Sunteți pe pagina 1din 12

ABIS

OVER IP
Co-Transmission

By

BARROU ZAKARIA
19 / 10 / 14

SUMMARY
1.
2.
3.
4.

Abis Over IP : Over View of the BTS 3900 A CASE


Deployment process
OperaKon instucKons
On the eld : MOHAMMADIA

BTS 3900 A (OUTDOOR)

BTS 3900 A (OUTDOOR)

FAN

BBU
2G : GTMU
3G : UMPT

DCDU

CARTES RFU
2G : 900
3G : 1800

BTS 3900 A (OUTDOOR)


BBU
2G : GTMU
3G : UMPT

Op>cal Fiber
To connect
BTS-BSC
NB-RNC
Ethernet cable
To connect to
the NodeB

BTS 3900 A (OUTDOOR)

GTMU
TYPE A

UMPT
TYPE B
(Label b1)
Ethernet cable
To connect to
the NodeB

BTS 3900 A (OUTDOOR)

BBU : BASE BAND UNIT

BTS 3900 A (OUTDOOR)

BBU : BASE BAND UNIT

There is two types of GTMU :


1- GTMU TYPE A
2- GTMU TYPE B (NoKced in Label)

BTS 3900 A (OUTDOOR)

BBU : BASE BAND UNIT


To establish the transmission between the NodeB-RNC or the BTS-BSC ,
Huawei provide the Abis Over Ip soluKon as below :

CASE 1 : GTMU TYPE A

Connect the GTMU to UMPT by


Ethernet cable or OpKcal Fiber

CASE 2 : GTMU TYPE B

The GTMU & UMPT are connected by


a tunnel congured by the OMC

Deployment process

OMC personnel

2
BTS/NB

4
Site engineer

1- The OMC personnel provide a plan


table of sites that will support Abis Over Ip
to site engineer
2- The site engineer check up the type of
the GTMU used (Type A or B) , the ESN of
the site and send it to the OMC personnel
3- The OMC personnel prepare the
conguraKon scripts and remotely
congure the sites
4- The site engineer supervise the
operaKon in terms to connect GTMU to
UMPT and clean the alarms .
5 - The OMC personnel noKce the site
engineer that the site is ON Air .

OperaKon instrucKons
Step 1
Fill in the plan table :
Site ID / Date of the opera>on

Step 2 & 3
Check up of the GTMU Type

TYPE A
AcKvate the FE0 port
of UMPT

TYPE B
The OMC congure
the site

Step 5
Ensure that the site goes ON Air
Otherwise roll back the site

Step 4
Type A :
Connect the GTMU to UMPT by :
- Eth cable : FE0 (UMPT) to FE0 (GTMU)
- FO : FE/GE1 (UMPT) to FE1 (GTMU)
Type B : The site engineer supevise the opera>on

On the eld : MOHAMMADIA


I had the opportunity to assist to the Co-trans operaKon with Abis Over IP on
Mohammadia , supervised by the site engineer El mounsi Yassine in coordinaKon
with the OMC personnel mr.Mehdi at INWI .

For two weeks from 13 to 24 October , we had 14 sites 2G & 3G in Mohammadia ,
8 Sites with GTMU type A and 6 sites GTMU type B as below :
DistribuKon of the 14 sites 2G & 3G by GTMU Type

Type A with
Eth cable
Type B with Eth
cable
Type A with OF

S-ar putea să vă placă și