GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
1501 Roanoke Blvd., Salem, VA 24153
Controlled Document
If its contents are to be used in your work, you should either use a CONTROLLED COPY by
co!y " and#or distribution list$, or use a co!y that you %ERI&Y 'E&ORE ()E*
Controlled copies can be obtained from: LiveLink
Authors: eTCSS Upgrade Team
The CURRENT VERSIN number can be chec!ed at:
"asalfpgmisge:N#I$ICS$%R&IN'$D()$*+,*-..-+/doc
..0A122,34
eTCSS )ull Upgrade and Verification #rocedure
A CONTROLLED COPY is denoted by either A VERIFIED COPY has the area to the left
a RED o!y "# or a hi$hli$hted %or RED ir& %the o!y " and the distrib'tion list infor(a&
led) na(e on the distrib'tion list tion) rossed o't and at least ONE entry
(ade
belo*+
Controlled Co!y ",---------- Date Initials Date Initials
and.or Distrib'tion List,
[ADD DISTRIBUTION LIST]
9/13/2006 08:20:00 PM Revision 8.0 Page #1 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
Re"ision 4istor5:
Rev Date /y Reason For Chan$e
0 24-Mar-01 RW MILLER Initial Release
1 12-Apr-02 R Vincent 0st '!date
2 -Ma!-0" A M#$ta%a 1nd 2!date
" 12-&#n-0" A M#$ta%a 3rd '!date
4 2'-&#n0" tea( Revie*ed /y tea(
2)-Sep-0" A$i( Add o((ent by Ron on +db
file save
' 1-DE*-0" D+ Mc*a,,#( 2!dates and Flash !ro$ra((in$
- 4-Oct-2004 D+& .e,tner Add !ro!rietary (arkin$
/ 1"-Sep-200' D+ Mc*a,,#( Revise to reflet 4'lti&version
(ark VI R'nti(e *ith eTC55
V67+63+66C and hi$her
9/13/2006 08:20:00 PM Revision 8.0 Page #2 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
Table of Contents
1 OVERVIEW 5
2 REQUIRED RESOURCES 6
3 PREPARATION FOR SOFTWARE LOADING 8
4 SYSTEM CHECKS PRIOR TO UPGRADE 8
+/2 Net6or! Time ,
+/* 47I Time and Configuration ,
+/. 7ar! VI Controller 2-
+/+ E8*2-- E9citation 2*
+/: #repare the S5stem Ser"ices 2.
4.5.1 Stop the applicable services 03
7+8+1 Close the NTP 5tat's Indiator 03
7+8+3 E9istin$ 4ark VI R'nti(e 03
5 PERFORM THE UPGRADE 14
:/2 Create Upgrade Directories 2+
:/* ;oad ne6 Soft6are on an 47I 2+
:/. Verif5 47I Soft6are Installation 2:
6 CONFIGURING TOOLBO 15
! PREPARING THE NEW MARK VI FILES 16
8 PREPARING OTHER SYSTEM FILES 1!
" SYNCHRONI#ING ALL SYSTEM FILES WITH THE NEW SDB 1"
1$ DOWNLOAD TO THE SYSTEM %MARK VI& 2$
9/13/2006 08:20:00 PM Revision 8.0 Page #3 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
11 DOWNLOAD TO THE SYSTEM %ECITER ' STATIC STARTER& 24
12 VALIDATE THE UPGRADE OPERATION 26
2*/2 7ar! VI Controller *0
2*/* E8*2-- )iles *1
2*/. ;S*2-- )iles *<
APPENDI A( HMI DIRECTORY STRUCTURE 2"
APPENDI B( UPGRADE CHECKLIST 3$
APPENDI C( CONFIGURING A NEW TRIP LOG 34
APPENDI D( HMI CONFIGURATION 38
APPENDI E( NTP CONFIGURATION 3"
APPENDI F( REFERENCE DOCUMENTATION 4$
9/13/2006 08:20:00 PM Revision 8.0 Page #4 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
1 OVERVIEW
The control systems for Mark VI turbine controls, E!1"" e#citer controls, an$
%S!1"" static starter uses several layers of pro&rammin&, 'hich can be broken
broa$ly into three ma(or cate&ories) *pro$uct co$e*, 'hich is the same for all
control systems of the same type, *application co$e*, 'hich inclu$es the lo&ic an$
parameters 'hich are specific to a sin&le machine, an$ the *pro&rammin& tools*
use$ to make chan&es to the application co$e +the ,ontrol System Toolbo#-.
.ro$uct co$e inclu$es $ifferent parts / the *firm'are* of the I01 car$s, an$ the
*runtime* of the controller. The application co$e inclu$es the se2uencin& an$ the
control lo&ic, the parameters 'hich a$(ust the operation of the lo&ic +inclu$in&
tunin& constants-, an$ the communications interface to e#ternal systems such as
the operator interface an$ plant 3,S system.
4 successful control system soft'are up&ra$e 'ill a$$ress kno'n issues by
installin& ne' pro$uct co$e an$ tools 'ithout chan&in& the control lo&ic, an$
preserve the structure of the communications interface. It 'ill not chan&e the
control system har$'are nor e#ternal har$'are connections to the control system.
4 5ull 6p&ra$e ,3 provi$es for the up&ra$e of the ,ontrol System Toolbo#, the
3ata 7istorian +if use$-, S38, E93, T,I, 7IST, the E!"", E!1"", E!1""
:e&ulator, %,I, Mark VI :untime an$ associate$ I01 car$ firm'are an$
confi&uration files. 4n up&ra$e re2uires that the application co$e files supportin&
'hat is actually runnin& be available. 4 5ull 6p&ra$e inclu$es a collection of all
pro$uct sof'are that has been vali$ate$ as a set usin& establishe$ factory test
proce$ures, an$ cannot be $one on an in$ivi$ual pro$uct basis.
This &ui$e $etails 'hat is necessary to accomplish a soft'are up&ra$e to a Mark
VI an$0or E!1"" an$ associate$ e2uipment 'ith an eT,SS 5ull 6p&ra$e ,3. It is
inten$e$ as &eneric &ui$e as confi&urations at each site may be $ifferent.
To re$uce the probability of uninten$e$ si$e effects $urin& an up&ra$e, 1;%< the
'ork items $escribe$ in the proce$ure an$ checklists shoul$ be un$ertaken. 4ny
other proce$ures, inclu$in& other control enhancement or maintenance operations,
must be carefully revie'e$ before they are inclu$e$ in the 'ork scope. 4ny
proce$ure, especially those 'hich intro$uce a *ma(or $ifference* into the control
system +inclu$in& the .m=b, .ecb, .ucb, etc-, shoul$ be performe$ either before or
after the up&ra$e. 6nless the TI% re2uires that the up&ra$e be installe$ first,
9/13/2006 08:20:00 PM Revision 8.0 Page #! of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
se2uencin& chan&es shoul$ be ma$e an$ verifie$ before installation of the
up&ra$e. >hen multiple control units 'hich interact +such as e#citation an$0or
static starters- are involve$, all interactions, inclu$in& but not limite$ to the E93
e#chan&e, must be completely un$erstoo$ before performin& the up&ra$e, since it
'ill touch all components of the system.
This $ocument $oes ;1T cover har$'are up&ra$es that may also be re2uire$ e.&.
6,V8 to 6,VE, 4,%4 to 4,%E, etc. 7ar$'are up&ra$es +e#cept up&ra$e to
6,V9- MUST be complete$ an$ verifie$ operational before performin& the eT,SS
up&ra$e since the up&ra$e may not be successful 'ithout the a$$itional resources
provi$e$ by the har$'are up&ra$e. The 6,V9 controller car$ may not be
supporte$ by ol$er eT,SS versions, an$ in those cases the eT,SS up&ra$e must
be $one first.
I) *+ ,-./00-12-2 )34) 5/6 ,-42 )3*+ -1)*,- 2/.60-1) 7,*/, )/
+)4,)*18 )3- 678,42-(
T/ 04*1)4*1 *1)-,94.-+ :*)3 /)3-, +5+)-0+; DO NOT <74.= 4>4,0+<
/, <./07,-++ %EGD& -?.3418-< 26,*18 41 678,42-(
2 R-@6*,-2 R-+/6,.-+
1. 4 Turbine ,ontrol System Solutions +eT,SS- compact $isc +,3- issue$ from
Salem for each 7MI, 7istorian, an$ if present 1SM, for the particular (ob site to
be up&ra$e$. ;ote that the content of the ,3 is $ifferent $epen$in& on it?s
application, an$ the correct ,3 must be installe$ on the correct 7MI etc. If there
is any 2uestion 'hether the eT,SS ,3 is the proper revision or content for a
site, please contact .ro$uct Service in Salem, Vir&inia at @1/54"/ABC/A!B" or 1/
B""/5AA/5BB5.
