Sunteți pe pagina 1din 3

NATIONAL GAS & INDUST.CO NATIONAL GAS & INDUST.CO NATIONAL GAS & INDUST.

CO NATIONAL GAS & INDUST.CO


HEAD OFFICE HEAD OFFICE HEAD OFFICE HEAD OFFICE
DATE : DATE : DATE : DATE : 20 20 20 20/ // /0 00 02 22 2/20 /20 /20 /201 11 14 44 4

H HY YD DR RA AU UL LI IC C P PO OW WE ER R U UN NI IT T S SP PE EC CI IF FI IC CA AT TI IO ON N

Aim:
To open & hold open the hydraulic operated Internal safety & shut-off valve and close rapidly all the
safety and shut off valves, in case of danger.
Scope of supply and work:
1. Vendor shall provide HPU sales & design, together with installation, commissioning and
comprehensive warranty for the system.
2. Vendor shall supply, install, test and commissioning the hydraulic tubing with supports and its
associated fitting network between the respective 'Internal safety & shut-off valves' and control
board of the hydraulic power unit.
Quantity: 2 (For Dammam & Riyadh).
General specification:
Ambient temperature range: -10
o
C to 60
o
C.
Electrical classification: Class 1, Division 1, Group D (Applicable to all electrical equipments /
instruments).
Power supply: 380V, 3 phase, 60hz.
Service location:
LPG pump and compressor room, Dammam & Riyadh Plant.
HPU construction:
All equipment & instrument mounted together, factory installed & tested and shipped as one piece.
Material: Frame & pipe work 304/316.
Components:
One electric motor operated hydraulic oil pump with tank.
Capacity: 16.2Liters per minute.
Discharge pressure: 1000 psig.
Tank capacity: 200Liters equipped with level indicator, drain plug and a filler cap with filter.
One standby hand pump.
Capacity: 20Liters/1000stroke.
Discharge pressure: 1150psig.
One accumulator, capacity 20 - 50 liters (as per design requirement) with pressure indicator,
valves, etc.
20 nos. 3-way ball valves with pressure gauges, manifolds, fittings, etc. mounted on a control
board.

NATIONAL GAS & INDUST.CO NATIONAL GAS & INDUST.CO NATIONAL GAS & INDUST.CO NATIONAL GAS & INDUST.CO
HEAD OFFICE HEAD OFFICE HEAD OFFICE HEAD OFFICE
DATE : DATE : DATE : DATE : 20 20 20 20/ // /0 00 02 22 2/20 /20 /20 /201 11 14 44 4

H HY YD DR RA AU UL LI IC C P PO OW WE ER R U UN NI IT T S SP PE EC CI IF FI IC CA AT TI IO ON N

Ex-proof control panel.
Accessories:
One solenoid valve connected to gas detection system and emergency stop button. (In the event
of an emergency when the alarm is activated the solenoid valve shall be activated which will put
the whole system or circuit at 0 bar.)
One differential pressure switch at discharge line. (Differential range 20 bar)
One low discharge pressure switch. (for the protection against leakage or no oil)
Pressure safety valves.
Pressure indicators on the main supply and return line.
Suction strainer, filters, etc.
Check valves, gate valve, ball valves, etc.
Hydraulic tubing and its associated fitting network :
Important Note:
1. The hydraulic tubing network is laid between 15 nos 'Internal safety & shut off valves' and
hydraulic power unit.
2. Hydraulic connection to 'Internal safety & shut off valve' 1/4" NPT.
Tubing
Size 3/8".
Material Stainless steel, seamless, A312 Gr. TP304, Schedule 80
Ends Threaded at each ends.
Rating Suitable for pressure rating over 200 bar.
Fittings (Elbow, Tee, Strainer, Nipple, Reducer, etc)
Size 3/8" &1/4".
Material Stainless steel, seamless, A403 Gr. WP 304.
Ends Threaded at each ends.
Rating 3000lb.
Fusible plugs
Body material Brass or Bronze.
Nominal yield temperature of fusible plug 85
o
C.
Connection 3/8" NPT.

NATIONAL GAS & INDUST.CO NATIONAL GAS & INDUST.CO NATIONAL GAS & INDUST.CO NATIONAL GAS & INDUST.CO
HEAD OFFICE HEAD OFFICE HEAD OFFICE HEAD OFFICE
DATE : DATE : DATE : DATE : 20 20 20 20/ // /0 00 02 22 2/20 /20 /20 /201 11 14 44 4

H HY YD DR RA AU UL LI IC C P PO OW WE ER R U UN NI IT T S SP PE EC CI IF FI IC CA AT TI IO ON N

Documentation:
Hydraulic schematic drawings showing all the equipments/ fittings/ components on HPU with
dimensions.
Material test certificate.
Certificate of quality.
Certificate of test and inspection.
Electrical schematic.
Installation, maintenance & safety manual in English and Arabic (if possible) languages.
Technical data sheet of each components and accessories.
Recommended spare parts for 2 years operation with complete details such as price, description, catalog
and data sheet with manufacturers identification number.

The vendor is responsible for all coordination of various disciplines, checking design & making shop
drawings and make sure the work shall be carried out with high profile technically & complete system
shall be provided operational conform to specifications and SASO standards and all international codes
and standards. Vendor shall include all hidden works and furnish all accessories needed to make
reliable system even if they are not stated in this HPU specification.
Vendor should arrange factory training for our technical team and also should arrange inspection of the
equipment prior to shipment.

S-ar putea să vă placă și