FUEL GAS HANDLING SYSTEM

AND BOG RELIQUEFACTION


FOR LNG CARRIER
EIRIK MELAAEN
WRTSIL OIL & GAS SYSTEMS AS

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Wrtsil Oil & Gas Systems

Agenda:
BOG Reliquefaction plant
Low Pressure Gas to Engine(e.g. DFDE, 2-Stroke DFE) and BOG
Reliquefaction System
High Pressure Gas to Engine(Gas Diesel Engine) and BOG
Reliquefaction System
Future concepts

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Our Expertise in the Gas Value Chain


Distribution & transport

Regasification
(FSRU/JRU)

LNG receiving
terminal

LNG liquefaction
& terminal
Re-liquefaction of
Boil
Off Gas,
LNG
fuelled
vessels

LNG carrier

Small scale
liquefaction plants
LNG/LBG

FPSO
Flare recovery
Oil separation

Exploration &
Drilling
LNG fuel gas
systems for OSVs
Gensets

Wrtsil

Production &
liquefaction
On- & Offshore small
scale liquefaction
Antiflaring/VOC
Oil separation
Gas FPSO

12 November 2013

LNG bunkering
& barges

Oil tanker
with VOC

Production

Exploration &
development

Power generation

Transport &
storage

Receiving
terminals &
regasification

LNG fuel gas systems


Jetty & Floating
LPG, LEG & LNG cargo regasification
handling
Bunkering & barges
Receiving terminals

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Distribution &
transport to the
users
Gas/LNG
distribution/logistics
Feed gas to Power
plants

LNG Technology Development


Wrtsil (Hamworthy) LNG process history

35 LNG BOG
Reliquefaction systems
Al Gattara (Hyundai) BOG Reliquefaction
System (58,000 tpy )

Snurrevarden LNG Plant


(22,000 tpy )

First free-standing small scale


LNG plant in Northern Europe
delivered March 2003.
Hamworthy EPCIC contract
with GASNOR.
Technology feasibility and
robustness thoroughly and
successfully demonstrated.
4

Wrtsil

12 November 2013

Kollsnes II LNG
2 x capacity of
existing Linde plant
(Kollsnes I).
Hamworthy EPCIC
contract with
GASNOR.
Full production
August 2007.

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Kollsnes II (Gasnor) LNG Plant


(84,000 tpy )

BOG RELIQUEFACTION PLANT

BOG to Engines or Returned to Tank


Different solutions available for LNG carrier propulsion:
1. Use BOG & LNG as fuel e.g steam turbines, dual-fuel diesel electric, dual-fuel engines
2. BOG reliquefaction, liquefy and sell excessive BOG or all LNG loaded onboard
LNG level
in tanks

Pattern for ships using BOG & LNG as fuel for propulsion

Maximum
(Laden
voyage)

Fuel used during roundtrip


(Natural BOG & forced)
Additional LNG delivered
with full BOG
Reliquefaction System

Minimum
(Ballast
voyage)

Minimum heel required for cool down of tanks

Ballast
6

Wrtsil

12 November 2013

Laden
Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Ballast

Boil-off gas from cargo tanks vs. Fuel


gas required by the engine

Forced
LNG

Boil-off Gas (kg/hr)

Excess
BOG

Available BOG

Speed of the Vessel (knots)

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Available BOG

BOG consumed
in the engine

Balance between
Vessel speed and
BOG flow

Boil-off gas

BOG Reliquefaction System (LNGRS Mark III)


No feeding of gas to engines (QFLEX vessels)

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Mark III layout/QG

Cold box

LNG pump
skid

N2
reservior
N2 supply
skid

N2
companders

Pre-heater
N2
companders

Typical dimensions: 30 x 22,5 x 7 m (L x W x H)


Equipment weights: 240 ton
9

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

BOG
compressors

ENGINES REQUIRING LOW


PRESSURE GAS (DFDE, 22--STROKE DFE)
AND BOG RELIQUEFACTION
PLANT

BOG Reliquefaction System (LNGRS)