!. 4 serial cable, supplie$ in the fiel$ service parts kit shippe$ 'ith the panel, an$ a
null mo$em :S/!A!, cable are re2uire$ for settin& I. a$$resses an$ flash
system up&ra$e. These cables are also useful for monitorin& the 6,V#
controller an$ the V,MI communication car$s. The 6,VE an$ 6,V5 controllers
re2uire a compact flash pro&rammer for flash pro&rammin&, also supplie$ in the
fiel$ service kit.
;1TE) The compact flash pro&rammer uses a 6S8 interface, 'hich is only
available 'ith >in$o's !""" an$ later operatin& systems.
9/13/2006 08:20:00 PM Revision 8.0 Page #6 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
A. .erform the up&ra$e in the or$er presente$ in this $ocument.
9/13/2006 08:20:00 PM Revision 8.0 Page #" of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
3 P,-74,4)*/1 9/, S/9):4,- L/42*18
This up&ra$e is to be performe$ only on turbine controls that are not actively
controllin& the e2uipment, 'ith e2uipment that has been taken to an appropriate
state of %1T1 +%ock/out, Ta&/out- to protect personnel an$ e2uipment 'hile the
control is bein& up$ate$. These inclu$e the same measures that 'oul$ normally be
taken before s'itchin& the controller po'er off.
Ensure all the turbine au#iliaries are put in manual mo$e as the control system 'ill
be reset an$0or reboote$ $urin& the up&ra$e process. This 'ill cause control relays
to $rop out, an$ sub/systems that are starte$ by normally/close$ contacts may be
tol$ to start. This may inclu$e, but is not limite$ to, emer&ency lube oil an$0or seal
oil pumps. ;ote that $urin& the time the controller is off/line, other time $elay
$evices may time out, an$ 'hen the controller &oes back on/line it may initiate
other actions for e#ample &enerator hy$ro&en pur&e. Secure systems an$ revie'
control lo&ic for au#iliary systems carefully before initiatin& an up&ra$e, as
controllers 'ill &o off/line 'ithout 'arnin& $urin& the up&ra$e process.
It is reco&niDe$ that a customer may choose to sche$ule only a partial outa&e 'ith
the intent of completin& the up&ra$e at a later time. This full up&ra$e proce$ure
has ;1T been $esi&ne$ to accommo$ate this scenario, an$ the complete up&ra$e
shoul$ be complete$ as soon as possible. The up&ra$e 'ill over/'rite the Mark VI
:untime 'ith a ne'er version so that once the up&ra$e process has be&un by
installin& a ne'er version of the ,ontrol System Toolbo# on the 7MIs, no
maintenance can be performe$ on units 'hich have not been up&ra$e$.
;ote) 1nce an up&ra$e proce$ure has starte$, $o ;1T perform *compress
E93* $urin& the up&ra$e process, to avoi$ makin& the e#chan&e+s- 'ith
other units usin& the $ata *unhealthy*. This 'ill a$versely affect operation of
e#citation, static start, an$ ,IM.%I,IT< 7MI screens. 1perations 'hich affect
E93 shoul$ be performe$ either before or after a site up&ra$e is performe$,
an$ M6ST ;1T be $one bet'een phases of a partial site up&ra$e.
>hen up&ra$in& a multi/unit site, all units shoul$ be $one at the same time if at all
possible.
4 S5+)-0 C3-.=+ P,*/, )/ U78,42-
:ecor$ an$ resolve active process alarms before procee$in&. It is important to
un$erstan$ each process alarm, an$ to pre$ict 'hether or not it shoul$ a&ain be
present follo'in& the up&ra$e. ;ote that cyclin& the po'er on the control, 'hich 'ill
occur $urin& the up&ra$e process, may either clear or create process alarms. The
9/13/2006 08:20:00 PM Revision 8.0 Page #8 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
root cause of each process alarm must be un$erstoo$ to evaluate 'hether or not
the up&ra$e process has occurre$ correctly.
:evie' the $irectory structure for the e#istin& soft'are on the 9E supplie$ 7MI an$
for E4,7 control locate the current version of the follo'in& confi&uration files)
Mark VI) the *.m=b* file
E!1"") the *.ecb* file
E!""") the *.ucb*, *.ocb*, an$ *.$cb* files
%S!1"") the *.lsb* file
%,I) the *.ucb*, *.ocb*, an$ *.$cb* files
:efer to 4ppen$i# 4 for the re2uire$ $irectory structure.
4(1 N-):/,= T*0-
A ne* version of NTP %Net*ork Ti(e Protool) (ay be inl'ded in the '!$rade# and (ay i(!at
:ti(e: in the syste(+ In addition# bea'se an '!$rade re;'ires re&bootin$ both ontrollers and
<4Is# it (ay reveal iss'es *ith syste( ti(e# and in so(e ases these (ay reate 'ne9!eted side&
effets+ Chan$es in ti(e an also affet other syste(s# (ost notably data lo$$in$ syste(s *hih
order events and or$ani=e their internal data str't'res based on ti(e+ To avoid these sit'ations#
before startin$ an '!$rade !ro!er o!eration of :ti(e: in the syste( sho'ld be verified# and
defiienies noted sho'ld be orreted+ This *ill (ini(i=e or eli(inate any effets fro( the
'!$rade
If ti(e is not 'nifor( thro'$ho't the syste(# revie* and 'nderstand the effet of han$es on any
other !ro$ra(s before orretin$ ti(e+ DO NOT !erfor( the '!$rade 'ntil syste( ti(e is
rational+
4(2 HMI T*0- 412 C/19*86,4)*/1
Refer to >EI&066868# fo'nd in :5tart.Pro$ra(s.>E Control 5yste( 5ol'tions.Net*ork Ti(e
Protool.Do'(entation:# for f'rther infor(ation on set'! and onfi$'ration of ti(e in the
syste(+
For eah <4I in the syste(# reord the 'rrent ti(e (aster and synhroni=ation stat's by do'ble&
likin$ on the lok ion on the ri$ht side of ?indo*s syste( tray# or 'sin$ :5tart.Pro$ra(s.>E
Control 5yste( 5ol'tions.Net*ork Ti(e Protool.NTP Dia$nostis:+ That ion sho'ld be $reen#
and the NTP statistis for :loalhost: sho'ld sho* the na(e of the 'rrent ti(e (aster *ith a
$reen bak$ro'nd# and less than 0866 %(illiseonds) of offset+ If the indiated ti(e (aster
inl'des a ti(e ard *ith aess to a >P5 satellite si$nal# the $trat#( of that (aster sho'ld be
:0:# in the :st: ol'(n of the stat's dis!lay+ Reord also the na(es of any seondary ti(e so'res
sho*n in the dis!lay# alon$ *ith their strat'( and offset+
2sin$ :start.settin$s.ontrol !anel.date&ti(e:# verify that the <4I o(!'ter ti(e is orret+
9/13/2006 08:20:00 PM Revision 8.0 Page #9 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
Verify the <4I@s NTP onfi$'ration 'sin$ :5tart.5ettin$s.Control Panel.Net*ork Ti(e Protool:+
In (ost ases# the <4I sho'ld be onfi$'red as a 'niast lient+ At least one <4I sho'ld be
onfi$'red as a 'niast (aster# nor(ally the <4I *ith onnetion to a satellite ti(e reeiver+
4(3 M4,= VI C/1),/>>-,
N/)- )34) )3*+ 7/,)*/1 /9 )3- *1+),6.)*/1+ 34+ A--1 +*81*9*.41)>5
.3418-2 )/ ,-9>-.) )3- 1-: 678,42- 7,/.-++ :3*.3 *+ 4++/.*4)-2
:*)3 )3- 1-: 06>)*BC-,+*/1 R61)*0- .474A*>*)5( T3*+ :4+ *1),/26.-2
:*)3 -TCSS V$4($3($$C 412 3*83-,(
The ne' multi/version capable :untime 'ill essentially allo' for more than one
version of Mark VI :untime to resi$e on a 7MI. This provi$es the ability to up&ra$e
the :untime on one or more units for a &iven site, 'ithout re2uirin& the up&ra$e to
be performe$ on all units. Each unit 'ill have the proper mappin& to the appropriate
version of :untime 'hich it is usin&.
This ne' multi/version capability has been implemente$ in the same 'ay that it has
been $one for other multi/version pro$ucts, such as E!1"" for instance. .lease
follo' these instructions e#plicitly to ensure that the up&ra$e is performe$ correctly.
