Documente Academic
Documente Profesional
Documente Cultură
Abbreviations:
k = Knit
p = Purl
c6f = (cable 6 front)- slip 3 stitches to a cable needle and hold at the front of the work, knit 3, then
knit the 3 stitches from the cable needle.
c6b = (cable 6 back)- slip 3 stitches to a cable needle and hold at the back of the work, knit 3, then
knit the 3 stitches from the cable needle.
Cast on multiples of 8
Row
Row
Row
Row
Row
Row
Row
Row
Row
Row
Connect With Me On
Facebook!
Knitting Bee
Like
cables
McGregor
MidSeason Deals
Uitverkoop: Shop nu met 30%
korting Deals voor Heren,
Dames & Kids.
2 Comments
Comments
Maureen Doyle
August 7th, 2013
Making an Aran pattern afghan and am trying to work out a stitch called
snake stitch described as follows P2, sk 2 sts, k next st, k 2 skipped sts, sl
knitted st already worked off left hand needle Well, I am an experienced
knitter of Aran patterns but this has me totally bamboozled. No matter how I
try it, it doesnt seem to work, so thought I could google it, to see if anyone
else has knitted it. Your stitch is not exactly the same but I might have to
substitute it for the patterns one. Any suggestions???? Cheers and have a nice
day.
Categories
Free Crochet Patterns
Crochet Amigurumi
Crochet Bags
Crochet Borders and Edgings
Crochet Butterflies
hmm, what does the abbreviation sk 2 sts mean? that is where it gets
confusing for me.
Knitting Bee
August 14th, 2013
Crochet Necklaces
Crochet Scarves
Sitemap Privacy Policy New Patterns Knitting Deals Knitting Bee Contact Knitting Bee About RSS