PROYECTO:
MEJORAMIENTO DE LA CARRETERA (PU 675) POMATA YOROHOCO, PROVINCIA DE CHUCUITO - PUNO
1.1
1.2
1.3
1.3.1
1.3.2
1.4
1.5
1.6
1.6.1
1.6.2
1.7
1.8
2.
GENERALIDADES .................................................................................................................................. 4
OBJETIVOS DEL ESTUDIO ..................................................................................................................... 4
UBICACIN DEL PROYECTO............................................................................................................... 5
UBICACIN POLTICA ....................................................................................................................... 5
UBICACIN GEOGRFICA .............................................................................................................. 5
DESCRIPCIN DEL REA DE TRABAJO ............................................................................................. 5
ALCANCE DEL TRABAJO ..................................................................................................................... 5
ANTECEDENTES DEL AREA DE TRABAJO ........................................................................................... 8
ESTUDIOS ANTERIORES ...................................................................................................................... 8
DESCRIPCIN DE LA ZONA ............................................................................................................. 8
RECOLECCIN Y ANLISIS DE INFORMACIN METEOROLGICA ............................................. 9
INFORMACIN CARTOGRFICA .................................................................................................... 10
PARMETROS CLIMTICOS ...................................................................................................... 12
2.1
2.2
2.3
2.4
2.5
2.6
2.7
3.
3.1
3.2
4.
4.1
4.2
4.3
4.3.1
4.3.2
4.4
4.5
4.6
4.6.1
4.6.2
4.7
4.8
4.9
5.
5.1
EVALUACIN DE INSUFICIENCIA HIDRAULICA E INSUFICIENCIA DE DRENAJE ........................ 65
5.2
DETERMINACIN DEL ANCHO ESTABLE DEL CURSOS DE AGUA ................................................ 66
5.3
CLCULOS HIDRULICOS EN PUENTES Y PONTONES ................................................................... 66
5.3.1
PARMETROS HIDRULICOS DE LA SECCIN DE INTERS ........................................................ 66
MEJORAMIENTO DE LA CARRETERA (PU 675)
5.4
DETERMINACIN DE LA PROFUNDIDAD DE EROSIN ................................................................. 68
5.4.1
DETERMINACIN DE LA SOCAVACIN GENERAL .................................................................... 68
5.4.2
DETERMINACIN DE LA SOCAVACIN LOCAL ........................................................................ 73
5.4.3
DETERMINACIN SOCAVACIN POTENCIAL TOTAL ................................................................ 75
5.4.3.1
PROFUNDIDAD DE SOCAVACIN COMBINADA PUENTE CASPA..................... 75
6.
6.1
6.1.1
6.2
6.3
6.4
7.
8.
CAUCE PRINCIPAL
CUENCA
ESTUDIO DE HIDROLOGA
1. ASPECTOS GENERALES
1.1 GENERALIDADES
1.2
1.3
1.3.1
UBICACIN POLTICA
El Proyecto est localizado en zona sur del departamento de Puno. Abarcando la
jurisdiccin de la provincia de Chucuito:
5
1.3.2
Carretera
UBICACIN GEOGRFICA
El proyecto vial Mejoramiento de la Carretera (Pu 675) Pomata - Yorohoco, PROVINCIA
de Chucuito - Puno, geogrficamente est comprendida entre las siguientes
coordenadas geogrficas; Latitud Sur: 16 33' 56.97 a 16 17' 26.80'' y Longitud Oeste: 69
19' 11.91'' a 69 16' 7.85'', se encuentra localizada en la parte suroriental de la regin
Puno, en el extremo sureste del Per, con una variacin altitudinal de 3826.00 a 4040.00
m.s.n.m.
1.4
1.5
Ubicar e identificar los lugares de la carretera que tienen obras mayores, como
puentes y pontones, analizando lo que requieren para la operacin segura y
eficiente de la va, garantizando las condiciones futuras del trnsito en el rea del
proyecto.
Analizar y cuantificar los fenmenos concurrentes que afecten las obras de drenaje,
para que se consideren en el diseo de las obras complementarias del sistema de
drenaje existente, incluyendo las obras de proteccin que fueran necesarias para el
adecuado funcionamiento de la va.
1.6
1.6.1
ESTUDIOS ANTERIORES
Entre los Estudios identificados se tienen los siguientes:
1.6.2
EXPEDIENTE TCNICO " MEJORAMIENTO DE LA CARRETERA (PU 675) POMATA YOROHOCO, PROVINCIA DE CHUCUITO - PUNO", en actual elaboracin por la
GERENCIA REGIONAL DE INFRAESTRUCTURA DEL Gobierno Regional de Puno, Ao
2014.
DESCRIPCIN DE LA ZONA
Se ha efectuado un trabajo de reconocimiento del Tramo Pomata - Yorohoco (Km
0+000 al 33+672), se encuentra actualmente a nivel de trocha carrozable, su longitud es
33.672 km, comprobndose que mayormente la superficie de rodadura est en muy mal
estado, con encalaminamiento de la misma, lo cual dificulta el traslado de personas y
productos a lo largo de la misma. Esta va une los distritos de Pomata, Zepita y Huacullani
pertenecientes a la provincia de Chucuito Juli, los Centros Poblados y/o caseros de la
zona de influencia directa del presente estudio se halla conformado por un total de 25
localidades, del cual 13 localidades en jurisdiccin de Pomata, 02 localidades en
jurisdiccin de Zepita y 10 localidades en jurisdiccin de Huacullani y 3 distritos, Ver
cuadro 1.
DISTRITO
Pomata
Pomata
Pomata
Pomata
Pomata
Pomata
Pomata
Pomata
Pomata
Pomata
Pomata
Pomata
CHUCUITO Pomata
Zepita
Zepita
Huacullani
Huacullani
Huacullani
Huacullani
Huacullani
Huacullani
Huacullani
Huacullani
Huacullani
Huacullani
Fuente: GRP-DEPI.
LOCALIDAD
POBLACIN
(HAB.)
UBICACIN EN LA
CARRETERA
(PROG.)
1383
213
587
512
1093
1207
1499
418
528
448
987
1765
192
117
94
152
68
68
173
175
241
161
471
319
414
0+00
0+300
2+460
8+700
14+200
16+200
14+000
14+180
13+800
2+468
13+720
14+250
23+160
27+420
24+500
26+760
26+700
26+800
27+100
28+200
30+050
32+100
33+700
33+500
33+653
MARGEN
Derecha e Izquierda
Derecha
Derecha
Derecha
Derecha
Derecha e Izquierda
Derecha
Derecha
Derecha
Derecha
Izquierda
Izquierda
Derecha e Izquierda
Izquierda
Izquierda
Derecha
Izquierda
Derecha
Derecha
Derecha
Derecha
Derecha e Izquierda
Derecha e Izquierda
Derecha e Izquierda
Derecha e Izquierda
1.7
Juli
Desaguadero
CO
CO
110880
116060
Senamhi
Senamhi
LATITUD
LONGITUD ALTITUD
1612'13.6'' 6927'35.7''
1633'48.06" 6902'19.8"
3812
3860
VARIABLE
PERIODO
1964 - 2013
1964 - 2011
1965 - 2007
1965 - 2007
1965 - 2007
1965 - 2007
1965 - 2007
1965 - 2007
1965 - 2007
1965 - 2007
1964 - 2013
1964 - 2010
1965 - 2007
1966 - 2007
1967 - 2007
1968 - 2007
1969 - 2007
1995 - 2007
1995 - 2007
1991 - 2007
1.8
INFORMACIN CARTOGRFICA
Para la identificacin y delimitacin de las quebradas y subcuenca, como la
caracterizacin de los parmetros geomorfolgicos principales y otros usos
cartogrficos, se utiliz la siguiente informacin cartogrfica:
Mapas Temticos del departamento de Puno, elaborados por la ONERN (1965) de:
Cobertura vegetal, Grandes grupos de suelos y capacidad de uso mayor, ecologa,
geologa y geomorfolgico e informacin cartogrfica y temtica complementaria
encontrada en los diferentes estudios realizados.
Imgenes satelitales AsterGdem, con una resolucin espacial de 30 m, tomada del
satlite Aster.
En todos los mapas, el formato digital del plano base utilizado, est en el sistema de
coordenadas UTM WGS84, proyectadas para la zona 19S.
En la Figura 3 se aprecia las quebradas y subcuencas que interceptan la lnea de la va
del
proyecto
mejoramiento
de
la
Carretera
Pomata
Yorohoco.
10
11
2.
PARMETROS CLIMTICOS
El clima de la zona de estudio, segn la clasificacin de Koppen, corresponde al tipo de
clima fro y seco; se puede decir que la precipitacin es abundante desde diciembre a
marzo, el mes de mnimos valores es en julio, existiendo meses (entre agosto a octubre)
en algunos aos, con precipitacin igual a cero., las temperaturas medias oscilan entre
4.8 9.9 C, segn las estaciones del ao.
2.1
PRECIPITACIN PLUVIAL
12
2.2
2.3
TEMPERATURA
La informacin de Temperatura mxima media y mnima de la zona de emplazamiento
del proyecto, se ha obtenido de la estacin meteorolgica C.O. Juli y Desaguadero
ubicado prximo a la zona de emplazamiento del proyecto.
La temperatura promedio mxima de la estacin Juli, segn los registros histricos es de
13.7 C., registrndose la mxima ms alta de 14.9 C., que ocurre en el mes de
Noviembre.
La temperatura media mensual de la estacin Juli, varia de 9.8 C a 5.7 C y el promedio
multianual es de 8.2 C., En la figura N 5 se aprecia la variacin del promedio mensual
de la temperatura media.
La temperatura promedio mnima de la estacin Juli, segn los registros histricos es de
2.7 C., registrndose la mnima ms baja de -1.0 C., que ocurre en el mes de Julio., en
la figura 5, se aprecia la variacin del promedio mensual de temperatura mnima.
13
14
2.4
HUMEDAD RELATIVA
La informacin de la humedad relativa mensual anual de la zona de emplazamiento del
proyecto, se ha obtenido de la estacin meteorolgica C.O. Juli y Desaguadero
ubicado prximo al rea del proyecto.
15
2.5
EVAPORACIN
La informacin de evaporacin mensual anual de la zona de emplazamiento del
proyecto, se ha obtenido de la estacin meteorolgica C.O. Juli y Desaguadero,
ubicado prximo al rea del proyecto.
La evaporacin total mensual en las estaciones de Juli y Desaguadero ha registrado un
promedio anual mensual de 135.8 y 147.7 mm., respectivamente, las variaciones
fluctan entre un mnimo 106.1 y 122.8 mm., registrado en el mes de junio a un mximo
con un valor de 174,2 mm., en ambas estaciones, registrado en el mes de octubre, que
fue el mes que ms ha evaporado, en la figura 8, se observa las fluctuaciones de la
evaporacin.
16
2.6
HORAS DE SOL
El Brillo solar corresponde al nmero de horas al da que hubo luz, llamado tambin
fotoperodo. El valor de este factor climtico tambin radica en la importancia para el
desarrollo de actividades como la construccin, turismo y otros.
El registro de las horas de sol en las estaciones de Juli y Desaguadero, alcanza una
mxima de 9.4 y 9.0 hr/da en el mes de Mayo y Julio respectivamente, y un valor
mnimo del orden de 6.6 y 7.0 hr/da, ambos en el mes de Enero, con un promedio anual
de 8.4 y 8.2 hr/da, respectivamente, tal como se muestra en la Figura 9.
Figura 9: Variacin mensual de las horas de sol Estacin C.O. Juli y Desaguadero.
2.7
Figura 10: Variacin mensual de la velocidad del viento Estacin C.O. Juli y
Desaguadero.
17
18
Figura 11: Registro anual de la Direccin del viento Estacin C.O. Juli
Figura 12: Registro anual de la Direccin del viento Estacin C.O. Desaguadero
3.
3.1
3.2
19
OBRA EXISTENTE
TIPO DE MATERIAL
(Km)
Long.
DIMENSIONES
Ancho Alto
Diametro
REMPLAZO
RECOMENDACIONES
Proyeccin
Encauzamiento
Cabezales y
Limpieza
Aliviadero
ESTADO
CAPAC.
HIDRAULICA
R.E.
R.E.
I
I
Reemplazar
Reemplazar
MC
MC
SI
SI
NO
NO
Reemplazar
Proyectar
Proyectar
MC
TMC
SI
SI
SI
NO
SI
SI
SI
SI
SI
NO
SI
SI
SI
SI
SI
NO
SI
SI
NO
NO
SI
SI
SI
NO
NO
NO
SI
SI
NO
NO
(m)
(m)
(m)
(pulg.)
5.5
5.5
1.38
1.3
1.2
1.1
TIPO
1
2
00+000
00+184
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Concreto Armado
Concreto Armado
3
4
5
00+370
00+580
Alcantarilla 04 ojos
Inexistente
Inexistente
Tajea
Proyectar
5.55
-
5.15
-
0.8
-
M.E.
-
Proyectar
Proyectar
Concreto Armado
6.05
0.6
0.6
R.E.
Concreto Armado
Concreto Armado
Concreto Armado
5.15
5.5
5.5
2.3
2
2
1.65
0.8
1.1
M.E.
R.E.
R.E.
Proyectar
Proyectar
Reemplazar
I
I
Reemplazar
Reemplazar
Concreto Armado
Tajea
5.5
6.8
2.05
2.25
1.1
0.6
R.E.
M.E.
6
7
6.5
2
0.75
1.7
1.2
0.75
1
R.E.
M.E.
M.E.
Reemplazar
Reemplazar
Reemplazar
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Concreto Armado
Tajea
Concreto Armado
I
I
I
I
I
Reemplazar
Reemplazar
MC
MC
MC
6.45
6.55
2.3
2
1
1.05
M.E.
M.E.
I
I
Reemplazar
Proyectar
Reemplazar
MC
MC
MC
SI
SI
SI
NO
SI
NO
Reemplazar
Reemplazar
Proyectar
TMC
MC
SI
SI
SI
NO
NO
SI
SI
SI
NO
SI
SI
SI
SI
NO
NO
NO
SI
SI
NO
SI
SI
SI
SI
SI
6
7
8
9
10
11
12
13
14
15
03+270
03+600
03+785
03+820
04+180
04+856
05+113
05+403
05+671
06+061
Inexistente
Alcantarilla 01 ojos
Inexistente
Inexistente
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Proyectar
Proyectar
OBSERVACION
16
17
06+160
06+210
06+500
18
19
20
06+542
06+614
06+690
Alcantarilla 02 ojos
Inexistente
Alcantarilla 01 ojos
Tajea
Proyectar
Tajea
21
22
23
07+460
08+050
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Inexistente
Concreto Armado
Concreto Armado
6
6
1.55
1.6
1.1
1.1
R.E.
R.E.
I
I
Proyectar
Concreto Armado
Proyectar
5.25
-
0.85
-
0.7
-
M.E.
-
Concreto Armado
Concreto Armado
6
6.05
1.6
0.75
0.9
0.5
R.E.
R.E.
Concreto Armado
Concreto Armado
Proyectar
4.5
4.35
-
3
3
-
1.66
1.7
-
R.E.
R.E.
-
24
25
26
27
28
09+140
09+438
09+660
10+290
13+620
29
30
14+117
14+265
15+555
31
32
15+675
15+881
Alcantarilla 01 ojos
Inexistente
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Inexistente
Inexistente
Inexistente
Proyectar
Proyectar
I
I
I
Proyectar
Reemplazar
Reemplazar
Proyectar
Reemplazar
Reemplazar
Reemplazar
TMC
TMC
TMC
TMC
TMC
MC
MC
MC
MC
MC
TMC
TMC
TMC
MC
TMC
Reemplazar
Proyectar
MC
MC
MC
Proyectar
Proyectar
MC
MC
20
OBRA EXISTENTE
TIPO DE MATERIAL
(Km)
Long.
