DAY-1 19 December,2012
This day we were allotted our workshops. Our group was allotted
machine shop. After allotment process got over ,we went to the
shop. We interacted with other three groups as well as with the
teachers. We were told that if we will work sincerely ,be
disciplined and be punctual we will be able to do well.
DAY-2 20 December,2012
This day all the groups were called in the morning shift at
9:00am.We were told to draw the sketch of job in our notebooks. It
was a stepwise mentioning i.e which process we have to perform
first. Each group had to make two jobs . So,we cut two pieces of
length 204 mm and diameter 36 mm out of the raw material of
mild steel.
We used Power Axe for this purpose. The blade used here is made
of high speed steel. Our instructors told us that it was based on
hydraulic mechanism.We poured a coolant on blade continuously
so as to avoid damage to the blade due to heat.
After this we did facing of one of the pieces.We used a single
cutting tool for ths purpose .In this the job is stuck in a three jaw
chuck.For good and smooth facing,the tool is taken from inside to
outside.Then we did counter shanking on both the faces of job to
hold the job in tail and head stock.
At the end groups were divided in shifts,two in each shifts which
were applicable only for one week.It was decided that after one
week groups would interchange their shifts.
DAY-3 21 December,2012
This day we completed the facing process of one of the jobs which
was left previously.We even get the centre of the circular
face.After facing we did counter shanking of the workpiece to hold
the job in tail and head stock.We were also told how to perform
turning process.
DAY-4
22 December,2012
On this day firstly we made marks on job with the help of chalk
and pencil as per the given dimensions.After marking we directly
started the step turning process.The job is first ststuck in the job
holder with the help of bench vice.This is done with the single
cutting toolwhich is moved from right to lef and job rotates
anticlockwise.
DAY-5
24 December,2012
DAY-6
26 December,2012
DAY-7
27 December,2012
DAY-8
28 December,2012
DAY-9
29 December,2012
DAY- 10
31 December, 2012
After this internal threading was done using taps. Nut was held on
bench vice and the tap was held in the tap handle and then it was
rotated clockwise while oil was poured on the blades timely.
At last chamfering was done using BSW threading tool.