PROJECT : O Mon Thermal Power Plant Unit No.

2 Construction Project Piping Work Building & STL STR Precomm. & Comm.
DISCIPLINE : Mechanical Work Mechanical Work Painting & Insulation
Steel structure Steel Struture - Main Frame/ Girt-Purlin/Crain Rail
EQ Foundation-UG Utilitiy (Ground Floor)
Misc. Steel Work -After EQ Install (GF)
Deck Plate & Conc' Pouring (Mezzanine)
EQ Foundation/ Handrail/ Wall (Mezzanine)
Deck Plate & Conc' Pouring (Operating Floor)
EQ Foundation/Grating/Handrail (Operating Floor)
Misc. Stell Work - After EQ Install (Operation Floor)
Deck Plate (Roof Floor)
EQ Foundation (Roof Floor)
CW Discharge CW Discharge & Inlet Piping
Lubrication & Control Oil Lubrication & Control Oil Piping
Extracting Extracting Piping
Condensate & Feed Water Condensate & Feed Water Piping
Chemical Dosing Chemical Dosing Piping
Aux. Cooling Water Aux. Cooling Water Piping
Compress Air Compress Air Piping
Gas System Gas System Piping
Hoist Beam Hoist Beam
Chipping & Sole Plate Set. Chipping & Sole Plate Setting
MSV/GV & RSV/ICV MSV/GV & RSV/ICV
Removal Temp. Strainer
Bearing Inspection
LP Turbine Installation Crossover Pipe
LP Rotor/ Turning Device
HP Turbine Installation
HP Rotor
HP-LP Pre Alignment/Grounting
HP-LP Final Alignment/Coupling
Chipping & Sole Plate Setting - Genrator Module
Install Generator
T/G Pre Alignment
T/G Final Alignment
Oil Flushing
Main Oil TK & Pump
Oil Cooler/ Purifer
Gen. Seal Oil/ H2 Gas Sys.
Set on Place LP Heater #1/#2
LP Heater #1/#2
LP Heater #3/#4 LP Heater #3/#4
LP Heater #6/#7/#8 LP Heater #6/#7/#8
Gland Condenser with Fan
Condensate Pump/ Condensate Vacuum Pump
Deaerator/Storage Tank
Deaerator Recir. Pump
M-BFP & Booster Pump
T-BFP Booster Pump
BFP & Turbine Drive
Aux. Cooling Water Sys. (Incl. River Water Booster Pump)
Chemical Doosing Sys.
O/H Craine O/H Crane - Rail & Calbe Extention
Painting & Insulation S/T Painting & Insulation
Piping Condensate Pump Pump Piping
Chipping & Sole Plate Setting - Condenser
Shell Skirt
Connect Expansion Joint
Fitting & Welding of Inlet Shell
Tube Plate Setting
Water Chamber
Tube Insertion
Water Chamber Inlet
Tuber Expand
Tube Seal Welding
CTCS & Debris Filter Installation
Water Fill Test
Vacuum Test
Air Removal Sys.
Piping Lube Oil Piping Interconnection
Main Steam & Feed Water Boiler Main STM Piping & Feed Water Piping
Steam Steam Piping
Aux. Steam Aux. Steam Piping
Water Water Piping
Air Air Piping
Exhaust Exhaust Piping
Fuel Oil Fuel Oil Piping
Main Frame (#1~#3)
Air Heater Structure
Platform & Handrail
Elevator Frame
Boiler Circulation Pump Boiler Down Comer/ BCP Inlet & Outlet
Preparation Jack for Steam Drum
Drum Lifting
Super Heater/Reheater SH/RH Tube & Header
Furnace Furnace & Buckstay
Economizer Economizer Tube
Preparation for Hydro Test Preparation for Hydro Test
Blowdown Tank Blowdown Tank
Instal Forced Draft Fan
Instal Gas Recirculation Fan
Install Colling Air Fan
Elevator Elevator
Sootblower Sootblower
Gas Air Heater Gas Air Heater
Steam Air Heater & Pump Steam Air Heater & Pump
Boiler Air Duct - Side Block Lifting & Installation
Boiler Air Duct - Vertical Block Lifting & Installation
Boiler Air Duct - GAH Oulet Lifting
GAH Outlet Installation
FDF GAH Outlet Lifting
FDF GAH Outlet Installation
GRF Vertical Air Duct Lifting
GRF Vertical Air Duct Installation
Fuel and Diesel Oil Burner
Diesel Oil Igniter
Nature Gas Burner
Piping Compress Air Compressed Air Piping with connection work
Piperack Piperack (Unit #2) Erection
Technical Corridor Technical Corridor Erection
Piperack Piping on Piperack (Unit #2)
Technical Corridor Piping on Technical Corridor
Piping CW Discharge/Inlet CW Piping (Inlet/ Disch.)
