Revolutionizing MEP
HVAC
Electrical
Plumbing
QC Process
Work Process
Why Pinnacle?
10
Testimonial
11
12
Revolutionizing MEP
Proper planning and coordination are the keys to the
successful execution of projects in the construction industry.
Advancements in 3D technology and the advent of
Building Information Modeling (BIM) have revolutionized the
Architectural, Engineering and Construction (AEC) industry.
BIM allows stakeholders to create and examine virtual
representations of the Mechanical, Electrical and Plumbing
(MEP) systems, and other utilities of their project. The
virtual construct can be used to generate accurate shop
drawings and address any and all design issues before
construction begins.
Pinnacle Infotech has been acknowledged as a global
leader in providing innovative BIM solutions. We have
received several awards and recognition from both industry
and government. NASSCOM, the leading IT trade
| EFFICIENCY : Check the accuracy and completeness of project plans and drawings before starting construction,
| SAVINGS : Pre-construction reviews mean better use of manpower, better quality construction and less waste of
time and materials, all of which translates into lower costs.
| PROJECT MANAGEMENT : The use of detailed materials such as conflict reports, sleeve drawings, hangers
and insert drawings allow for a better look at the big picture and aid in the review, scheduling and monitoring
of each project from beginning to end.
Our clients have reported cost savings of 10 - 40% by successfully implementing BIM.
eliminating delays due to pending Requests for Information (RFI) and Change Orders.
01
HVAC
Pinnacle specializes in the virtual construction of 3D BIM
models using a range of inputs including contract
documents, specification sheets, design documents and
equipment submittals. A model of the HVAC system,
including Hangers, Trapeze and seismic restrainers,
is created and augmented using information from
architectural, structural and other trade and utility sources.
The final model is generated after resolving any potential
issues by re-routing ductwork, changing elevations and
duct resizing. Value Engineering and Design Validations
are also offered.
Equipment Pad Layouts need to be accurately determined to ensure the proper installation of HVAC equipment.
The innovative use of the BIM model provides accurate pad layout with reference to the architectural grids and structural
drawings.
02
Shop Drawings
Shop drawings are created based on client standards and are useful for contractors, fabricators, suppliers and
manufacturers. These drawings are generated from coordinated HVAC BIM models and are detailed enough to use for
workshop fabrication and on-site installations.
Quantity Take-off
Quantity take-off is an automated procedure on the HVAC
model and is 100% accurate as per the design. Quantity
take-off covers all ducts, duct-fittings, equipment, hangers,
etc.
Equipment Modeling
03
Electrical
We can create a 3D BIM electrical model of all conduits, cable tray, lighting fixtures, fire alarms, and other electrical
equipment, from contract drawings, manufacturer cut-sheets based on client work process and standards.
SYMBOL
DESCRIPTION
HA-1
B
4 "C.
EACH CIRCUIT
AE
(E) HA
DUPLEX RECEPTACLE, 125V, 20A, 24" A.F.F. C= CEILING MOUNTED FOR PROJECTOR
QUADRAPLEX RECEPTACLE, 125V, 20A, 24" A.F.F.
30AF/20AT/3P
CIRCUIT BREAKER, 30AF = MIN. 30A FRAME BREAKER (WHEN INDICATED), 20AT =
20A TRIP BREAKER, 3P = 3 POLE
ST
30AS/3P/
20AF/4X
100AF
VFD
#2
45
a
4
3
2
D
DRY-TYPE TRANSFORMER, IN PLAN & ONE LINE DIAGRAM. 45= kVA RATING
480V-208Y/120V, UNLESS OTHERWISE NOTED, WITH GROUNDING ELECTRODE
CONDUCTOR TO NEAREST ELECTRODE (DASHED = MOUNTED FROM STRUCTURE)
SINGLE POLE LIGHT SWITCH, 120/277V, 42" A.F.F. a=LUMINAIRES SWITCHED
FOUR-WAY LIGHT SWITCH, 42"A.F.F.
THREE-WAY LIGHT SWITCH, 42" A.F.F.
2 POLE LIGHT SWITCH, 42" A.F.F.
WALLBOX DIMMER SWITCH, 42" A.F.F.
THREE-WAY DIMMER SWITCH, 42" A.F.F.
Electrical Model
The electrical model is coordinated with architectural, structural, HVAC and plumbing models and an interference report is
created. We redesign the route, fixture, tray layout, etc. based on the interference report. An updated electrical model is
created after resolving all constructability issues with other systems. This saves rework, time and money on the site, as all
issues are resolved before construction begins.
04
Construction Documents
From our model, construction documents are generated automatically. We provide fixture, conduit locations and tray
layouts with reference to the architectural walls. This provides the electrical contractor with precise location for material
and equipment installation.