DIMENSIONES
Ancho Alto
Diametro
(m)
(m)
(m)
(pulg.)
REMPLAZO
ESTADO
33
34
16+340
16+390
Inexistente
Alcantarilla 01 ojos
Proyectar
Concreto Armado
5.2
1.1
M.E.
35
36
37
16+828
17+019
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Concreto Armado
Concreto Armado
4.4
4.5
0.95
1.45
0.5
0.5
M.E.
M.E.
Concreto Armado
Concreto Armado
Concreto Armado
5
5
4.6
2
2
1.5
0.68
1
0.85
M.E.
M.E.
M.E.
Tajea
Concreto Armado
5.7
5.15
0.5
1
0.4
0.75
Proyectar
Concreto Armado
Proyectar
4.4
-
0.95
-
0.78
-
Concreto Armado
Concreto Armado
5.7
4.95
1
2.1
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Proyectar
Concreto Armado
Concreto Armado
5.1
4.35
38
39
40
41
42
43
44
45
46
47
17+229
17+353
17+460
17+558
17+651
17+740
17+855
18+000
18+304
19+035
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Inexistente
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Inexistente
Proyectar
Eliminar
I
I
Reemplazar
Reemplazar
M.E.
M.E.
I
I
M.E.
-
Reemplazar
Reemplazar
Proyectar
0.6
2.05
M.E.
M.E.
I
I
1.2
1
1
1.55
M.E.
M.E.
I
I
19+350
19+431
19+532
50
51
52
19+960
20+396
20+659
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Concreto Armado
Concreto Armado
Concreto Armado
4.4
5
4.4
1.6
1.05
1.5
0.8
0.6
0.55
M.E.
M.E.
M.E.
53
54
55
20+917
21+022
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Concreto Armado
Tajea
4.4
5.3
1.05
0.6
0.5
0.45
M.E.
M.E.
Concreto Armado
Concreto Armado
Proyectar
4.5
4.75
-
1.05
1.2
-
0.8
0.1
-
M.E.
M.E.
-
Proyectar
Concreto Armado
1.3
1.5
M.E.
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Tajea
Concreto Armado
Concreto Armado
4.9
6
8.8
3
0.3
2.2
1.4
0.3
1.3
M.E.
M.E.
M.E.
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Concreto Armado
Concreto Armado
5.15
7
1.3
1
0.2
0.8
M.E.
M.E.
58
59
60
21+150
21+556
22+050
22+305
22+532
61
62
22+830
23+299
23+567
63
64
24+192
25+707
Alcantarilla 01 ojos
Inexistente
Inexistente
Alcantarilla 01 ojos
Alcantarilla 02 ojos
OBSERVACION
I
I
I
I
48
49
56
57
CAPAC.
HIDRAULICA
Reemplazar
Reemplazar
Reemplazar
Reemplazar
Proyectar
Reemplazar
Reemplazar
Proyectar
TIPO
RECOMENDACIONES
Proyeccin
Encauzamiento
Cabezales y
Limpieza
Aliviadero
TMC
-
SI
-
SI
-
MC
MC
SI
SI
SI
NO
NO
NO
SI
SI
NO
NO
SI
SI
SI
NO
NO
SI
SI
SI
NO
SI
SI
SI
SI
NO
NO
SI
SI
SI
NO
NO
TMC
TMC
TMC
TMC
TMC
TMC
TMC
TMC
MC
MC
Reemplazar
Reemplazar
TMC
TMC
TMC
I
I
I
Reemplazar
Reemplazar
Reemplazar
MC
MC
MC
SI
SI
SI
NO
NO
NO
I
I
I
Reemplazar
Reemplazar
Reemplazar
TMC
TMC
SI
SI
SI
NO
NO
NO
I
-
Reemplazar
Proyectar
SI
SI
NO
SI
I
I
Proyectar
Reemplazar
Reemplazar
SI
NO
NO
I
I
Reemplazar
Reemplazar
MC
TMC
MC
SI
SI
SI
SI
SI
NO
NO
I
I
Reemplazar
Reemplazar
TMC
TMC
SI
SI
NO
NO
TMC
TMC
TMC
TMC
MC
21
OBRA EXISTENTE
TIPO DE MATERIAL
(Km)
Long.
DIMENSIONES
Ancho Alto
Diametro
(m)
(m)
(m)
(pulg.)
REMPLAZO
ESTADO
CAPAC.
HIDRAULICA
OBSERVACION
TIPO
RECOMENDACIONES
Proyeccin
Encauzamiento
Cabezales y
Limpieza
Aliviadero
65
66
26+146
26+473
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Concreto Armado
Tajea
7.05
5.1
1.4
1
1.35
1.3
M.E.
M.E.
I
I
Reemplazar
Reemplazar
MC
MC
SI
SI
NO
NO
67
68
69
26+600
26+706
27+061
Inexistente
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Proyectar
Tajea
Concreto Armado
4.4
5.6
0.3
1
0.4
0.7
M.E.
M.E.
I
I
Proyectar
Reemplazar
Reemplazar
TMC
TMC
MC
SI
SI
SI
SI
NO
NO
70
71
72
27+425
27+960
Inexistente
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Proyectar
Concreto Armado
0.9
0.65
M.E.
5.4
5.6
5.3
1.1
0.9
0.9
0.8
0.6
0.6
M.E.
M.E.
M.E.
Proyectar
Reemplazar
Reemplazar
TMC
TMC
Concreto Armado
Concreto Armado
Concreto Armado
I
I
SI
SI
SI
SI
NO
NO
5.4
5.2
5.2
1
0.6
0.7
1.2
0.6
0.8
M.E.
M.E.
M.E.
Reemplazar
Reemplazar
Reemplazar
NO
NO
NO
I
I
Reemplazar
Reemplazar
MC
TMC
TMC
SI
SI
SI
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Concreto Armado
Concreto Armado
Concreto Armado
I
I
I
SI
SI
NO
NO
Reemplazar
Proyectar
Reemplazar
TMC
TMC
TMC
SI
SI
SI
NO
SI
NO
Reemplazar
Reemplazar
Proyectar
TMC
TMC
SI
SI
SI
NO
NO
SI
SI
SI
NO
NO
73
74
75
28+178
28+465
28+701
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Alcantarilla 01 ojos
76
77
28+828
29+308
29+452
78
79
80
29+620
30+150
30+439
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Concreto Armado
Proyectar
Concreto Armado
5.45
5.2
0.8
0.7
0.5
0.7
M.E.
M.E.
81
82
83
30+598
30+947
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Inexistente
Concreto Armado
Concreto Armado
4.4
5.1
0.6
0.6
0.7
0.8
M.E.
M.E.
I
I
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Proyectar
Concreto Armado
Concreto Armado
4.9
6
1
0.8
0.9
0.55
M.E.
M.E.
I
I
84
85
31+120
31+485
31+687
86
87
88
32+475
32+731
32+851
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Concreto Armado
Concreto Armado
Concreto Armado
4.3
4.85
5.1
0.85
0.65
0.6
0.75
0.85
0.5
M.E.
M.E.
M.E.
89
90
33+008
33+437
Alcantarilla 01 ojos
Alcantarilla 01 ojos
Concreto Armado
Concreto Armado
4.8
4.5
0.9
1.25
0.9
0.85
M.E.
M.E.
I
S
= INSUFICIENTE
= SUFICIENTE
TMC
TMC
TMC
Reemplazar
Reemplazar
TMC
MC
TMC
I
I
I
Reemplazar
Reemplazar
Reemplazar
TMC
TMC
TMC
SI
SI
SI
NO
NO
NO
I
I
Reemplazar
Reemplazar
TMC
MC
SI
SI
NO
NO
22
OBRA EXISTENTE
(Km)
1
2
3
4
5
2+462.00
PUENTE N 01
5+863.00
PONTON 01
18+113.00
PONTON 02
18+699.00
PONTON 03
18+950.00
PONTON 04
M.E. = MAL ESTADO
R.E. = REGULAR ESTADO
B.E. = BUEN ESTADO
TIPO DE MATERIAL
Long.
(m)
DIMENSIONES
Ancho Alto Diametro
(m)
(m)
(pulg.)
Concreto Armado
18.7
4
1.56
Concreto Armado
6
4.65
1
Concreto Armado
5.4
3.05
1.72
Concreto Armado
7.7
4.2
2.1
Concreto Armado
6.45
4.45
1.3
TMC = TUBERIA METALICA CORRUGADA
I
= INSUFICIENTE
S
= SUFICIENTE
REMPLAZO
CAPAC. OBSERVACI
ESTADO
HIDRAULICA
ON
M.E.
M.E.
R.E.
R.E.
M.E.
S
I
I
I
S
Reemplazar
Reemplazar
Reemplazar
Reemplazar
Reemplazar
TIPO
PUENTE
PONTON
PONTON
PONTON
PONTON
RECOMENDACIONES
Proyeccin Encauzamiento
Cabezales y
Limpieza
Aliviadero
SI
SI
SI
SI
SI
SI
SI
SI
SI
SI
23
4. ANLISIS HIDROLOGICO
4.1 ANLISIS ESTADSTICO DE PRECIPITACIONES MXIMAS DIARIAS
Con la finalidad de ajustar la precipitacin mxima de las Estaciones de Juli y
Desaguadero, a una serie anual de distribucin terica, la informacin de la estacin en
estudio ser analizada, empleando para ello las siguientes distribuciones de
probabilidad:
Normal
Log Normal II parmetros
Log Normal III parmetros
Gumbel
Pearson tipo III
Log. Pearson Tipo III.
Para trabajar estas distribuciones tericas se recurri a los mtodos de los mnimos
cuadrados y de Kolmogorov Smirnov, se obtiene a que distribucin probabilstica se
ajustan mejor los datos histricos.
El las figuras 13 y 14 se observan los registros histricos anuales de la precipitacin
mxima de 24h. de las estaciones Juli y Desaguadero., el registro histrico de
precipitaciones alcanzado por SENAMHI, presenta 43 y 47 aos respectivamente.
24
N DATOS
PROM.
DESVEST
MAXIMA
MINIMA
44.0
41.7
11.3
71.9
25.4
Estacin Desaguadero
Precipitacin
AO
Mxima Diaria
(mm)
dic-66
47.5
ene-68
25.5
ene-69
38.0
feb-70
34.1
ene-71
25.8
mar-72
45.6
feb-73
50.5
feb-74
34.2
feb-75
44.2
ene-76
43.3
oct-77
37.0
ene-78
34.0
mar-79
37.8
mar-80
34.3
dic-81
34.0
oct-82
61.3
dic-83
30.9
may-84
44.5
dic-85
39.1
ene-86
50.7
ene-86
40.0
mar-88
55.2
abr-89
38.7
mar-90
51.2
mar-91
25.3
ene-92
31.0
jul-93
38.9
feb-94
34.5
feb-95
39.1
ene-96
37.7
feb-97
37.0
abr-98
25.0
abr-99
51.0
nov-00
42.7
feb-01
58.6
mar-02
71.8
mar-03
43.0
feb-04
35.1
mar-05
60.4
mar-06
57.4
mar-07
48.4
ene-08
31.6
feb-09
60.9
ene-10
45.2
feb-11
36.3
ene-12
39.7
ene-13
53.7
N DATOS
47.0
PROM.
42.2
DESVEST
10.7
MAXIMA
71.8
MINIMA
25.0
25
26
1 X
f ( x) =
( )
*e
Funcin Acumulada
La funcin de distribucin acumulada de la distribucin Pearson Tipo III o Gamma de III
parametros es:
x
1
f ( x) =
e
( ) 0
MEJORAMIENTO DE LA CARRETERA (PU 675)
X
*
dx
En el cual:
X = Variable aleatoria Pearson tipo III
= Parmetro de escala
= Parmetro de forma
= Funcin gamma completa
(1)
La variable reducida y Pearson Tipo III, es:
y=
27
y=
0
y 1 1e y
dy
( 1 )
X = + * 1
Varianza:
S 2 = 2 * 1
2
Cs = g =
Sesgo:
2
1 =
Cs
= Cs s / 2
=X
2S
Cs
Para el clculo de Cs, para los datos muestrales, usar las ecuaciones:
n
n ( X i )
CS =
Donde:
f(X)
()
i =1
(n 1)(n 2)S 3
= Funcin densidad
= Parmetro de escala
= Parmetro de forma
= Media de los datos observados
= Desviacin estndar de los datos observados
= Parmetro de posicin
= Funcin gamma
b) Distribucin Gumbel
La distribucin Gumbel, es una de las distribuciones de valor extremo, es llamado
tambin Valor Extremo Tipo I, Fisher-Tippett tipo I distribucin doble exponencial.
La funcin de distribucin acumulada de la distribucin Gumbel tiene la forma:
F(x) = e
Para:
- < x <
Donde:
F(x)
x
e
0 < < ,
- < <,
6
S
= 0.78S
= X 0.57721
= X 0.45S
Donde:
X
S
,
28
Cuadro 06: Ajuste Mtodo del Error Cuadrtico Mnimo Estacin Juli
DATOS
OBSERVADOS
T
Xo
(AOS)
(mm)
44.000
71.90
22.000
68.00
14.667
67.40
11.000
66.10
8.800
63.70
7.333
53.60
6.286
50.60
5.500
49.80
4.889
48.00
4.400
47.30
4.000
46.30
3.667
45.60
3.385
44.60
3.143
44.20
2.933
43.70
2.750
43.50
2.588
42.50
2.444
42.00
2.316
41.50
2.200
41.10
2.095
38.40
2.000
37.50
1.913
37.50
1.833
37.40
1.760
37.20
1.692
36.70
1.630
36.40
1.571
35.20
1.517
34.80
1.467
34.20
1.419
34.10
1.375
33.60
1.333
33.40
1.294
33.20
1.257
32.70
1.222
32.60
1.189
32.40
1.158
31.50
1.128
30.60
1.100
30.50
1.073
30.10
1.048
29.20
1.023
25.40
SUMA
C
Fuente: Elaboracion propia
LogNormal II
Parmetros.
Momentos
Xe
Normal
Momentos
Xe
(mm)
64.60
61.06
58.77
57.01
55.55
54.28
53.16
52.13
51.19
50.30
49.46
48.66
47.90
47.16
46.44
45.74
45.06
44.39
43.72
43.07
42.42
41.77
41.12
40.47
39.81
39.15
38.48
37.79
37.09
36.38
35.64
34.87
34.08
33.24
32.35
31.40
30.38
29.25
27.99
26.53
24.77
22.47
18.937
(Xe - Xo)
53.32
48.12
74.55
82.72
66.49
0.47
6.54
5.44
10.14
8.99
9.99
9.38
10.86
8.74
7.51
5.03
6.54
5.69
4.94
3.87
16.13
18.21
13.10
9.41
6.82
6.00
4.31
6.72
5.26
4.74
2.37
1.62
0.46
0.00
0.12
1.43
4.09
5.05
6.82
15.76
28.43
45.27
41.77
673.22
25.95
(mm)
66.72
61.74
58.71
56.49
54.71
53.21
51.92
50.76
49.72
48.76
47.87
47.04
46.26
45.52
44.81
44.13
43.47
42.83
42.21
41.61
41.02
40.44
39.87
39.31
38.74
38.19
37.63
37.07
36.50
35.93
35.36
34.77
34.16
33.54
32.90
32.22
31.50
30.74
29.90
28.95
27.86
26.49
24.51
LogNormal III
Parmetros.