MAR OCT AUG SEP APR MAY JUN JUL OCT NOV JUL AUG SEP OCT NOV
WORKING AREA
1) POWER HOUSE
Deaerator
Condensate
JAN
Annex 1. Preliminary Construction Schedule for Mechanical Work
2013 2014 2015
APR MAY JUN FEB NOV DEC JUL AUG SEP DEC DEC JAN FEB MAR
Roof Floor
Building
& STL STR
2) T/G AREA
Mechanical
Boiler Feed Pump
Cooling Water Sys.
Mechanical
Oil & Gas System
LP Heater #1/#2
Piping
LP & HP Installation
Ground Floor
Removal Temp. Strainer &
Bearing Inspection
TG Installation
Mezzanine Floor
Operation Floor
Piping
Mechanical
Condenser
3) CLEAN OIL STORAGE TANK
4) BOILER AREA
Boiler Steel Structure Erection
Steam Drum
Install Fan
Boiler Air Duct
Fuel Oil Burner/Igniter
5) CENTRAL CONTROL BUILDING
6) PIPERACK & TECHNICAL CORRIDOR
Building
& STL STR
Piping
7) MAIN & UNIT TRANSFORMER
PROJECT : O Mon Thermal Power Plant Unit No.2 Construction Project Piping Work Building & STL STR Precomm. & Comm.
DISCIPLINE : Mechanical Work Mechanical Work Painting & Insulation
MAR OCT AUG SEP APR MAY JUN JUL OCT NOV JUL AUG SEP OCT NOV
WORKING AREA
JAN
Annex 1. Preliminary Construction Schedule for Mechanical Work
2013 2014 2015
APR MAY JUN FEB NOV DEC JUL AUG SEP DEC DEC JAN FEB MAR
Prefab - Gas Duct
Erection - Gas Duct
Supporting Structure Assembly - EP
Hopper Assembly - EP
Upper Column/Wall Assembly - EP
Roof Girder Assembly - EP
Roof Assembly
Nozzle Casing Assembly Inlet/Outlet Nozzle Casing Assembly - EP
DE/CE Assembly DE/CE Assembly - EP
Piping Work Piping Work - EP
Final Adjustment
EP Test
Ash Handling Sys.
Amonia Injection Sys.