T/ 04*1)4*1 *1)-,94.-+ :*)3 /)3-, +5+)-0+; DO NOT <74.= 4>4,0+<
/, <./07,-++ %EGD& -?.3418-< 26,*18 41 678,42-(
5or each control, open that unit?s confi&uration file usin& the current version of
,ontrol System Toolbo#, connect to the control, an$ verify that the file is *e2ual* an$
on/line +controllin&-. 5or an .m=b file, this can be verifie$ usin& the toolbo# to check
that the 6,V# +controller- I01 state is *=4* +in a TM: system, this is re2uire$ for all
racks- an$ that the control state is *,4* +a&ain re2uire$ for all racks in a TM:
system-. The presence of either a ma(or or minor revision M6ST be resolve$ before
procee$in& 'ith the up&ra$e, as this in$icates that the file that is open $oes not
match 'hat is currently runnin& in the control. If the up&ra$e is performe$ 'ithout
resolvin& the $ifferences, chan&es ma$e +an$ runnin& in the machine- may be lost.
In a$$ition, the ma(or revision status may in$icate that chan&es have occurre$ in the
E93 pa&es, an$ may result in loss of $ata to the screens after the up&ra$e.
4 file that is e2ual, but 'ill not &o *on/line* +into the control state-, M6ST be
resolve$ before procee$in&.
M4EE S6:E all confi&uration files are *e2ual* 'ith panel before procee$in&.
9/13/2006 08:20:00 PM Revision 8.0 Page #10 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
>hen the correct, e2ual, confi&uration file has been i$entifie$, revie' an$ recor$
any control constants that are not the same in the control as in the confi&uration file.
>ith the *master* confi&uration file open an$ on/line to the controller, recor$ any
constants that are $ifferent as in$icate$ usin& the *vie'0control constants* screen of
the ,ontrol System Toolbo#. >hile the screen is open, use *file0e#port to .csv*
comman$ to pro$uce a recor$ of the constants. If the *value* $oes not match the
*initial value* it 'ill revert to the *initial value* 'hen the control is re/boote$.
3ifferences may reflect thin&s such as tunin& or e#perimental chan&es to operatin&
con$itions, an$ each $ifference must be recor$e$ an$ un$erstoo$ before the
up&ra$e. :ecor$ the $ecision an$ value for each to be use$ after the up&ra$e in the
.csv file pro$uce$ above.
6n$er the same con$itions, recor$ the alarm $rop numbers usin& the
*vie'0reports0alarm list* ,ontrol System Toolbo# screen. 6se *file0e#port to .csv* to
recor$ the $rop numbers. ;ote) $o ;1T perform *$evice0pack alarms* before,
$urin&, or after the up&ra$e process, to avoi$ chan&in& the alarm $rop numbers.
6n$er the same con$itions, repeat for any lo&ic forcin& usin& the *vie'0force lists*
,ontrol System Toolbo# screen. Each force$ si&nal must be recor$e$ an$
un$erstoo$ before the up&ra$e. :ecor$ the $ecision an$ value for each to be use$
after the up&ra$e.
6n$er the same con$itions, navi&ate to the *MkVI I01* level in the .m=b file, ri&ht/
click on that level, an$ select *,ompare ,onfi&uration*. 4ny $ifferences must be
resolve$ before procee$in&, since they represent chan&es ma$e to car$s that 'ere
not save$ in the confi&uration file. :ecor$ them if necessary by pro$ucin& an$
printin& a $ifferences report.
>hile on/line 'ith the controller, check for active $ia&nostic alarms on the Mark VI
I01 car$s. 5or each car$, ri&ht/click, use the *vie' $ia&nostic alarms* choice, an$
recor$ any active $ia&nostic alarms. It may be necessary to first clear inactive
$ia&nostic alarms to reach the state 'here the $ia&nostic car$ point is Dero.
:esolve or un$erstan$ all active $ia&nostic alarms before procee$in& 'ith the
up&ra$e. ;ote that althou&h a yello' %E3 on an I01 car$ or a V,MI in$icates that a
$ia&nostic alarm +not necessarily active- is present, the lack of an %E3 may simply
in$icate a faile$ %E3 / use the toolbo#.
5or TM: systems, resolve all the issues relate$ to TM: operation an$ make sure all
the controllers are on line before the up&ra$e. Vie' the 3ia&nostic alarms an$ make
sure no *mismatch* $ia&nostic alarms are present, as these $ia&nostics may
9/13/2006 08:20:00 PM Revision 8.0 Page #11 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
in$icate har$'are or application soft'are issues that coul$ compromise TM:
operation. :esolve all issues before procee$in& 'ith the up&ra$e.
,reate a backup copy of the .m=b file by renamin&, suffi#in& *yyyymm$$Fhhmm* to
the filename, an$ then copy that file back to the ori&inal filename. 5or e#ample,
*914.m=b* 'oul$ be rename$ to *914F!""41"1GF"4!5.m=b* an$ then that file
copie$ back to *914.m=b*. This se2uence preserves the file creation $ates an$
times to avoi$ confusion. ,han&e the properties of the ne' .m=b file to un/check the
rea$/only attribute.
8ack up e#istin& soft'are to a backup portion of the har$ $rive or to another
machineHs har$ $rive. Inclu$e the e#istin& S38, firm'are an$ .tre files. This 'ill
make it possible to return to the e#istin& operatin& point if problems occur. The
backup shoul$ inclu$e the IMasterJ sub$irectory an$ the Ifirm'areH an$ Istan$ar$
treH sub$irectories locate$ I,)K.ro&ram 5ilesK9E ,ontrol System SolutionsKMarkVIH
sub$irectory.
8efore be&innin& the up&ra$e, it is recommen$e$ that the Mark VI m=b files be
checke$ for e#istin& confi&uration issues by first performin& an e#port0re/import.
This 'ill verify that all re2uire$ libraries can be properly instance$. ;ote that this
verification step can also be performe$ by the ,ontrols ,1E if the up&ra$e is bein&
performe$ in con(unction 'ith other TI% up$ates. ;ote that the actual e#ports an$
imports are no lon&er performe$ as part of the up&ra$e proce$ure 'ith the multi/
version :untime. The up&ra$e proce$ure 'ill instea$ use Toolbo# +menu bar L 5ile,
6p&ra$e- to perform the up&ra$e. If any errors are foun$, contact the ,ontrols ,1E
in or$er to obtain the correct libraries.
4(4 E21$$ E?.*)4)*/1
,heck the E!1"" har$'are an$ $etermine 'hich type of controller +4,%4 or
4,%E- is in the system. This information 'ill be re2uire$ $urin& the up&ra$e.
,onfirmin& the e#istin& E,8 5ile +$o this prior to installin& the Service .ack S>
onto the 7MI- by openin& the E,8 file in the e#istin& version of toolbo#. Verify there
are no messa&es in$icatin& that it 'as create$ 'ith an ol$er or ne'er version of
Toolbo#. If a 'arnin& messa&e appears then it is not the correct E,8 file. 1nce the
file is open, connect to the active Master core. There shoul$ be no messa&es about
problems in 5irm'are or :untime 'hen connectin&. If an error messa&e appears
then it is not the ri&ht file. 1nce connecte$, the lo'er ri&ht corner of the Status bar
shoul$ not in$icate any Minor or Ma(or $ifferences an$ the .arameter in$icator +M
si&n- shoul$ not be :e$ colore$. Either of these con$itions in$icates that the file is
not correct. It is possible that the latest file coul$ sho' Minor $ifferences, but that is
9/13/2006 08:20:00 PM Revision 8.0 Page #12 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
not $esire$. Save a copy of this file in a backup location usin& the same renamin&
se2uence as above.
4(5 P,-74,- )3- S5+)-0 S-,C*.-+
4(5(1 S)/7 )3- 477>*.4A>- +-,C*.-+
,lick on >in$o's *Start0Settin&s0,ontrol .anel*. 3ouble click on the services icon
an$ stop the follo'in& services +if runnin&-)
T,I +Turbine ,ontrol Interface-
;et'ork Time .rotocol +or ;et'ork Time .rotocol Server-
E93 Service ,ontrol System Solutions
S38 Server
3ata 7istorian
,lose the *Services* 'in$o', but leave the *,ontrol .anel* 'in$o' open.
+/:/* Close the NT# Status Indicator
,lose the ;T. Status In$icator by ri&ht/clickin& on the clock icon in the system tray
in the lo'er ri&ht han$ corner of the screen an$ selectin& *,lose ;T. Status
In$icator*.
+/:/. E9isting 7ar! VI Runtime
This multi/version :untime is inten$e$ to co/e#ist 'ith the e#istin& Mark VI :untime.
It 'ill be locate$ in a $ifferent sub$irectory than the e#istin& :untime installation.
