gangue Gangue Power Power Power Power Plant. Plant. Plant. Plant.
The project is located in Shuozhou Shanxi. It has Net Dependable Capacity
(NDC) 2 x 50 MW and adopts air cooling fire coal units. BTG equipments were
supplied by Harbin Boiler Manufacture, Dongfang Steam Turbine Manufacture, Jinan
Power Equipment Factory.
Jiang Jiang Jiang Jiang County, County, County, County, Shanxi Shanxi Shanxi Shanxi State-owned State-owned State-owned State-owned Five-Four-One Five-Four-One Five-Four-One Five-Four-One Captive Captive Captive Captive Power Power Power Power
Plant Plant Plant Plant Technical Technical Technical Technical Transformation Transformation Transformation Transformation Project Project Project Project
The project is located in Jiang County, Yuncheng Shanxi. It has primary Net
Dependable Capacity (NDC) 425MW and adopts condensing
steam turbine generating units. It is the first project of recirculating fluidized bed
construction.The boiler was supplied by Jinan Boiler Group Co.Ltd. 5# steam turbine
and generator were supplied by Wuhan Turbine Factory.
55
7. 7. 7. 7.Shanxi Shanxi Shanxi Shanxi Zhongyang Zhongyang Zhongyang Zhongyang Steel Steel Steel Steel Group Group Group Group Coal Coal Coal Coal Gangue Gangue Gangue Gangue Captive Captive Captive Captive Power Power Power Power Plant Plant Plant Plant Project Project Project Project
The project is located in Zhongyang County, shanxi. It has Net Dependable
Capacity (NDC) 2135MW units. BTG were supplied by Harbin Boiler Manufacture,
Harbin Steam Turbine Manufacture and Harbin Power Equipment Factory. It is
sponsored by Shanxi Zhongyang Steel Plant.
8.Yuci 8.Yuci 8.Yuci 8.Yuci Heat Heat Heat Heat Electric Electric Electric Electric Power Power Power Power Plant Plant Plant Plant Phase Phase Phase Phase IIII Project Project Project Project
Shanxi Yuci Heat Electric Power Plant Phase I Project is located in Kou Village ,Zhangqing
County ,Yuci District ,Jinzhong City with Net Dependable Capacity 25MW.BTG were supplied
by Sichuan Boiler Factory ,Qingdao Jieneng Turbine Co.,Ltd and Shandong Jinan Generating
Equipment Factory.
56
9.Keban 9.Keban 9.Keban 9.Keban Agung Agung Agung Agung 2x135MW 2x135MW 2x135MW 2x135MW Coal-Fired Coal-Fired Coal-Fired Coal-Fired Power Power Power Power Plant Plant Plant Plant
Keban Agung 2x135MW Coal-Fired Power Plant islocated at Lahat, South Sumatera,
Indonesia.The general contractor is Hebei Machinery Import and Export Co.Ltd .BTG were
supplied by China Western Power Energy Industrial Co.,Ltd, Nanjing Turbine Factory and Jinan
Generating Equipment Factory .We are responsible for installation of the two units .Now the
project is in construction .
57
58
Project Project Project Project HHHHonors onors onors onors
No. Awarded name Awarded
level
Awarded
time
1
The 6th extension project of Taiyuan No.1 Heat Power Plant.
(2300MW) won China Project Construction LuBan Award
national high quality project.
National 2001.12
2
Yangcheng Power Plant first-stage project6350MW:No.3
unit was awarded national thermal power import large unit
(300MW class) competitionthe first prize
2007.6
3
Acquire national excellent welding project in unit4 welding
project of Shanxi Ping shuo second extension project 2004.8
4
2#unit of Shanxi Luneng Hequ Generating Co.,Ltd was
awarded standard and operation unit of electric industy in
2005.