Momentos
Xe
2
(Xe - X o)
26.81
39.14
75.48
92.41
80.84
0.15
1.73
0.93
2.95
2.14
2.48
2.08
2.76
1.73
1.22
0.39
0.94
0.69
0.51
0.26
6.87
8.66
5.62
3.63
2.38
2.21
1.51
3.48
2.90
3.01
1.58
1.36
0.58
0.12
0.04
0.14
0.80
0.59
0.50
2.39
5.03
7.35
0.79
397.17
19.93
(mm)
70.35
64.00
60.26
57.57
55.46
53.71
52.21
50.89
49.71
48.64
47.66
46.74
45.89
45.09
44.33
43.60
42.91
42.24
41.60
40.98
40.37
39.78
39.20
38.63
38.07
37.52
36.97
36.43
35.88
35.33
34.78
34.22
33.66
33.08
32.49
34.78
34.22
33.66
29.80
28.98
28.05
26.91
25.31
Gumbel
Momentos
Xe
2
(Xe - X o)
Gumbel
2.40
15.98
51.04
72.81
67.98
0.01
2.58
1.19
2.92
1.79
1.84
1.30
1.66
0.78
0.39
0.01
0.17
0.06
0.01
0.02
3.88
5.19
2.90
1.52
0.76
0.67
0.33
1.50
1.16
1.28
0.46
0.39
0.07
0.01
0.05
4.76
3.33
4.66
0.64
2.31
4.22
5.27
0.01
270.31
16.44
(mm)
70.20
63.93
60.21
57.55
55.45
53.71
52.23
50.92
49.75
48.69
47.72
46.81
45.97
45.17
44.42
43.70
43.01
42.35
41.71
41.09
40.48
39.89
39.32
38.75
38.19
37.63
37.08
36.53
35.98
35.43
34.87
34.30
33.73
33.13
32.52
31.89
31.22
30.50
29.72
28.85
27.84
26.59
24.79
Pearson III
Max. Verosimilitud
Xe
2
(Xe - Xo)
2.90
16.60
51.65
73.19
68.08
0.01
2.65
1.26
3.07
1.93
2.01
1.47
1.87
0.94
0.51
0.04
0.26
0.12
0.04
0.00
4.33
5.73
3.30
1.82
0.97
0.87
0.46
1.77
1.39
1.51
0.59
0.49
0.11
0.00
0.03
0.51
1.40
1.00
0.77
2.72
5.09
6.80
0.37
270.65
16.45
(mm)
67.12
61.45
58.10
55.68
53.79
52.22
50.88
49.70
48.64
47.68
46.80
45.98
45.22
44.50
43.82
43.17
42.55
41.95
41.37
40.81
40.26
39.73
39.21
38.69
38.19
37.69
37.19
36.69
36.19
35.69
35.19
34.68
34.16
33.62
33.07
32.49
31.89
31.24
30.54
29.75
28.84
27.71
26.08
Pearson III
Momentos
Xe
2
(Xe - Xo)
22.86
42.89
86.58
108.49
98.21
1.90
0.08
0.01
0.41
0.15
0.25
0.15
0.38
0.09
0.01
0.11
0.00
0.00
0.02
0.09
3.47
4.97
2.92
1.67
0.98
0.97
0.62
2.22
1.94
2.23
1.18
1.16
0.57
0.18
0.14
0.01
0.26
0.07
0.00
0.56
1.59
2.23
0.46
393.09
19.83
(mm)
70.70
64.47
60.71
57.98
55.81
53.99
52.44
51.08
49.87
48.78
47.79
46.87
46.01
45.19
44.40
43.64
42.89
42.17
41.47
40.78
40.13
39.50
38.89
38.31
37.73
37.17
36.62
36.08
35.54
35.00
34.46
33.92
33.38
32.83
32.27
31.69
31.11
30.49
29.85
29.16
28.39
27.50
26.35
Max. Verosimilitud
Xe
2
(Xe - Xo)
1.44
12.47
44.73
65.93
62.28
0.16
3.38
1.63
3.48
2.19
2.22
1.62
1.99
0.98
0.49
0.02
0.15
0.03
0.00
0.10
2.99
4.00
1.94
0.82
0.28
0.22
0.05
0.77
0.54
0.64
0.13
0.10
0.00
0.14
0.19
0.82
1.68
1.01
0.56
1.81
2.92
2.88
0.91
230.71
15.19
(mm)
69.601
63.592
59.971
57.338
55.246
53.499
52.001
50.69
49.525
48.482
47.53
46.647
45.818
45.03
44.274
43.539
42.825
42.132
41.46
40.794
40.172
39.57
38.988
38.424
37.874
37.337
36.809
36.288
35.772
35.258
34.746
34.23
33.71
33.184
32.649
32.104
31.543
30.96
30.348
29.691
28.965
28.124
27.036
(Xe - Xo)
5.29
19.43
55.19
76.77
71.47
0.01
1.96
0.79
2.33
1.40
1.51
1.10
1.48
0.69
0.33
0.00
0.11
0.02
0.00
0.09
3.14
4.28
2.21
1.05
0.45
0.41
0.17
1.18
0.94
1.12
0.42
0.40
0.10
0.00
0.00
0.25
0.73
0.29
0.06
0.65
1.29
1.16
2.68
262.96
16.22
29
Cuadro 07: Ajuste Mtodo del Error Cuadrtico Mnimo Estacin Desaguadero
DATOS
OBSERVADOS
LogNormal II
Parmetros.
Momentos
Xe
Normal
Momentos
Xo
(AOS)
(mm)
48.000
71.80
24.000
61.30
16.000
60.90
12.000
60.40
9.600
58.60
8.000
57.40
6.857
55.20
6.000
53.70
5.333
51.20
4.800
51.00
4.364
50.70
4.000
50.50
3.692
48.40
3.429
47.50
3.200
45.60
3.000
45.20
2.824
44.50
2.667
44.20
2.526
43.30
2.400
43.00
2.286
42.70
2.182
40.00
2.087
39.70
2.000
39.10
1.920
39.10
1.846
38.90
1.778
38.70
1.714
38.00
1.655
37.80
1.600
37.70
1.548
37.00
1.500
37.00
1.455
36.30
1.412
35.10
1.371
34.50
1.333
34.30
1.297
34.20
1.263
34.10
1.231
34.00
1.200
34.00
1.171
31.60
1.143
31.00
1.116
30.90
1.091
25.80
1.067
25.50
1.043
25.30
1.021
25.00
SUMA
C
Fuente: Elaboracion propia
Xe
(mm)
63.93
60.67
58.56
56.94
55.61
54.46
53.43
52.50
51.16
50.84
50.09
49.37
48.68
48.02
46.76
46.76
46.16
45.57
44.98
44.41
43.84
43.28
42.72
42.16
41.61
41.05
40.49
39.92
39.35
38.76
38.17
37.57
36.95
36.31
35.65
34.96
34.24
33.49
32.69
31.83
30.90
29.87
28.72
27.38
25.77
23.66
20.396
(Xe - Xo)
61.91
0.40
5.48
11.94
8.95
8.67
3.13
1.44
0.00
0.03
0.38
1.28
0.08
0.27
1.35
2.44
2.75
1.86
2.83
1.98
1.30
10.75
9.13
9.39
6.29
4.61
3.19
3.69
2.39
1.13
1.37
0.32
0.42
1.46
1.32
0.44
0.00
0.38
1.73
4.72
0.49
1.27
4.76
2.51
0.07
2.70
21.20
214.16
14.63
(mm)
68.15
63.13
60.08
57.84
56.06
54.56
53.26
52.11
51.07
50.12
49.24
48.42
47.64
46.91
46.21
45.55
44.90
44.28
43.68
43.10
42.53
41.97
41.42
40.89
40.36
39.83
39.31
38.79
38.27
37.75
37.23
36.70
36.17
35.64
35.09
34.53
33.95
33.35
32.73
32.08
31.39
30.64
29.82
28.90
27.83
26.48
24.53
LogNormal III
Parmetros.
Momentos
Xe
2
(Xe - Xo)
13.33
3.34
0.68
6.55
6.47
8.07
3.75
2.52
0.02
0.77
2.13
4.33
0.57
0.35
0.38
0.12
0.16
0.01
0.15
0.01
0.03
3.88
2.97
3.19
1.58
0.86
0.37
0.62
0.22
0.00
0.05
0.09
0.02
0.29
0.34
0.05
0.06
0.56
1.61
3.69
0.05
0.13
1.16
9.62
5.41
1.39
0.22
92.19
9.60
(mm)
67.23
62.60
59.75
57.64
55.95
54.53
53.28
52.18
51.17
50.25
49.39
48.59
47.83
47.11
46.42
45.76
45.12
44.50
43.90
43.33
42.76
42.20
41.65
41.11
40.57
40.04
39.51
38.98
38.45
37.91
37.38
36.84
36.29
35.73
35.16
34.58
33.97
33.35
32.69
32.00
31.27
30.47
29.59
28.60
27.44
25.96
23.80
Gumbel
Pearson III
Pearson III
Max. Verosimilitud
Xe
Momentos
Max. Verosimilitud
Xe
Xe
2
(Xe - Xo)
Gumbel
Momentos
20.91
1.68
1.33
7.60
7.01
8.25
3.67
2.32
0.00
0.56
1.71
3.65
0.32
0.15
0.68
0.32
0.39
0.09
0.36
0.11
0.00
4.84
3.80
4.02
2.16
1.29
0.65
0.95
0.42
0.04
0.14
0.03
0.00
0.40
0.44
0.08
0.05
0.57
1.71
4.00
0.11
0.28
1.71
7.85
3.74
0.44
1.44
102.26
10.11
(mm)
69.52
63.66
60.19
57.70
55.74
54.13
52.75
51.53
50.45
49.47
48.57
47.74
46.96
46.23
45.53
44.88
44.24
43.63
43.05
42.50
41.96
41.43
40.91
40.41
39.91
39.42
38.94
38.46
37.99
37.52
37.05
36.57
36.10
35.62
35.13
34.63
34.13
33.60
33.06
32.50
31.90
31.26
30.56
29.77
28.86
27.72
26.08
(Xe - Xo)
5.20
5.55
0.51
7.31
8.16
10.70
6.02
4.69
0.56
2.34
4.54
7.65
2.08
1.63
0.00
0.10
0.07
0.32
0.06
0.25
0.55
2.04
1.47
1.71
0.66
0.27
0.06
0.22
0.04
0.03
0.00
0.18
0.04
0.27
0.40
0.11
0.01
0.25
0.88
2.26
0.09
0.07
0.12
15.78
11.28
5.87
1.16
113.55
10.66
(mm)
71.71
65.40
61.67
59.00
56.90
55.16
53.67
52.37
51.21
50.15
49.18
48.29
47.45
46.66
45.92
45.21
44.53
43.88
43.25
42.66
42.08
41.51
40.95
40.41
39.88
39.35
38.83
38.32
37.81
37.30
36.79
36.28
35.77
35.26
34.73
34.20
33.65
33.09
32.51
31.90
31.26
30.57
29.82
28.97
27.99
26.77
25.00
Xe
2
(Xe - Xo)
0.01
16.83
0.60
1.97
2.90
5.02
2.33
1.77
0.00
0.72
2.30
4.91
0.91
0.70
0.10
0.00
0.00
0.10
0.00
0.12
0.39
2.27
1.57
1.71
0.60
0.20
0.02
0.10
0.00
0.16
0.04
0.51
0.28
0.02
0.05
0.01
0.30
1.01
2.22
4.41
0.12
0.19
1.18
10.06
6.21
2.16
0.00
77.07
8.78
(mm)
67.22
62.67
59.85
57.75
56.06
54.62
53.37
52.25
51.25
50.33
49.49
48.70
47.96
47.25
46.57
45.91
45.26
44.62
44.00
43.38
42.78
42.20
41.63
41.07
40.52
39.97
39.44
38.90
38.37
37.83
37.29
36.75
36.20
35.64
35.07
34.49
33.88
33.26
32.61
31.92
31.19
30.40
29.54
28.57
27.44
26.03
24.01
(Xe - Xo)
20.95
1.87
1.11
7.03
6.47
7.74
3.36
2.09
0.00
0.45
1.47
3.24
0.20
0.06
0.93
0.50
0.57
0.18
0.49
0.14
0.01
4.84
3.73
3.88
2.01
1.15
0.54
0.81
0.32
0.02
0.09
0.06
0.01
0.30
0.33
0.04
0.10
0.71
1.95
4.33
0.17
0.36
1.85
7.68
3.76
0.53
0.99
99.44
9.97
(mm)
68.356
63.34
60.263
57.998
56.181
54.648
53.318
52.143
51.087
50.129
49.252
48.437
47.671
46.943
46.246
45.573
44.922
44.283
43.654
43.006
42.408
41.824
41.254
40.696
40.15
39.614
39.086
38.563
38.045
37.528
37.011
36.493
35.97
35.441
34.904
34.355
33.792
33.213
32.613
31.988
31.328
30.625
29.863
29.017
28.046
26.859
25.207
(Xe - Xo)
11.86
4.16
0.41
5.77
5.85
7.57
3.54
2.42
0.01
0.76
2.10
4.26
0.53
0.31
0.42
0.14
0.18
0.01
0.13
0.00
0.09
3.33
2.41
2.55
1.10
0.51
0.15
0.32
0.06
0.03
0.00
0.26
0.11
0.12
0.16
0.00
0.17
0.79
1.92
4.05
0.07
0.14
1.08
10.35
6.48
2.43
0.04
89.13
9.44
30
4.2
PUENTE DE CARRETERA
Sistema Secundario
Sistema Primario
10 - 50
50 - 100
ALCANTARILLAS DE
CARRETERA
5 10
10 - 25
50 - 100
R = 1 - (1 - 1/T)n
Donde:
R : Riesgo de falla
T : Periodo de retorno
n : Vida til de la estructura
El periodo de vida til de un puente o estructura hidrulica, en razn a sus activos fijos
de mayor vida til es de 20 aos o ms, por lo tanto asumiremos un riesgo de falla de
18.21% para 100 aos y de 33.23% para 50 aos.
31
4.3
4.3.1
PRECIPITACIN DE DISEO
Para el anlisis de frecuencia de la precipitacin mxima en 24 horas se ha empleado el
modelo HYFRAN Plus 2009, es un programa que permite calcular la precipitacin
mxima en 24 horas para diferentes perodos de retorno, utilizando los siguientes
mtodos estadsticos paramtricos: Normal, Log Normal II parmetros, Log Normal III
parmetros, Gumbel, Pearson tipo III y Log. Pearson Tipo III. Ver Cuadro 10 y 11.
Momentos
Momentos
Momentos
Momentos
Momentos
41.7674
my =
3.6999
my =
3.3135
36.6321
0.1437
64.5386
11.4105
sy =
0.2502
sy =
0.3738
8.8967
2.6891
51.3689
a=
12.2974
23.0558
0.8104
PARMETROS DE LA FUNCIN DE
DISTRIBUCIN
Max .Ver
DISTRIBUCION
NORMAL
FUNCIN DE DISTRIBUCIN
TR
(Aos)
XT (mm)
Probab.