N/)- )34) )3- -?*+)*18 M4,= VI R61)*0- +3/6>2 1/) A- ,-0/C-2
6+*18 C/1),/> P41->; A22DR-0/C- P,/8,40+( T3*+ :*>> 4++*+) *9
)3-,- *+ 4 1--2 )/ ,-C-,) )/ )3- 7,-C*/6+ R61)*0- +3/6>2 415
7,/A>-0+ A- -1./61)-,-2 *1 )3- 678,42-( T3*+ *+ 4>+/ 4 .3418-
9,/0 )3- 7,-C*/6+ 678,42- *1+),6.)*/1+(
9/13/2006 08:20:00 PM Revision 8.0 Page #13 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
5 P-,9/,0 )3- U78,42-
;1TE) This proce$ure must be repeate$ for each control in the system.
5(1 C,-4)- U78,42- D*,-.)/,*-+
4fter $eterminin& 'here the latest files for the Mark VI, e#citation, an$ static starter
are, create ne' sub$irectories for the up&ra$e at the same level in the $irectory
structure as the ori&inal .m=b file. >hen creatin& ne' sub$irectories, use the
e#istin& name plus the $ate to keep track of 'hat is bein& $one, i.e. unit1/!""51"!1
as sho'n in 4ppen$i# 4. 4&ain, MAKE SURE all files are e2ual 'ith panel before
procee$in&.
NTE! Close all Telnet and T"# sessions and exit from all $yperTerminal
sessions.
5(2 L/42 1-: S/9):4,- /1 41 HMI
I$entify the correct ,3 for the server. Most 7MIs 'ill use the NInterface to Turbine
,ontrol +T,I-J ,3. Insert the ne' eT,SS ,3 into the ,3 $rive, rememberin& to
'rite $o'n the license co$e off of the ,3. If enable$, the eT,SS ,3 'ill start itself,
but if it $oesnHt, $ouble click on My ,omputer an$ a&ain on the ,3 $rive icon. ;o'
$ouble click on setup.e#e.
4ccept the license an$ enter the license co$e, click on *;e#t*, an$ select *5ull*)
9/13/2006 08:20:00 PM Revision 8.0 Page #14 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
;ote) ,heck that the N;T.J service is offere$ for all 7MIHs e#cept those 'ith an
e#ternal clock car$. Those 7MIs must use the N;T. serviceJ.
4ccept the $efaults for the remain$er of the loa$in& process.
The eT,SS Service .ack ,3 'ill install the ne' Toolbo#, 3ata 7istorian, Mark VI
an$ E!1"" :untime soft'are as 'ell as a$$ the ne' firm'are an$ confi&uration
files to the 7MI.
6pon completion of soft'are loa$in&, remove the eT,SS ,3 from the ,3 $rive an$
,-A//) )3- HMI. This 'ill start all of the services back up, inclu$in& ,IM.%I,IT<, if
installe$.
5(3 V-,*95 HMI S/9):4,- I1+)4>>4)*/1
Verify that the installation 'as successful) from >in$o's *Start0.ro&rams09E
,ontrol System Solutions0Versions*, an$ confirm that all versions have been
up$ate$ as reflecte$ by the ?Install Source? fiel$)
1ptional / ;ote that the ne' installation may chan&e the location 'here the T,I
soft'are resi$es on the computer to *,)K.ro&ram 5ilesK9E ,ontrol System
SolutionsKT,I*. If present, the *,)KT,I $irectory* can be $elete$ to prevent
confusion. It may be necessary to stop the T,I service to accomplish this.
9/13/2006 08:20:00 PM Revision 8.0 Page #1! of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
6 C/19*86,*18 T//>A/?
If there is a Toolbo# icon on the $esktop, $ouble click on it other'ise click on
>in$o's *Start0.ro&rams09E ,ontrol System Solutions0,ontrol System Toolbo#*,
an$ then on the *,ontrol System Toolbo#* icon to brin& up the Toolbo# soft'are.
;ote) It is han$y to have a Toolbo# icon on the $esktop. 8efore startin& Toolbo#,
ri&ht/click on the icon an$ *,reate Shortcut*. 3ra& the ne' shortcut that
appears, an$ $rop it on the $esktop.
>hen the Toolbo# starts, click on *1ptions0Settin&s*, an$ click on the *3atabase*
tab. 5ill in the location of the S38 on the .37 +typically locate$ in the
,)KmasterKS38 sub$irectory-. Make sure the S38 sub$irectory has no files in it an$
then click on *,reate S38* for the S38 7MI only.
,lick on the *Tren$ :ecor$er* tab. Set the 3efault pen 'i$th to 1 an$ $isk space to
!" M8. ,lick on 1E.
! P,-74,*18 )3- N-: M4,= VI F*>-+
3ouble click on 9# or S# to e$it ,ontroller .roperties. Select the NMemoryJ tab an$
set NSystemJ memory to B1G! if available, or 4"G= if that is the ma#imum available.
1. 5or each unit, $etermine 'hether or not the :untime is bein& up&ra$e$ at
this time. 5or units that are not bein& up&ra$e$ to the ne' :untime, simply
open the file an$ save it in the ne' Toolbo# version. This 'ill ensure that it
$oesnHt &enerate the version mismatch $ialo& 'hen it is opene$ at a later
$ate.
!. 5or units 'hich are bein& up&ra$e$, please follo' this ne' up&ra$e
proce$ure. 9o to the ne' sub$irectories create$ in N.reparation for Soft'are
%oa$in&J section above.
5or each Mark VI to be up&ra$e$, the proce$ure is $ifferent.
D/ 1/) -?7/,) )3- (06A 9*>-+E If the .m=b file is e#porte$ from the
ol$ toolbo# an$ then importe$ 'ith the ne' toolbo#, the resultin&
file 'ill not contain the ne' :untime files.
5or each unit, open the I.m=bH files 'ith the ne' Toolbo# an$ click on N5ile,
6p&ra$eJ from the menu bar. 3o not use the previously use$ E#port0Import
process, as that 'ill result in the ol$ :untime soft'are bein& use$. The
6p&ra$e comman$ is nee$e$ to re$irect the confi&uration to the ne'
9/13/2006 08:20:00 PM Revision 8.0 Page #16 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
:untime version. >hen you select 6p&ra$e, it 'ill notify you that it is creatin&
an a$$itional backup file, an$ also prompt you for the ne' :untime version.
4fter you select the :untime version, it 'ill re$irect the confi&uration to the
ne' :untime an$ then perform an automatic back&roun$ e#port0import
resultin& in a ne' confi&uration file.
A. Verify that there are no errors 'hen the 6p&ra$e process is complete$. If
there are errors, they must be fi#e$ before procee$in& further. ;ote that it is
al'ays best to resolve the very first error encountere$, as the first error can
cause many a$$itional false errors to be &enerate$.
4. Verify that any 'arnin&s that may occur $urin& the 6p&ra$e are okay. These
are usually $ue to the .tre file up$ates that accompany the up$ate$ firm'are.
1pen the ol$ I.m=bH file an$ check each of the parameters that &enerate
'arnin&s an$ fin$ any 'ith si&nal names attache$. These si&nal names 'ill
not correctly import into the ne' I.m=bH file an$ must be resolve$ manually.
NTE! The tre file for V.:1 has chan&e$ its format for the thermocouple
inputs. Verify that the si&nals that 'ere on the ol$ thermocouple inputs are put
back on the ne' inputs. Input name chan&e$ from T,11 to T,1, T,1! to
T,1<, T,1A to T,1O etc.
5. Vali$ate +privile&e re2uire$-, buil$, an$ save usin& the same name as the
ori&inal .m=b, 'ith comments Nfirm'are up&ra$eJ. Inclu$e the eT,SS
version from the front of the ,3 in the comment. Make sure that the .m=b file
save is $one to the correct $irectory level, as the pro(ect file is one level
$eeper than 'here the .m=b belon&s.
=. 1pen S<S.syb +un$er ,)KMasterK7MI3eviceK-, perform a put to the S38 by
clickin& on N3evice0.ut Into 3atabase05ullJ, an$ save the file.
C. 5rom each .m=b file, perform a put to the S38 as in the previous step.
;ote) 4t this point, it is not a$vise$ to perform a N9et 5rom 3atabaseJ for the
Mark VI files since the e#citer an$ static starter files also nee$ to be up$ate$. 4s
these ne' files are create$, a N.ut Into 3atabaseJ shoul$ be performe$ from
each of these ne' files. 1nly after all controllers have NputJ their information to
the $atabase shoul$ all controllers +an$ other $evices- N9et 5rom 3atabaseJ for
the ne' information.
