Vietnam MW ("VMW") is an established Vietnamese company which provides services to firms operating in Vietnam's electricity industry, technology transfer in the fields of electricity activity, developing optimization software, forecasting software, power market software for long-term planning, short-term planning and bidding strategy in power market.
VMW is a technical electricity industry specialist firm with understanding of most aspects of Vietnam's electricity industry and experience in interoperating with international firms. VMW has provided consulting and other services to government firms in Vietnam, private firms in Vietnam, and services to international firms that have an interest in Vietnam's electricity industry. VMW has undertaken work for World Bank (WB), Electricity Regulatory Authority of Vietnam (ERAV), Vietnam Electricity (EVN), National Transmission Corporation (NPT), 5 Power Distribution Corporations (PCs), Petro Vietnam Power Corporation (PVPower), Generation Companies, foreign investors and IPP investors.
VMW offers a full range of consulting services for the power sector, including:
• SCADA/EMS, SCADA/DMS, metering system consulting services: VMW consults on the technical specifications for: SCADA systems, EMS functionality of EMS and DMS system, tele-metering systems (AMI, AMR);
• Smart Grid: data collection and storage solutions, automation and control systems, real-time power system study and developing approaches to perform grid optimisation;
• Demand side management (DSM) and demand response (DR): involving study and support to government organisations on DSM and DR policy, DSM and DR impacts on electricity pricing;
• Power market: Designing, market rules, bidding in power market, planning;
• Energy and power balancing: forecasting demand including peak load, load curves and executing optimisation models to determine the least cost quantity of each power plant, generation pricing, marginal price and answer the questions “is there lack electricity in the system?”;
• Power plant optimal operations and scheduling: assisting power plant to make long-term and short-term operation planning including outage schedule, fuel planning (for thermal plant), quantity, revenue, cost and profit;
• Generator decision-support systems to support bidding in Vietnam's electricity market: assisting power plant to develop and optimise their bidding strategy;
• Electricity price and power purchase agreement: provision of electricity modelling services to support negotiations for power purchase agreements;
• Power system engineering study: undertaking power flow modelling and simulations, conducting short circuit analysis and power system stability analyses;
• Grid connection impact study: undertaking detailed power engineering study to assess the impact on the power system when a new power plant is connected to the national power system;
• IT infrastructure: consulting on Intelligent Technology infrastructure to support power plant operations and operations in electricity markets, optimization solution, Artificial Nature Network (ANN) and database management.
VMW consultants have deep understanding of Vietnam's electricity industry and power system operations, spanning: power generation, power plant operations, transmission systems, distribution systems, issues around demand-side management and end-use power consumption. Based on our knowledge and experience, we believe that we provide our clients with full range of consulting services and deliver services to the highest standard.
Vietnam MW ("VMW") is an established Vietnamese company which provides services to firms operating in Vietnam's electricity industry, technology transfer in the fields of electricity activity, developing optimization software, forecasting software, power market software for long-term planning, short-term planning and bidding strategy in power market.
VMW is a technical electricity industry specialist firm with understanding of most aspects of Vietnam's electricity industry and experience in interoperating with international firms. VMW has provided consulting and other services to government firms in Vietnam, private firms in Vietnam, and services to international firms that have an interest in Vietnam's electricity industry. VMW has undertaken work for World Bank (WB), Electricity Regulatory Authority of Vietnam (ERAV), Vietnam Electricity (EVN), National Transmission Corporation (NPT), 5 Power Distribution Corporations (PCs), Petro Vietnam Power Corporation (PVPower), Generation Companies, foreign investors and IPP investors.
VMW offers a full range of consulting services for the power sector, including:
• SCADA/EMS, SCADA/DMS, metering system consulting services: VMW consults on the technical specifications for: SCADA systems, EMS functionality of EMS and DMS system, tele-metering systems (AMI, AMR);
• Smart Grid: data collection and storage solutions, automation and control systems, real-time power system study and developing approaches to perform grid optimisation;
• Demand side management (DSM) and demand response (DR): involving study and support to government organisations on DSM and DR policy, DSM and DR impacts on electricity pricing;
• Power market: Designing, market rules, bidding in power market, planning;
• Energy and power balancing: forecasting demand including peak load, load curves and executing optimisation models to determine the least cost quantity of each power plant, generation pricing, marginal price and answer the questions “is there lack electricity in the system?”;
• Power plant optimal operations and scheduling: assisting power plant to make long-term and short-term operation planning including outage schedule, fuel planning (for thermal plant), quantity, revenue, cost and profit;
• Generator decision-support systems to support bidding in Vietnam's electricity market: assisting power plant to develop and optimise their bidding strategy;
• Electricity price and power purchase agreement: provision of electricity modelling services to support negotiations for power purchase agreements;
• Power system engineering study: undertaking power flow modelling and simulations, conducting short circuit analysis and power system stability analyses;
• Grid connection impact study: undertaking detailed power engineering study to assess the impact on the power system when a new power plant is connected to the national power system;
• IT infrastructure: consulting on Intelligent Technology infrastructure to support power plant operations and operations in electricity markets, optimization solution, Artificial Nature Network (ANN) and database management.
VMW consultants have deep understanding of Vietnam's electricity industry and power system operations, spanning: power generation, power plant operations, transmission systems, distribution systems, issues around demand-side management and end-use power consumption. Based on our knowledge and experience, we believe that we provide our clients with full range of consulting services and deliver services to the highest standard.
Vietnam MW ("VMW") is an established Vietnamese company which provides services to firms operating in Vietnam's electricity industry, technology transfer in the fields of electricity activity, developing optimization software, forecasting software, power market software for long-term planning, short-term planning and bidding strategy in power market.
VMW is a technical electricity industry specialist firm with understanding of most aspects of Vietnam's electricity industry and experience in interoperating with international firms. VMW has provided consulting and other services to government firms in Vietnam, private firms in Vietnam, and services to international firms that have an interest in Vietnam's electricity industry. VMW has undertaken work for World Bank (WB), Electricity Regulatory Authority of Vietnam (ERAV), Vietnam Electricity (EVN), National Transmission Corporation (NPT), 5 Power Distribution Corporations (PCs), Petro Vietnam Power Corporation (PVPower), Generation Companies, foreign investors and IPP investors.
VMW offers a full range of consulting services for the power sector, including:
• SCADA/EMS, SCADA/DMS, metering system consulting services: VMW consults on the technical specifications for: SCADA systems, EMS functionality of EMS and DMS system, tele-metering systems (AMI, AMR);
• Smart Grid: data collection and storage solutions, automation and control systems, real-time power system study and developing approaches to perform grid optimisation;
• Demand side management (DSM) and demand response (DR): involving study and support to government organisations on DSM and DR policy, DSM and DR impacts on electricity pricing;
• Power market: Designing, market rules, bidding in power market, planning;
• Energy and power balancing: forecasting demand including peak load, load curves and executing optimisation models to determine the least cost quantity of each power plant, generation pricing, marginal price and answer the questions “is there lack electricity in the system?”;
• Power plant optimal operations and scheduling: assisting power plant to make long-term and short-term operation planning including outage schedule, fuel planning (for thermal plant), quantity, revenue, cost and profit;
• Generator decision-support systems to support bidding in Vietnam's electricity market: assisting power plant to develop and optimise their bidding strategy;
• Electricity price and power purchase agreement: provision of electricity modelling services to support negotiations for power purchase agreements;
• Power system engineering study: undertaking power flow modelling and simulations, conducting short circuit analysis and power system stability analyses;
• Grid connection impact study: undertaking detailed power engineering study to assess the impact on the power system when a new power plant is connected to the national power system;
• IT infrastructure: consulting on Intelligent Technology infrastructure to support power plant operations and operations in electricity markets, optimization solution, Artificial Nature Network (ANN) and database management.