YT
Max .Ver
Max .Ver
my =
3.6999
my =
2.9156
sy =
0.2502
sy =
0.5129
a=
20.716
DISTRIBUCION
LOG-NORMAL DE 2
DISTRIBUCION
LOG-NORMAL DE 3
PARAMETROS
PARAMETROS
XT (mm)
XT (mm)
Max .Ver
36.78220
8.04115
33
Max .Ver
0.1481
27.7231
2.6345
8.8279
23.9817
1.2884
DISTRIBUCION
GUMBEL
DISTRIBUCION
PEARSON TIPO III
DISTRIBUCION
LOG-PEARSON TIPO III
XT (mm)
XT (mm)
XT (mm)
Momentos y
Max.Ver
Momentos
Max.Ver
Momentos
Max.Ver
Momentos
Max.Ver
Momentos
Max.Ver
Momentos
Max.Ver
39.35
2.00
0.500
1.177
0.000
0.3665
41.77
40.44
40.44
39.78
39.18
39.89
39.73
39.50
39.57
39.92
5.00
0.200
1.794
0.841
1.4999
51.37
49.92
49.92
49.94
49.14
49.98
48.84
50.10
49.75
49.88
49.18
10.00
0.100
2.146
1.281
2.2504
56.39
55.73
55.73
56.67
56.34
56.65
54.88
57.06
56.45
56.43
56.18
20.00
0.050
2.448
1.645
2.9702
60.54
61.04
61.04
63.12
63.64
63.06
60.67
63.59
62.75
62.71
63.26
25.00
0.040
2.537
1.751
3.1985
61.75
62.68
62.68
65.18
66.04
65.09
62.50
65.63
64.72
64.71
65.59
50.00
0.020
2.797
2.054
3.9019
65.21
67.62
67.62
71.52
73.66
71.35
68.16
71.83
70.69
70.90
73.02
75.00
0.013
2.939
2.216
4.3108
67.06
70.43
70.43
75.23
78.27
74.98
71.45
75.36
74.10
74.53
77.53
100.00
0.010
3.035
2.326
4.6001
68.32
72.39
72.39
77.87
81.61
77.56
73.77
77.84
76.50
77.12
80.82
200.00
0.005
3.255
2.576
5.2958
71.16
77.05
77.05
84.28
89.92
83.75
79.37
83.73
82.18
83.44
89.06
500.00
0.002
3.526
2.878
6.2136
74.61
83.11
83.11
92.89
101.52
91.91
86.75
91.35
89.54
91.99
100.72
1000.00
0.001
3.717
3.090
6.9073
77.03
87.64
87.64
99.53
110.81
98.08
92.32
97.02
95.02
98.64
110.19
2000.00
0.001
3.899
3.290
7.6007
79.32
92.14
92.14
106.31
120.55
104.25
97.90
102.62
100.44
105.48
120.29
5000.00
0.000
4.127
3.540
8.5171
82.16
98.08
98.08
115.50
134.18
112.41
105.27
109.95
107.52
114.84
134.68
10000.00
0.000
4.292
3.718
9.2103
84.20
102.56
102.56
122.64
145.09
118.57
110.84
115.43
112.82
122.19
146.42
Momentos
Momentos
Momentos
Momentos
Momentos
42.1638
my =
3.7108
my =
3.9369
37.3550
0.3013
-122.4400
10.6849
sy =
0.2508
sy =
0.2021
8.3310
10.3658
178.8730
a=
-10.1555
7.7626
3.0723
PARMETROS DE LA FUNCIN DE
DISTRIBUCIN
Max .Ver
FUNCIN DE DISTRIBUCIN
TR
(Aos)
Probab.
YT
Max .Ver
Max .Ver
my =
3.7108
my =
3.6135
sy =
0.2508
sy =
0.2733
a=
3.665
DISTRIBUCION
NORMAL
DISTRIBUCION
DISTRIBUCION
LOG-NORMAL DE 2
LOG-NORMAL DE 3
PARAMETROS
PARAMETROS
XT (mm)
XT (mm)
XT (mm)
Max .Ver
37.12520
8.95718
34
Max .Ver
0.2244
774.6550
5.8000
6951.7900
16.3129
-7.3625
DISTRIBUCION
GUMBEL
DISTRIBUCION
PEARSON TIPO III
DISTRIBUCION
LOG-PEARSON TIPO III
XT (mm)
XT (mm)
XT (mm)
Momentos y
Max.Ver
Momentos
Max.Ver
Momentos
Max.Ver
Momentos
Max.Ver
Momentos
Max.Ver
Momentos
Max.Ver
2.00
0.500
1.177
0.000
0.3665
42.16
40.89
40.89
41.11
40.76
40.41
40.41
41.07
40.70
41.12
40.84
5.00
0.200
1.794
0.841
1.4999
51.16
50.49
50.49
50.61
50.35
49.85
50.56
50.69
50.50
50.58
50.35
10.00
0.100
2.146
1.281
2.2504
55.86
56.39
56.39
56.27
56.32
56.10
57.28
56.37
56.52
56.17
56.21
20.00
0.050
2.448
1.645
2.9702
59.74
61.77
61.77
61.33
61.83
62.10
63.73
61.42
61.97
61.14
61.57
25.00
0.040
2.537
1.751
3.1985
60.87
63.43
63.43
62.88
63.53
64.00
65.78
62.95
63.64
62.65
63.22
50.00
0.020
2.797
2.054
3.9019
64.11
68.44
68.44
67.49
68.71
69.86
72.08
67.48
68.64
67.13
68.23
75.00
0.013
2.939
2.216
4.3108
65.85
71.29
71.29
70.09
71.66
73.27
75.74
70.01
71.46
69.64
71.09
100.00
0.010
3.035
2.326
4.6001
67.03
73.28
73.28
71.89
73.74
75.68
78.33
71.76
73.42
71.38
73.09
200.00
0.005
3.255
2.576
5.2958
69.69
78.01
78.01
76.13
78.68
81.48
84.56
75.84
78.01
75.44
77.84
500.00
0.002
3.526
2.878
6.2136
72.92
84.16
84.16
81.57
85.14
89.12
92.78
81.00
83.88
80.58
84.03
1000.00
0.001
3.717
3.090
6.9073
75.19
88.75
88.75
85.59
90.00
94.90
99.00
84.76
88.20
84.34
88.67
2000.00
0.001
3.899
3.290
7.6007
77.33
93.32
93.32
89.54
94.86
100.68
105.21
88.43
92.42
88.00
93.29
5000.00
0.000
4.127
3.540
8.5171
79.99
99.35
99.35
94.70
101.30
108.31
113.41
93.14
97.89
92.71
99.40
10000.00
0.000
4.292
3.718
9.2103
81.90
103.90
103.90
98.56
106.19
114.09
119.62
96.62
101.96
96.20
104.03
35
Segn el Ajuste Mtodo del Error Cuadrtico Mnimo y de Kolmogorov Smirnov, la serie
de precipitacin mxima en 24 horas de las estacin Juli y Desaguadero, la que ms se
ajusta a la distribucin de probabilidades de la muestra (Weibull), es la Distribucin
Pearson tipo III Momentos y Gumbel Mxima Verosimilitud, respectivamente. Ver
Figura 17 y 18.
36
2
5
10
20
50
100
200
500
1000
2000
5000
10000
39.50
50.10
57.06
63.59
71.83
77.84
83.73
91.35
97.02
102.62
109.95
115.43
2
5
10
20
50
100
200
500
1000
2000
5000
10000
4.3.2
40.41
50.56
57.28
63.73
72.08
78.33
84.56
92.78
99.00
105.21
113.41
119.62
INTENSIDADES DE LLUVIA
La estacin de lluvia ubicada en la zona no cuenta con registros pluviograficos que
permitan obtener las intensidades mximas. Sin embargo estos pueden ser calculados a
partir de las lluvias mximas en base al modelo de Dick y Peschke. Este modelo permite
calcular la lluvia mxima en funcin de la precipitacin mxima en 24 horas, la
expresin es la siguiente:
& (.!)
= !"# %
'
1440
Donde:
= Precipitacin Total (mm)
d
= Duracin en minutos
!"# = Precipitacin mxima en 24 horas (mm).
La intensidad se halla dividiendo la precipitacin total entre la duracin, el
procedimiento.
Las curvas de intensidad-duracin-frecuencia, se han calculado indirectamente,
mediante la siguiente relacin:
I=
K Tm
tn
37
Donde:
I
= Intensidad mxima (mm/h)
K, m, n = Factores caractersticos de la zona de estudio
T
= Perodo de retorno en aos
t
= Duracin de la precipitacin equivalente al tiempo de concentracin (min)
Si se toman los logaritmos de la ecuacin anterior se obtiene:
Log (I) = Log (K) + m Log (T) -n Log (t)
O bien:
38
Y = a0 + a1 X1 + a2 X2
Donde:
Y = Log (p),
a0 = Log K
X1 = Log (T)
a1 = m
X2 = Log (t)
a2 = -n
Para E. Juli
a0 = Log K =2.484
entonces k = 304.806
I=
a1 = m = 0.272
304.806 T 0.272
t 0.750
a2 = -n =-(-0.75) = 0.750
Para E. Desaguadero
a0 = Log K =2.491 entonces k= 309.407
a1 = m = 0.263
a2 = -n =-(-0.75) = 0.750
309.407 T 0.263
I=
t 0.750
Duracion (t) en
minutos
5
10
15
20
30
40
50
60
70
80
90
100
110
120
10
20
170.72
101.51
74.89
60.36
44.53
35.89
30.36
26.48
23.59
21.34
19.54
18.05
16.81
15.74
206.21
122.61
90.46
72.91
53.79
43.35
36.67
31.98
28.49
25.78
23.60
21.80
20.30
19.02
50
264.69
157.38
116.12
93.58
69.04
55.64
47.07
41.05
36.57
33.09
30.29
27.99
26.06
24.41
100
319.71
190.10
140.25
113.04
83.40
67.21
56.85
49.59
44.17
39.96
36.59
33.81
31.47
29.48
500
495.70
294.74
217.46
175.25
129.30
104.21
88.15
76.88
68.49
61.96
56.72
52.41
48.80
45.71
10000
TR = 500
Aos
Frecuencia (aos)
1000
TR = 100
Aos
TR = 50
Aos
100
TR = 20
Aos
TR = 10
Aos
10
TR = 5
Aos
1
5
10
15
20
30
40 50 60 70
Duracin (min)
80
90
141.24
83.98
61.96
49.94
36.84
29.69
25.12
21.91
19.51
17.66
16.16
14.93
13.90
13.03
169.46
100.76
74.34
59.91
44.20
35.62
30.13
26.28
23.41
21.18
19.39
17.92
16.68
15.63
203.31
120.89
89.19
71.88
53.03
42.74
36.15
31.53
28.09
25.41
23.26
21.50
20.01
18.75
258.65
153.80
113.47
91.45
67.47
54.38
46.00
40.12
35.74
32.33
29.60
27.35
25.46
23.85
310.32
184.52
136.14
109.72
80.95
65.24
55.18
48.13
42.88
38.79
35.51
32.81
30.55
28.62
500
473.67
281.64
207.79
167.47
123.55
99.58
84.23
73.47
65.45
59.21
54.20
50.08
46.63
43.68
39
10000
TR = 500
Aos
Frecuencia (aos)
1000
TR = 100
Aos
TR = 50
Aos
100
TR = 20
Aos
TR = 10
Aos
10
TR = 5
Aos
1
5
10
15
20
30
40 50 60 70
Duracin (min)
80
90
4.4
40
4.5
FACTORES DE LA INFILTRACIN
La capacidad de infiltracin depende de muchos factores: tipo de suelo, contenido de
materia orgnica, contenido de humedad, cobertura vegetal y poca del ao.
De todas las caractersticas del suelo, que afectan la infiltracin, la porosidad es
probablemente la ms importante. La porosidad, define la capacidad de
almacenamiento y tambin influye en la resistencia al flujo. La infiltracin, tiende a
aumentar con el aumento de la porosidad.
El incremento del contenido de materia orgnica, tiende a incrementar la capacidad
de infiltracin, debido principalmente al aumento que produce en la porosidad.
La infiltracin, para un mismo tipo de suelo, es menor en un suelo hmedo que en un
suelo seco y, esta disminucin es ms notoria en los momentos iniciales.
El efecto de la cobertura vegetal, en la capacidad de infiltracin, es difcilmente
determinable, puesto que tambin influye en la intercepcin. La presencia de
vegetacin, incrementa la capacidad de infiltracin; esto lo podemos corroborar a
travs de una comparacin con un suelo desnudo. Esto obedece a que: retarda el flujo
de superficie, dando al agua ms tiempo para que penetre en el suelo; los sistemas de
races hacen al suelo ms permeable; el follaje protege al suelo de la erosin causada
por las gotas de agua y, disminuye la compactacin de la superficie del suelo.
4.6
41
4.6.1
42
D
F
Ia
Precipitacin
Efectiva
Figura 21: Variables del mtodo SCS para abstracciones.
La escorrenta se inicia cuando la precipitacin excede a
I a , asumindose que la
I a = 5.08 S mm.
La escorrenta directa en mm, est dada por la siguiente expresin:
Pei =
Donde:
(Pi 5.08 S )2
(Pi 20.32 S )
QPi =
0.208 Pei A
TP
Donde:
Q pi
Pe i
TP
43
100
90
80
70
60
50
40
44
30
20
10
0
0
10
12
14
16
18
20
22
24
TIEMPO EN HORAS
Figura 22: Perfiles de lluvia para 24 Horas - Programa del mtodo SCS
a). IMPLEMENTACIN
Al representar en grficas la informacin de P y Pe para muchas cuencas, el SCS
encontr curvas. Para estandarizar estas curvas, se define un nmero adimensional de
curva CN, tal que 0 CN 100 para superficies impermeables y superficies de agua CN
= 100; para superficies naturales CN<100.
El nmero de curva y S se relacionan mediante:
S=
1000
10
CN
Dnde:
S; est en pulgadas.
Un factor importante a tener en cuenta en estas curvas son las condiciones
antecedentes de humedad (Antecedent Moisture Conditions), las cuales se agrupan en
tres condiciones bsicas. Ver cuadro 16:
Cuadro 15. Condiciones antecedentes de humedad bsicas empleadas en el mtodo
SCS.
AMC (1)
Condiciones secas
AMC (II)
Condiciones normales
AMC (III)
Condiciones hmedas
Los nmeros de curva del cuadro 15, se aplican para condiciones con antecedentes de
humedad (AMC, por sus siglas en ingls) normales, y se establecen las siguientes
relaciones para las otras dos condiciones. Ver cuadro 16 y 17
Grupo Hidrolgico
Grupo
Hidrolgico
Grupo
Hidrolgico
Grupo
Hidrolgico
A
45
Cuadro 17: Curvas de Escorrenta para los complejos Suelo Cobertura (CN)
Pastos de Pastoreo
Leguminosas en
hileras estrechas o
forraje en rotacin *
Cultivos en hileras
estrechas
Uso de la
Tierra
Bosque
Pasto de
Corte
Cobertura
Tratamiento o
prctica
Grupo de Suelos
B
C
Nmero de Curva
86
91
Hileras rectas
Condicin
hidrolgica
-.-
77
Hileras rectas
Mala
71
91
88
91
Hileras rectas
Buena
67
78
85
89
C/curvas de nivel
Mala
70
94
79
84
88
C/curvas de
de nivel
nivel y Buena
C/curvas
terrazas
C/curvas de nivel y Mala
65
75
82
86
66
74
80
82
terrazas
Buena
62
71
78
81
Hileras rectas
Mala
65
76
84
86
Hileras rectas
Buena
63
75
83
87
Curvas de nivel
Mala
63
74
82
85
Curvas
Curvas de
de nivel
nivel y
terrazas
Curvas de nivel y
Buena
61
73
81
84
Mala
61
72
79
82
terrazas
Buena
59
70
78
81
Hileras rectas
Mala
66
77
85
89
Hileras rectas
Buena
58
72
81
85
Curvas de nivel
Mala
64
75
83
85
Curvas
Curvas de
de nivel
nivel y
terrazas
Curvas de nivel y
Buena
55
69
78
83
Mala
63
73
80
83
terrazas
Buena
51
67
76
80
Mala
68
79
86
89
Regular
49
69
79
84
Buena
39
31
74
80
Pastizales o
similares
Curvas de Nivel
Mala
78
37
81
88
Curvas de Nivel
Regular
25
59
75
83
Curvas de Nivel
Buena
35
70
79
Buena
30
59
71
78
Mala
Regular
Buena
-.-
45
36
25
59
66
60
55
74
77
73
70
82
83
79
77
86
-.-
72
82
87
89
-.-
74
84
90
92
Pradera
Bosque
Cortijos
Patios
Caminos
Tierra**
Pavimentos
**
4.6.2
46
+
TR
D
QP
47
TP
Tb
Figura 23: Hidrograma unitario triangular del Soil Conservation Service (SCS)
Donde:
TR
caudal pico(horas).
