valve TAG Remarks Done Yes/no LV3002 by pass 6"PW400028 1 FE3000 by pass 8"GH300018 2 Drain header to closed drain 4"DF350001 3 Oil outlet to closed drain 1"DF350288 4 water outlet to 8'' oily water header 6'' PW400028 require flexible Not necessary LDG 3000 50 LDT 3001 51 LDT 3002 52 LG 3003 53 LT 3004 54 LT 3005 55 Link water/oil outlet 6"GH300038 5 Y Sampling oil outlet 18"GH300040 6 Y Drain header to closed drain 4"DF350002 7 Y water outlet to 8'' oily water header 6'' PW400001 require flexible Not necessary LDG 3010 Y LDT 3011 Y LDT 3012 Y LG1 3013 Y LG2 3013 Y LDT 3014 Y LDT 3015 Y 10'' GH300127 10'' GH300128 12'' GH300129 12'' GH300130 DS301 outlet to closed drain C523A-P 8 Y Outlet EC313A to closed drain 2"DF350211 9 Y 1" EC313A body drain cold side 1" 10 Y Outlet EC313B to closed drain 2"DF350213 11 N 1" EC313B body drain cold side 1" 12 N Outlet EC313C to closed drain 2"DF350215 13 N 1" EC313C body drain cold side 1" 14 N Outlet EC313D to closed drain 2"DF350217 15 N 1" EC313D body drain cold side 1" 16 N EC313 A/B/C/D by bass cold side 16"GH300096 17 N Link water/oil outlet 3"GH300071 18 Y Drain header to closed drain 4"GH300075 19 Pressure balanced by LG drain Y water sampling connection 4 ''PW 300073 Y LDG2 3020 Y LDT 3021 Y LDT 3022 Y LG1 3023 Y LG2 3023 Y LG3 3023 Y LT 3024 Y LT 3025 Y GX310A suction strainer drain 2"DF350080 20 to be done even if pump not running N GX310A discharge drain 2"DF350077 21 to be done even if pump not running N GX310A suction vent 1"GH310074 22 to be done even if pump not running N GX310B suction strainer drain 2"DF350080 23 to be done even if pump not running Y GX310B discharge drain 2" 24 to be done even if pump not running Y GX310B suction vent 1"GH310075 25 to be done even if pump not running Y PDV3201A by pass 2" by pass 26 Y 1"Drain of DS320A inlet 1"DF350292 27 Y 3" drain of outlet water 4"PW320028 28 Y GX320 discharge to oily water package 4"PW400006 29 Y try-cock 49 Y LDG3204A 48 Y LDT3202A 47 Y LDT 3201A 46 Y PDV3201B by pass 2" by pass 30 Y 3" drain of outlet water 4"PW320016 31 Y EC321 by pass 4"PW320028 32 Y Oily water U/S EC321 to open Drain 2"DO360079 33 Y Oily water to sand jet DS400 3"PW400058 34 Y Oily water to sample box 2"PW400042 35 Y 1"Drain of DS320B inlet 3/4" 36 Y try-cock 45 Y LDG3204B 44 Y LDT3202B 43 Y LDT 3201B 42 Y DS401( Vendor PID) Drain D/S LV4007 3/4" 37 Y GX400A discharge drain to closed drain 1"DF350244 38 Y GX400B discharge drain to closed drain 1"DF350245 39 Y GX400B PSV 4012B 1 1/2'' PW400054 Y GX400A PSV 4012A 2 1/2'' PW400056 Y CA310 water condensate pot 2'' PW400004 require flexible Not necessary GX350A recirculation line 2"DF350222 40 Y GX350B recirculation line 2"DF350223 41 Y DEAD LEG WHILE DS 320B BY PASS GX320: pump stopped DS320B/1955(02) Mini flow GX320 2"PW320025 In Service Y GX320 GX320A suction line 6"PW320016 Drain by 3/4"drain valve Y GX320A discharge line 4"PW320018 Drain by 3/4"drain valve Y GX320B suction line 6"PW320017 Drain by 3/4"drain valve Y GX320B discharge line 4"PW320019 Drain by 3/4"drain valve Y Instruction: Flush 2 hours after the beginning of biocide treatment Location Pump Yes / No DS300 GX822B DS301 GX822B Yes DS302 GX822B Yes PSV3130A (or B) CANCELLED DA350 GX822B Yes Suction GX722/721A/B GX822B Yes DA350/1866 DS320A/1955(02) DS302/1953 (02/02) GX310/1954 DS320A/1955(01/02) DS320B/1955(02/02) \\vboxsrv\conversion_tmp\scratch_6\[246837123.xls.ms_office.xls]Dead legs Injection point of Biocide Treatment PSV3130: no more biocide required due to bonnet destruction of PSV. PSV3130A/B DS300/ 1950 DS301/1951 EC313/1953 (01/02) Skimmed oil pipe