2005.11
5
No.2 unit of Shanxi Luneng Hequ Power Plant was awarded
national thermal power large unit (600MW class) competition
championtop awardin 2005
2006.5
6
No.2 unit of Shanxi Luneng Hequ Power Plant was awarded
national thermal power large unit (600MW class) competition
championthe first prize in 2006
2007.6
7
No.2 unit installation and welding project of Shanxi
Luneng Hequ first stage power plant 2*600 MWwas awarded
national excellent welding project
2007. 8
8 No.2 unit of Shanxi Luneng Hequ Power Plant was awarded
thermal power generating reliability gold medal unit (600MW
class) in 2006
2007. 5
9
2*300MW units project chimney and common
building installation project of Shanxi Zhangshan
Generating Co.,Ltd was awarded China high quality
project of the unit
2006 .6
10
2*300MW units of Shanxi Zhangshan Generating Co.,Ltd
was awarded state high quality projectsilver medal in 2006 2006. 11
11
#6 unit of Yangcheng International Generating Co.,Ltd was
awarded the gold and reliable metal in 2008 national
generatingunits
2009.5
12 No.7 unit of Datang Yangcheng generating co., ltd was
awarded national thermal power large unit (600MW class)
competitionthe third prize in 2008
2009.5
59
13 1000kv Jindongnan - Nanyang - Jingmen UHV AC pilot
demonstration project was awarded high quality competitive
projects of New Peoples Republic of China establishing 60
years
2009. 10
14
1000kv Jindongnan - Nanyang - Jingmen UHV AC pilot
demonstration project was awarded the gold medal in 2010
National Quality Engineering
2010 .12
15
1000KV ultra-high Jindongnan Substation construction project
was awarded consumer satisfaction project in Shanxi
province constructive field in 2009 Province
2009 .12
16
15#,16# of Taiyuan No.1 Heat Power Plant was awarded
Shanxi construction project high quality prize Fenshui Cup 2002. 12
17
7#cooling tower of Datang Yangcheng Power Plant second
-stage project 2600MW was awarded consumer
satisfaction project in Shanxi province constructive field in
2008
2009. 1
18 7#cooling tower of Datang Yangcheng Power Plant second
-stage project 2600MWwas awarded standard and
operation unit
2009. 1
19 7#cooling tower of Datang Yangcheng Power Plant second
-stage project 2600MWwas awarded Shanxi construction
project high quality prize Fenshui Cup
2009.12
20
The 5
th
extension technical and improving project of Taiyuan
No.2 Heat Power Plant1200MWwas awarded Shanxi
construction project high quality prize Fenshui Cup
2005.1
21
The air-cooling tower and chimney project of the 5
th
extension
technical and improving project of Taiyuan No.2 Heat Power
Plant 1200MW was awarded first session civil
engineering prizeTaihang Cup of Shanxi Province
2005.12
22
No.2 unit of Shanxi Luneng Hequ Power Plant first-stage
project (2600MW) was awarded consumer satisfaction
project in Shanxi province constructive field
2007.1
23
The 3rd extension project of Shanxi Zhangze Power Plant
(2300MW) was awarded the First Civil Taihang Cup Civil
Engineering Prize
2005.12
24
The 201m chimney of 2nd extension project of Huaneng
Yushe Power Plant (2300MW) was awardedShanxi
construction project high quality prize Fenshui Cup
2006.1
25
The first-stage project of North Unite Electric Power Linhe
Heat Power Plant (2300MW) was awarded consumer
satisfaction award of No.1 unit construction and installation
engineering
2007.3
26
Liulin power plant second project (unit 3) of Huaguang
Generating Co.,Ltd was awarded consumer satisfaction
2009.1
60
project in Shanxi province constructive field in 2008
27
The first-stage project of Chongqin Hechuan Shuanghuai
Power Plant (2300MW) was named project quality
excellent unit
2007.8
28
The first-stage project of Chongqin Hechuan Shuanghuai
Power Plant (2300MW) was named standard and operation
unitby China Energy Investment Corporation
2008.10
29
Shanxi Zhangshan Power Plant second extension project
(2600MW) was awarded consumer satisfaction project in
Shanxi province constructive field in 2010
2010.12
Please Please Please Please see see see see pictures pictures pictures pictures of of of of honors: honors: honors: honors:
The 6th extension project of Taiyuan No.1 Heat Power Plant. (2300MW) won China
Project Construction LuBanAwardnational high quality project.
