This flow chat is combination about the incoming business and job activity .First we identify all the operational activities required for the production of the product. Then we arrange these activities according to sequence and proceed to draw the process chart.
Figure above show the production activities required to sell the frozen food. 1. First, we find the potential location for business and construct a building. 2. Then, order and purchasing product from the suppliers. 3. After that, we check the product we order is right or wrong, check the quality of product and so on. 4. Before we start operating, we make sure that our futsal centre is clean and all the equipment is ready for customer. The job activity chart will show the sequence of jobs that need to be done by a worker. Figure above shows a job activity chart for the counter staff in a D Futsal Ent. The job activity for our staff is very easy because they just does the simple thing. Besides that, our staff also responsible in care our store and give good service to our customer. All the partners have each work to do and they just help them when they in the centre.
Business and Operation Planning
This table shows our business hour. Business hours refer to the time the business is open to the customers. Operation hours refer to the hours the worker has to work. We decide to have two shifts which start from 1000 to 1800 and 1800 to 0200. For the worker, she works same with office hours. Some of the partners will work together with our worker and the other partners will continue for the next shift. The dutys partner is to make sure the court is ready for customer next day. This is because our cashier always at the cashier counters. Partners also should clean our courts and arrange the facilities very tidy every day before closing.
Saturday Sunday : 1000-0200
Schedule Work Every Week
SCHEDULE WORK
First shift = cashier Second shift = cashier + partners
Saturday Sunday : 1000-0200
DAYS FIRST SHIFT 1000 to 1800 SECOND SHIFT 1800 to 0200
Average sales forecast per month: = RM12000 Price per games: = RM 90
Average games per day: = 6
Purchase Requirement
Table 10: List of materials/stocks
Operation Personnel
Table 12: Position and number of staff
Position No of staff Operation partners 1 Cashier 1
Types of purchases/stock Quantity
Price (cost price) RM Total (RM) 1. Building 2. Carpet 3. Goal Post 4. Net 5. Ball 6. Refrigerator 7. Caf Table and chair 8. Waiting chair
TOTAL 1 2 4 2 4 1 6
4 150000 25000 350 10000 40 500 250
100 150000 50000 1400 20000 160 500 1250
400
223710 Operation Layout
We decide to use the layout based on marketing. This type of layout is designed to utilize the available space for our futsal house.
The layout of our store is illustrated above that arranged in such a way like: Arrangements of goods are attractive we arrange the equipment straight and side by side to give the customers easier walk around it. Location Plan
All the partners have to make decision which premise is the best for the business to operate. Choice of location is important because it will affect the sales revenue, business operation cost and long term investment. Factors to be considered for choice of location are public awareness and other facilities.
Public awareness is the first factors that influence the choice of location. Public awareness means that Dungun is the place that people aware or we can say as a famous place in centre of study. A lot of IPTAs and IPTS are building here. Besides that, Dungun near to the Petronas plant where can attract the workers there. From this advantage, we can increase our sales and expand our business.
Besides that, other facilities also the factor that have to be considered. Other factors that we considered before choose our place is the availability such as utilities, banks (A.T.M), parking lot and safety of the surrounding areas.
ACTIVITIES DEADLINES DURATIONS Incorporation of business Sept - Nov 3months Application for permits and license Sept - Nov 3months Searching for business premise Oct 1 month Renovation of premise Nov 2 weeks Procurement of raw material Nov - Dec 2months Recruitment of labour Dec 2 weeks Installation of freezers Dec 1month