VMW consultants have deep understanding of Vietnam's electricity industry and power system operations, spanning: power generation, power plant operations, transmission systems, distribution systems, issues around demand-side management and end-use power consumption. Based on our knowledge and experience, we believe that we provide our clients with full range of consulting services and deliver services to the highest standard.
Office : 10 th Floor, CLand Tower, 156 Xa Dan 2 Street, Hanoi, Vietnam Phone : +84.966.866.766 or +84.92.92.92.92.5 Email : nam@vmw.vn Website: www.vmw.vn Skype : vmw.info 2
1 Vietnam MW Company Profile Vietnam MW ("VMW") is an established Vietnamese company which provides services to firms operating in Vietnam's electricity industry, technology transfer in the fields of electricity activity, developing optimization software, forecasting software, power market software for long-term planning, short-term planning and bidding strategy in power market. VMW is a technical electricity industry specialist firm with understanding of most aspects of Vietnam's electricity industry and experience in interoperating with international firms. VMW has provided consulting and other services to government firms in Vietnam, private firms in Vietnam, and services to international firms that have an interest in Vietnam's electricity industry. VMW has undertaken work for World Bank (WB), Electricity Regulatory Authority of Vietnam (ERAV), Vietnam Electricity (EVN), National Transmission Corporation (NPT), 5 Power Distribution Corporations (PCs), Petro Vietnam Power Corporation (PVPower), Generation Companies, foreign investors and IPP investors. VMW offers a full range of consulting services for the power sector, including: SCADA/EMS, SCADA/DMS, metering system consulting services: VMW consults on the technical specifications for: SCADA systems, EMS functionality of EMS and DMS system, tele-metering systems (AMI, AMR); Smart Grid: data collection and storage solutions, automation and control systems, real -time power system study and developing approaches to perform grid optimisation; Demand side management (DSM) and demand response (DR): involving study and support to government organisations on DSM and DR policy, DSM and DR impacts on electricity pricing; Power market: Designing, market rules, bidding in power market, planning; Energy and power balancing: forecasting demand including peak load, load curves and executing optimisation models to determine the least cost quantity of each power plant, generation pricing, marginal price and answer the questions is there lack electricity in the system?; Power plant optimal operations and scheduling: assisting power plant to make long-term and short- term operation planning including outage schedule, fuel planning (for thermal plant), quantity, revenue, cost and profit; Generator decision-support systems to support bidding in Vietnam's electricity market: assisting power plant to develop and optimise their bidding strategy; Electricity price and power purchase agreement: provision of electricity modelling services to support negotiations for power purchase agreements; Power system engineering study: undertaking power flow modelling and simulations, conducting short circuit analysis and power system stability analyses; Grid connection impact study: undertaking detailed power engineering study to assess the impact on the power system when a new power plant is connected to the national power system; IT infrastructure: consulting on Intelligent Technology infrastructure to support power plant operations and operations in electricity markets, optimization solution, Artificial Nature Network (ANN) and database management. VMW consultants have deep understanding of Vietnam's electricity industry and power system operations, spanning: power generation, power plant operations, transmission systems, distribution systems, issues around demand-side management and end-use power consumption. Based on our knowledge and experience, we believe that we provide our clients with full range of consulting services and deliver services to the highest standard. 3
Key Project Experience Salient project experience is as follows: 1. Support hydro power plants under PetroVietnam for optimal operation and bidding in Vietnam Competitive Generation Market (2014) The general objective of this project is to provide optimal solution for hydro power plants under PetroVietnam for operation and bidding in Vietnam Competitive Generation Market to maximize its revenue as well as profit based on market rules, actual condition of power plants and number of reservoir operation constraints. The tasks including: Data collection Forecasting inflow Forecasting power market price Optimal operation planning for year ahead, month ahead and week ahead o Optimal reservoir operation o Generation planning o Revenue/profit Operation schedule for day ahead o Generation schedule o Revenue/profit o Optimal bidding for day ahead Value at risk analysis Reports 2. Support Electricity Regulatory Authority of Vietnam (ERAV) in implementation of pilot demand response program(s) for Power Corporations (PCs) (2014-2015) The general objective of this consultancy service is to provide international expertise, and support and assist the ERAV to successfully implement Pilot Demand Response program(s) under DEP Component. For the duration of this assignment, the main objectives of project are: Based on draft regulations, proposed incentives and reports from previous ERAV consultancies, design pilot/trial Demand Response (DR) program(s) starting in at least one PC, and then extending to other PCs, including setting of objectives, customer DR target of program(s), baselines of performance indicators, implementation arrangements of pilot DR programs, data collection and reporting requirements, and monitoring and evaluation arrangements; Support ERAV in addressing issues to ensure effective implementation and in monitoring of pilot DR programs (duration of pilot 12 months); Support ERAV in evaluation of results, successes, lessons and issues to be addressed The project involved Diamond Energy Services Pte Ltd and Vietnam MW Co., Ltd. 3. The electricity supply chain analysis and Proposals for Revamping (2014) Public Utilities Commission of Sri Lanka (PUCSL) intends to engage the task of carrying out a supply chain analysis of the electricity generation in Sri Lanka. The main objective of this study would be to identify the costs of the existing supply chain up to the Generation Transmission boundary and to find ways to revamp the supply chain with a view to reduce the costs of generation. The tasks including: 4
1. Conduct a supply chain analysis in electricity generation covering all areas up to the Energy meter between generation licensee and transmission licensee including following and make recommendation on revamping measures based on the analysis o Fuel procurement, storage and transportation, and related agreements o Equipment procurement maintenance, and retirement procedures o Material procurement, stock holding and supply procedures o Accounting Policies on plant depreciation o The analysis should take into account all cost that contributes to the capacity and energy costs 2. Scrutinize common cost apportioning methods used by utilities. 3. Scrutinize the apportionment of overhead costs to other non- utility activities conducted by utilities. 4. Dispatch analysis 5. International comparison of costs associated with Generation, 6. Comparison of performances with regional and global performances/benchmarks 7. Identification/ recommendation of areas that require better transparency and /or better management and possible intervention areas for PUCSL 8. Workshop to disseminate of study finding to relevant stakeholders The project involved The Pathfinder Foundation, KPMG - Sri Lanka, Economic Consulting Associates of United Kingdom and Mr. Nguyen Thanh Nam - Vietnam MW Co., Ltd. 4. Smart Grid implementation support consultant for National Transmission Corporation of Vietnam & The World Bank (2013-2014) By means of technical assistance, the World Bank intends to support NTP in capturing the opportunities of new technologies and relevant international experience on developing the national smart grid in order to improve the efficiency, resilience, and increase the transmission grids ability to absorb intermittent renewable energy resources such as wind and solar. More specifically, the World Bank intends to: (i) support NPT to refine the existing Smart Grid tentative roadmap; (ii) define and help NPT perform technical and economic analyses of some priority projects (which actual implementation will be financed by the Bank); and (iii) define metrics for the success of the roadmap as a whole and for the specific projects to be financed by the Bank. It is expected that the consultant will bring top-notch, state-of-the-art knowledge with regard to the applications that NPT intends to implement and increase the capacity of in order to analyse, prepare, execute, and monitor the success of smart grid activities. The tasks including: 1. Refined Smart Grid Roadmap Strategy Document for NPT 2. Detailed Technical and Economic Assessment of Priority Smart Grid Actions to be Financed by the Bank a. Substation Automation Modernization Projects Technical and Economic Assessment b. Procurement Strategy and Functional Specifications 3. Strategy for Implementation of other Priority-revised Smart Grid Applications The project involved AF Mercados Consultant and Vietnam MW Co., Ltd. 5. Strategic Options for Enhanced Financial Performance of Vietnam Electricity (EVN) ( 2013-2014) The objective of the proposed consultants services is to support EVN in developing a comprehensive strategy for enhanced financing performance of its group of power companies, including EVN corporate, the Gencos, Power Corporation (PCs), National Power Transmission Corporation (NPT) and 5
