CHAPTER-5
BUILDING PLAN
BAB 5. PERENCANAAN BANGUNAN
5.1. SEDIMENT TRAP
5.1.1. Check Dam
Plans check dam placed at two locations Tungoi its tributaries upstream, where the two
creeks flow is a source of sediment transport into Tungoi River. What is planned is at p.140
(North Side Tungoi Creeks) and P.131 A (Tungoi Creeks South Side). The building check
dams are planned with couples where the calculation of dimensional stone and hidrolisnya
refers SK SNI - T - 19 - 1991-03 Technical Planning Procedures Retaining Sediment weirs.
Here is a check dam location planning calculations 1 (p.140), which consists of planning and
Sub Main Dam dam.
EXCECUTIVE SUMMARY
Design check dam location 2 (P.131A) accounted for at the planning stage check dam
location 1. The results of the calculations resume the calculation is as follows:
EXCECUTIVE SUMMARY
EXCECUTIVE SUMMARY
EXCECUTIVE SUMMARY
variation, the excavation of the river 0 s / d 0.4 m with a bottom elevation corresponding
slope planned.
5.2.3. Gabion
Gabion mattress design is planned with the size 0.5 x 1 m with a span length of 2.0 m. That
are not easily washed away the mat brojong reinforced with piles dolken / timber. Placement
position adjustable mattress gabion slope cliff following the existing stacking shapes as
shown below.
SID Pengendalian Sedimen Sungai Tungoi
Kabupaten Bolaang Mongondow
EXCECUTIVE SUMMARY
Table 5.3 HecRas Modelling Result Design Condition Of Ongkag With Q10th
EXCECUTIVE SUMMARY
Table 5.4 HecRas Modelling Result Design Condition Of Tungoi With Q10th
EXCECUTIVE SUMMARY
EXCECUTIVE SUMMARY
Based on empirical calculations above, the protection plan on the river bluff with gabions and
Ongkag Tungoi need to be deepened from 1 to 1.2 meters below the riverbed.
5.2.6. Groin
In the segment of the river that frasenya shaped curve or turn, then grinding the river may
occur in outer corner. River bend area will cause problems with the stability of the outer side
of the river bank facing the possibility of blow energy of water large enough. If left
unchecked, it will further erode the river flow to the outer corner and could harm existing
infrastructure. It happened outside of river bends Ogkag especially P.170.A 173.A (back
Puskesmas Tungoi). To direct the flow of the river bend while protecting river banks from the
water blow, then planned krib impermiable gabion wire form.
EXCECUTIVE SUMMARY
Perhitungan krib
Contents
BAB 5. PERENCANAAN
BANGUNAN
.......................................................................................
5-1
5.1. SEDIMENT
TRAP
.............................................................................................................
5-1
5.1.1. Check
SID Pengendalian Sedimen Sungai Tungoi
Kabupaten Bolaang Mongondow
Dam
10
EXCECUTIVE SUMMARY
...................................................................................................
5-1
5.2. FLOOD
CONTROL
.............................................................................................................
5-3
5.2.1. Embankment
and
Parapet
...................................................................................................
5-3
5.2.2. River
Normalization
...................................................................................................
5-4
5.2.3. Gabion
...................................................................................................
5-5
5.2.4. River
Modeling
Design
Conditions
...................................................................................................
5-6
5.2.5. Local
Scouring
...................................................................................................
5-9
5.2.6. Groin
...................................................................................................
5-9
Figure 5.1 River Levee Planning Ongkag P. 170
.....................................................................................................................
5-4
Figure 5.2 Planning Tungoi River Levees Parapet P.44A
.....................................................................................................................
5-4
Figure 5.3 Slope of Tungoi
.....................................................................................................................
5-5
Figure 5.4 Slope Design Tungoi P.3-P.88
.....................................................................................................................
5-5
Figure 5.5 Tungoi Normalization (P.57)
.....................................................................................................................
5-5
Figure 5.6 Gabion Of Ongkag (P.170A)
.....................................................................................................................
5-6
Figure 5.7 Gabion Of Tungoi (P.99)
.....................................................................................................................
5-6
Figure 5.8 Groin Of Ongkag Rivers
.....................................................................................................................
5-10
SID Pengendalian Sedimen Sungai Tungoi
Kabupaten Bolaang Mongondow
11
EXCECUTIVE SUMMARY
12