WEIGHTS
AND
FITNESS
ROOM
UP
CORRIDOR
WEIGHT
ROOM
STOR
CORRIDOR
FAMILY
RESTROOM
WEIGHT
ROOM
STOR
WOMEN'S
GROUP
EXERCISE /
DANCE
ROOM
FAMILY
RESTROOM
WOMENS
RESTROOM
WOMEN'S
LOCKER
GROUP
EXERCISE /
DANCE
ROOM
GROUP EX.
STOR
WOMENS
RESTROOM
POWER PLAN
GROUP EX.
STOR
LIGHTING PLAN
WOMEN'S
WOMEN'S
AV
Electrical Take-off
The final output from the model is an accurate quantity take-off. We provide all the equipment, fixtures and material
details in a tabulated form with quantities. It helps the contractors to estimate the project cost and plan material
procurement.
ELECTRICAL TAKE-OFF
Date: 05/09/2008 JOB: PinnacleSample
Aarchitects & Engineers:
Description of Item
Location
Quantity
Total
11
11
23
23
12
12
Equipment Modeling
10
LIGHTING
Symbol as per
Legend
05
Plumbing
Plumbing Model
SLEEVE DRAWING
A critical component of plumbing project is proper sleeve location, inserts, and hanger positions. We can generate
accurate sleeve, penetration, and hanger locations from the plumbing model prior to the start of plumbing installation.
These drawings can be directly downloaded on GPS instruments for fast and accurate layout on site.
06
Installation Drawings
We provide detailed installation drawings to help the
contractors in planning and installing plumbing services
efficiently, saving both time and cost.
Spool Drawings
Spool drawings can be generated from the model for accurate pre-fabrication off-site / on-site. Segmented spool drawings
and a spool map with segment locations are generated in accordance with the contractors pre-fabricating standards and
preferences. Pre-fabrication significantly improves quality and reduces cost. Clients have reported cost savings
of 15-20% using this process.
Quantity Take-off
07
QC 1
QC 2
QC 3
Plot Check
Screen Check
Pre-Shipment Check
Performed by
Production Team
Performed by
QC Dept./Team
Performed by
Project Manager
DELIVERY
TO
CLIENT
100% Quality
QC Check Phase I
The model is plotted on paper and a preliminary grid by grid check highlighted in yellow marker is done comparing
it with the original contract documents. Member of the project team assists with this part of the process.
The project team leader sends a status report to the QC Department.
The QA/QC Manager reviews and distributes the files to QC Team to begin QC phase II.
QC Check Phase II
1. Missing data
2. Mismatches with the contract documents
3. Clashes (Old/New), Elevation, Routing, Fittings, etc.
4. Construction point of view.
5. No-Fly-Zones.
6. Attribute Checking (Pressure class, Pipe material, etc.)
7. Location of Equipment such as VAV, Sleeves, Hangers, Valves.
8. Equipment Connection details as per Schematic Drawings.
9. Equipment Models as per Technical Submittals.
10. Annotations & Dimensions, Aesthetic View.
11. Any miscellaneous issues
The QA/QC Team continuously interacts with the Project Lead and other team members to resolve all
technical issues related to the project.
The QC Team performs a more detailed comparison of the contract documents against the 3D BIM model.
Their main objective is to review, identify and address the following:
08
Work Process
CLIENT
Deliverables
RFI / Clarifications
PINNACLE
ESTIMATES
MARKETING
TEAM
PINNACLE
BIM
PROJECT
MANAGER
Design Development
Construction Docs
Constructability Review
Coordination Drawings
Elevation Features
Quantity Takeoff
Revit Family Creation
Presentation
Phasing/4D Schedule
STRUCTURAL
TEAM
Concrete Lift Drawing
Steel Shop Drawing
Erection Plan
Detail Sheets
Coordination Drawing
Quantity Takeoff
Presentation
Phasing/4D Schedule
COORDINATION &
QUALITY CHECK
DELIVERABLES
MEP
TEAM
3D Models
Shop Drawing
Coordination Drawing
Hangers & Inserts
Spool & Fabrication dwgs
Quantity Takeoff
Equipment Pad Layout
Block-out / Sleeve Drawing
Lighting Plan
Presentation/4D Schedule
ARCHITECTURAL
TEAM
09
Why Pinnacle?
Fast Turnaround
Our skilled team of professionals can provide quick
turnarounds on complex projects. Pinnacle has managed
several large-scale projects across multiple verticals
including Health Care, Hospitality, Airports, University
Centers, Retail Centers, Convention Centers, Commercial,
Industrial and Residential Projects.
Technical Strengths
Pinnacle engineers specialize in the latest BIM software : Revit Software Suite (Revit, Revit MEP, Revit Architecture and
Revit Structure), Ecotect Analysis, NavisWorks, Inventor, Civil 3D, Plant Design Suite, Pro/Engineer, Tekla Structure,
SolidWorks, Autodesk Fabrication Suite, Quickpen, Cadpipe etc.
