NO-------------DATE------TEST REPORT
CUSTOMER
:
ORDER REFERENCE
:
PRODUCT
:
PANEL SR. NO-----------DRAWING NO. ---------------QUANTITY ----- ---SYPPLY VOLTAGE .
CONTROL VOLTAGE
AMPERE -----------The following routine test and inspection were carried out on the above control panel.
GENERAL INSPECTION
1. Verification of bill of material and rating of components
---------------------------------
-------------------------------
---------------------------------
--------------------------------
(Inside outside..
ELECTRICAL OPERATION AND TEST
1. Verification of control transformer
2. Verification of proper function of all components
3. Verification of correct sequence of operation
-----------------------------------------------------------------------------------------------------
DI-ELECTRIC TEST
1. High voltage test conducted at -------KV Voltage for 1 minute
seconds
2. Between each pole and earth
--------------------3. Between the poles when contacts are open
--------------------INSULATION RESISTANCE TEST
1. Measurement of insulation resistance with 500/1000V DC Megger
Mega ohm
Clients Rep..
Reviewed by .
Tested by