developing financial recovery plan(s). While recognizing the impacts of broader sector restructuring and general state enterprise performance issues as well as the on-going efforts to address them, this study will focus on addressing performance matters from financial, operational and technical perspectives. The project involved AF Mercados Consultant and Vietnam MW Co., Ltd. 6. Consulting Service For Establishing Technical Specifications of AMI for Vietnam (2013) The objective of this assignment was to design of a standard integrated structure, technical specification, functional requirements to be met by an advanced metering infrastructure (AMI) system and its main components. The tasks including: 1. Review and analysis of existing metering systems and current experience in the appli cations of AMR/AMI in Vietnam (including 5 PCs: Ho Chi Minh City Power Corporation, Hanoi Power Corporation, North Power Corporation, Central Power Corporation and South Power Corporation). 2. Review and analysis of current AMI applications in emerging countries comparable to Vietnam; 3. Design of a standard integrated structure, technical specification, functional requirements to be met by an AMI system and its main components (such as meters, information communication equipment, communication technologies, MDMS, In-home displays, Web portal, ) that will be applicable for PCs. 4. Identification and analysis of technological options available meeting the functional requirements identified in the previous task and compatible with the communication infrastructure existing in Vietnam; estimation of related investment and operating costs; 5. Assessment of the economic and financial feasibility of AMI systems in Vietnam. The project involved AF Mercados Consultant and Vietnam MW Co., Ltd. 7. Consulting and building new SCADA system at Se San 3A Joint Stock Company office (2013) Consulting and building new SCADA system at Se San 3A Joint Stock Company office, this system can connect to DCS system, remote control and supervisory the power plant far from 90 km. The work including: Survey existing Distributed Control System (DCS), gateway system, tele-communication system; Consulting and building system in Gateway configuration, database design and building, software development, Man-Machine Interface building, communication installation and configuration, installation and Integrated system, End to end testing. 8. Assessment of Transmission Charges and Transmission Marginal Loss Factors (2013) The project concerned with providing an assessment of how a number of candidate generation projects under consideration in North Queensland would affect the Cost Reflective Network Pricing (CRNP) transmission pricing regime in Queensland and an assessment of the marginal transmission loss factors for each candidate project. In order to do this, a number of power flow studies of Queenslands power system were carried out by VietnamMW, to support the economic and technical assessment conducted by Intelligent Energy Systems (IES). 9. Vietnam Rural Distribution Project: Organisation of District Power Distribution Company (2012-13). The objective of this assignment was to assist Vietnam's Power Corporations in evaluating the organisation functions and management arrangements of the District Branches that operate under Vietnam's provincial power company, and establish a unified organizational model applicable to all district branches, in order to enhance their efficiency. The project involved Dr. Stuart Thorncraft (Intelligent Energy Systems - IES) and Mr. Nguyen Thanh Nam (VMW).
6
10. Vietnam Rural Distribution Project component: Network Modelling (2011-12). Consultant shall conduct an assessment of the existing and required network modelling systems for 5 Power Corporations (Distribution Utility) in Vietnam. Following a preliminary assessment, Consultant sets out a set of recommendations in regards to the required training and systems and proceeded to conduct a training course, building exercises, building network modelling to improve the knowledge and capability of the Power Corporations. Mr. Nguyen Thanh Nam undertook this project as an individual consultant to Central Power Corporation (EVNCPC). 11. Power market trading system for PetroVietnam Power Corporation - PVPower (2011-2013). Vietnam Power Market is operated in 2012, all of power generation companies must competitive to sell electricity in the market. PVPower is biggest generation company in Vietnam, the annual revenue approximate 1 billion US$. PVPower need an optimization trading system to help them make long- term planning, short-term planning and strategist bidding in the market with the aim is maximize their revenue/profit. Vietnam MW is chosen to develop the system, PVP completely satisfy with the system and our solution. 7
2 Key Team Members Brief Profiles MSc. Nguyen Thanh Nam (VMW, Vietnam) Qualifications: Master of Science in Electrical Engineering, Hanoi University of Technology and Science, 2004 Power System Engineer, Hanoi University of Technology and Science, 2000 Position at Firm: General Director Brief Profile: Nguyen Thanh Nam is a Power System Engineer and Master of Science in Electrical Engineering with 15 years of experience in the power sector, 7 of which in management positions, 13 of which in power system study and 10 of which in power sector consultant. At present, He is General Director at Vietnam MW Co., Ltd (his own company). Previously, He worked for a consulting company and two subsidiary companies of Vietnam Electricity (EVN): Electric Power Trading Company (EPTC) as Head of Planning Department, National Load Dispatch Centre (NLDC) as National Power System Planning Engineer and Northern Power Corporation as Power System Designing Engineer. Over the years He have developed strong relationships with power sector stakeholders, including World Bank (WB), Electricity Regulatory Authority of Vietnam (ERAV), Vietnam Electricity (EVN), National Power Transmission Corporation (NPT), 5 Power Distribution Corporations (PCs), Petro Vietnam Power Corporation (PVPower), Generation Corporation, Generation Companies and foreign investors. He has much experience and deeply understanding in power system: demand, demand response, generation, transmission system, distribution system, metering system, AMI system, smart-grid, power system study, master plan and power system expanse, automation system and smart grid (SCADA/EMS, SCADA/DMS, automation system, tele-metering system), IT system (optimization software, forecasting software, Artificial Neural Network techniques, database management and data storage solutions), finance model. Dr. Tran Anh Tuan (VMW, Vietnam) Qualifications: Ph.D. in Electrical Engineering, cole Centrale de Lyon, France, 2006 M.Sc.in Electrical Engineering, Institut National Polytechnique de Grenoble, France, 2002 Power System Engineer, Hanoi University of Technology and Science, 2001 Position at Firm: Chief Technical Officer Brief Profile: Tran Anh Tuan is Chief Technical Officer at VMW who undertakes company technical as: power system, power market, automation system. He has over 8 year experience in the power system (demand, generation, and transmission system), automation system and smart grid (SCADA/EMS, SCADA/DMS, automation system, Project Management and Business Development.
8
MSc. Nguyen Tuan Ninh (VMW, Vietnam) Qualifications: Master of Science in Instrumentation and Control, Hanoi University of Technology and Science, 2002 Engineer of Control System and Measurement, Hanoi University of Technology and Science, 2000 Position at Firm: Head of Automation Department Brief Profile: Nguyen Tuan Ninh is head of Automation Department. He has over 13 year experience in the power system (generation, and transmission system), automation system and smart grid (SCADA/EMS, SCADA/DMS, automation system, tele-metering system). Prior joined VMW, He is a lecturer at Hanoi University of Technology and Science (2002-2011). MA. Hoang Ha Quynh Giao (VMW, Vietnam) Qualifications: Master of Business Administration, Hanoi Foreign Trade University, 2009 Power System Engineer, Hanoi University of Technology and Science, 2006 Position at Firm: Senior Engineer Brief Profile: Hoang Ha Quynh Giao is Senior Engineer at Vietnam MW ("VMW") who undertakes power system study and software sale and marketing. She has over 7 year experience in the power system (demand, generation, and transmission system), power market (generation pricing, marginal price, bidding in power market, value at risk, financial model). Prior to joined VMW, Quynh Giao was Electrical Power System Engineer at Electricity Regulatory Authority of Vietnam (2006-2010), Quynh Giao worked at PetroVietnam Power Corporation (PVPower) from 2010- 2012, from 2012 to present Quynh Giao is Senior Engineer at Vietnam MW. Eng. Hoang Van Hai (VMW, Vietnam) Qualifications: Power System Engineer, Hanoi University of Technology and Science, 1993 Position at Firm: Senior Engineer Brief Profile: Hoang Van Hai is Senior Staff at Vietnam MW ("VMW") who undertakes power system study, software development. He has over 22 year experience in the power system (demand, generation, and transmission system), power market (generation pricing, marginal price, bidding in power market) .
