REF.

NO-------------DATE------TEST REPORT
CUSTOMER
:
ORDER REFERENCE
:
PRODUCT
:
PANEL SR. NO-----------DRAWING NO. ---------------QUANTITY ----- ---SYPPLY VOLTAGE .
CONTROL VOLTAGE
AMPERE -----------The following routine test and inspection were carried out on the above control panel.
GENERAL INSPECTION
1. Verification of bill of material and rating of components

---------------------------------

(As per drawing no..


2. Overall &Mounting of dimension of panel

-------------------------------

(As per drawing no..


3. Power wiring and control wiring of components

---------------------------------

(As per drawing no..


4. Paint finish and overall appearance

--------------------------------

(Inside outside..
ELECTRICAL OPERATION AND TEST
1. Verification of control transformer
2. Verification of proper function of all components
3. Verification of correct sequence of operation

-----------------------------------------------------------------------------------------------------

DI-ELECTRIC TEST
1. High voltage test conducted at -------KV Voltage for 1 minute
seconds
2. Between each pole and earth
--------------------3. Between the poles when contacts are open
--------------------INSULATION RESISTANCE TEST
1. Measurement of insulation resistance with 500/1000V DC Megger
Mega ohm

2. Between each pole and earth


--------------------3. Between the poles when contacts are open
---------------------

Clients Rep..
Reviewed by .

Tested by