EXCECUTIVE SUMMARY

CHAPTER-5
BUILDING PLAN
BAB 5. PERENCANAAN BANGUNAN
5.1. SEDIMENT TRAP
5.1.1. Check Dam
Plans check dam placed at two locations Tungoi its tributaries upstream, where the two
creeks flow is a source of sediment transport into Tungoi River. What is planned is at p.140
(North Side Tungoi Creeks) and P.131 A (Tungoi Creeks South Side). The building check
dams are planned with couples where the calculation of dimensional stone and hidrolisnya
refers SK SNI - T - 19 - 1991-03 Technical Planning Procedures Retaining Sediment weirs.
Here is a check dam location planning calculations 1 (p.140), which consists of planning and
Sub Main Dam dam.

SID Pengendalian Sedimen Sungai Tungoi


Kabupaten Bolaang Mongondow

EXCECUTIVE SUMMARY

Design check dam location 2 (P.131A) accounted for at the planning stage check dam
location 1. The results of the calculations resume the calculation is as follows:

SID Pengendalian Sedimen Sungai Tungoi


Kabupaten Bolaang Mongondow

EXCECUTIVE SUMMARY

5.2. FLOOD CONTROL


5.2.1. Embankment and Parapet
In the case of river flooding Ongkag, urugan soil embankment is still possible to build
because there are still land on either side of the existing riverbank. As for the case of a flood
in the river Tungoi impossible to build because of the condition of the soil embankment
bantarannya already coincide with the settlements, it is planned for the dike being shaped
parapet walls made of stone masonry times.
Planned flood control embankment on river segments (based on the results of running
Hecras Existing Condition) and meggenangi houses and paddy fields. Design plans for river
levee elevation and Tungoi Ongkag further shown in the following table:
Table 5.1 Design Plans Elevation of Ongkag Lavee

Table 5.2 Design Plans Elevation of Tungoi Lavee


SID Pengendalian Sedimen Sungai Tungoi
Kabupaten Bolaang Mongondow

EXCECUTIVE SUMMARY

Figure 5.1 River Levee Planning Ongkag P. 170

Figure 5.2 Planning Tungoi River Levees Parapet P.44A

5.2.2. River Normalization


Normalization condition of the river stream is created with a certain width and depth to
increase the capacity to be able to drain the flood water so there is no overflow.
Normalization river watercourses Tungoi planned under 4 m in width, the width of the
SID Pengendalian Sedimen Sungai Tungoi
Kabupaten Bolaang Mongondow

EXCECUTIVE SUMMARY

variation, the excavation of the river 0 s / d 0.4 m with a bottom elevation corresponding
slope planned.

Figure 5.3 Slope of Tungoi

Figure 5.4 Slope Design Tungoi P.3-P.88

Figure 5.5 Tungoi Normalization (P.57)

5.2.3. Gabion
Gabion mattress design is planned with the size 0.5 x 1 m with a span length of 2.0 m. That
are not easily washed away the mat brojong reinforced with piles dolken / timber. Placement
position adjustable mattress gabion slope cliff following the existing stacking shapes as
shown below.
SID Pengendalian Sedimen Sungai Tungoi
Kabupaten Bolaang Mongondow

EXCECUTIVE SUMMARY

Figure 5.6 Gabion Of Ongkag (P.170A)

Figure 5.7 Gabion Of Tungoi (P.99)

5.2.4. River Modeling Design Conditions


Modeling the design conditions is done using the design flood discharge data on 10-year
return period (Q10th), so that the plan can be evaluated results on river flood control
structures that were reviewed have been effective or not.
From the modeling results for the discharge Q10th at design conditions are obtained that
plan design with mounting flood embankment on the river and parafet Ongkag Tungoi the
river is enough to effectively reduce flood overflow. Special design flood embankment on the
river Ongkag is still sufficient to reduce the flood discharge at the time 25th anniversary
(Q25th). To bend of the river and river banks Ongkag and retrofitting installed Tungoi flow by
installing gabions.