9
APPENDIX: CURRICULUM VITAE OF KEY TEAM MEMBERS
Curriculum Vitae: MSc. Nguyen Thanh Nam (VMW, Vietnam) Profile Nguyen Thanh Nam is General Director at Vietnam MW ("VMW") who undertakes company strategy for development, Companys products strategy for development, leading in business, technical and human resource, Cooperation with partners. He has over 15 year experience in the power system (demand, generation, transmission system and distribution system), power market (generation pricing, marginal price, bidding in power market, value at risk, financial model ), power sector reform, automation system and smart grid (SCADA/EMS, SCADA/DMS, automation system, tele-metering system, AMI system), IT system (optimization software, forecasting software, Artificial Neuron Network - ANN, database management and storing) Prior to establish VMW, Nam was Chief Technical Officer at Vietnam Power Resource Partners Corporation (2009-2011), Nam worked for Vietnam Electricity (EVN) from 2000-2009 (Nam was Power System Planning Engineer, System and Market Operator at National Load Dispatch Centre - NLDC from 2000-2008, Nam was head of Planning Department at Electric Power Trading Company - EPTC from 2008-2009, both NLDC and EPTC are subsidiary company of EVN). 1. Proposed Position Consultant 2. Name of Firm Vietnam MW Company., Ltd 3. Name of Staff Nguyen Thanh Nam 4. Date of Birth 30 May 1977 Nationality: Vietnam 5. Telephone Mobile: +84 966 866 766 Email: nam@vmw.vn Land line: +84 462 767 080 6. Education
2004-2006 Master of Science in Electrical Engineering, Hanoi University of Technology and Science
1995-2000 Power System Engineer, Hanoi University of Technology and Science 7. Membership of Professional Associations - 8. Country of Work Experience Vietnam, Australia, Sri Lanka 9. Other Training
2008 Power market training course., Singapore 2007 Power market training course, Korea Power Exchange., Korea 10
2006 Power market intensive training course, PB Associates., NZ 2004 Power System Analysis at Energy Concepts International Corporation., USA 2001 Operation and Maintenance of Thermal Power Plant at Japan Electric Power Information Centre, INC., Japan 2000-2001 Power System Operator and Power System Planning Engineer, National Load Dispatch Centre, Vietnam 2000 Consultant and designing transmission, distribution lines and substations at Northern Power Corporation 10. Languages English, Vietnamese 11. Employment Record
2011- present General Director at Vietnam MW (VMW) Company strategy for development Companys products strategy for development Leading in business, technical and human resource Cooperation with partners. Consulting in: Power market, power system analysis, SCADA/EMS system, Smart Grid, Advanced Metering Infrastructure (AMI), Demand Response Optimization software solution and development 2009-2011 Chief Technical Officer at Vietnam Power Resource Partners Corporation (Vietnam PRP) Responsibility for technical aspects Managing technical department: Power system analysis, IT and research group 2008-2009 Head of Planning Department at Electric Power Trading Company Vietnam Electricity (EPTC-EVN) Electric power trading planning: Year ahead, month ahead, week ahead planning Determining generation pricing and power purchase agreement (PPA) negotiation Power market: Contribution to Vietnam power market development (power market design, market rules) and relevant decisions and procedures as Grid Code for Generation Competitive Market, standard PPA, Least-Cost Planning and Implementation Procedures For the Competitive Generation Market, Transmission fees methodologies for Vietnam, dispute settlement & enforcement procedure regulation 2000-2008 National Power System Planning Engineer at National Load Dispatch Centre Vietnam Electricity (NLDC-EVN) 11
Power market: Contribution to Vietnam power market development (power market design, market rules), market operator Power system study: Load flow, short circuit, dynamic stability, static stability Vietnam power system operation and control Making Vietnam power system operational planning: Five year ahead, year ahead, month ahead, week ahead, day ahead and hour ahead planning. Energy and Power balancing Supervisory Control And Data Acquisition/Energy Management System (SCADA/EMS) integrated 2000 Power System Engineer at Northern Power Corporation Vietnam Electricity (NPC-EVN) Designing: distribution line and substation 12. Detailed Tasks Assigned Nguyen Thanh Nam proposes to undertake the role of consultant on this project. 13. Work Undertaken that best illustrates capability to handle the tasks assigned
Project Name: Vietnam Power Market Development Year: 2014-2015 Location: Vietnam Client: Asian Development Bank (ADB) Position held: Local Resident Advisor Activities Performed: o Assist the Resident Advisor in familiarizing with the existing Vietnam Wholesale Competitive Market (VWCM) conceptual design; research international practices and experiences in power sector reforms applicable to Vietnams situation; Interact with ERAVs other consultants preparing the VWCM detailed design to provide timely interim advice and comments on the VWCM detailed design as it is being prepared; and reviewing the VWCM detailed design and provide comments. o Together with the Resident Advisor, the Consultant will: o Review the current structure of Vietnam power sector and the evolution of the sector since Vietnam has initiated the Road Map; o Review the current status and legal and regulatory frameworks of Vietnam power sector; o Propose options for power sector reform which are focused on 03 segments: (i) Generation; (ii) Distribution/retail segment; and (iii) System and market operation; o Prepare a transition plan to transition smoothly from the current structure to the proposed VWCM structure which shall include: (i) legal framework, (ii) sector reform requirement for the VWCM operation, (iii) infrastructure for the VWCM, and capacity building requirements for the VWCM. o Prepare capacity development plan for ERAV and stakeholders. o Support ERAV in monitoring the VCGM operation and assessing market performance 12
o Assist ERAVs other day to day tasks related to establishing VWCM
Project Name: The electricity supply chain analysis and Proposals for Revamping Year: 2014 Location: Sri Lanka Client: Public Utilities Commission of Sri Lanka (PUCSL) Position held: Technical Expert Activities Performed: o Review generation and transmission operation planning process, including: year ahead, month ahead, week ahead, day ahead planning; o Review dispatch instruction and ex-post calculation; o Analyse the efficiency of the existing electricity supply chain; o Propose about Economic Dispatch and Planning methodology with transmission constraint to minimize generation cost, including long-term and short-term; o Proposal on real-time operation mechanism; o Proposal on ex-post calculation mechanism; o Proposal on requirements of software using for operational planning Proposal on Data collection and management.