Low-Pressure Fuel Gas Supply System (LP FSSS)

Boil-off gas

LP-compressor

11

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Wrtsil Oil & Gas Systems AS


Dual-fuel propulsion system

12

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

ENGINES REQUIRING HIGH


PRESSURE GAS (Gas Diesel Engine
Engine))
AND BOG RELIQUEFACTION
SYSTEM

BOG Reliquefaction System (LNGRS)


High-Pressure Fuel Gas Supply System (HP FGSS)
HP-pump and Optimizer

14

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

PFD Vaporization System

STEAM/HOT WATER
HEATER

BRINE PUMP

CONDENSATE FROM BOG RS


OR LNG FROM CARGO TANKS

HP PUMP

Pressure: 3-5 bar


Temprature: -160C

15

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

HIGH PRESSURE GAS


TO GAS ENGINE
LNG VAPORIZER

Pressure: Max 300 bar


Temprature: 45 10C

Updated Arrangement - Gas Supply System

Pulse
damper (1)

LNG vaporizer
(1)

Suction
drum (1)

Brine
circulation
pump (2)

HP LNG
pump (2)

Brine
heater (1)

Typical dimensions: 7 x 3 x 2 m (L x W x H)
Equipment weights: Ca 25 ton
16

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

HP LNG
pump (2)

BOG Reliquefaction System (LNGRS)


High-Pressure Fuel Gas Supply System (HP FGSS)
HP-compressor and HP-pump
LNGRS for excessive BOG?

17

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Wrtsil Oil & Gas Systems AS


Layout Burckhardt compressors + BOG Reliq plant

Typical dimensions:
30 x 22,5 x 7 m (L x W x H)

18

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

FUTURE CONCEPTS
NEW MR
TWO REFERENCES:
NEW MR DEMONSTRATION PLANT 2,5 TON/DAY
NEWMR EGE PLANT 11 TON/DAY

Demonstration plant 2,5 ton/hr

20

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

New MR Process Overview

21

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Pictures EGE - Project

22

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Flow Sheet of Liquefaction Plant

Liquefaction process

Pretreatment
H2O & CO2
removal
Raw gas
inlet

Gas
precooling

H2O
&
CO2

Storage
system

Cold Box

Pre Cooling
system

MR
refrigeration
unit

Expansion

To flare gas
system

Main biomethane flow


Mixed refrigerant (MR) flow

Gas return
from trucks

CO2 from stripper column


Glycol cooling from pre-cooling unit

LNG tank

Return gas truck loading

LBG Truck
Filling station

Flare gas
Export LNG pump

23

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

BOG Reliquefaction System (LNGRS)


NewMR LP-Pressure Fuel Gas Supply System (LP FGSS)
Compressor and Forcing Vaporizer
LNGRS for excessive BOG

24

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Summary Wrtsil NewMR technology

only electric power needed


BOG reliquefaction system
on LNG vessels in the future Easy and quick start up and
NewMR
shut down of all systems
Why?
Standardisation of
capacities: 1,5 ton/hr, 2,5
Demonstration plant proven
ton/hr etc.
to be successful
Robust
Supplied as modules
Low OPEX
Refrigerant process with
Load variations
phase changes which reduce
the size of equipment and
Robust main rotating
piping
machinery with high
efficiency
Simplified maintenance
Designed for unmanned
Reduced CAPEX compared
operation
to Nitrogen loop
Shorter delivery time
Two references
Simple energy supply,

25

Wrtsil

12 November 2013

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Thank you for your attention!

EIRIK MELAAEN
Business Development Manager
Tel:
+47 66 10 95 66
Mobile: +47 959 67 377
Fax: +47 815 48 510
E-mail: emelaaen@hamworthy.com
Web: http://www.hamworthy.com

S-ar putea să vă placă și