ANNEXURE 1.0
CALCULATION OF WIND EFFECTS (Ref. IS 875 Part 3 : 1987)
Vb
Vz
Vb x K1 x K2 x K3
K1
Risk co-efficient
K2
=
=
44
m/sec
Where
1.07
K3
Vz
48.86904
m/sec
47.08
m/sec
0.6 Vz2
1432.91
N/m2
1329.92
N/m2
Fwt
Pz x cf x Ae
Pz
cf
Ae
Pz
Topography factor
1.0
to the face in m2
Ae will be calculated during detail design of individual structure.
Fwc
Pz x cf x L x D
Wind span i.e. the sum of half the spans on either side in mtrs.
Where,
Page 15of 20
Therefore,
and
Cf
Force coefficient
1.2
Dia. of conductor
0.02862
Fwc
49.21
N/m
5.02
Kg/m
45.67
N/m
4.66
Kg/m
Fwg
Pz x cf x L x D
Wind span i.e. the sum of half the spans on either side in mtrs.
Cf
Force coefficient
1.2
0.01098
Fwg
18.88
1.93
Kg
Fwc
Where
Therefore,
Fwi
Cf x Pz x A1
Cf
Force coefficient
Pz
A1
Where
A1
Fwi
1.2
1.45
0.185
m2
318.11
32.44
Kg
Page 15of 20
Fwi
Therefore,
295.24
30.11
Kg
FWH
Cfx Pz x Area
Cf
Force coefficient
Pz
Area
FWH
FWH
1.2
0.025875
m2
44.49
4.54
Kg
41.29
4.21
Kg
Page 4 of 12
ANNEXURE 1.0
CALCULATION OF WIND EFFECTS (Ref. IS 802 Part 1/ Sec 1 : 1995)
Vb
44
Vr
Vb
Ko
Ko
m/sec
Where,
\
3. Design wind speed
1.375
Vr
32
Vd
V R x K1 x K2
K1
Risk co-efficient
m/sec
Where
=
1.08
Therefore
4. Design wind pressure
Vd
34.56
Pd
0.6 Vd2
716.64
m/sec
N/m2
Fwt
Pd x cdt x Ae x GT
Pd
cdt
Ae
716.64
N/m2
to the face in m2
Ae will be calculated during detail design of individual structure.
GT
Page 5 of 12
Fwc
Wind span i.e. the sum of half the spans on either side in mtrs.
Cdc
Gc
Therefore
Fwc
Fwc
39.17
N/m
3.99
Kg/m
37.53
N/m
For 15 m. height
3.83
Kg/m
For 15 m. height
Fwi
Cdi x Pd x A1 x G1
Cdi
Pd
A1
Where
716.64
N/m2
=
G1
0.185
1.45
m2
G1
1.99
1.92
Page 6 of 12
Fwi
316.6
32.28
Kg
305.46
31.15
Kg
FWH
Cdi x Pd x Area x GH
GH
1.91
GH
1.83
Area
Cdi
0.025875
1.2
m2
For 400 kV
FWH
42.5
4.33
Kg
For 15 m. height
40.72
For 15 m. height
4.15
Kg
For 15 m. height
ANNEXURE 1.0
TEMPERATURE RISE IN STRUNG BUS BAR
A. 400kV Jack Bus
I
Data
1. Type of conductor
604
mm2
3. Overall diameter
31.95
mm
455
o
6. AC resistance at 20 C
0.0568 W/Km.
[Ref IS 398 (Part 4) : 1994 Table 2]
o
0.0036 / C
[Cl. 4.4 IS 398 (Part 4) : 1994]
r20
at 20oC
0.0328
Amps.
W/mm2 / m
50
SRAD
SABS
0.6
0.3
m/sec
(Assumed)
0.965x10-1 w/cm2
Page 7 of 12
ERAD
=
R
Where
Therefore
58.12
1 x r20 [1 + a (t + d t - 20)]
604
dt
Temperature rise
\R
12.463 + 0.041 d t
I 2R
Wc
Ohms
Watts
Ta0.123D
Where
Pressure in atmosphere = 1
Wc
Ta
(273+t) + dt
2
31.95 = 1.258
25.4
Page 8 of 12
5 x 3.281
= 16.405 feet / sec
= 0.0128 16.405 x dt x 155.587
\ Wc
= 7.192 dt
(323 + dt) 0.123
2
Wr
4
4
= 36.8 x0.3 x 155.587 (323+dt) - (323)
1000
1000
-12
4
10
= 1717.68 x 10 { (323 + dt) - 1.088 x 10 } W
o
= 19 C
\ dt
B) 220kV Main Bus
I
Data :
Same as for 400kV except I = 900A
II Calculations
ERAD =
I2 R =
=
58.12W
9002 {6.02 x 10-5 + 0.02 dt x 10-5}
48.762 + 0.162 dt
Page 9 of 12
7.192 dt
Wc =
(323 + dt)0.123
2
Wr
\ dt
29.8oC
Page 10 of 12
ANNEXURE 3.0
ADEQUACY OF CONDUCTOR SPACINGS
1.0
Temp
% of wind
Sag
Deflection Swing
( C)
load
(m )
(m )
(m )
400kV
(72 m span)
70
70
Nil
100%
2.52
--
-3.31
-2.15
220kV
(53.5 m span)
80
80
nil
100%
2.061
--
-2.57
-1.53
2.0
400kV yard
2.1
Vertical Clearance
Required clearance between main bus bar and jack bus bar
=
2.52 + 4
6.52
m.
Horizontal Clearance
Required clearance between center line of two phase
=
6.6
m.
220kV yard
3.1
Vertical clearance
Required clearance between main bus bar and jack bus bar. As well
as Main busbar and equipment bus bars
=
2.061 + 2.4
4.461 m
4.18 m