Project Name: Support hydro power plants under PetroVietnam for optimal operation and bidding in Vietnam Competitive Generation Market. Year: 2014 Location: Vietnam Client: Vietnam Petroleum Institute (VPI) Position held: Project Manager Activities Performed: o Data collection o Forecasting inflow o Forecasting power market price o Optimal operation planning for year ahead, month ahead and week ahead Optimal reservoir operation Generation planning Revenue/profit o Operation schedule for day ahead Generation schedule Revenue/profit Optimal bidding for day ahead o Value at risk analysis o Reports
Project Name: Support Electricity Regulatory Authority of Vietnam (ERAV) in implementation of pilot demand response program(s) for Power Corporations (PCs) Year: 2014 - 2015 13
Location: Vietnam Client: ERAV Position held: Local Consultant Activities Performed: o Local support (Local consultant) to assist, among others, in information collection, translations and communication with PCs. o Collecting and translating into English all documents relating to current situation/changes of power system, demand supply planning, electricity consumption, scheduling/dispatching issues, 30-minute load profile database and send to the Consultant; translate PCs and EVN documents/reports; communicate with PCs and EVN as may be required; o Implement marketing program; o Supervisory pilot project implementation; o Contribution and review reports.
Project Name: Strategic Options for Enhanced Financial Performance of Vietnam Electricity (EVN) Year: 2013-2014 Location: Vietnam Client: The World Bank Position held: Local Project Coordinator and Specialist Activities Performed: o Liaise in communications with the different stakeholders, and primarily with the EVN project managers o Join with project team to assist in the collection of data o Provide input on the social issues in the social impact assessment o Attend project workshops and meetings with the international consultants when they are in Hanoi. o Provide translation of the report deliverables o Review and provide feedback on key deliverables as per International Consultant request.
Project Name: Smart Grid implementation support consultant for National Transmission Corporation of Vietnam & The World Bank Year: 2013-2014 Location: Vietnam Client: The World Bank (WB) Position held: Local Project Coordinator and Specialist Activities Performed: o Provide inputs relied on his technical knowledge of the Vietnamese Power Sector to the International Specialists. o Assist to the Consultant team in collecting all the information available of the existing experiences in the Substation Automation System in Vietnam. o Contribute in the preparation of the reports o Collaborate on the preparation and assist in reviewing the Final Report o Translate the deliverables from English to Vietnamese and if required the data received if from Vietnamese to English. 14
o Facilitate communications with The World Bank project managers and with the different stakeholders. o Participate on every mission to Vietnam assisting in the translation and in the collection of data from EVN, National Power Transmission Corporation (NPT), Power Transmission Companies (PTCs) and others. o Attend to all the project site visits, workshops and meetings with the international consultants when they are in Vietnam. o Organize workshop logistics: reserve hotel meeting facilities, arrange for interpreter (with technical translation ability), and liaise with WB/NPT and stakeholders as needed.
Project Name: Consulting Service For Establishing Technical Specifications of AMI for Vietnam Year: 2013 Location: Vietnam Client: Ho Chi Minh Power Corporation Position held: Local Project Coordinator and Specialist Activities Performed: o Provide inputs relied on his technical knowledge of the Vietnamese Power Sector to the International Specialists. o Assist to the Consultant team in collecting all the information available of the existing experiences in the applications of AMR/AMI in Vietnam. o Contribute in the preparation of the AMI full technical specifications according to telecommunications, metering code, electricity pricing and payment, SCADA/EMS system, SCADA/DMS system, telecommunication, etc o Assist in developing the AMI solution matrix. o Provide assistance to the Consultant team in the evaluation of the technology options. o Collaborate on the preparation and assist in reviewing the Final Report o Translate the deliverables from English to Vietnamese and if required the data received if from Vietnamese to English. o Facilitate communications with HCMPC project managers and with the different stakeholders. o Participate on every mission to Vietnam assisting in the translation and in the collection of data from ERAV, EVNIT, 5 PCs and others. o Attend to all the project site visits, workshops and meetings with the international consultants when they are in Vietnam. o Organize workshop logistics: reserve hotel meeting facilities, arrange for interpreter (with technical translation ability), and liaise with HCMPC/stakeholders as needed.
Project Name: SCADA system of Se San 3A hydro power plant Year: 2013 Location: Vietnam Client: Se San 3A Joint Stock Company Position held: Project Leader Activities Performed: - Survey: o Existing Distributed Control System (DCS) o Gateway system 15
o Tele-communication system - Consulting and building new SCADA system at Se San 3A Joint Stock Company office, this system can connect to DCS system, remote control and supervisory the power plant far from 90 km. o Gateway configuration o Database design and building o Software development o Man - Machine Interface building o Communication installation and configuration o Installation and Integrated system o End to end testing
Project Name: Assessment of Transmission Charges and Transmission Marginal Loss Factors Year: 2013 Location: Australia Client: Intelligent Energy Systems (IES) Position held: Power System Expert Activities Performed: o Building power system model o Run many power flow studies o Results analysis
Project Name: Consulting Services for Organization of District Power Distribution Company Year: 2013 Location: Vietnam Client: EVNCPC Position held: Local consultant Activities Performed: o Local project coordination o Survey: Review of Existing Arrangements o Review and comment on report taking into account the Vietnamese context.
Project Name: Vietnam Rural Distribution Project, project component: Network modelling Year: 2011-2012 Location: Vietnam Client: EVNCPC Position held: Individual Consultant Activities Performed: o Visiting the 5 PCs survey and assess the available facility and staff skills in using PSS/E o Preparing PSS/E users manual o Conducting Training Program o Application of Training o Conducting study tour in Australia o Continued Support
Project Name: Power market trading system for PetroVietnam Power Corporation (PVPower) Year: 2011-2012 Location: Vietnam 16
Client: PVPower Position held: Project Director Activities Performed: - Survey: o Operation of power plants under PVPower o Existing IT system at PVPower and their power plants - Developing Power market trading system with functions: o Long-term and short-term planning (Year ahead, month ahead, week ahead, day ahead planning): Quantity, Revenue, Cost, Profit, fuel, outage schedule o Bidding in the market: Strategy, value at risk, optimal bid o Report: Yearly, monthly, weekly, daily report o Database management and storing.
Project Name: Supporting Saigon Asset Management (SAM) in Technical and financial due diligence of An Khanh 1 thermal power plant. Year: 2010 - 2011 Location: Vietnam Client: Saigon Asset Management (SAM) Position held: Deputy project manager Activities Performed: o Review the technical design o Review the input data for financial model o Constructing a financial model based upon the inputs and assumptions (electricity tariff, coal prices, interest rates, efficiency, etc) o Detailed analysis of proceed projects with many scenarios
Project Name: Consulting Services on Information Infrastructure for the Power Market in Vietnam Year: 2010 Location: Vietnam Client: EVN Position held: Local consultant of Energy Concept Inc., USA Activities Performed: o Support Energy Concept Inc. international consultant review and assess overall current Information o Infrastructure of participants in Vietnam Competitive Generation Market (VCGM) o Support for conceptual overall information architecture for VCGM o Support in designing information system for participants synchronous with Overall Information Architecture. Project Name: Design Mini -SCADA system for Bac Ninh Power Company Year: 2010 Location: Vietnam Client: Bac Ninh Power Company North Power Corporation Position held: Technical support Activities Performed: 17
o Data collection in existing information system o Design overall structure of mini SCADA system o Design hardware system in substation and control center o Design structure of HMI module for SCADA system o Design structure of HMI module for metering system o Design Web-Based interface Application.
Project Name: Guang Lian Steel Cogeneration power plant project Year: 2010 Location: Vietnam Client: Guang Lian Steel (Vietnam) Co., Ltd (GLSC) Position held: Deputy project manager Activities Performed: o Grid connection impact study o Draft the Power Purchase Agreement (PPA) o Document to get Electricity License Project Name: Transmission charges calculation model development, data collection and calculation Year: 2009-2010 Location: Vietnam Client: Electricity Regulatory Authority of Vietnam (ERAV) Position held: Deputy project manager Activities Performed: o Design database and calculation model, specific technical features and plan for implementation o Development of detailed database and computer models o Transmission charges calculation o Manuals, training on design and use of model and database.