8 P,-74,*18 O)3-, S5+)-0 F*>-+
9/13/2006 08:20:00 PM Revision 8.0 Page #1" of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
;1TE) If the system has an E!1"", as $iscusse$ earlier, an
e#port0import is ;1T performe$ 'ith E!1"" .ecb files. Instea$, after the
ne' toolbo# is installe$ the ol$ .ecb file shoul$ be opene$ an$ a 5ile P
6p&ra$e performe$. 1nce this is $one an$ each e#citer file is save$ in
the ne' Toolbo# version, the N.ut Into 3atabaseJ shoul$ be $one for each
e#citer. >hen the I9et 5rom 3atabaseH is performe$ later 'ith all of the
other files, it shoul$ also be $one 'ith the .ecb files.
6p$atin& the E#citation an$ Static Starter files is very similar to the prece$in& section
for Mark VI.
9o to the ne' sub$irectories create$ in I.reparation for Soft'are %oa$in&H section
above. 5or each of the follo'in& files, open the file 'ith the ne' toolbo# an$ click on
N5ile0E#port/I4llJ to e#port the pro(ect. 1pen the resultin& pro(ect file +.pr(- to import in
the ne' toolbo#, an$ save the results. Then N3evice0.ut Into 3atabase05ullJ for
each $evice. These have to be e#porte$ one by one, not all at the same time. Select
specifie$ fol$er +create$ for up&ra$e in step !- for the files
1. 5or each E!""" e#citer, bro'se to itHs fol$er, e#port0import, save, an$ put)
.ucb +un$er ,)KMasterK9#Ke#citerKe#!kKuc!kKmain-
.ocb +un$er ,)KMasterK9#Ke#citerKe#!kKoc!kKlocal-
.$cb +un$er ,)KMasterK9#Ke#citerKe#!kKuc!kKlocal- 3o not e#port .$cb
files. 1pen the e#istin& .$cb files 'ith the ne' toolbo# an$ perform a
N.ut Into 3atabaseJ. Save the file an$ close it.
!. 5or each E!1"" e#citers the proce$ure is $ifferent.
D/ 1/) -?7/,) )3- (-.A 9*>-+E If the .ecb file is e#porte$ from the
ol$ toolbo# an$ then importe$ 'ith the ne' toolbo#, the resultin&
file 'ill not be usable.
>ith the ne' toolbo# loa$e$ onto the computer, open the ol$ .ecb file in the
ne' toolbo#. 1nce it is open, choose N5ile06p&ra$eJ to up&ra$e it to the ne'
version of toolbo#. Save the resultin& file, an$ put to the $atabase.
9/13/2006 08:20:00 PM Revision 8.0 Page #18 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
A. 5or each %,I Static Starter# bro'se to itHs fol$er an$ e#port0import, save, an$
put .ucb +un$er ,)KMasterK9#KStaticStartKSS#-
;ote) This may be un$er ,)KMasterK9#KStaticStartKuc!k in ol$er
systems.
.ocb +un$er ,)KMasterK9#KStaticStartKoc!k-
.$cb 3o not e#port .$cb files. 1pen the e#istin& .$cb files 'ith the ne'
toolbo# an$ perform a N.ut Into 3atabaseJ. Save the file an$ close it.
4. 5or each %S!1"" Static starter, bro'se to itHs fol$er, open the .lsb file, an$
save it in the ne' toolbo# version
5. 1ther system files, bro'se to itHs fol$er,
.reb +un$er ,)KMasterK9#K- e#port0import, an$ save the file)
9/13/2006 08:20:00 PM Revision 8.0 Page #19 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
" S51.3,/1*F*18 A>> S5+)-0 F*>-+ :*)3 )3- N-: SDB
4t this point, all components of the system +.m=b, .ucb, .ocb, .ecb, etc- shoul$ have
been converte$ to the ne' toolbo# version, save$ as a file in the ne' version, an$
NputJ their up&ra$e$ information into the S38. ONLY after ALL components have
contribute$ their information to the S38 in the up&ra$e$ format, perform a N9et
5rom 3atabaseJ for each ne'ly importe$ file. Vali$ate, buil$, an$ save the ne' files.
If it is later $iscovere$ that a component has been overlooke$, after itHs information
has been put to the $ata base the N9et, Vali$ate, 8uil$, 3o'nloa$J se2uence shoul$
be repeate$ for all of the system components. This assures that all $evices are
usin& the correct format of the $ata that they e#chan&e. 8ecause the impact of this
can be si&nificant late in the process, it is important that an accurate inventory of
the components is create$ an$ maintaine$ $urin& the up&ra$e process.
9/13/2006 08:20:00 PM Revision 8.0 Page #20 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
1$ D/:1>/42 )/ )3- S5+)-0 %M4,= VI&
1. Isolate the panel from the 1SM +1n Site Monitor-, if the site has an 1SM. There
have been instances 'here an 1SM has prevente$ $o'nloa$s from bein&
performe$. 8e certain to contact the 9E MQ3 1perations &roup notifyin& them
of the status of the 1SM before an$ after the up&ra$e has been performe$.
They may be contacte$ at BR!B=/C""" or +B""-CA5/!"44.
!. 8efore startin& $o'nloa$s to the system, the S38 must be current from all units,
inclu$in& e#citers, starters, etc. 4s e#plaine$ earlier, perform a N.ut Into
3atabaseJ from all units, an$ then a N9et 5rom 3atabaseJ for each of the .m=b
files. Then vali$ate an$ buil$ the .m=b files, an$ use the resultin& application +p/
co$e- for the $o'nloa$s.
O,2-, /9 2/:1>/42 /9 9*>-+G
Summary) +see $etails belo'-
5lash 1ne controller at a time
:untime :eboot entire panel
4pplication co$e :eboot entire panel
5irm'are
N/)- )34) )3- 2/:1>/42 /,2-, 34+ .3418-2(
;ote) 3urin& the up&ra$e if you come across any unusual problem
the best thin& is contact Salem to &et the problem resolve$. It is very
important to have a backup of the m=b files to help to resolve any
problems $urin& an$ after the up&ra$e.
4l'ays observe an$ revie' any error or 'arnin& messa&es that occur,
an$ correct the problem before procee$in& to the ne#t step.
A. ,ontroller ,ompact 5lash must be loa$e$ if there has been a revision. The
5lash version may be $etermine$ one of t'o 'ays. <ou can lo&in to the
controller +serial or Telnet- an$ issue the *ucinfo* comman$, or you may use
Toolbo# to &o online to the controller of interest, an$ select NVie'0,ontroller
Status ,omman$s0;et'ork03isplay controller I. informationJ. 8oth metho$s 'ill
&ive you the controller 5lash version. To fin$ out 'hich version of 5lash has
been loa$e$ on your 7MI from the up&ra$e, click on NStart0.ro&rams09E ,ontrol
9/13/2006 08:20:00 PM Revision 8.0 Page #21 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
System Solutions0Mark VI ,ontroller07elp05lash :elease ;otesJ. The specific
5lash Versions are liste$ at the top for each of the $ifferent versions of
Innovation Series controllers. %ook for the one associate$ 'ith 6,VE. These
versions shoul$ match.
The ,ompact 5lash is loa$e$ usin& a ,ompact 5lash pro&rammer. This is a
$evice 'hich is inclu$e$ in the Mark VI Service Eit that ships 'ith every Mark VI
panel. It is usually enclose$ in plastic alon& 'ith the remain$er of the parts like
fuses, (umpers, an$ serial cables. It can be foun$ tape$ to the floor of the panel.
This pro&rammer is a 6S8 $evice, so it nee$s a >in$o's !""" or later 1S
'hich supports 6S8. >in$o's ;T, an$ some ol$er computers, $o not support
6S8 / it may be necessary to loa$ the eT,SS ,3 onto a >in$o's !""" or later
computer 'ith a 6S8 port to use the ,ompact 5lash pro&rammer. Make sure that
the correct eT,SS version is use$ L use the ,3 that 'as use$ to loa$ the 7MI
'orkstation+s-.
:emove the ,ompact 5lash from the 6,VE +clip the cable tie an$ raise the 'ire
clip- an$ place it into the compact flash pro&rammer. To pro&ram it, open the
associate$ .m=b file for that unit in Toolbo#. Select N3evice03o'nloa$ ,ompact
5lashJ an$ follo' the prompts. The prompt for processor helps it $etermine
'hich I. a$$ress to loa$ it 'ith the flash ima&e.
