Sunteți pe pagina 1din 6

PEMILIK PROYEK KONTRAKTOR

Latar Belakang, Tujuan dsb Bentuk Badan Usaha e.g JV


Kelayakan, Skema, Ijin, Pendanaan, Bahan Baku Dsb
Memilih Teknologi & Kontraktor Dsb.
Akses ke Teknologi
Memilih Teknologi & Kontraktor Dsb.
Menyusun Project Spec & Issue Itb
EVALUASI
Proposal Teknis, Komersial
& Garansi
CONTRACT AWARD
Eksekusi EPC
Agust 08 yostri-unpar 1
Eksekusi Owner Scope
Eksekusi EPC
Mechanical Completion - Rfc
Commissioning, Start Up & Performance Test
PLANT ACCEPTANCE
Kegiatan Kontraktor-Pemilik
(Diagram- typical)
Agust 08 yostri-unpar 2
TAHAPAN PROYEK & SCOPE (typical)
PROCESS
DESIGN
Scope
Contract Award
KICK OFF MEETING
& Process Release
Mechanical
Completion
Plant
Acceptance
DESIGN
(general)
BASICDESIGN
(spesifik}
DETAILED ENGINEERING
(Planning phase, Production phase
& Revision if any)
PROCUREMENT
Commissioning
& Start Up
Performance Test
Scope
Process
Owner
Scope
EPC Contractor
Agust 08 yostri-unpar 3
PROCUREMENT
Equipment Fabrication
Performance Test
Civil Work &
Mechanical Construction
Scope Supplier
Contractor activities - EPC
Proc Design &
Job Coord.
Analytical &
Planning
Final Eng. & Proc. Field Erection Start up
Start of Engineering
Early release of process data
Process Release
Planning Release
Start of Construction
RFC
Client
Acceptance
Job Coord. Planning
Eng.
Proj. Mgt. Coord proced
Project descr
Release of master
&
Eng Sched Process
Rev
Client appr. :
P& ID, plot plan,
process
design etc
Authorize spec
changes
Control Sch &
Budget
Constr Status
meeting
Participate in start
up -
Obtain Client
acceptance
FINANCE Cost reporting , bill to client, payment to vendor and
subcontractors
Issue final cost
report
DATA PROCESS Proces analys &
design
Manpower print
out, CPM,
matl status
Agust 08 yostri-unpar 4
COST ESTIMAT Initial cost &
control estim
Initiate Cost control
report
Planning check
estimat
Prod check
estimate
Proj. Plan Starter Sch
Master Sch
Net work Diagram Periodic issue
(detail sch &
matl status
report-
Update
schedule
Contractor activities - EPC
Process
Engineering
Proc. Desgn -
Process data
Consult Analytical
Eng.
Assist prepare test
run procedure
Advise start up
Direct performance
Start of Engineering
Early release of process data
Process Release
Planning Release
Start of Construction
RFC
Client
Acceptance
Engineering
Process data
Critical Eq.-
Coordinate
all Eng.
effort
Eng. run procedure Direct performance
test run
ENGINEERING
CONTROL
Coordinate PE &
Eng
Consult Eng
Analytical
group
Assist test run
procedure
preparation
Resolve field
questions
PROJECT SYSTEM Data sheet and
reqst for
criticl
equipmt
P & I D
Issue R, 1, 1A, and
2- Prep
Process Ctrl
diagram
&request
P & ID
Issue 3
& for Constr.
Finalize
desgn, vendor
dwg matl
idem
Agust 08 yostri-unpar 5
&request
Check vendor
dwg
dwg matl
take off
CIVIL MECHANICAL Critical Eq. Dwg. & Data sheet.
-Bulk Matl
take off
Final Desg
Mat. take off
Mat. Req.
DESIGN Plot plan
Model
Final dwg
Piping, Inst, Electric,
final
Mat. Req.
Contractor activities - EPC
General
Facilities
Conceptual system
desgn
P & ID Issue
R, 1, 1A, 2
P & ID
Issue 3
idem
Start of Engineering
Early release of process data
Process Release
Planning Release
Start of Construction
RFC
Client
Acceptance
Facilities
desgn
block diagr
syst descr-
load sheet-
critical
equip.- matl
handilng
diagram
R, 1, 1A, 2
Complete
planning-
issu specs,
data sheet
and
requisitions
Issue 3
Issue for
Constr.,Final
equipment,
plot plan,road
paving dwg, ,
vendor dwg.
PROCURE MENT Proc. Plan -
Critical Eq.
Quotations
Commit
Bulk Matl Bulk Matl
commitment
(final)
CONSTRUCTION Detail Constr
Philosophy
Deliv.
Preliminary Rigging Tool & Eq.-
Temp build.- Compl
rigging
Constr mgt
Sub contr.
Mech.Erect
Agust 08 yostri-unpar 6
Sequen
input to sch
update sch.
PROCESS
PLANT
SERVICES
Review desgn
Comments
on Process
Rev. P&ID-
Op. Philsph-
Op. Manual
Prepare test run &
lab.proc
training
progr-chem
cleaning
Lubemanual,S/U
schedule,
Class room
Training,
assist pre-
commisionin
On the job
Start up
Assist Test
summary Report