Project Name: Support Information Technology / Database System Design and Training for Electricity Regulatory Authority of Vietnam (ERAV) Year: 2009-2010 Location: Vietnam Client: Electricity Regulatory Authority of Vietnam (ERAV) Position held: Deputy project Director Activities Performed: o General structure design of database and communication system o Detailed design of database, communication system, required applications for power market monitoring, operation status of national power system, dispute resolution, electricity license o System Implementation and Deployment o User Manual and training for ERAV
Project Name: Technical support for Grid Impact study for Transmission Access Year: 2004-2008 18
Location: Vietnam Client: Thang Long Power Joint-stock Company (TLP), AES Transpower Pte Ltd, Nhon Trach 2 Thermal Power Plant Joint-Stock company Position held: Technical Senior Expert Activities Performed: o Data collection and update o Connection scheme proposal o Energy & power balance study o Load flow analysis o Short circuit study o Dynamic stability study o Static stability study o Measuring system proposal o SCADA/EMS connection proposal o Communication solution proposal
Project Name: Determining generation price and Power Purchase Agreement negotiation Year: 2008-2009 Location: Vietnam Client: BOT Mong Duong 2 (coal thermal, 1200MW), Vinh Tan 1 (coal thermal, 1200 MW), Nhon Trach 1 (Gas turbine, 450 MW), Ca Mau (Gas turbine, 1500 MW), Cua Dat (Hydro, 97 MW), Huong Dien (Hydro, 54 MW)... Position held: EVN Expert Activities Performed: o Financial model o Determining generation price and o Negotiation power purchase Agreement
Project Name: - Design of Vietnam Generation Competitive Market - Development of market rules for Vietnam competitive generation market - Grid Code for Generation Competitive Market - Standard PPA and dispute settlement & enforcement procedure regulation for Single Buyer model market - Least-Cost Planning and Implementation Procedures For the Competitive Generation Market - Transmission fees methodologies for Vietnam Year: 2008-2009 Location: Vietnam Client: Electricity Regulatory Authority of Vietnam (ERAV) Position held: EVN Expert Activities Performed: o Technical support o Review and comment on report taking into account the Vietnamese context 19
Project Name: Supervisory Control And Data Acquisition/Energy Management System (SCADA/EMS) integrated Year: 2002-2008 Location: Vietnam Client: National Load Dispatch Centre Position held: Technical support Activities Performed: Integrated Substation Automation System (SAS) of Substation, Distributed Control System (DCS) of power plant, Regional Load Dispatch Centres SCADA/EMS and Communication System into National Load Dispatch Centres SCADA/EMS system. o Database setting up o Communication install and testing o System integrated o End-to-end test o Man Machine Interface o EMS system integrated o Run EMS system
Project Name: Thanh Hoa City Network Rehabilitation and Extension - Medium and Low Voltage Network Year: 2000 Location: Vietnam Client: Thanh Hoa Power Distribution Company Position held: Consultant Engineer Activities Performed: o Designing distribution line and substation o Financial model and analysis
14. Certification: I, the undersigned, certify that to the best of my knowledge and believe, this CV correctly describes my- self, my qualifications, and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged. Date: 18 October 2014 Signature of staff member or authorised representative of the staff
Full name of authorised representative: Nguyen Thanh Nam
20
Curriculum Vitae: Dr. Tran Anh Tuan (VMW, Vietnam) Profile Tran Anh Tuan is Chief Technical Officer at Vietnam MW ("VMW") who undertakes company technical as: power system, power market, automation system. He has over 8 year experience in the power system (demand, generation, and transmission system), automation system and smart grid (SCADA/EMS, SCADA/DMS, automation system, Project Management and Business Development. Prior to joint VMW, Tuan was Senior Manager at Utilitrade Ltd (2009-11), Senior Engineer Automation, Areva T&D (2007-09) and Application Engineer at Applied Technical Systems Co., Ltd (2006-07) 1. Proposed Position Consultant 2. Name of Firm Vietnam MW Company., Ltd 3. Name of Staff Tran Anh Tuan 4. Date of Birth 23 August 1978 Nationality: Vietnam 5. Telephone Mobile: +84 90 678 0179 Email: tuanta@vmw.vn Land line: +84 462 767 080 6. Education
2006 Ph.D. in Electrical Engineering, coleCentrale de Lyon, France 2002 M.Sc. in Electrical Engineering, Institut National Polytechnique de Grenoble, France 2001 Power System Engineer, Hanoi University of Technology and Science 7. Membership of Professional Associations - 8. Country of Work Experience Vietnam 9. Other Training
10. Languages Vietnamese, English and French 11. Employment Record
2011- present Chief Technical Officer at Vietnam MW (VMW) Responsibility for technical aspects Management Technical department, Power market department 2009-2011 Senior Manager at Utilitrade Ltd Project Management and Business Development. 2007-2009 Senior Engineer Automation at Areva T&D Team leader for system software engineers, lead and supervise multiple projects at the same time. Supervise system engineers in reviewing & analysing 21
customers tender specification, automation offer, clarifications and the final order received from the customer. Work with project engineer to review technical requirements, scope of supply & work involved, ordering of l ong lead items and special/specific design feature/requirement 2006-2007 Application Engineer at Applied Technical Systems Co., Ltd. Designed the secondary circuit for control and protection of substation, prepared tendering document, did commissioning work, set relay parameters for protection and control purposes
12. Detailed Tasks Assigned Tran Anh Tuan proposes to undertake the role of consultant on this project. 13. Work Undertaken that best illustrates capability to handle the tasks assigned
Project Name: Support Electricity Regulatory Authority of Vietnam (ERAV) in implementation of pilot demand response program(s) for Power Corporations (PCs) Year: 2014 - 2015 Location: Vietnam Client: ERAV Position held: Local Consultant Activities Performed: o Local support (Local consultant) to assist, among others, in information collection, translations and communication with PCs. o Collecting and translating into English all documents relating to current situation/changes of power system, demand supply planning, electricity consumption, scheduling/dispatching issues, 30-minute load profile database and send to the Consultant; translate PCs and EVN documents/reports; communicate with PCs and EVN as may be required; o Implement marketing program; o Supervisory pilot project implementation; Contribution and review reports.
Project Name: SCADA system of Se San 3A hydro power plant Year: 2013 Location: Vietnam Client: Se San 3A Joint Stock Company Position held: Deputy Project Leader Activities Performed: - Survey: o Existing Distributed Control System (DCS) o Gateway system o Tele-communication system 22
- Consulting and building new SCADA system at Se San 3A Joint Stock Company office, this system can connect to DCS system, remote control and supervisory the power plant far from 90 km. o Gateway configuration o Database design and building o Software development o Man - Machine Interface building o Communication installation and configuration o Installation and Integrated system o End to end testing
Project Name: Assessment of Transmission Charges and Transmission Marginal Loss Factors Year: 2013 Location: Australia Client: Intelligent Energy Systems (IES) Position held: Power System Expert Activities Performed: o Building power system model o Run many power flow studies o Analysing result
Project Name: Power market trading system for PetroVietnam Power Corporation (PVPower) Year: 2011-2012 Location: Vietnam Client: PVPower Position held: Deputy Project Leader Activities Performed: - Survey: o Operation of power plants under PVPower o Existing IT system at PVPower and their power plants - Developing Power market trading system with functions: o Long-term and short-term planning (Year ahead, month ahead, week ahead, day ahead planning): Quantity, Revenue, Cost, Profit, fuel, outage schedule o Bidding in the market: Strategy, value at risk, optimal bid o Report: Yearly, monthly, weekly, daily report o Database management and storing.