Duracin del incremento unitario de precipitacin efectiva(hrs).
TP
Tiempo pico(horas).
Tb
Tiempo base(horas).
QP
D = 0.40 TR
TP =
D
+ TR = 3 D
2
Tb = 2.67 TP
0.208 Pe A
QP =
TP
1.67
TR =
L0.8 (S + 1)
13.9 I 0.5
Donde:
A
L
I
S
Pe
=
=
=
=
=
S=
1000
10
CN
CN
4.7
48
Cota
Max.
(msnm)
sc-5
sc-6
0.039
0.09
3875.0 3835.1
3890.0 3836.7
40
53
473.7
471.9
0.084
0.113
0.10
0.09
0.13
0.12
0.18
0.16
0.48
0.43
0.04
0.12
76.00
76.00
63.59
63.59
17.70
17.70
0.71
1.49
03+785
03+820
sc-7
sc-8
0.047
0.068
3890.0 3841.9
3890.0 3841.4
48
49
483.0
570.6
0.100
0.085
0.09
0.11
0.12
0.15
0.17
0.20
0.45
0.53
0.06
0.07
76.00
76.00
63.59
63.59
17.70
17.70
1.06
1.24
5
6
04+180
06+500
sc-9
sc-17
0.076
0.06
3877.4 3836.4
3828.0 3820.9
41
7
531.0
415.8
0.077
0.017
0.11
0.16
0.14
0.20
0.20
0.28
0.53
0.75
0.08
0.05
76.00
76.00
63.59
63.59
17.70
17.70
1.42
4.73
7
8
06+542
06+614
sc-18
sc-19
0.06
0.02
3828.0 3820.9
3823.4 3820.0
7
3
415.8
313.0
0.017
0.011
0.16
0.15
0.20
0.19
0.28
0.27
0.75
0.72
0.05
0.02
76.00
76.00
63.59
63.59
17.70
17.70
4.73
4.20
9
10
07+460
09+140
sc-21
sc-23
0.20
0.087
3822.0 3820.0
3846.0 3822.0
2
24
955.0
327.0
0.002
0.073
0.70
0.08
0.68
0.11
1.03
0.15
2.75
0.40
0.04
0.12
76.00
76.00
63.59
63.59
17.70
17.70
0.71
1.49
11
12
13
09+438
09+660
15+555
sc-24
sc-25
sc-30
0.26
0.23
0.04
4020.0 3823.5
4020.0 3823.5
3859.4 3845.2
197
197
14
1,390.0
1,200.0
252.0
0.141
0.164
0.056
0.18
0.15
0.07
0.22
0.19
0.10
0.65
0.58
0.13
1.74
1.55
0.35
0.08
0.08
0.06
76.00
76.00
76.00
63.59
63.59
63.73
17.70
17.70
17.78
1.42
1.42
1.07
14
15
15+675
15+881
sc-31
sc-32
0.02
0.09
3860.0 3846.0
3893.9 3846.0
14
48
297.5
540.8
0.047
0.088
0.08
0.11
0.12
0.14
0.16
0.19
0.43
0.51
0.03
0.10
76.00
76.00
63.73
63.73
17.78
17.78
0.53
1.78
16
17
16+340
16+828
sc-33
sc-34
0.06
0.13
3908.6 3852.0
3955.9 3854.1
57
102
306.9
409.0
0.185
0.249
0.05
0.06
0.08
0.08
0.10
0.11
0.27
0.29
0.13
0.24
76.00
76.00
63.73
63.73
17.78
17.78
2.31
4.27
18
19
17+019
17+229
sc-35
sc-36
0.10
0.07
3995.1 3863.0
4007.9 3864.7
132
143
473.8
433.3
0.279
0.330
0.06
0.05
0.09
0.08
0.12
0.11
0.32
0.29
0.18
0.13
76.00
76.00
63.73
63.73
17.78
17.78
3.20
2.31
20
21
17+353
17+460
sc-37
sc-38
0.04
0.04
4007.9 3870.4
3989.7 3871.5
138
118
445.4
403.0
0.309
0.293
0.06
0.05
0.08
0.08
0.11
0.11
0.29
0.29
0.08
0.08
76.00
76.00
63.73
63.73
17.78
17.78
1.42
1.42
22
23
17+558
17+651
sc-39
sc-40
0.04
0.04
3989.0 3870.3
4013.3 3870.5
119
143
393.0
432.0
0.302
0.331
0.05
0.05
0.08
0.08
0.10
0.11
0.27
0.29
0.08
0.08
76.00
76.00
63.73
63.73
17.78
17.78
1.42
1.42
24
25
17+740
17+855
sc-41
sc-42
0.03
0.03
4017.5 3872.4
4017.5 3873.1
145
144
440.0
462.7
0.330
0.312
0.05
0.06
0.08
0.08
0.11
0.11
0.29
0.29
0.05
0.05
76.00
76.00
63.73
63.73
17.78
17.78
0.89
0.89
26
27
18+000
19+350
sc-43
sc-46
0.04
0.02
4016.9 3873.0
3902.4 3885.0
144
17
525.0
158.7
0.274
0.109
0.07
0.04
0.10
0.06
0.13
0.08
0.35
0.21
0.06
0.06
76.00
76.00
63.73
63.73
17.78
17.78
1.07
1.07
Ubicacin
Inicial
Nombre
1
2
03+270
03+600
3
4
Cota
Desnivel Longitud Pendiente Tiempo de Tiempo de Tiempo de Tiempo
Min.
del cauce
concentracin retraso
pico
base
(msnm)
H (m.)
L (m .)
S (m/m)
tc (horas)
tr (horas) tp (horas) tb (horas)
Caudal
Num ero de
Unitario qp
Curva (N)
(m 3/s/m m)
Precip. 24 h
Tr=20 aos
P (m m)
Lluvia
efectiva
Pe(mm)
Caudal
Mximo
(m3/s)
49
Cuadro 18: Caudal de diseo para reas menores (Caudal de Alcantarillas) - (Continuacin)
CALCULO POR EL METODO DEL HIDROGRAMA UNITARIO TRIANGULAR
Area
A (km2)
Cota
Max.
(msnm)
Cota
Desnivel Longitud Pendiente Tiem po de Tiempo de Tiempo de Tiempo
Min.
del cauce
concentracin retraso
pico
base
(msnm)
H (m.)
L (m.)
S (m/m)
tc (horas)
tr (horas) tp (horas) tb (horas)
sc-47
0.02
3912.5
3889.5
23
142.7
0.161
0.03
0.05
0.06
sc-48
0.10
3971.0
3894.6
76
488.9
0.156
0.08
0.11
0.15
19+960
20+396
sc-49
sc-50
0.16
0.11
4024.0
4072.2
3904.1
3923.6
120
149
506.3
527.2
0.237
0.282
0.07
0.07
0.10
0.09
32
20+659
sc-51
0.39
4149.0
3936.0
213
1,108.5
0.192
0.14
33
34
20+917
21+022
sc-52
sc-53
0.04
0.13
4133.0
4133.0
3957.5
3969.2
176
164
751.2
814.3
0.234
0.201
0.09
0.11
35
21+150
sc-54
0.12
4113.1
3971.4
142
795.8
0.178
0.11
0.14
0.20
0.53
0.13
76.00
63.73
17.78
2.31
36
21+556
sc-55
0.04
4032.0
4000.3
32
291.5
0.109
0.06
0.09
0.12
0.32
0.07
76.00
63.73
17.78
1.24
37
38
22+050
22+305
sc-56
sc-57
0.03
0.03
4017.0
4010.0
3979.8
3968.8
37
41
233.6
352.7
0.159
0.117
0.04
0.07
0.07
0.10
0.09
0.13
0.24
0.35
0.07
0.05
76.00
76.00
63.73
63.73
17.78
17.78
1.24
0.89
39
26+600
sc-66
0.03
3875.6
3869.0
334.4
0.020
0.13
0.17
0.23
0.61
0.03
76.00
63.73
17.78
0.53
40
41
26+706
27+425
sc-67
sc-69
0.07
0.10
3878.0
3887.7
3869.0
3870.0
9
18
641.5
500.0
0.014
0.035
0.24
0.14
0.28
0.18
0.40
0.25
1.07
0.67
0.04
0.08
76.00
76.00
63.73
63.73
17.78
17.78
0.71
1.42
42
27+960
sc-70
0.11
3912.2
3873.0
39
730.2
0.054
0.16
0.20
0.28
0.75
0.08
76.00
63.73
17.78
1.42
43
28+178
sc-71
0.05
3886.1
3870.1
16
300.0
0.053
0.08
0.11
0.15
0.40
0.08
76.00
63.73
17.78
1.42
44
45
28+465
28+701
sc-72
sc-73
0.05
0.02
3878.0
3875.0
3869.1
3869.2
9
6
254.6
237.0
0.035
0.024
0.08
0.09
0.12
0.13
0.16
0.17
0.43
0.45
0.06
0.03
76.00
76.00
63.73
63.73
17.78
17.78
1.07
0.53
46
29+308
sc-75
0.27
3933.9
3865.0
69
725.1
0.095
0.13
0.16
0.23
0.61
0.25
76.00
63.73
17.78
1.49
47
48
29+452
29+620
sc-76
sc-77
0.08
0.16
3919.2
3917.1
3862.6
3862.6
57
54
601.5
587.9
0.094
0.093
0.11
0.11
0.15
0.15
0.20
0.20
0.53
0.53
0.08
0.17
76.00
76.00
63.73
63.73
17.78
17.78
1.42
1.50
49
30+150
sc-78
0.07
3908.4
3866.4
42
491.7
0.085
0.10
0.13
0.18
0.48
0.08
76.00
63.73
17.78
1.42
50
30+439
sc-79
0.09
3907.5
3863.8
44
650.0
0.067
0.13
0.17
0.24
0.64
0.08
76.00
63.73
17.78
1.42
51
52
30+598
30+947
sc-80
sc-81
0.08
0.06
3888.4
3888.9
3863.8
3867.0
25
22
500.0
407.4
0.049
0.054
0.12
0.10
0.16
0.14
0.22
0.19
0.59
0.51
0.08
0.06
76.00
76.00
63.73
63.73
17.78
17.78
1.42
1.07
53
31+120
sc-82
0.04
3888.9
3861.4
28
357.0
0.077
0.08
0.11
0.15
0.40
0.06
76.00
63.73
17.78
1.07
54
55
32+731
32+851
sc-86
sc-87
0.10
0.08
3916.9
3909.6
3851.0
3851.0
66
59
802.6
657.4
0.082
0.089
0.15
0.12
0.18
0.16
0.26
0.22
0.69
0.59
0.08
0.08
76.00
76.00
63.73
63.73
17.78
17.78
1.42
1.42
56
33+008
sc-88
0.07
3878.1
3851.0
27
415.5
0.065
0.10
0.13
0.44
1.17
0.03
76.00
63.73
17.78
0.13
Ubicacin
Inicial
Nom bre
28
19+431
29
19+532
30
31
Caudal
Unitario qp
(m3/s/mm )
Numero de
Curva (N)
Precip. 24 h
Tr=20 aos
P (mm)
Lluvia
efectiva
Pe(m m)
Caudal
Mximo
(m3/s)
0.16
0.06
76.00
63.73
17.78
1.07
0.40
0.14
76.00
63.73
17.78
2.49
0.13
0.13
0.35
0.35
0.25
0.18
76.00
76.00
63.73
63.73
17.78
17.78
4.45
3.20
0.17
0.24
0.64
0.34
76.00
63.73
17.78
6.05
0.13
0.14
0.17
0.19
0.45
0.51
0.05
0.14
76.00
76.00
63.73
63.73
17.78
17.78
0.89
2.49
50
4.8
Cota
Max.
(msnm)
Cota
Desnivel Longitud Pendiente Tiempo de Abstraccin Tiempo de Tiempo Numero de
Min.
del cauce
concentracin
inicial
pico
base
Curva (N)
(msnm) H (m.)
L (km.)
S (%)
tc (horas)
(mm)
tp (horas) tb (horas)
Precip. 24 h
Tr=20 aos
P (mm)
Duracin
Lluvia
(horas)
Caudal
Mximo
(m3/s)
Ubicacin
Inicial
Nombre
00+000
sc-1
2
3
00+184
00+370
sc-2
sc-3
00+580
sc-4
04+856
sc-10
05+113
8.88
4164.9
3820.0
345
9.00
3.83
1.26
12.70
1.74
4.65
76.00
63.59
0.69
05+403
sc-11
sc-12
0.14
3868.8
3820.0
49
0.73
6.68
0.15
12.70
0.26
0.69
80.00
63.59
0.16
10.30
0.62
3883.8
3820.0
64
1.50
4.24
0.31
12.70
0.47
1.25
80.00
63.59
0.16
10.90
6.53
A (km2)
2.93
15.44
4179.0
3817.0
362
7.1
5.11
0.94
12.70
1.48
3.96
80.00
63.59
0.49
2.93
7.35
1.49
9.38
9.38
8
9
05+671
06+061
sc-13
10
11
06+160
06+210
sc-15
sc-16
76.50
4532.9
3820.0
713
21.85
3.26
2.66
12.70
4.57
12.20
80.00
63.59
1.52
6.53
6.53
12
06+690
sc-20
4.88
4120.6
3820.0
301
5.87
5.12
0.81
12.70
1.27
3.40
80.00
63.59
0.42
5.00
13
14
08+050
10+290
sc-22
sc-26
1.75
5.77
4045.0
4356.8
3820.0
3825.0
225
532
2.26
4.04
9.96
13.18
0.30
0.42
12.70
12.70
0.43
0.59
1.14
1.57
80.00
80.00
63.59
63.59
0.14
0.20
3.30
4.65
15
13+620
sc-27
0.89
3964.7
3834.1
131
1.92
6.81
0.31
12.70
0.45
1.21
80.00
63.59
0.15
1.49
16
17
14+117
14+265
sc-28
2.77
5.78
4273.2
4378.0
3839.0
3845.0
434
533
3.88
2.30
11.20
23.18
0.44
0.22
12.70
12.70
0.62
0.28
1.65
0.76
80.00
80.00
63.59
63.59
0.21
0.09
4.20
13.10
18
18+304
0.41
19
19+035
sc-45
3.52
4381.9
3885.0
497
2.69
18.48
0.27
12.70
0.36
0.96
80.00
63.66
0.12
7.10
20
21
22+532
22+830
sc-58
sc-59
1.29
5.65
4291.1
4532.9
3953.0
3943.0
338
590
2.72
5.56
12.45
10.62
0.32
0.59
12.70
12.70
0.44
0.85
1.18
2.26
80.00
80.00
63.73
63.66
0.15
0.28
2.40
7.40
22
23+299
sc-60
0.31
4054.2
3938.2
116
1.42
8.15
0.23
12.70
0.32
0.87
80.00
63.73
0.10
0.70
23
24
23+567
24+192
sc-61
5.00
0.43
4530.3
4089.1
3925.1
3897.0
605
192
4.82
1.12
12.54
17.11
0.50
0.14
12.70
12.70
0.70
0.23
1.86
0.61
80.00
80.00
63.73
63.73
0.23
0.08
7.30
0.75
25
25+707
0.91
4070.0
3878.0
192
1.85
10.37
0.26
12.70
0.36
0.95
80.00
63.73
0.12
1.49
sc-14
sc-29
sc-44
sc-62
sc-63
52
Cuadro 19: Caudal de diseo para reas mayores (Caudal de Alcantarillas) - (Continuacin)
Ubicacin
Inicial
Nombre
A (km2)
Cota
Max.