Painting & Insulation Insulation Work - EP
Piping Piping with Connection - ATP
Mechanical Breaching Duct Insulation
Erection - Absorber
Lining - Absorber
Erection - Absorber Internal
FGD Steel Structure Erection - FGD Steel Structure
Flue Gas Duct Flue Gas Duct Work
Absorber Recirculation Pump Absorber Recirculation Pump
Absorbing Slurry Tank Absorbing Slurry Tank
Piping Work Piping
GGH Gas Gas Heater
Booster Fan Booster Fan
Expansion Joint & Damper Expansion Joint & Damper
Piping Filter Feed Tank Piping Fitting & Valve Common Facility
Filter Feed Tank Gypsum Filter Feed Tank
Reclaim Water Tank Reclaim Water Tank
Painting & Insulation Paiting Work
Limestone Storage Silo Limestone Storage Silo
Reagent Feed Tank Reagent Feed Tank
Painting & Insulation Painting Work
Mechanical Install Oxidation Air Blower
Painting & Insulation Painting Work - OAB House
Mechanical Limestone Conveyor
Piping Condensate Storage Tank Piping - Condensate Storage Tank
Condensate Storage Tank Install Condensate Storage Tank
Condensate Tranfer Pump Install Condensate Tranfer Pump
Piping Flue Gas Piping Flue Gas Piping
Flue Gas Reducing Station Install Flue Gas Reducing Station
Flue Gas Heater Install Flue Gas Heater
Install Flue Gas Filter
Install Moisture Separator
Fuel Oil Pump Fuel Oil Pump
Diesel Oil Pump Diesel Oil Pump
Fuel Oil Service Tank Install Fuel Oil Service Tank
Mechanical Chlorination Unit Install Chlorination Unit
Piping Piping Intake to Condenser CW Piping - Intake to Condenser
Install CW Pump
Install Traveling Screen
Install Screen Wash Pump
Install Chlorination Dosing Sys.
Start
Gas Station Commissioning Gas Station Commissioning
FGD Plant Commissioning FGD Plant Commissioning
Preparation for Initial Firing (Boiler Interlock & Initial Firing Test) Preparation for Initial Firing (Boiler Interlock & Initial Firing Test)
Chemical Cleaning Chemical Cleaning
Restoration of Chemical Cleaning Restoration of Chemical Cleaning
Boiler Pressure Rising Boiler Pressure Rising
Blowing Out & Steam Flushing Blowing Out & Steam Flushing
Restoration of Blowing Out Restoration of Blowing Out
Turbine Control Appratus Adjustment Turbine Control Appratus Adjustment
Turbine Interlock Test Turbine Interlock Test
Safety Valve Test Safety Valve Test
Electrical Interlock Test Electrical Interlock Test
Unit Interlock Test Unit Interlock Test
Condenser Vacuum Up Test Condenser Vacuum Up Test
Turbine Initial Start-up Turbine Initial Start-up
Steam Admission to Turbine Steam Admission to Turbine
Turbine Generator No Load Test Turbine Generator No Load Test
Ash Hopper Blind Plate Removal Ash Hopper Blind Plate Removal
Synchronization Synchronization
Turbine Overspeed Test Turbine Overspeed Test
Load Rejection Test Load Rejection Test
Unit Shutdown Work Unit Shutdown Work
Unit Start-up Unit Start-up
FCB & House Load Operation Test FCB & House Load Operation Test
MSV/RSV Temporary Strainer Removal MSV/RSV Temporary Strainer Removal
Combustion Tuning (Oil Firing) Combustion Tuning (Oil Firing)
Load Swing Test Load Swing Test
Special Test Special Test
Combustion Tuning (Gas Firing) Combustion Tuning (Gas Firing)
Reliability Run Reliability Run
Performance Test (Gas & Oil) Performance Test (Gas & Oil) Finish
23) PRECOMM. & COMMISSIONING
21) FUEL OIL PUMP HOUSE
Mechanical
22) CW INTAKE ELECTRICAL & CHLORINATION BLDG
22) CW Pump Pit & CW Pipe
CW Pump Pit Mechanical
19) CONDENSATE STORAGE TANK
20) GAS STATION SHELTER
Mechanical
Flue Gas Filter
Mechanical
Mechanical
17) OXIDATION AIR BLOWER (OAB) HOUSE
18) TRANFER CONVEYOR
16) LIMESTONE BALL MILL HOUSE
Mechanical
Absorber
Mechanical
14) BUF & GAS DUCT AREA
Mechanical
15) GYPSUM DEWATERING AND STORAGE HOUSE
11) ASH TREATMENT PLANT (ATP)
12) STACK
13) FLUE GAS DESULPHURIZATION AREA
Other System
Mechanical
Steel Structure
Final Adjustment & Test
10) ELECTROSTATIC PRECIPITATOR
8) GAS DUCT (EP - BOILER)
Gas Duct Mechanical