Project Name: Substation Automation System (220kV Substation of O Mon Thermal Power Plant, 220kV Long An Substation, 220kV Chau Doc Substation, 220kV Switchyard for Nhon Trach Thermal Power Plant, 500kV Thuong Tin Substation, 500kV Nho Quan Substation) Year: 2006-2007 Location: Vietnam Client: Vietnam Electricity (EVN) Position held: Senior Engineer Activities Performed: 23
o System design o Install and testing system o Operator training
Project Name: Substation Automation System (500kV Tan Dinh substation, 220kV Ben Tre substation) Year: 2006-2007 Location: Vietnam Client: Vietnam Electricity (EVN) Position held: Application Engineer Activities Performed: o System design o Install and testing system o Operator training
14. Certification: I, the undersigned, certify that to the best of my knowledge and believe, this CV correctly describes my- self, my qualifications, and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged. Date: 28 August 2014 Signature of staff member or authorised representative of the staff
Full name of authorised representative: Tran Anh Tuan
24
Curriculum Vitae: MSc. Nguyen Tuan Ninh (VMW, Vietnam) Profile Nguyen Tuan Ninh is head of Automation Department. He has over 14 year experience in the power system (generation, and transmission system), automation system and smart grid (SCADA/EMS, SCADA/DMS, automation system, tele-metering system). Prior joined VMW, He is a lecturer at Hanoi University of Technology and Science (2002-2011). 1. Proposed Position Consultant 2. Name of Firm Vietnam MW Company., Ltd 3. Name of Staff Nguyen Tuan Ninh 4. Date of Birth 05 November 1977 Nationality: Vietnam 5. Telephone Mobile: +84 915 423 686 Email: ninh@vmw.vn Land line: +84 462 767 080 6. Education
2000-2002 Master of Science in Instrumentation and Control, Hanoi University of Technology and Science 1995-2000 Engineer of Control System and Measurement, Hanoi University of Technology and Science 7. Membership of Professional Associations - 8. Country of Work Experience Vietnam 9. Other Training
2010 DCS\SCADA 800F, ABB., Singapore 2008 Integrated Control System for Solar Energy, BP Solar., Australia 2006 SAS and RTU560, ABB., Germany 2005 DCS\SCADA 800xA, ABB., Singapore 2003 SCADA system, ABB., Finland 2001 Mini SCADA, RTU, Relay., ABB, Vietnam 10. Languages English, Vietnamese 11. Employment Record
2011- present Head of Automation Department at Vietnam MW (VMW) 25
Departments products strategy for development Leading in technical and human resource 2002-2011 Lecturer at Hanoi University of Technology and Science Teaching student Science research 12. Detailed Tasks Assigned Nguyen Tuan Ninh proposes to undertake the role of consultant on this project. 13. Work Undertaken that best illustrates capability to handle the tasks assigned
Project Name: SCADA system of Se San 3A hydro power plant Year: 2013 Location: Vietnam Client: Se San 3A Joint Stock Company Position held: Deputy Project Leader Activities Performed: - Survey: o Existing Distributed Control System (DCS) o Gateway system o Tele-communication system - Consulting and building new SCADA system at Se San 3A Joint Stock Company office, this system can connect to DCS system, remote control and supervisory the power plant far from 90 km. o Gateway configuration o Database design and building o Software development o Man - Machine Interface building o Communication installation and configuration o Installation and Integrated system o End to end testing
Project Name: Install DCS system for Pha Lai II Power plant Year: 2000 Location: Vietnam Client: Pha Lai II Power plant Position held: Engineer Activities Performed: - Gateway configuration - Man - Machine Interface building - Installation and Integrated system End to end testing
Project Name: SCADA system installation for Ham Yen 110 kV Substation Year: 2003 Location: Vietnam 26
Client: Northern Power Corporation Position held: Technical management Activities Performed: - RTU configuration - Communication system installation and testing - Installation and Integrated system - End to end testing
Project Name: Substation Automation System installation for Dinh Vu 220 kV and Vinh Yen 220 kV Substation Year: 2004 Location: Vietnam Client: Transmission Company No1 Position held: Project Director Activities Performed: - Database and gateway configuration - Man - Machine Interface building - Communication installation and configuration - Installation and Integrated system - End to end testing
Project Name: Consulting Mini SCADA system for four Cities in Central Region Year: 2003 - 2005 Location: Vietnam Client: Central Power Corporation Position held: Project Director Activities Performed: o Design SCADA system o Technical specification requirement
Project Name: Consulting supervisory system for IALY power plant. Year: 2006 Location: Vietnam Client: IALY power plant Position held: Project Director Activities Performed: o Survey existing system o Design SCADA system o Technical specification requirement
14. Certification: I, the undersigned, certify that to the best of my knowledge and believe, this CV correctly describes my- self, my qualifications, and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged.
27
Date: 28 August 2014 Signature of staff member or authorised representative of the staff
Full name of authorised representative: Nguyen Tuan Ninh
28
Curriculum Vitae: MA. Hoang Ha Quynh Giao (VMW, Vietnam) Profile Hoang Ha Quynh Giao is Senior Engineer at Vietnam MW ("VMW") who undertakes power system study and software sale and marketing. She has over 8 year experience in the power system (demand, generation, and transmission system), power market (generation pricing, marginal price, bidding in power market, value at risk, financial model). Prior to joined VMW, Quynh Giao was Electrical Power System Engineer at Electricity Regulatory Authority of Vietnam (2006-2010), Quynh Giao worked at PetroVietnam Power Corporation (PVPower) from 2010- 2012, from 2012 to present Quynh Giao is Senior Engineer at Vietnam MW. 1. Proposed Position Consultant 2. Name of Firm Vietnam MW Company., Ltd 3. Name of Staff Hoang Ha Quynh Giao 4. Date of Birth 22 November 1983 Nationality: Vietnam 5. Telephone Mobile: +84 12 66666 012 Email: quynhgiao@vmw.vn Land line: +84 462 767 080 6. Education
2008-2009 Master of Business Administration, Hanoi Foreign Trade University 2000-2006 Power System Engineer, Hanoi University of Technology and Science 7. Membership of Professional Associations - 8. Country of Work Experience Vietnam 9. Other Training
2011 Sale and marketing training course., Singapore 2012 Power Purchase Agreement., Singapore 10. Languages English, Vietnamese 11. Employment Record
2012- present Senior Engineer at Vietnam MW (VMW) Power System Study: Load flow, stability, short-circuit Software Sale and marketing 2010-2012 Senior Staff at PetroVietnam Power Corporation Power Purchase Agreement 29
Financial model Contract negotiation Power market 2006-2010 Electrical Power System Engineer at Electricity Regulatory Authority of Vietnam Power market regulation Power system operation regulation Energy balancing Vietnam power system operation 12. Detailed Tasks Assigned Hoang Ha Quynh Giao proposes to undertake the role of consultant. 13. Work Undertaken that best illustrates capability to handle the tasks assigned
Project Name: Smart Grid implementation support consultant for National Transmission Corporation of Vietnam & The World Bank Year: 2013-2014 Location: Vietnam Client: The World Bank (WB) Position held: Local consultant and Translator Activities Performed: o Assist to the Consultant team in collecting all the information available of the existing experiences in the Substation Automation System in Vietnam. o Translate the deliverables from English to Vietnamese and if required the data received if from Vietnamese to English. o Facilitate communications with The World Bank project managers and with the different stakeholders. o Participate on every mission to Vietnam assisting in the translation and in the collection of data from EVN, National Power Transmission Corporation (NPT), Power Transmission Companies (PTCs) and others. o Attend to all the project site visits, workshops and meetings with the international consultants when they are in Vietnam. o Organize workshop logistics: reserve hotel meeting facilities, arrange for interpreter (with technical translation ability), and liaise with WB/NPT and stakeholders as needed.