(msnm)
Cota
Desnivel Longitud Pendiente Tiempo de Abstraccin Tiempo de Tiempo Numero de
Min.
del cauce
concentracin
inicial
pico
base
Curva (N)
(msnm)
H (m.)
L (km.)
S (%)
tc (horas)
(mm)
tp (horas) tb (horas)
Precip. 24 h
Tr=20 aos
P (mm)
Duracin
Lluvia
(horas)
Caudal
Mximo
(m3/s)
26
26+146
sc-64
2.15
4201.7 3870.0
332
3.63
9.14
0.45
12.70
0.65
1.73
80.00
63.73
0.22
3.30
27
28
26+473
27+061
sc-65
5.76
1.88
4507.4 3869.9
4109.0 3871.0
637
238
4.61
2.58
13.83
9.21
0.46
0.35
12.70
12.70
0.64
0.49
1.71
1.31
80.00
80.00
63.73
63.73
0.21
0.16
8.90
3.30
29
30
28+828
31+485
2.15
4225.0 3866.0
359
3.78
9.49
0.46
12.70
0.66
1.76
80.00
63.73
0.22
sc-83
31
31+687
sc-84
8.80
4454.5 3850.0
605
6.04
10.02
0.64
12.70
0.93
2.49
80.00
63.73
0.31
3.30
7.90
32
32+475
sc-85
0.30
3917.0 3851.0
66
0.94
7.02
0.18
12.70
0.25
0.67
80.00
63.73
0.08
0.70
33
33+437
sc-89
1.10
4160.0 3853.0
307
2.90
10.58
0.36
12.70
0.50
1.35
80.00
63.73
0.10
1.90
sc-68
sc-74
1.49
53
80
2.50
12.70
CUENCA TANANA
Area de la Subcuenca (km2)
Longitud del cauce principal L(m)
Cota mayor (msnm)
Cota menor (msnm)
Desnivel del cauce principal H(m)
Prog. 2+462
63.20
18,986.64
4671.97
3831.00
840.97
PARMETROS
Longitud del cauce principal L(m)
Desnivel del cauce principal H(m)
Pendiente del cauce principal (%)
K
Curva nmero CN
S
Perdida inicial Ia (mm)
Porcentaje impermeable
Tiempo de concentracin Tc (min)
Tiempo de concentracin Tc (hr)
SCS Lag (hr)
SCS Lag (min)
Prog. 2+462
18,986.64
840.97
4.43
90,215.73
80.00
2.50
12.70
0.00
127.53
2.13
1.28
76.52
54
80
2.50
12.70
55
CUENCA COLLINI
Area de la Subcuenca (km2)
Longitud del cauce principal L(m)
Cota mayor (msnm)
Cota menor (msnm)
Desnivel del cauce principal H(m)
Prog. 5+863
76.39
21,845.61
4532.90
3820.00
712.90
PARMETROS
Longitud del cauce principal L(m)
Desnivel del cauce principal H(m)
Pendiente del cauce principal (%)
K
Curva nmero CN
S
Perdida inicial Ia (mm)
Porcentaje impermeable
Tiempo de concentracin Tc (min)
Tiempo de concentracin Tc (hr)
SCS Lag (hr)
SCS Lag (min)
Prog. 5+863
21,845.61
712.90
3.26
120,929.83
80.00
2.50
12.70
0.00
159.80
2.66
1.60
95.88
80
2.50
12.70
56
CUENCA HUAPACA
Area de la Subcuenca (km2)
Longitud del cauce principal L(m)
Cota mayor (msnm)
Cota menor (msnm)
Desnivel del cauce principal H(m)
Prog. 18+113
22.62
8,232.61
4456.02
3873.00
583.02
PARMETROS
Longitud del cauce principal L(m)
Desnivel del cauce principal H(m)
Pendiente del cauce principal (%)
K
Curva nmero CN
S
Perdida inicial Ia (mm)
Porcentaje impermeable
Tiempo de concentracin Tc (min)
Tiempo de concentracin Tc (hr)
SCS Lag (hr)
SCS Lag (min)
Prog. 18+113
8,232.61
583.02
7.08
30,936.05
80.00
2.50
12.70
0.00
55.94
0.93
0.56
33.56
80
2.50
12.70
57
CUENCA TARAPOTO
Area de la Subcuenca (km2)
Longitud del cauce principal L(m)
Cota mayor (msnm)
Cota menor (msnm)
Desnivel del cauce principal H(m)
Prog. 18+699
16.75
7,552.86
4456.06
3882.00
574.06
PARMETROS
Longitud del cauce principal L(m)
Desnivel del cauce principal H(m)
Pendiente del cauce principal (%)
K
Curva nmero CN
S
Perdida inicial Ia (mm)
Porcentaje impermeable
Tiempo de concentracin Tc (min)
Tiempo de concentracin Tc (hr)
SCS Lag (hr)
SCS Lag (min)
Prog. 18+699
7,552.86
574.06
7.60
27,396.17
80.00
2.50
12.70
0.00
50.94
0.85
0.51
30.56
80
2.50
12.70
58
CUENCA COLLPAUYO
Area de la Subcuenca (km2)
Longitud del cauce principal L(m)
Cota mayor (msnm)
Cota menor (msnm)
Desnivel del cauce principal H(m)
Prog. 18+950
3.03
3,975.35
4456.04
3885.00
571.04
PARMETROS
Longitud del cauce principal L(m)
Desnivel del cauce principal H(m)
Pendiente del cauce principal (%)
K
Curva nmero CN
S
Perdida inicial Ia (mm)
Porcentaje impermeable
Tiempo de concentracin Tc (min)
Tiempo de concentracin Tc (hr)
SCS Lag (hr)
SCS Lag (min)
Prog. 18+950
3,975.35
571.04
14.36
10,488.92
80.00
2.50
12.70
0.00
24.32
0.41
0.24
14.59
Con los parmetros considerados se calcula las mximas avenidas de diseo para
diferentes perodos de retorno.
A continuacin se muestran los resultados de caudales mximos instantneos para el
diseo del puente del ro Tanana, para el perodo de retorno de 50 aos. Ver Cuadro
24, 25 y 26
59
60
61
62
A continuacin se tiene el resumen de las mximas avenidas de diseo. Ver cuadro 23.
MEJORAMIENTO DE LA CARRETERA (PU 675)
2
5
10
20
25
50
100
200
1000
4.9
Cuenca Tanana
Prog. 2+462
Prog. 5+863
Prog. 18+113
Prog. 18+699
Prog. 18+950
11.50
21.10
29.20
36.70
39.00
46.90
56.70
64.30
84.60
12.70
22.60
30.20
39.20
42.00
49.40
56.90
65.60
87.60
5.80
11.90
16.90
22.10
23.60
29.00
34.30
39.60
52.50
4.50
9.40
13.30
17.30
18.60
22.70
27.00
31.40
41.20
1.20
2.70
3.80
4.90
5.40
6.60
7.80
9.10
11.70
Cuadro N 30: Caudal de Diseo para cunetas Prog. 0+000 hasta 33+672
(Tr = 20 aos)
Longitud de la
Cuneta (km)
0.150
0.200
0.250
0.300
q (l/s/m)
Q (m/s)
2.914
2.914
2.914
2.914
0.44
0.58
0.73
0.87
En conclusin se podr disear una cuneta que soporte un caudal de 0.87 m3/s para el
tramo ms largo. Con los valores del cuadro 24., el diseador podr dar las pendientes
requeridas de acuerdo a la longitud del tramo a drenar.
63
En regin seca o poco lluviosa la longitud de las cunetas ser de 250 m. como mximo.
Las longitudes de recorridos mayores debern justificarse tcnicamente. En regin muy
lluviosa se recomienda reducir esta longitud mxima a 200 m., que corresponde a un
caudal de diseo de 0.58 m3/s.
Cuadro N 31: Norma de diseo de Cunetas segn regin
Profudidad Ancho
Regin
(m)
(m)
Seca
0.2
0.5
Lluviosa
0.3
0.75
Muy Lluviosa
0.3*
1.2
La mayor parte de las cunetas sern triangulares, con talud interior de 2:1 y exterior
Variable 1:1, de 0.88 m. de ancho y 0.4 m. de altura (medida a partir del nivel de la
rasante) y revestidas en toda su longitud.
En el plano de planta de cunetas, se detallan los tramos de va en que se construirn
cunetas laterales, as tambin, se muestran las progresivas entre las que se construir
cada tipo de cuneta y en el plano de seccin tpica se muestra sus caractersticas.
64
ESTUDIO DE HIDRULICA
5.
CALCULOS HIDRAULICOS
65
El diseo de puentes y/o pontones sobre un cruce de agua demanda que se tomen en
cuenta las caractersticas del flujo que pasa por de debajo de este, de modo de
establecer los parmetros hidrulicos para el dimensionamiento de la estructura.
Conociendo el caudal de diseo se deben determinar las caractersticas hidrulicas del
flujo a su paso a travs de la seccin de cruce y de algunas secciones aguas arriba y
aguas abajo de este cruce. Para ello se ha realizado el uso del programa de cmputo
Hec - Ras versin 3.1.3 River Anlisis System de la U.S. Army Corps of Engeneers y el uso
de frmulas planteadas por investigadores tales como, Froehlich, Laursen, LischtvanLebediev, Blench, Lacey, etc. para la determinacin de la socavacin en el lecho del
rio, el cual permite determinar el perfil de flujo en un tramo dado ante el paso de cierto
caudal, proporcionando adems datos de velocidad, rgimen de flujo, rea, ancho
superficial, dems caractersticas hidrulicas de inters.
5.1
NOMBRE DEL
CURSO PRINCIPAL
Rio Tanana
Rio Collini
Rio Huapaca
Rio Tarapoto
Rio Collpauyo
PROG.
(Km)
2+462
5+863
18+113
18+699
18+950
REA
(Km2)
LONGITUD CURSO
PRINCIPAL
(Km)
CAUDAL
(DIMENSIONAMIENTO
PUENTE)
TR = 50 aos
Q (m3/s)
CAUDAL
(DISEO DE CIMENTACIN)
TR = 100 aos
Q (m3/s)
63.20
76.39
22.62
16.75
3.03
18.986
21.845
8.232
7.552
3.975
46.90
49.40
29.00
22.70
6.60
56.70
56.90
34.30
27.00
7.80
5.2
Rio
Progresiva
Rio Tanana
Rio Collini
Rio Huapaca
Rio Tarapoto
Rio Collpauyo
2.65
(2)
CAUDAL promedioD84
(1)
(Levant.
Topografico)
2+462
5+863
18+113
18+699
18+950
T=2-5 aos
(m3/s)
11.5
12.7
5.8
4.5
1.2
w
(3)
1
(4)
(5)
S
m/m
0.004
0.003
0.01
0.008
0.008
0.025
0.023
0.043
0.042
0.022
0.034
0.028
0.028
0.028
0.028
1.65
(6)
(7)
(S/D)^5/3
(1/D84)^5/3
Q*n/S^0.5
6.182
6.492
1.624
1.409
0.376
4.37E-05
2.71E-05
2.01E-04
1.39E-04
1.39E-04
467.843
537.593
189.475
197.054
578.934
(8)
66
(9)
Bcalculado Basumido
(5)*(6)*(7)
20.67
15.44
10.13
6.30
4.93
20
6
6
6
6
Rio
Rio
Rio
Rio
Rio
Rio
Tanana
Collini
Huapaca
Tarapoto
Collpauyo
s
(1)
Progresiva
CAUDAL pico
T=50-100 aos
(Levant.
(m3/s)
Topografico)
2+462
46.9
5+863
49.4
18+113
29
18+699
22.7
18+950
6.6
2.65
(2)
D50
w
(3)
S
1
(4)
n
m/m
0.004
0.003
0.01
0.008
0.008
12
4
5
5
5
0.034
0.028
0.028
0.028
0.028
(5)
Fbo
1.65
(6)
Fb
(7)
Fs
(D50^(1/3)) Fbo(1+0.12C)
2.289
2.303
1.587
1.597
1.710
1.720
1.710
1.720
1.710
1.720
0.100
0.100
0.100
1.100
2.100
(8)
(9)
Bcalculado Basumido
(5)*(6)*(7)
59.49
50.84
40.43
10.78
4.21
25
6
6
6
6
Rio
Rio Tanana
Rio Collini
Rio Huapaca
Rio Tarapoto
Rio Collpauyo
5.3
s
(1)
Progresiva
CAUDAL pico
T=50-100 aos
(Levant.
(m3/s)
Topografico)
46.9
2+462
5+863
49.4
18+113
29
18+699
22.7
18+950
6.6
2.65
(2)
D50
12
4
5
5
5
w
(3)
S
m/m
0.004
0.003
0.01
0.008
0.008
1
(4)
n
0.034
0.028
0.028
0.028
0.028
(5)
K1
2.900
2.900
2.900
2.900
2.900
1.65
(6)
(7)
Bcalculado
Basumido
K1*(Q)^1/2
19.86
20.38
15.62
13.82
7.45
20
6
6
6
6
5.3.1
.04
3832
01/05/2014
.035
.04
Legend
WS TR=100 Aos
WS TR=50 Aos
Crit TR=100 Aos
3831
Elevation (m)
Ground
Bank Sta
3830
67
NAME = m
3829
3828
3827
10
20
30
40
50
60
Station (m)
01/05/2014
3832
Legend
WS TR=100 Aos
WS TR=50 Aos
3831
Elevation (m)
3830
3829
3828
3827
3826
20
40
60
80
100
120
140
160
01/05/2014
Legend
WS TR=50 Aos
160
WS TR=100 Aos
150
Ground
140.0001
Bank Sta
130
120
110
90
80
105 70.00003
95
60
50
40
30
20
10
0
BORDE
LIBRE
N
NOMBRE
MNIMO
(m)
(m)
2+462
01 Rio Tanana
20.0
1.46
3827.25
1.20
5+863
02 Rio Collini
6.0
1.35
0.70
18+113
03 Rio Huapaca
6.0
1.13
0.70
18+699
04 Rio Tarapoto
6.0
1.05
0.70
18+950
05 Rio Collpauyo
6.0
.52
0.70
(*) ngulo aproximado entre la direccin de flujo a la salida de la estructura y el alineamiento
de la carretera en sentido ascendente de la progresiva, segn planos topogrficos.
PROG.
(Km.)
5.4
TIRANTE
MXIMO
(m)
COTA
CAUCE
(mnsm)
COTA NIVEL
MXIMO
AGUA
(msnm)
3828.71
5.4.1
68
=
Donde:
Hs
Ho
Dm
B
Hm
Q
e
Q
H
5/3
m
Para proceder con los clculos de la socavacin general se debern utilizar las
siguientes frmulas, donde la profundidad est medida desde la superficie del agua:
Para suelos no- cohesivos
Hs = (
H 0 5 3
0.68 Dm0.28
1
1+ x
H 05 3 1+ x
Hs = (
)
0.68 m0.28
Donde Hs= profundidad del flujo incluyendo la socavacin.