Table 5.3 HecRas Modelling Result Design Condition Of Ongkag With Q10th

SID Pengendalian Sedimen Sungai Tungoi


Kabupaten Bolaang Mongondow

EXCECUTIVE SUMMARY

Table 5.4 HecRas Modelling Result Design Condition Of Tungoi With Q10th

SID Pengendalian Sedimen Sungai Tungoi


Kabupaten Bolaang Mongondow

EXCECUTIVE SUMMARY

5.2.5. Local Scouring


To protect the base of the cliff to be secure against scour, the scour depth needs to be
happening. Degan scour depths calculated using the formula Lacey with the calculation as
follows:

SID Pengendalian Sedimen Sungai Tungoi


Kabupaten Bolaang Mongondow

EXCECUTIVE SUMMARY

Based on empirical calculations above, the protection plan on the river bluff with gabions and
Ongkag Tungoi need to be deepened from 1 to 1.2 meters below the riverbed.

5.2.6. Groin
In the segment of the river that frasenya shaped curve or turn, then grinding the river may
occur in outer corner. River bend area will cause problems with the stability of the outer side
of the river bank facing the possibility of blow energy of water large enough. If left
unchecked, it will further erode the river flow to the outer corner and could harm existing
infrastructure. It happened outside of river bends Ogkag especially P.170.A 173.A (back
Puskesmas Tungoi). To direct the flow of the river bend while protecting river banks from the
water blow, then planned krib impermiable gabion wire form.

SID Pengendalian Sedimen Sungai Tungoi


Kabupaten Bolaang Mongondow

EXCECUTIVE SUMMARY

Figure 5.8 Groin Of Ongkag Rivers

Perhitungan krib

Contents
BAB 5. PERENCANAAN
BANGUNAN
.......................................................................................
5-1
5.1. SEDIMENT
TRAP
.............................................................................................................
5-1
5.1.1. Check
SID Pengendalian Sedimen Sungai Tungoi
Kabupaten Bolaang Mongondow

Dam
10

EXCECUTIVE SUMMARY

...................................................................................................
5-1
5.2. FLOOD
CONTROL
.............................................................................................................
5-3
5.2.1. Embankment
and
Parapet
...................................................................................................
5-3
5.2.2. River
Normalization
...................................................................................................
5-4
5.2.3. Gabion
...................................................................................................
5-5
5.2.4. River
Modeling
Design
Conditions
...................................................................................................
5-6
5.2.5. Local
Scouring
...................................................................................................
5-9
5.2.6. Groin
...................................................................................................
5-9
Figure 5.1 River Levee Planning Ongkag P. 170
.....................................................................................................................
5-4
Figure 5.2 Planning Tungoi River Levees Parapet P.44A
.....................................................................................................................
5-4
Figure 5.3 Slope of Tungoi
.....................................................................................................................
5-5
Figure 5.4 Slope Design Tungoi P.3-P.88
.....................................................................................................................
5-5
Figure 5.5 Tungoi Normalization (P.57)
.....................................................................................................................
5-5
Figure 5.6 Gabion Of Ongkag (P.170A)
.....................................................................................................................
5-6
Figure 5.7 Gabion Of Tungoi (P.99)
.....................................................................................................................
5-6
Figure 5.8 Groin Of Ongkag Rivers
.....................................................................................................................
5-10
SID Pengendalian Sedimen Sungai Tungoi
Kabupaten Bolaang Mongondow

11

EXCECUTIVE SUMMARY

Table 5.1 Design Plans Elevation of Ongkag Lavee


.....................................................................................................................
5-3
Table 5.2 Design Plans Elevation of Tungoi Lavee
.....................................................................................................................
5-4
Table 5.3 HecRas Modelling Result Design Condition Of Ongkag With
Q10th
.....................................................................................................................
5-7
Table 5.4 HecRas Modelling Result Design Condition Of Tungoi With Q10th
.....................................................................................................................
5-8

SID Pengendalian Sedimen Sungai Tungoi


Kabupaten Bolaang Mongondow

12