Project Name: Consulting Service For Establishing Technical Specifications of AMI for Vietnam Year: 2013 Location: Vietnam Client: Ho Chi Minh Power Corporation Position held: Local consultant and Translator Activities Performed: o Assist to the Consultant team in collecting all the information available of the existing experiences in the applications of AMR/AMI in Vietnam. 30
o Contribute in the preparation of the AMI full technical specifications according to telecommunications, metering code, electricity pricing and payment, SCADA/EMS system, SCADA/DMS system, telecommunication, etc o Translate the deliverables from English to Vietnamese and if required the data received if from Vietnamese to English. o Facilitate communications with HCMPC project managers and with the different stakeholders. o Participate on every mission to Vietnam assisting in the translation and in the collection of data from ERAV, EVNIT, 5 PCs and others. o Attend to all the project site visits, workshops and meetings with the international consultants when they are in Vietnam. o Organize workshop logistics: reserve hotel meeting facilities, arrange for interpreter (with technical translation ability), and liaise with HCMPC/stakeholders as needed.
Project Name: Assessment of Transmission Charges and Transmission Marginal Loss Factors Year: 2013 Location: Australia Client: Intelligent Energy Systems (IES) Position held: Power System Expert Activities Performed: o Building power system model o Run many power flow studies o Analysing result
Project Name: Power Purchase Agreement (PPA) for: Nhon Trach 1, Nhon Trach 2, Ca Mau 1, Ca Mau 2 gas turbine power plant, Hua Na, Dakrinh hydro power plant Year: 2010-2012 Location: Vietnam Client: PetroVietnam Power Corporation Position held: Senior Staff Activities Performed: o Financial model o PPA negotiation
Project Name: Distribution Code for Vietnam Generation Competitive Market Year: 2008-2009 Location: Vietnam Client: Electricity Regulatory Authority of Vietnam (ERAV) Position held: Electrical Power System Engineer Activities Performed: o Technical support o Review and comment on report of Neil Walbran Consulting Ltd International taking into account the Vietnamese context
Project Name: Least-Cost Planning and Implementation Procedures For the Competitive Generation Market Year: 2008-2009 31
Location: Vietnam Client: Electricity Regulatory Authority of Vietnam (ERAV) Position held: Electrical Power System Engineer Activities Performed: o Technical support o Review and comment on the reports of Duncan Wilson International Consultant taking into account the Vietnamese context.
Project Name: Transmission fees methodologies for Vietnam Year: 2008 Location: Vietnam Client: Electricity Regulatory Authority of Vietnam (ERAV) Position held: Electrical Power System Engineer Activities Performed: o Technical support o Review and comment on the reports of Roberto RAddario International Consultant taking into account the Vietnamese context
Project Name: Benefit sharing for people adversely affected by hydro power project (Sponsored by Asian Development Bank) Year: 2006-2007 Location: Vietnam Client: Electricity Regulatory Authority of Vietnam (ERAV) Position held: Electrical Power System Engineer Activities Performed: o Data collection and analysis o Technical support
14. Certification: I, the undersigned, certify that to the best of my knowledge and believe, this CV correctly describes my- self, my qualifications, and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged. Date: 28 August 2014 Signature of staff member or authorised representative of the staff
Full name of authorised representative: Hoang Ha Quynh Giao
32
Curriculum Vitae: Hoang Van Hai (VMW, Vietnam) Profile Hoang Van Hai is Senior Staff at Vietnam MW ("VMW") who undertakes power system study, software development. He has over 22 year experience in the power system (demand, generation, and transmission system), power market (generation pricing, marginal price, bidding in power market) . 1. Proposed Position National Energy Specialist 2. Name of Firm Vietnam MW Company., Ltd 3. Name of Staff Hoang Van Hai 4. Date of Birth 12 September 1964 Nationality: Vietnam 5. Telephone Mobile: +84 962 088 998 Email: hai@vmw.vn 6. Education
1983-1993 Power System Engineer, Hanoi University of Technology and Science 7. Membership of Professional Associations - 8. Country of Work Experience Vietnam 9. Other Training
10. Languages English, Vietnamese 11. Employment Record
1993-2007 National Power System Planning Engineer at National Load Dispatch Centre, Electricity of Vietnam Power system analysis: Load flow, short circuit, static stability Energy and Power balancing Vietnam power system operation and control Making Vietnam power system operation planning: Year ahead, month ahead, week ahead, day ahead, hour ahead planning Power market: participating in building Vietnam power market (market designing, market rules) 2007-2008 Engineer at Vietnam Power Resources Partners Corp. (Vietnam PRP) Power system analysis: Load flow, short circuit, static stability Energy and Power balancing Power market: Consulting in Vietnam power market (market designing, market rules) IT infrastructure 2008-2010 Engineer at Power Engineering consulting Joint Stock Company 2 (Pecc 2) 33
Power system analysis: Load flow, short circuit, static stability Energy and Power balancing 2010- Present Engineer at Power Engineering consulting Joint Stock Company 4 (Pecc 4) Power system analysis: Load flow, short circuit, static stability Energy and Power balancing 2013-Present Senior Engineer at VietnamMW Co.,Ltd (VMW) Power system analysis: Load flow, short circuit, static stability Energy and Power balancing Optimal operation of Hydro power plant Consulting in power market 12. Detailed Tasks Assigned Hoang Van Hai proposes to undertake the role of National Energy Specialist. 13. Work Undertaken that best illustrates capability to handle the tasks assigned
Project Name: power system study for energizing and synchronization of 500 kV transmission line Year: 1993-1994 Location: Vietnam Client: National Load Dispatch Centre Position held: Power system planning engineer Activities Performed: o Participating in power system study for energizing and synchronization of 500 kV transmission line and initial operation of Vietnam's whole power system
Project Name: Power system operation and control Year: 1994-2003 Location: Vietnam Client: National Load Dispatch Centre Position held: Power system planning engineer Activities Performed: o Participating in Vietnam national power system study for year ahead, month ahead, week ahead and daily operation planning.
Project Name: Vietnam Power Market Year: 2004-2007 Location: Vietnam Client: National Load Dispatch Centre Position held: Deputy manager of power market department Activities Performed: o Participating in building Vietnam power market (market designing, market rules) o Pilot power market operation with EVNs power plants
Project Name: Report on system adequacy of five year operation of Vietnam Power Network (2003- 2007) Year: 2003 Location: Vietnam 34
Client: National Load Dispatch Centre Position held: Power system planning engineer Activities Performed: o Participating in power system study and generation planning.
Project Name: Power system study for Transmission Access for Thang Long Coal Fired Power Plant (600MW Installed Capacity), AES. Mong Duong 2 Coal Fired power plant (1200 MW of capacity), Nhon Trach 2, Combined Cycle Power Plant, Kien Luong Power Thermal Plant Center, Cong Thanh, Coal Fired Power Plant (600MW), Uong Bi 3 (1200MW) & Yen Hung (2400MW), Coal Fired Power Plant Year: 2007-2013 Location: Vietnam Client: Power plants Position held: Power system engineer Activities Performed: o Grid Impact study for Transmission Access: o Load flow, short circuit, stability analysis o Contingency analysis o Energy balancing
14. Certification: I, the undersigned, certify that to the best of my knowledge and believe, this CV correctly describes my- self, my qualifications, and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged. Date: 28 August 2014 Signature of staff member or authorised representative of the staff
Full name of authorised representative: Hoang Van Hai