4. ;e#t $o'nloa$ :untime +select the unit, then use *3evice03o'nloa$0.ro$uct
,o$e +:untime-*- to all three controllers. ;ote that this 'ill chan&e the status
from *e2ual* to *ma(or $ifferences*, an$ any attempt to &o online 'ith the
controller 'ill probably fail until the up&ra$e is complete$. Make sure the
follo'in& selections are ma$e or enable$. Select *;o* 'hen prompte$ to reboot
the controller, as all three 'ill be re/boote$ later.
9/13/2006 08:20:00 PM Revision 8.0 Page #22 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
NTE! "%TP and #odbus are less frequently used than some of the other
files. $old &ist is typically used only for steam turbines. 'n (eneral it
is ad)ised to use the pre)ious selections and ne)er use the *"can
hardware for su((estions+ option.
9/13/2006 08:20:00 PM Revision 8.0 Page #23 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
Vali$ate, 8uil$ an$ 3o'nloa$ the 4pplication ,o$e to the controllers.
9/13/2006 08:20:00 PM Revision 8.0 Page #24 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
9/13/2006 08:20:00 PM Revision 8.0 Page #2! of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
;ote that there are no lon&er options for buil$in&0$o'nloa$in& of symbols an$
compresse$ controller files, as these are no' $one automatically. 4&ain reboot
all of the controllers an$ the V.:1 car$s.
5. 3o'nloa$ the firm'are to the panel usin& Toolbo#. ;ote that 5lashman cannot
be use$ on systems 'ith V,MI7!, boar$s $ue to har$'are chan&es, so these
instructions no lon&er support the use of 5lashman. The preferre$ metho$ is to
select an$ hi&hli&ht IMark VI I01H, ri&ht click, then select I3o'nloa$H an$
I3o'nloa$ 5irm'areH, an$ click I1EH. This 'ill loa$ the firm'are into all of the
car$s in the panel. :epeat the firm'are $o'nloa$ until all car$s report
*Skippin&*, to verify that firm'are has been successfully $o'nloa$ to all I01
car$s. ,onnect to the controller usin& the Toolbo#. The controller shoul$ be
Ne2ualJ, an$ &o Non/lineJ at this sta&e. :efer to 1! NVali$ate the 6p&ra$eJ section
belo' for further information.
=. Stop an$ restart the T,I service on the 7MI, usin& the comman$ prompt to N;et
Stop T,IJ an$ N;et Start T,IJ.
C. Verify the co$e is 'orkin& properly an$ the Mark VI unit shoul$ be rea$y for
operation. Verify that all converte$ .m=b files have been save$ back to the
Master $irectory.
11 D/:1>/42 )/ )3- +5+)-0 %E?.*)-, ' S)4)*. S)4,)-,&
1. 3o'nloa$ runtime to the controllers.
5or the E?.*)-,, $o'nloa$ the follo'in& runtimes)
M1;IT1:
6TI%IT<
ST4T6SFS
E93
S:T.
If the system has E!1""?s, the follo'in& thin&s nee$ to be $o'nloa$e$ to each
E!1"" after the .ecb files 'ere up&ra$e$ to the ne' toolbo#.
a. T,.0I. a$$resses must be loa$e$ into each 4,%404,%E car$ if the
correct T,.0I. a$$ress is not alrea$y loa$e$ +serial $o'nloa$-.
b. 3S. runtime +firm'are- to all A 3S. car$s +serial $o'nloa$-
9/13/2006 08:20:00 PM Revision 8.0 Page #26 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
c. 3S. parameters to all A 3S. +serial $o'nloa$-
$. 4,%404,%E pro$uct co$e +runtime- to both M1 an$ M!?s 4,%404,%E
car$s / $o'nloa$e$ throu&h Ethernet
e. 4,%404,%E application co$e to both M1 an$ M!?s 4,%404,%E car$s
+$o'nloa$e$ to each controller after the file is vali$ate$, built an$ save$
once- / $o'nloa$e$ throu&h Ethernet
Specific instructions are available for each of these $o'nloa$s to the
E!1"". These instructions can be foun$ on Support ,entral in the *E!1""
9enerator E#citation* community. The $ocument is the *4,%4 an$ 3S.
$o'nloa$in& instructions* un$er *Suick Tips* an$ *Information an$ 5i#es.*
5or %,I S)4)*. S)4,)-,, $o'nloa$ the follo'in& runtimes)
M1;IT1:
6TI%IT<
4,%
ST4T6SFS
E93
9E;I6S
N/)-G See appen$i# for $etail instruction
!. 3o'nloa$ the application co$e to the controllers.
A. :eboot all of the controllers.
4. Verify the co$e is 'orkin& properly an$ the unit shoul$ be rea$y for operation.
5. ,lean up the 7MI by removin& the $irectory 'ith the tree file that you create$ at
the be&innin& of this soft'are installation. These are the $irectories that you
e#porte$ the files to. Verify that all converte$ files have been save$ back to the
Master $irectory.
9/13/2006 08:20:00 PM Revision 8.0 Page #2" of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
12 V4>*24)- )3- 678,42- /7-,4)*/1
12(1 M4,= VI C/1),/>>-,
1pen the .m=b file, connect to the controller, an$ verify that it is e2ual an$ on/line.
6sin& the capabilities of the up&ra$e$ ,ontrol System Toolbo#, initially 'hen you
connect to the controller a &rey/out bo# *6;E;* 'ill appear on lo'er status bar of
the screen, (ust to the left of 'here the *e2ual* bo# appears on the ri&ht/han$ en$ of
the bar. 4s the controllers po'er up, this bo# 'ill in$icate their status.
3ouble/click on this bo# to brin& up a $isplay of the I01 an$ control states for the
controller+s-. They shoul$ all reach &reen *on/line* states, 'ith the I01 at state *=4*
an$ the controller at state *,4*.
The screen shoul$ also in$icate *e2ual*. The combination of the &reen *on/line* +or
state 1"= in the controllers- an$ *e2ual* in$ications sho' that the control is
up&ra$e$, an$ that the E93 e#chan&e has been preserve$.
NOTEG W3*>- 41 678,42- *+ *1 7,/8,-++; 74,)*.6>4,>5 4 74,)*4>
678,42- /9 4 06>)*B61*) +5+)-0; 2/ NOT 6+- <M/2*95<; <U1>/.=<; /,
<C/07,-++ E?.3418-< /1 415 /9 )3- EGD -?.3418-+; 415:3-,- *1
)3- +5+)-0; )/ 7,-C-1) >/++ /9 24)4 -?.3418- A-):--1 61*)+ *1 )3-
+5+)-0(
6n$er the same con$itions, use the *vie'0reports0alarm list* ,ontrol System Toolbo#
screen an$ *file0e#port to .csv* to a&ain collect the $rop numbers. 5or each alarm,
sort the *before* an$ *after* files by *alarm I3*, an$ compare the t'o files to verify
that the $rop numbers have not chan&e$ $urin& the up&ra$e.
D/ NOT 6+- <2-C*.-D74.= 4>4,0+< A-9/,-; 26,*18; /, 49)-, )3-
678,42- 7,/.-++; +*1.- )3*+ :*>> .3418- )3- 4>4,0 2,/7 160A-,+(
6se *vie'0controller status comman$s0&eneral0controller states* to verify the
controller runtime version that has been loa$e$, an$ recor$ it usin& file0save to save
it as a .t#t file. The runtime version must be i$entical in all controllers.
>hen the controller is on/line, navi&ate to the *MkVI I01* level in the .m=b file, ri&ht/
click on that level, an$ select *,ompare 70> 8oar$ :evisions*. 5or each car$,
verify that the value in the *Tool 5irm'are :evision* column matches the value in
the *3evice 5irm'are :evision* column, to confirm that all the firm'are $o'nloa$s
succee$e$. >hile in the compare screen, use file0e#port to recor$ the information in
a .csv file.
9/13/2006 08:20:00 PM Revision 8.0 Page #28 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
6n$er the same con$itions, navi&ate to the *MkVI I01* level in the .m=b file, ri&ht/
click on that level, an$ select *,ompare ,onfi&uration*. 4t this sta&e there shoul$
be no $ifferences. Make any necessary confi&uration chan&es usin& the $ifferences
report prepare$ earlier.
>hen the controller is on/line, up$ate the control constants usin& the recor$ ma$e
earlier an$ re/force the points recor$e$ earlier to return the control system to its
operational state. ,reate an$ save another .csv file of the control constants to
recor$ the *as/up&ra$e$* state of these values.
5or turbine controls, in the tripFhistory mo$ule verify the presence of a FmoveFb
block bet'een the %4T si&nal an$ the tr_sig input of the capture block+s-. 4$$ that
block if necessary +minor $ifference, on/line $o'nloa$ an$ save .m=b-. Test the trip
lo& by +1- force the moveFb output to ", +!- force the bfilt block output to 1 to make
the enaFcap capture block+s- input true, +A- force the moveFb output to 1 an$ then
back to ". >ait until the capture block done output &oes true an$ remove the forces.