69
70
Progresiva
CAUDAL
(Levant.
Topografico)
T=100 aos
Tanana
2+462
(m3/s)
56.70
Ho
Hm
HEC-RAS HEC-RAS
(m)
20
(m2)
34.33
dm
1/(X+1)
Hs
(Hs-Ho) (Hs-Ho)
A/B
(m)
1.47
(m)
1.7165
(mm)
1.15
(m)
3
(calculado) (asumido)
1.02
0.735
1.86
0.39
1.00
Donde:
Qd = caudal de diseo
71
y2 Qt
=
y1 Qc
6/7
W1
W2
n2
n1
72
(26)
y s = y2 y1
(27)
Donde
y1
y2
W1
W2
Qt
Qc
n2
n1
A, B
TRANSPORTE DE SEDIMENTO
< 0.5
1.0
0.25
1.00
0.59
0.64
0.066
0.21
> 2.0
2.25
0.69
0.37
Donde:
V*
w
e
En este caso se presenta la salida del programa HEC-RAS que utiliza esta ecuacin por
defecto. Para cada una de las estructuras, como sigue:
Puente : Tanana
Cuadro N 42: Socavacin por contraccin (Contraction Scour) - Tr = 200 aos
MTODO N 02: LAURSEN
Margen
Cauce
Margen
Izquierda
Principal
Derecha
Input Data
0.69
2.62
0.74
46.90
20.00
3.00
46.90
26.63
0.64
3.00
Results
1.30
5.4.2
Clear
a'
ys
= 2.27 K1K 2
y1
y1
0.43
Fr 0.61 + 1.0
Donde:
K1
K2
a
Fr
y1
ys
En este caso se presenta el resultado que arroja el programa HEC-RAS, para cada uno de
los puentes y pontn mencionados.
Cuadro N 43: Socavacin local en los estribos (ABUTMENT SCOUR) - Tr = 100 aos
Puente : Tanana
MTODO N 02: FROEHLICH
Izquierdo
Derecho
Datos
Estacion al pie (m):
18.00
38.00
Toe Sta at appr (m):
2.18
56.97
Abutment Length (m):
0.97
1.34
Depth at Toe (m)
0.90
0.97
Coef.de forma K1::
1.00
Estribo Vertical
Angulo de Esviaje (grados):
90
90
Coef. de Esviaje K2:
1.00
1.00
MEJORAMIENTO DE LA CARRETERA (PU 675)
73
1.34
0.74
2.37
1.00
Resultados
2.48
2.36
0.88
Froehlich
2.74
2.37
0.88
Froehlich
Segn los clculos efectuados, se obtiene como socavacin local una profundidad de
2.48m y 2.74m por debajo del cauce para los dos estribos, izquierdo y derecho
respectivamente.
b) Mtodo de Liu
Con el propsito de verificar los resultados obtenidos con la metodologa de Froehlich, se ha
hecho uso del mtodo de Liu para socavacin local en estribos, la cual se basa en la
siguiente ecuacin.
La '
ys
= K
y1
y1
0.40
Fr 0.33
Donde:
K : Constante que depende de la forma de los estribos.
K : 1.10, si los estribos estn protegidos por un terrapln que rodea al estribo con
una forma circular en planta.
K : 2.15, si los estribos son verticales.
La
: Longitud del estribo proyectado en direccin normal al flujo (m).
Fr
: Nmero de Froude aguas arriba del estribo.
y1
: Tirante en el estribo (m).
ys
: Profundidad de socavacin (m).
74
CLCULOS HIDRAULICOS
K
y1
La'
Fr
PROFUNDIDAD DE SOCAVACIN ys
5.4.3
:
:
:
:
2.15
1.47
1.85
0.50
m
m
2.76
yT = y g + ys
Donde:
yT: Socavacin potencial total (m).
yg: Socavacin general (m).
ys: Socavacin local (m).
75
Legend
WS TR=50 Aos
Ground
3830
Bank Sta
Contr Scour
Elevation (m)
Total Scour
3828
76
3826
3824
3822
10
20
30
40
50
60
Station (m)
N
1
6.
NOMBRE
Tanana
(Km.)
LUZ
MNIMA
RECOMENDADA
2+462
20.00
PROG.
TIRANTE
(m)
(m)
1.47
SOCAVACION
ESTRIBOS (m)
Izquierda Derech
a
3.76
3.76
SOCAVACI
ON
PILARES
(m)
-
6.1
CUNETAS
En la va actual Pomata - Yorohoco, se han encontrado cunetas que captan y drenan las
aguas pluviales de la va, por lo general son zanjas de tierra.
Se plantea la construccin de cunetas para el drenaje en longitudes de va donde se
ingresa en corte y no se eleva la rasante. En los tramos que se eleva la rasante el drenaje
lo efectuarn las zanjas laterales.
6.1.1
La de mayor dimensin ser la cuneta que tenga el talud hacia la ladera de 1:2
(horizontal: vertical) y hacia la va de 2:1 (horizontal: vertical), el ancho mayor de la
cunetas ser aproximadamente de 1.0 m y su tirante ser de 0.5 m.
Cuadro 46: Secciones de las Cunetas Vial Pomata - Yorohoco
Seccin
Triangular
0.88
Tipo/Uso
Vial
1
(2)(.)
Donde:
NF, es el nmero de Froude
V, es la velocidad en m/s
G, es la aceleracin de la gravedad, en m/s2
h, es el tirante hidrulico en m, (rea / ancho mximo)
6.2
Siendo:
He
: La profundidad de la carga en el control de entrada
D
: El dimetro interno de la tubera. Q, caudal
A
: Es el rea llena de la tubera
K y M : Constantes, que dependen del tipo de alcantarilla y la forma de los aletones de
entrada. La FHWA3 elabor valores para estas constantes.
77
79
80
00+580
03+270
03+600
03+785
03+820
04+180
07+460
09+140
09+438
09+660
13+620
16+340
17+229
17+353
17+460
17+558
17+651
17+740
17+855
18+000
19+350
19+431
19+532
20+917
21+022
21+150
21+556
22+050
22+305
23+299
24+192
25+707
26+600
26+706
27+425
27+960
28+178
28+465
28+701
29+308
29+452
29+620
30+150
30+439
30+598
30+947
31+120
31+687
32+475
32+731
32+851
33+008
Nombre
sc-4
sc-5
sc-6
sc-7
sc-8
sc-9
sc-21
sc-23
sc-24
sc-25
sc-27
sc-33
sc-36
sc-37
sc-38
sc-39
sc-40
sc-41
sc-42
sc-43
sc-46
sc-47
sc-48
sc-52
sc-53
sc-54
sc-55
sc-56
sc-57
sc-60
sc-62
sc-63
sc-66
sc-67
sc-69
sc-70
sc-71
sc-72
sc-73
sc-75
sc-76
sc-77
sc-78
sc-79
sc-80
sc-81
sc-82
sc-84
sc-85
sc-86
sc-87
sc-88
Caudal
Mximo
(m3/s)
Carga
sobre la
corona (H)
Diametro
(D)
(")
1.49
0.71
1.49
1.06
1.24
1.42
0.71
1.49
1.42
1.42
1.55
2.31
2.31
1.42
1.42
1.42
1.42
0.89
0.89
1.07
1.07
1.07
2.49
0.89
2.49
2.31
1.24
1.24
0.89
0.70
0.80
1.55
0.53
0.71
1.42
1.42
1.42
1.07
0.53
1.49
1.42
1.49
1.42
1.42
1.42
1.07
1.07
1.49
0.70
1.42
1.42
0.13
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
36
36
36
36
36
36
36
36
36
36
36
48
48
36
36
36
36
36
36
36
36
36
48
36
48
48
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
48
36
Diametro
Nro
(D)
(m)
Ojos/Vanos
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
1.22
1.22
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
1.22
0.91
1.22
1.22
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
1.22
0.91
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
He
He/D
(m)
(m)
m3/s
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.67
1.67
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.67
1.36
1.67
1.67
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.67
1.36
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.37
1.37
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.37
1.49
1.37
1.37
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.37
1.49
1.55
1.50
1.55
1.50
1.55
1.55
1.55
1.55
1.55
1.55
1.55
3.00
3.00
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
3.00
1.55
3.00
3.00
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
1.55
Evaluacin
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
81
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Ubicacin
Inicial
Nombre
00+000
00+184
00+370
04+856
05+113
05+403
05+671
06+061
06+160
06+210
06+500
06+542
06+614
06+690
08+050
10+290
14+117
14+265
15+555
15+675
15+881
16+828
17+019
18+304
19+035
19+960
20+396
20+659
22+532
22+830
23+567
26+146
26+473
27+061
28+828
31+485
33+437
sc-1
sc-2
sc-3
sc-10
sc-11
sc-12
sc-13
sc-14
sc-15
sc-16
sc-17
sc-18
sc-19
sc-20
sc-22
sc-26
sc-28
sc-29
sc-30
sc-31
sc-32
sc-34
sc-35
sc-44
sc-45
sc-49
sc-50
sc-51
sc-58
sc-59
sc-61
sc-64
sc-65
sc-68
sc-74
sc-83
sc-89
Carga
sobre la
corona (H)
(m3/s/mt)
(m)
Caudal
1.95
1.95
4.90
6.25
6.25
6.87
7.27
4.36
4.36
4.36
2.37
2.37
2.10
3.33
2.20
2.33
2.80
8.73
1.07
0.53
1.78
2.14
2.13
0.41
3.55
2.23
2.13
4.03
1.60
4.93
3.65
2.20
3.90
2.20
2.20
3.95
1.27
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
Nro
He
He/D
(m)
(m)
Ojos/Vanos
(m)
(m)
(m3/s/mt)
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
2
2
2
1.5
1.5
2
1.5
1.5
1
1
1
2
1.5
1
2
2
1.5
1.5
1.5
1.5
2
1.5
1.5
1.5
1.5
2
1.5
1.00
1.00
1.00
1.50
1.50
1.50
1.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.70
1.70
0.80
0.80
0.80
1.00
1.00
0.80
1.50
1.00
1.00
1.00
1.50
1.50
1.50
1.00
1.50
1.00
1.00
1.50
1.50
1
1
2
2
2
2
2
2
2
2
1
1
1
2
1
1
2
2
1
1
1
1
1
1
1
1
1
2
1
2
1
1
1
1
1
1
1
1.45
1.45
1.45
1.95
1.95
1.95
1.95
1.45
1.45
1.45
1.45
1.45
1.45
1.45
1.45
1.45
2.15
2.15
1.25
1.25
1.25
1.45
1.45
1.25
1.95
1.45
1.45
1.45
1.95
1.95
1.95
1.45
1.95
1.45
1.45
1.95
1.95
1.45
1.45
1.45
1.30
1.30
1.30
1.30
1.45
1.45
1.45
1.45
1.45
1.45
1.45
1.45
1.45
1.26
1.26
1.56
1.56
1.56
1.45
1.45
1.56
1.30
1.45
1.45
1.45
1.30
1.30
1.30
1.45
1.30
1.45
1.45
1.30
1.30
2.50
2.50
5.00
8.00
8.00
8.00
8.00
5.00
5.00
5.00
2.50
2.50
2.50
5.00
2.50
2.50
9.40
9.40
1.90
1.90
1.90
2.50
2.50
2.50
4.00
2.50
2.50
5.00
4.00
8.00
4.00
2.50
4.00
2.50
2.50
4.00
4.00
Evaluacin
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
OK!
82
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
Cuenca
sc-4
sc-5
sc-6
sc-7
sc-8
sc-9
sc-21
sc-23
sc-24
sc-25
sc-27
sc-33
sc-36
sc-37
sc-38
sc-39
sc-40
sc-41
sc-42
sc-43
sc-46
sc-47
sc-48
sc-52
sc-53
sc-54
sc-55
sc-56
sc-57
sc-60
sc-62
sc-63
sc-66
sc-67
sc-69
sc-70
sc-71
sc-72
sc-73
sc-75
sc-76
sc-77
sc-78
sc-79
Caudal Total
No.
Caudal Unit
Diametro
Nro
Diametro
Tirante
B.L.
Are a
Permetro
Radio Hid.
Velocidad
(m3/s)
Alcant
m3/s
(-)
(%)
(")
Ojos/Vanos
(m)
(m)
(")
(o)
(m2)
(m)
(m)
(m/s)
1.49
0.71
1.49
1.06
1.24
1.42
0.71
1.49
1.42
1.42
1.49
2.31
2.31
1.42
1.42
1.42
1.42
0.89
0.89
1.07
1.07
1.07
2.49
0.89
2.49
2.31
1.24
1.24
0.89
0.70
0.80
1.49
0.53
0.71
1.42
1.42
1.42
1.07
0.53
1.49
1.42
1.49
1.42
1.42
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1.49
0.71
1.49
1.06
1.24
1.42
0.71
1.49
1.42
1.42
1.49
2.31
2.31
1.42
1.42
1.42
1.42
0.89
0.89
1.07
1.07
1.07
2.49
0.89
2.49
2.31
1.24
1.24
0.89
0.70
0.80
1.49
0.53
0.71
1.42
1.42
1.42
1.07
0.53
1.49
1.42
1.49
1.42
1.42
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
36
36
36
36
36
36
36
36
36
36
36
48
48
36
36
36
36
36
36
36
36
36
48
36
48
48
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
1.2192
1.2192
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
1.2192
0.9144
1.2192
1.2192
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.84
0.46
0.8
0.60
0.67
0.77
0.46
0.84
0.77
0.77
0.84
0.80
0.80
0.77
0.77
0.77
0.77
0.53
0.53
0.60
0.60
0.60
0.85
0.53
0.85
0.80
0.67
0.67
0.53
0.46
0.50
0.84
0.39
0.46
0.77
0.77
0.77
0.60
0.39
0.84
0.77
0.84
0.77
0.77
0.07
0.45
0.07
0.32
0.24
0.15
0.45
0.07
0.15
0.15
0.07
0.42
0.42
0.15
0.15
0.15
0.15
0.38
0.38
0.31
0.31
0.31
0.37
0.38
0.37
0.42
0.24
0.24
0.38
0.46
0.42
0.07
0.52
0.45
0.15
0.15
0.15
0.31
0.52
0.07
0.15
0.07
0.15
0.15
294
182
294
216
237
266
182
294
266
266
294
217
217
266
266
266
266
199
199
217
217
217
226
199
226
217
237
237
199
181
190
294
164
182
266
266
266
217
164
294
266
294
266
266
0.631
0.334
0.631
0.455
0.519
0.590
0.334
0.631
0.590
0.590
0.631
0.817
0.817
0.590
0.590
0.590
0.590
0.397
0.397
0.459
0.459
0.459
0.869
0.397
0.869
0.817
0.519
0.519
0.397
0.330
0.365
0.631
0.269
0.334
0.590
0.590
0.590
0.459
0.269
0.631
0.590
0.631
0.590
0.590
2.343
1.448
2.343
1.723
1.887
2.124
1.448
2.343
2.124
2.124
2.343
2.311
2.311
2.124
2.124
2.124
2.124
1.587
1.587
1.731
1.731
1.731
2.409
1.587
2.409
2.311
1.887
1.887
1.587
1.441
1.518
2.343
1.305
1.448
2.124
2.124
2.124
1.731
1.305
2.343
2.124
2.343
2.124
2.124
0.269
0.231
0.269
0.264
0.275
0.278
0.231
0.269
0.278
0.278
0.269
0.353
0.353
0.278
0.278
0.278
0.278
0.250
0.250
0.265
0.265
0.265
0.361
0.250
0.361
0.353
0.275
0.275
0.250
0.229
0.241
0.269
0.206
0.231
0.278
0.278
0.278
0.265
0.206
0.269
0.278
0.269
0.278
0.278
2.36
2.13
2.36
2.33
2.39
2.41
2.13
2.36
2.41
2.41
2.36
2.83
2.83
2.41
2.41
2.41
2.41
2.24
2.24
2.33
2.33
2.33
2.87
2.24
2.87
2.83
2.39
2.39
2.24
2.12
2.19
2.36
1.97
2.13
2.41
2.41
2.41
2.33
1.97
2.36
2.41
2.36
2.41
2.41
Froude
Flujo
0.67
1.12
0.67
1.03
0.95
0.82
1.12
0.67
0.82
0.82
0.67
1.07
1.07
0.82
0.82
0.82
0.82
1.08
1.08
1.02
1.02
1.02
1.04
1.08
1.04
1.07
0.95
0.95
1.08
1.13
1.10
0.67
1.16
1.12
0.82
0.82
0.82
1.02
1.16
0.67
0.82
0.67
0.82
0.82
SUBCRITICO
Tirante <
< Dimetro
OK!