61
Yangcheng Power Plant first-stage project6350MW:No.3 unit was awarded national
thermal power import large unit (300MWclass) competitionthe first prize
Acquire national excellent welding project in unit4 welding project of Shanxi
Pingshuo second extensionproject
62
2#unit of Shanxi Luneng Hequ Generating Co.,Ltd was awarded
standard and operation unit of electric industyin 2005.
No.2 unit of Shanxi Luneng Hequ Power Plant was awarded national thermal power
large unit (600MWclass) competitionchampiontop awardin 2005
63
No.2 unit of Shanxi Luneng Hequ Power Plant was awarded national thermal power large
unit (600MWclass) competitionchampionthe first prize in 2006
No.2 unit installation and welding project of Shanxi Luneng Hequ first stage power plant
2*600 MWwas awarded national excellent welding project
64
No.2 unit of Shanxi Luneng Hequ Power Plant was awarded
thermal power generating reliability gold medal unit (600MW class) in 2006
2*300MW units project chimney and common building installation project of
Shanxi Zhangshan Generating Co.,Ltd was awarded China high quality project of the unit
65
2*300MW units of Shanxi Zhangshan Generating Co.,Ltd was awarded
state high quality projectsilver medal in 2006
#6 unit of YangchengInternational GeneratingCo.,Ltd was awarded
the gold and reliable metal in 2008 national generatingunits
66
No.7unit of DatangYangcheng generating co., ltd was awarded
national thermal power large unit (600MWclass) competitionthe third prize in 2008
1000kv Jindongnan - Nanyang - Jingmen UHVACpilot demonstrationproject was awarded
high quality competitive projects of NewPeoples Republic of China establishing 60years
67
1000kv Jindongnan - Nanyang - Jingmen UHVACpilot demonstration project
was awarded the gold medal in 2010 National Quality Engineering
1000KV ultra-high Jindongnan Substation construction project was awarded
Consumer satisfaction project in Shanxi province constructive field in 2009
68
15#,16# of Taiyuan No.1 Heat Power Plant was awarded
Shanxi construction project high quality prize Fenshui Cup
7#coolingtower of DatangYangchengPower Plant second -stage project2600MWwas
awarded consumer satisfaction project in Shanxi province constructive field in 2008
69
7#coolingtower of DatangYangcheng Power Plant second -stage project2600MW
was awarded standard and operation unit
7#coolingtower of DatangYangchengPower Plant second -stage project2600MWwas
awarded Shanxi construction project high quality prize Fenshui Cup
70
The 5
th
extension technical and improving project of Taiyuan No.2 Heat Power Plant
1200MWwas awarded Shanxi construction project high quality prize Fenshui Cup
The air-cooling tower and chimney project of the 5
th
extension technical and improving
project of Taiyuan No.2 Heat Power Plant 1200MWwas awarded first session civil
engineering prizeTaihang Cup of Shanxi Province
71
No.2 unit of Shanxi Luneng Hequ Power Plant first-stage project (2600MW) was
awarded consumer satisfaction project in Shanxi province constructive field
The 3rd extension project of Shanxi Zhangze Power Plant (2300MW) was awarded The
First Civil Taihang Cup Civil Engineering Prize
72
The 201m chimney of 2nd extension project of Huaneng Yushe Power Plant (2300MW)
was awarded Shanxi construction project high quality prize Fenshui Cup
The first-stage project of North Unite Electric Power Linhe Heat Power Plant (2300MW)
was awarded consumer satisfaction awardof No.1 unit construction and installation engineering
73
Liulin power plant second project (unit 3) of Huaguang Generating Co.,Ltd was awarded
consumer satisfaction project in Shanxi province constructive field in 2008
Thefirst-stage project of Chongqin Hechuan Shuanghuai Power Plant (2300MW)
was named project quality excellent unit
74
The first-stage project of Chongqin Hechuan Shuanghuai Power Plant (2300MW) was
named standard and operation unit by China Energy Investment Corporation
Shanxi Zhangshan Power Plant second extension project (2600MW) was awarded
consumer satisfaction project in Shanxi province constructive field in 2010