Verify that a ne' trip lo& file 'ith the correct $ate an$ time has been create$.
4t this point the .m=b shoul$ be e2ual, the .m=b file save$, an$ the control on/line.
,lose the toolbo#, re/open the .m=b file +shoul$ still be e2ual-, connect to the
control +shoul$ still be on/line-, an$ uploa$ the compresse$ .m=b that 'as
$o'nloa$e$ to the control earlier. Verify that the $o'nloa$e$ .m=b is e2ual an$ the
control on/line.
:esolve an$ clear if possible any $ia&nostic alarms that may have appeare$ $urin&
the re/boot process. 4t this point the Mark VI control is rea$y for operation.
9/13/2006 08:20:00 PM Revision 8.0 Page #29 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
12(2 E21$$ F*>-+
,onnect to the M1 core. There shoul$ be no messa&es about problems in 5irm'are
or :untime 'hen connectin&. If an error messa&e appears then there may have
been a problem in the vali$ation $urin& the up&ra$e process. 1nce connecte$, the
lo'er ri&ht corner of the Status bar shoul$ not in$icate any Minor or Ma(or
$ifferences an$ the .arameter in$icator +M si&n- shoul$ not be :e$ colore$. Either
of these con$itions in$icates that an error may have occurre$. ,onnect to the M!
core. There shoul$ be no messa&es about problems in 5irm'are or :untime 'hen
connectin&. If an error messa&e appears then there may have been a problem in the
vali$ation. 1nce connecte$, the lo'er ri&ht corner of the Status bar shoul$ not
in$icate any Minor or Ma(or $ifferences an$ the .arameter in$icator +M si&n- shoul$
not be :e$ colore$. Either of these con$itions in$icates that an error may have
occurre$. 6sin& the serial cable, connect to the , core. There shoul$ be no
messa&es about problems in 5irm'are or :untime 'hen connectin&. If an error
messa&e appears then there may have been a problem in the vali$ation. 1nce
connecte$, the .arameter in$icator +M si&n- shoul$ not be :e$ colore$. This
con$ition in$icates that an error may have occurre$.
These steps confirm that the soft'are up&ra$e has complete$ successfully, that the
E!1"" has been fully $o'nloa$e$, an$ is it rea$y to start.
12(3 LS21$$ F*>-+
1pen the .lsb file an$ verify that it is e2ual.
9/13/2006 08:20:00 PM Revision 8.0 Page #30 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
A77-12*? A( HMI D*,-.)/,5 S),6.)6,-
,)KmasterK +;ote that E $rive is use$ on >in$o's !""" 7MIs-
Sys.sys
hmi$evice
9TI1.hmb
,:M1.7M8
Trip%o&.reb
unit1K
,impro(K
4larm 7elpK
4larm 7elp 5iles
e#citerK
e1.ecb
staticstartK
oc#!k
oc1.ocb
uc!k
ss1.ucb
alarm.$at
soe.$at
&1.m=b
&1r.ssf
&1s.ssf
&1t.ssf
unit1/!""1"A11K+contains .tre Q .pr( files-
unit!K
unitAK
unit#K
s$bK 6sually on remote hmi for multi/unit systems
;ote) If the unit has an E!""" instea$ of E!1"", the E1.ecb file 'ill be replace$
by E!E, 1,!E an$ 6,!E fol$ers containin& .ubc, .ocb an$ .$cb files respectively.
3epen$in& on 'hat version of %,I the system has, the static start fol$er coul$ be
set up completely $ifferent. Insi$e the Static Start fol$er coul$ contain the follo'in&
fol$ers if these components e#ist on the system +3atapanel15", 3S.,, .%,, SS1-.
The SS1.ucb file 'ill be containe$ in the SS1 fol$er.
9/13/2006 08:20:00 PM Revision 8.0 Page #31 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
A77-12*? B( U78,42- C3-.=>*+)
6nit M% ;umber) 6nit M% ;umber) 6nit M% ;umber)
Item ;ame
Item Status for 6nit
FFFFFFFFFFFFFFF
Item Status for 6nit
FFFFFFFFFFFFFFF
Item Status for 6nit
FFFFFFFFFFFFFFF
.re/6p$ate ,hecklist
1
>ork scope an$ interactions
revie'e$
!
,urrent installe$ version+s-
i$entifie$ an$ correct service
pack or$ere$
A
%1T1 plan inclu$in&
au#iliaries revie'e$
4
E#port0Import 'ith current
toolbo#
.rocess 4larms
,onfi& 5ile
4.1 MkVI E2ual
1n/%ine
,ontrol ,onstants
,, 5ile Save$
4larm 3rop Ts
4larm 5ile Save$
5orce %ist
I01 ,onfi&uration
3ifferences :eport
4ctive 3ia&nostics
Mismatch 3ia&s
Esport0Import to verify
libraries
8ackup Save$
9/13/2006 08:20:00 PM Revision 8.0 Page #32 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
4.! E#!1"" Version ,heck
4ctive ,ore Errors
3ifferences0E2ual
8ackup Save$
6p&ra$e ,hecklist
5.1 Mark VI ;et stop T,I
Start eT,SS ,3
;et start T,I
;e' E#port 5ol$er
5.! E#port Mark VI 1pen .m=b
1ver/ri$e mo$ules
5ile0E#port0all
Verify no errors
5.A ,reate ;e' Mark VI 1pen .pr(
Verify no errors
Vali$ate08uil$0Save
5.4 Mark VI 3o'nloa$s
5.4.1 :untime
3o'nloa$ :untime :,S,T
Selecte$ 5iles
5.4.! 4pplication
Vali$ate08uil$03o'nloa$
4pplication, Symbols,
,ompresse$ .m=b
Save .m=b
5.4.A 5irm'are 3o'nloa$ 5irm'are
:epeat firm'are
$o'nloa$ until all car$s
report *skippe$*
:epeat confi&uration
$o'nloa$
:eboot .anel, inclu$in&
V.:1s
9/13/2006 08:20:00 PM Revision 8.0 Page #33 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
5.5 6p&ra$e E!1"" 1pen .ecb, &o online
4$$ note
:ecor$ 8oar$ Type
5ile06p&ra$e
Vali$ate08uilt0Save
5.4 E!1"" 3o'nloa$s
5.=.1 3S. 3o'nloa$ 3S., M1
3o'nloa$ 3S., M!
3o'nloa$ 3S., ,
5.=.! 3o'nloa$ 4,%#
5irm'are 3o'nloa$ M1 :untime
3o'nloa$ M! :untime
3o'nloa$ , :untime
:eboot ,ontrollers
5.=.A 3o'nloa$ 4,%#
4pplication 3o'nloa$ M1 4pplication
3o'nloa$ M! 4pplication
3o'nloa$ M1 .arameters
3o'nloa$ M! .arameters
5.=.4 Vali$ate E!1"" .o'er cycle M1, M!, ,
M1 E2ual Status
E2ual .arameters
M! E2ual Status
5.C :emainin& System
%ist other .,s an$ install
,3
1pen an$ Save units not
up&ra$e$
.ost/6p$ate Verification ,hecklist
=.1 MkVI Version ,heck
E2ual
,ontrol Status
I01 Status
4larm 5ile Save$
4larm 3rop Ts
:untime Version
Version 5ile Save$
5irm'are Versions Match
9/13/2006 08:20:00 PM Revision 8.0 Page #34 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
5irm'are Version 5ile
save$
,ontrol ,onstants
,, 5ile Save$
,onfi&uration
5orce %ist
3o'nloa$e$ .m=b e2ual
Turbine Triplo& Test
=.! E#!1"" M1 ,ore ,onnect
M1 E2ual
M! ,ore ,onnect
M! E2ual
,,ore ,onnect
, E2ual
9/13/2006 08:20:00 PM Revision 8.0 Page #3! of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
A77-12*? C( C/19*86,*18 A N-: T,*7 L/8
W*)3 -TCSS V$1($$($2 412 >4)-, C-,+*/1+; )3- T,*7 >/8 06+) A-
./19*86,-2 6+*18 )3- D4)4 H*+)/,*41(
1. :ecor$ information nee$e$ to confi&ure the trip lo&
hosts file) :ecor$ name an$ I. a$$ress of the 7MI on the 637
hosts file) :ecor$ name an$ 637 I. a$$ress of theU:P controller for
each unit to be a$$e$ to the triplo&, for e#ample *91* an$
1G!.1=B.1"1.111
,reate $irectory structure on the 7MI
,)KMasterK
,)KMasterKTripF%o&
!. 1pen toolbo# an$ the appropriate .m=b file for the turbine control for 'hich
the trip lo& is to be confi&ure$.
