WTG FOUNDATIONS
ITEM
PRICE
DESCRIPTION
QUANTITY
UN ()
TOTAL ()
SCOPE OF WORKS
Un. Excavation: this includes the removal of the material extracted for its use as backfill or, if
in excess, for removal to a dump.
Excavation made at any depht and all kind of soils as defined on the technical specification
and preliminar geotecnical information. Including dewatering or lowering water table of the
excavation if necessary
50
1.1
Un. Backfilling: with miaterial minimum density 1.8 Tn/m3. included transport of the preceding
excavated materials or brought-in materials.
Includes all clearing work before soil layer removal; rocks and wall removal, tree pruning and
cutting down.
For all the items, the price is considered as lump sum for work execution in turn key modality
including all the auxiliaries and annexed necessities.
Earthwork
1.1.1
30,788
1.1.2
1.1.3
73,985
47,179
1.2
m2 Soil layer removal by mechanical means, to a depth of 30cm, for later flatwork of the
WTG foundations. Including storage of vegetal soil for coverage of last layer of
backfilling of the foundation.
m3 Excavation of WTG foundations in natural existing soil at any depth.
3
0.00
0.00
0.00
Foundations
Cleaning concrete layer, C20/25 (fck 20 MPa in cylindrical sample), 10cm high.
0.00
0.00
0.00
50
Un Supply and installation of high strength non shrinking grout, Masterflow -9300
(BASF), Conbextra BB92O (Fosroc) or similar, homologated by GAMESA and
installed with applicator homologated by grout manufacturer. Completely finished.
0.00
1.2.8
50
0.00
1.2.9
50
Un Sealing of the joint between the tower flange and the grout, by supply and installation
of sealing material, Sikaflex 35SL type, Sikaflex 27ML, or similar
Un Extraordinary means for concreting and curing in hot or cold weather.
1.2.1
1,901
1.2.2
24,905
1.2.3
493
1.2.4
2,403
1.2.5
135,876,199
1.2.6
50
1.2.7
1.3
0.00
0.00
0.00
0.00
Various
1.3.1
50
Un Unloading, laying and leveling foundation anchor cage (supply not included)
0.00
1.3.2
50
50
Un Electrical conduit PVC (or similar) wrinkled tubes diameter 200mm (30kV cables) and
diameter 90mm (F.O.) Includes cover of concrete layer C20/25.
Un Wind Turbine Grounding System(Typicaly bare copper cable 130 m , 70mm ,four
0.00
1.3.3
0.00
2m length Copper bonded steel Rods &22 cad well ,Alumino-thermic welding
1.3.4
50
0.00
0.00
TOTAL CAPITULO 1
0.00
PE
2 l2
p
Relleno
d1 d2 d3
d4
d5
N.F.
d0
v
l
1 l1
Datos geometricos
(m)
ep (m)
ip (m)
d0 (m)
d1 (m)
d2 (m)
d3 (m)
d4 (m)
d5 (m)
21.00
5.40
2.60
0.10
0.60
1.90
0.50
0.30
2.90
Volumenes de hormigon
A1 (m2)
346.36
A2 (m2)
22.90
A3 (m2)
5.31
v1 (m3)
207.82
v2 (m3)
290.27
v3 (m3)
11.45
v4 (m3)
1.59
Vzp (m3)
498.09
Vzp (m3)
9.86
Vlim (m3)
38.01
Diametro de la zapata
Diametro del pedestal
Diametro interno del pedestal
Hormigon de limpieza
Altura canto constante
Altura canto variable
Altura del pedestal
Altura del pedestal
Altura de las tierras
Area de la base
Area en la union con el pedestal
Area interior en la union con el pedestal
Volumen 1
Volumen 2
Volumen 3
Volumen 4
Volumen de la losa de la zapata
Volumen del pedestal de la zapata
Volumen hormigon de limpieza
Superficie desbroce
Sdesb (m2)
615.75
Superficie desbroce
Volumen relleno
Vrell (m3)
943.59
Volumen de relleno
Encofrado
Encofr (m2)
48.07
Superficie a encofrar