SUPERCRITICO
OK!
SUBCRITICO
OK!
SUPERCRITICO
OK!
SUBCRITICO
OK!
SUBCRITICO
OK!
SUPERCRITICO
OK!
SUBCRITICO
OK!
SUBCRITICO
OK!
SUBCRITICO
OK!
SUBCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUBCRITICO
OK!
SUBCRITICO
OK!
SUBCRITICO
OK!
SUBCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUBCRITICO
OK!
SUBCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUBCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUBCRITICO
OK!
SUBCRITICO
OK!
SUBCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUBCRITICO
OK!
SUBCRITICO
OK!
SUBCRITICO
OK!
SUBCRITICO
OK!
83
44
45
46
47
48
49
50
51
52
Cuenca
sc-79
sc-80
sc-81
sc-82
sc-84
sc-85
sc-86
sc-87
sc-88
Caudal Total
No.
Caudal Unit
Diametro
Nro
Diametro
Tirante
B.L.
Area
Permetro
Radio Hid.
Ve locidad
(m3/s)
Alcant
m3/s
(-)
(%)
(")
Ojos/Vanos
(m)
(m)
(")
(o)
(m2)
(m)
(m)
(m/s)
1.42
1.42
1.07
1.07
1.49
0.70
1.42
1.42
0.13
1
1
1
1
1
1
1
1
1
1.42
1.42
1.07
1.07
1.49
0.70
1.42
1.42
0.13
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
0.025
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
36
36
36
36
36
36
36
48
36
1
1
1
1
1
1
1
1
1
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
0.9144
1.2192
0.9144
0.77
0.77
0.60
0.60
0.84
0.46
0.77
0.59
0.19
0.15
0.15
0.31
0.31
0.07
0.46
0.15
0.63
0.72
266
266
217
217
294
181
266
177
109
0.590
0.590
0.459
0.459
0.631
0.330
0.590
0.562
0.099
2.124
2.124
1.731
1.731
2.343
1.441
2.124
1.879
0.868
0.278
0.278
0.265
0.265
0.269
0.229
0.278
0.299
0.115
2.41
2.41
2.33
2.33
2.36
2.12
2.41
2.53
1.33
Froude
Flujo
0.82
0.82
1.02
1.02
0.67
1.13
0.82
1.19
1.16
SUBCRITICO
Tirante <
< Dimetro
OK!
SUBCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUBCRITICO
OK!
SUPERCRITICO
OK!
SUBCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
84
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Cuenca
sc-1
sc-2
sc-3
sc-10
sc-11
sc-12
sc-13
sc-14
sc-15
sc-16
sc-17
sc-18
sc-19
sc-20
sc-22
sc-26
sc-28
sc-29
sc-30
sc-31
sc-32
sc-34
sc-35
sc-44
sc-45
sc-49
sc-50
sc-51
sc-58
sc-59
sc-61
sc-64
sc-65
sc-68
sc-74
sc-83
sc-89
Caudal Total
No.
Caudal Unit
(m3/s)
Alcant.
m3/s
2.93
2.93
7.35
9.38
9.38
10.30
10.90
6.53
6.53
6.53
4.73
4.73
4.20
5.00
3.30
4.65
4.20
13.10
1.07
0.53
1.78
4.27
3.20
0.41
7.10
4.45
3.20
6.05
2.40
7.40
7.30
3.30
8.90
3.30
3.30
7.90
1.90
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2.93
2.93
7.35
9.38
9.38
10.30
10.90
6.53
6.53
6.53
4.73
4.73
4.20
5.00
3.30
4.65
4.20
13.10
1.07
0.53
1.78
4.27
3.20
0.41
7.10
4.45
3.20
6.05
2.40
7.40
7.30
3.30
8.90
3.30
3.30
7.90
1.90
n
(-)
S
(%)
Ancho
(m)
Nro
Ojos/Vanos
Altura
(m)
Tirante
(m)
B.L.
(m)
Area
(m2)
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
0.023
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
2.0
2.0
2.0
1.5
1.5
2.0
1.5
1.5
1.0
1.0
1.0
2.0
1.5
1.0
2.0
2.0
1.5
1.5
1.5
1.5
2.0
1.5
1.5
1.5
1.5
2.0
1.5
1
1
2
2
2
2
2
2
2
2
1
1
1
2
1
1
2
2
1
1
1
1
1
1
1
1
1
2
1
2
1
1
1
1
1
1
1
1.00
1.00
1.00
1.50
1.50
1.50
1.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.70
1.70
0.80
0.80
0.80
1.00
1.00
0.80
1.50
1.00
1.00
1.00
1.50
1.50
1.50
1.00
1.50
1.00
1.00
1.50
1.50
0.49
0.49
0.81
0.84
0.84
0.88
0.91
0.76
0.76
0.76
0.55
0.55
0.51
0.66
0.52
0.54
0.54
0.96
0.35
0.23
0.47
0.52
0.51
0.20
0.65
0.53
0.51
0.73
0.41
0.75
0.66
0.52
0.82
0.52
0.52
0.69
0.36
0.51
0.51
0.19
0.66
0.66
0.62
0.59
0.24
0.24
0.24
0.45
0.45
0.49
0.34
0.48
0.46
1.16
0.74
0.45
0.57
0.33
0.48
0.49
0.60
0.85
0.47
0.49
0.27
1.09
0.75
0.84
0.48
0.68
0.48
0.48
0.81
1.14
0.728
0.728
1.215
1.264
1.264
1.325
1.363
1.140
1.140
1.140
1.098
1.098
1.026
0.984
0.780
1.088
0.815
1.447
0.349
0.230
0.468
1.035
0.766
0.198
1.301
1.060
0.766
1.093
0.616
1.120
1.321
0.780
1.231
0.780
0.780
1.378
0.541
2.471
2.471
3.121
3.185
3.185
3.266
3.317
3.020
3.020
3.020
3.098
3.098
3.026
2.812
2.540
3.088
2.587
3.429
1.698
1.461
1.936
3.035
2.522
1.395
3.301
3.060
2.522
2.958
2.321
2.994
3.321
2.540
3.141
2.540
2.540
3.378
2.222
0.295
0.295
0.389
0.397
0.397
0.406
0.411
0.378
0.378
0.378
0.355
0.355
0.339
0.350
0.307
0.352
0.315
0.422
0.205
0.158
0.242
0.341
0.304
0.142
0.394
0.347
0.304
0.370
0.265
0.374
0.398
0.307
0.392
0.307
0.307
0.408
0.244
4.02
4.02
6.05
7.42
7.42
7.78
8.00
5.73
5.73
5.73
4.31
4.31
4.10
5.08
4.23
4.27
5.15
9.05
3.07
2.30
3.81
4.12
4.18
2.07
5.46
4.20
4.18
5.53
3.90
6.61
5.53
4.23
7.23
4.23
4.23
5.73
3.51
Froude
Flujo
Evaluacin
1.047
1.047
1.576
1.935
1.935
2.027
2.085
1.494
1.494
1.494
0.972
0.972
0.925
1.324
1.103
0.965
1.343
2.360
0.979
0.734
1.215
0.931
1.089
0.662
1.232
0.947
1.089
1.443
1.016
1.722
1.248
1.103
1.885
1.103
1.103
1.294
0.915
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUBCRITICO
OK!
SUBCRITICO
OK!
SUBCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUBCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUBCRITICO
OK!
SUBCRITICO
OK!
SUPERCRITICO
OK!
SUBCRITICO
OK!
SUPERCRITICO
OK!
SUBCRITICO
OK!
SUPERCRITICO
OK!
SUBCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUPERCRITICO
OK!
SUBCRITICO
OK!
85
86
No.
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
87
6.3
PONTONES PROYECTADOS
En la va Pomata - Yorohoco, se plantea la construccin de 04 pontones para el cruce de
los ros Puenton Collini, Huapaca, Tarapoto y Collpauyo en las progresivas Km. 5+863,
18+113, 18+699 y 18+950 cuyas luces son de 6 m respectivamente.
Los estribos de los pontones sern independientes del apoyo del canal que tiene su propia
estructura, se ha realizado el dimensionamiento de la luz y altura principalmente.
En los dos casos estos pontones estn en funcionamiento y todos son de una sola va. En
algunos casos tienen problemas estructurales y en otros de socavacin.
Se ha considerado los clculos del tirante y rea hidrulica del caudal de diseo
mediante el uso del Hidrograma Unitario Triangular y la socavacin general por
contraccin mediante el mtodo de Lischtvan Levediev y en los estribos mediante el
mtodo de LIU.
6.4
PUENTES PROYECTADOS
En la va Pomata - Yorohoco, se plantea la construccin de un puente de doble va para
el cruce del ro Tanana ubicado en la progresivas Km. 2+462 cuyo luz ser de 20 m.
En el caso del puente est en funcionamiento y es de una sola va., tienen problemas
estructurales (fisuramiento en las vigas) y de socavacin, por lo que se ha considerado el
remplazo con un puente de doble va.
Se ha considerado los clculos del tirante y rea hidrulica del caudal de diseo
mediante el uso del Hidrograma Unitario Triangular y la socavacin general por
contraccin mediante el mtodo de Lischtvan Levediev., en los estribos mediante el
mtodo de LIU.
88
Cuenca
Ubicacin
Caudal Total
No.
Caudal Unit
Luz
Altura
Tirante
B. L.
Area
Inicial
(m3/s)
Ojos/Vanos
m3/s
(-)
(%)
(m)
(m)
(m)
(m)
(m2)
(m)
(m/s)
Froude
Flujo
Evaluacin
1
2
Cuenca Collini
Cuenca Huapaca
5+863
18+113
49.40
29.00
1
1
49.40
29.00
0.030 1.50
0.030 1.50
6.0
6.0
1.80
1.72
1.40
1.05
0.40
0.67
8.424
6.305
8.808
8.102
0.956
0.778
5.86
4.60
0.764
0.600
SUBCRITICO
SUBCRITICO
OK!
OK!
3
4
Cuenca Tarapoto
Cuenca Collpauyo
18+699
18+950
22.70
6.60
1
1
22.70
6.60
0.030 1.50
0.030 1.50
6.0
6.0
2.10
1.30
0.90
0.45
1.20
0.85
5.388
2.718
7.796
6.906
0.691
0.394
4.21
2.43
0.549
0.317
SUBCRITICO
SUBCRITICO
OK!
OK!
89
PROYECTADOS
Altura
Longitud
(m)
(m)
2.5
8.9
1
8.4
2
8.4
2
8.4
2
8.4
7.
CONCLUSIONES Y RECOMENDACIONES
La va Pomata - Yorohoco, atraviesa una zona con topografa medianamente ondulada,
sobre material predominantemente coluvial, de suelos arenosos, limosos. El paisaje est
cubierto por vegetacin de puna (ichu y paja), con algunas estancias al inicio del tramo
de cultivos de papa, haba, quinua, kiwicha, etc., es comn la crianza de ganado
vacuno y ovino.
El clima en el rea del proyecto es seco, fro y relativamente lluvioso. El rgimen de
precipitacin pluvial se presenta como lluvia, granizo, nevada, en el orden de 792.2
mm/ao, durante las tormentas, es comn la aparicin de rayos y truenos, el mayor
volumen de precipitacin se presenta desde diciembre a marzo.
Para la obtencin de los caudales de diseo se realizado el anlisis de frecuencias de las
precipitaciones mximas en 24 horas, adoptando para alcantarillas 20 aos, para
puentes/pontones 50 aos y para socavacin 100 aos.
Se han delimitado 94 subcuencas entre pequeas y grandes reas, entre las progresivas
0+00 a 33+6720, las cuales presentan drenaje transversal al eje de va.
En la va Pomata - Yorohoco, de la Progresiva 0+ 00.00 a Progresiva 33+672, se plantea en
cuanto al drenaje, el funcionamiento de 9,990 m., de cunetas revestidas rurales Tipo I, y
860.00 m de cuneta triangular urbana, 320.00 m de zanja de coronacin, 89 alcantarillas,
4 pontones y 1 puente.
90
8.
REFERENCIAS
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
ALA ILAVE Ramis (2008), EVALUACION DE LOS RECURSOS HIDRICOS EN LA CUENCA DEL
RIO ILAVE, Estudio Hidrolgico.
Barnes, Harry, Jr. (1967) Roughness Characteristics of Natural Channels U.S. Geological
Survey, Water Supply Paper 1849, Washington D.C.
Chanson, Hubert (1999). The Hydraulics of Open Channel Flow John Wiley & Sons Inc.,
New York.
Melville, B. W. 1997. Pier and abutment scour: Integrated approach. ASCE Journal of
Hydraulic Engineering, Vol. 123, No. 2, February.
Chow, Ven Te, D.R. Maidment, L.W. Mays (1994), HIDROLOGIA APLICADA, Mc Graw Hill.
Cowan, W.L. (1956) Estimating Hydraulic Roughness Coefficients Agricultural
Engineering, Vol. 37, No. 7, pp 473-475.
Federal Highway Administration (1995). Evaluating Scour at Bridges, Federal Highway
Administration, HEC No. 18, Publication No. FHWA-IP-90-017, 3rd Edition, November 1995,
Washington D.C.
Hydrologic Engineering Center, (1996). HEC-RAS River Analysis System, Hydraulic
Reference Manual, U.S. Army Corps of Engineers, Davis, CA.
Hydrologic Engineering Center, US Army Corps of Engineers, (2011), HEC-HMS Hydrologic
Modeling System, User Manual, USA.
Monsalve S., Germn (1999) Hidrologa en la Ingeniera, Segunda Edicin, Editorial
Escuela Colombiana de Ingeniera - Alfaomega, Colombia.
Natural Resources Conservation Service (1986), Urban Hydrology for Small Watersheds:
TR-55, United States Department of Agriculture.
Ponce, V.M. (1989), Engineering Hydrologic, Prentice Hall.
Richardson, E.V., D.B. Simons and P. Julien, (1990). Highways in the River Environment,
FHWA-HI-90-016, Federal Highways Administration, U.S. Departament of Transportation,
Washington, D.C.
91
92
ANEXOS
93
ANEXO A
FICHAS DE CAMPO CON EL INVENTARIO DE OBRAS DE ARTE
EXISTENTES
94
ANEXO B
DATOS CLIMATICOS ORIGINALES