A. Select *5ile0;e'* an$ create a 3ata 7istorian)
4. 3ouble/ or ri&ht/click on the ne'ly create$ *$h1* an$ use *mo$ify* to chan&e
the $evice name to *Trip 7istory 6nit 1* +for 91-, an$ the *3ata 7istorian
7ost ;ame* to the name of the 7MI as recor$e$ from the hosts file. The
*7ost I. 4$$ress* shoul$ $efault to the 7MI?s 637 a$$ress, if not a$$ that
a$$ress from the hosts file +for e#ample 1G!.1=B.1"1.AG-. ,lick I1EH.
5. 4$$ collections for each of the units. :i&ht/click on *collections* an$ use
*insert first* to a$$ the first collection. Select *Trip %o&* as the collection type
9/13/2006 08:20:00 PM Revision 8.0 Page #36 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
=. ,onfi&ure the source of the collection $ata)
The *E93 ;et ;ame* is al'ays E931. *6nit ;ame* an$ *T,I 4larm Server
,omputer ;ame* must match the name of the unit an$ the 7MI respectively.
The *Site ;ame* an$ *3escription* fiel$s are optional, but the convention is
to use the turbine number for *Site ;ame*. ,lick I1EH.
C. :i&ht/click on the ne'ly create$ trip lo&, an$ use *Insert 5irst* an$ *Insert
;e#t* to a$$ the names of the trip history collections, usually *T71* throu&h
*T75*. 4vailable collections 'ill appear in a pick list. If necessary, refer to the
.m=b file un$er *5unctions*, an$ use the fin$er to locate the mo$ule 'hose
name be&ins 'ith *9n)T:.F7IST*, e#clu$in& the libraries. 6n$er *.ins*,
locate the names of the capture blocks, an$ insert these names into the trip
lo&.
9/13/2006 08:20:00 PM Revision 8.0 Page #3" of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
;ote) Verify that TT31F1 throu&h TT31F!C an$ %4T si&nals are present in
the trip capture blocks. 4$$ them if they are not present. Set T7S4M. M
5""", T7.:ES4M M 4""", an$ the 31F3el pin of the F85I%T blocks to
5",""" msec.
B. >hen all the collections are a$$e$, use select each collection an$ use
*3evice04utoconfi&ure* to a$$ the si&nals from the capture blocks to the
collection. Save the .reb file to prevent loss of 'ork.
G. To permit testin& the trip lo& function 'ithout incrementin& the trip counter,
verify that F85I%T an$ FM1VEF8 blocks are installe$ bet'een the capture
blocks an$ the %4 an$ %4T control si&nals)
9/13/2006 08:20:00 PM Revision 8.0 Page #38 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
1". .erform a N9et 5rom $atabaseJ.
11. 4$$ 'hatever si&nals sho' up as errors $ue to not bein& in the E93 pa&e to
the en$ of one of the slo' e&$ pa&es in the .m=b file0 3o a Nput to $atabaseJ
from the .m=b, vali$ate, buil$, an$ save the .m=b file.
1!. :epeat last t'o steps until all errors are correcte$.
1A. Vali$ate, buil$ an$ save the trip lo& .reb file un$er ,)KSite on the Trip %o&
Master 7MI or un$er ,)KSiteK6nitn on other 7MIs. 3o'nloa$ the $ata
historian. +8e sure 3ata 7istorian service is runnin& prior to this $o'nloa$-.
14. Ins're that the 5D/ 5erver 5ervie is on 4an'al 5tart'! for all <4Is e9e!t the 5D/
5erver <4I+
15. 5to! and restart the Data <istorian servie+
9/13/2006 08:20:00 PM Revision 8.0 Page #39 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
A77-12*? D( HMI C/19*86,4)*/1
1. Each 7MI server must be confi&ure$ to post its 7MI $evice $efinition to the S38.
This is accomplishe$ via the use of the 7MI $evice.
!. 1pen the .hmb file in the toolbo#
A. ,onfi&ure the 7MI information, for each 7MI Server, 'hich inclu$es 7MI name
7MI1", 7MI11, 7MI#, etc.- on the .37, net'orks +E931, typically- an$
resources +91, 9!, 9#, etc- necessary
4. .ost this information to the S38 an$ save the file.
5. The ,IM.%I,IT< si&nals nee$ to be importe$ to inclu$e the E!1"" an$ 3S.
$ia&nostics.If $urin& the .m=b up&ra$e, a I.ackH E93 si&nals 'as performe$, the
E93 si&nals in the ,IM.%I,IT< nee$ to be up$ate$ to ensure correct
a$$ressin& of the si&nals.
=. To obtain the up$ate$ si&nals &o to points in ,IM.%I,IT< 'orkbench, select the
$evice +i.e. 91- an$ $elete the e&$ si&nals for that $evice. Then buil$ the 7MI
$evice usin& the .hmb file.
9/13/2006 08:20:00 PM Revision 8.0 Page #40 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
A77-12*? E( NTP C/19*86,4)*/1
The best place to look at time is the toolbo# *3evice03o'nloa$0Vie'/Set Time*. The
bo# that pops up 'ill sho' the clock on the *Toolbo# .,* i.e. the 7MI or other .,
that is runnin& Toolbo#, in 6T, an$ *Site %ocal* inclu$in& the time Done. These
settin&s are ma$e on the .,, an$ it is possible +althou&h not correct- that they can
vary from computer to computer. If you are connecte$ to the Mark VI, this toolbo#
'in$o' 'ill also sho' 6T, from that controller.
6T, shoul$ match e#actly bet'een the toolbo# ., an$ the controller, since both
shoul$ be listenin& to the same ;T. time source / usually one of the control room
7MIs 'ith a time car$, listenin& to a satellite. The .,?s time Done settin& 'ill control
the conversion from 6T, to *site local*, an$ if properly confi&ure$ 'ill accommo$ate
$ayli&ht savin& chan&es. The controller thinks only in 6T, / no concept of 'hat time
Done it is in.
;T. is the key / it must be properly confi&ure$ +6nicast Server-, an$ then the
controllers have to be properly confi&ure$ +6nicast ,lient, listenin& to the correct
server-. If they are too far off, they may not sync to the server / use Vie'0Set time to
*(am* time to the controller. 1ther 7MIs +e#cept the secon$ary master, it you are
usin& one- shoul$ also be unicast clients of the primary time server.
>hen a 3ata 7istorian &ets an alarm or event from the controller +timeta&e$ in
6T,-, it then uses the settin&s in it?s *timeDone.$at* file to convert the reports. ;ote
that the conversion $epen$s only on timeDone.$at, an$ not *., time* on the 7MI.
1. 1n each 7MI, use NStart0Settin&s0,ontrol .anelJ an$ $ouble click on N;et'ork
Time .rotocol0,onfi&ureJ. ,hoose N,ustom ,onfi&urationJ an$ click N;e#tJ.
Select N,lientJ an$ N6nicastJ an$ click N;e#tJ. 1n the open $ialo& ;et'ork Time
.rotocol specify the I. a$$ress of the ;T. Master an$ click N5inishJ.
!. The ;T. service shoul$ re/start. It can take several minutes for the service to
start +clock &oes from &ray to re$-, an$ lon&er for it to synchroniDe +clock &oes to
&reen-.
9/13/2006 08:20:00 PM Revision 8.0 Page #41 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.
g
GE Energy

eTCSS Service Pack Installation and Verifcation Procedure GE Drives & Controls, Inc.
A77-12*? F( R-9-,-1.- D/.60-1)4)*/1
5ollo'in& the $irections in this &ui$e for soft'are loa$in& 'ill also loa$ all applicable
release$ $ocumentation on the 7MI. These $ocuments are loa$e$ in their appropriate
application sub$irectories un$er I,)K.ro&ram 5ilesK9E ,ontrol System SolutionsH.
1. ,rossover .anel / %,I $o'nloa$...
!. ;o ,rossover .anel / Mark VI, ...
A. ;o ,rossover .anel / MarkV, %...
4. 4,%4 an$ 3S. $o'nloa$in& inst...
;1TES)
>hen copie$ over net'ork or from ,3, the files become rea$ only an$ must be set to
rea$0'rite before startin&.
9/13/2006 08:20:00 PM Revision 8.0 Page #42 of
42
Master Document ocation is
Vasalfpgmisge:\NPI\ICS\WORKING\DJF\249203304.!"
Company Proprietary
This document contains proprietary information of the General Electric Company intended for customer use only in operation and/or maintenance of equipment
furnished by General Electric Company and may not be disclosed to others, except with the written permission of the General Electric Company.