Pinnacle engineers have a deep understanding of global and regional codes and standards. We maintain a consistent
level of quality by carefully following the process oriented production and quality control guidelines as per ISO 9001:2008.
Global Presence
Pinnacle has offices around the world (Texas, Durgapur, Kolkata, Abu Dhabi and Italy ) enabling us to serve our clients
around the clock.
Pinnacle is one of the leading service providers in the BIM domain. We have successfully collaborated with several
leading contractors on BIM projects for specialty hospitals, stadiums, universities, dams, apartment complexes, hotels,
casinos, large retail center, high school, airport, commercial buildings, convention center, high rise tower, and industrial
projects.
Communication
Pinnacles Project team is available to clients through a number of communication channels including:
1. Global telephone network for instant communication.
2. FTP over a secured network for file transfers.
3. Email for reports and interactions.
4. Video and teleconferencing for presentations and conversations.
5. WebEx conferences with US-based phone systems.
10
Testimonial
We are thrilled to have find a group like yours that service all our MEP drafting needs, and at record response. We truly feel like
you have met and exceeded everything we could have asked of your group. We look forward to a long and bright future together.
Bobby Mayfield | MCC Group | Mechanical Contractor
Pinnacle has revolutionized the BIM elements of our company. They are extremely professional and skilled at what they do and
develop a personal relationship with ease. Since our first project, we have used Pinnacle for over a dozen and will continue to do so
consistently in the future.
Nicholas Zent | C.W. Driver | General Contractor
I was given exactly what I asked for. Everyone was very helpful and responsive. Thanks to everyone who worked on this for us.
We were in a short turn around schedule and we did not have the manpower to respond. I believe Pinnacle is a great resource for
supplementing our force. Construction is unpredictable and keeping ample coordination manpower for all situations is difficult.
Thanks again.
Larry J. Randolph | TD Industries | Mechanical Contractor
This was our first experience with Pinnacle, and we at Waldrop were satisfied with the level of performance by the Pinnacle team.
We were under extreme pressure to deliver under a tight deadline and your team aided us in doing so. We appreciate your work
to date and look forward to another successful project together.
Jamie Porterfield | Waldrop Mechanical Services | Mechanical Contractor
My experiences with Pinnacle on this project have been very good to say the least. The Meldahl project was a very complex and
demanding project. I feel that without Pinnacle's hard work, dedication and attention to detail we would not be as successful
as we have been thus far. I would also like to thank the team members for the quality work they have provided.
Kevin McGuire | Baker Concrete Construction, Inc. | General Contractor
You guys are doing an excellent job and providing my team with excellent tools to excel in our performance in the
preconstruction process.
Chris Dolan | The Whiting-Turner Contracting Company | General Contractor
Pinnacle delivers a great deal of value for a very reasonable price. They consistently deliver my expectations on-time.
This was our first project that required 3D coordination drawings. We entered this not knowing 100% on how we were going
to handle this process. We have received many compliments on the professionalism of the drawings especially the clash reports.
Pinnacle worked through the plans to solve the clashes detected and then only brought us into the process when a clash could not
be resolved without further input. With their knowledge it allowed me to concentrate on other aspects of the project. I would highly
recommend them to anyone required for coordination drawings.
Fred Prezioso | Dan-Cel Co. | Plumbing Sub-Contractor
Very much appreciate of the performance of the Pinnacle team. We will continue to work with Pinnacle; Abhik has done wonderfully
with us especially with the issues of our time difference.
Fry Kreit | Kreit Mechanical Associates, Inc. | Plumbing Sub-Contractor
Terrific team and effort. Looking forward to additional project opportunities for the Pinnacle/PPM team.
Jim Browne | PPM Inc., An EMCOR Company | Mechanical Contractor
Pinnacle did a great job on this scope of work. We will hopefully be using your services for more work in the near future.
Neil Umpstead | Harper Construction Company, Inc. | General Contractor
11
CLIENT
PROJECT NAME
DETAILS
TIME
LINE
PROJECT AREA
MANPOWER
Mixed Use
Residential
Township
Conspel
and
Obayashi
Corporation
and HBK
Construction
July
2013
374,541 Sq.M.
June
2013
3,300,677 Sq.Ft.
September
2012
1,320,000 Sq.Ft.
BK Gulf
LLC.
March
2013
167,748 Sq.M.
February
2013
106,000 Sq.Ft.
May
2013
1,345,488 Sq.Ft.
December
2012
746,696 Sq.Ft.
March
2012
63,310 Sq.Ft.
December
2012
6,000,000 Sq.Ft.
March
2012
25,000 Sq.M.
Residencial
Complex
Kolkata
India
Industrial Plant
South Carolina
USA
Airport
Dubai
UAE
Public
Community
College
Los Angeles
USA
IT & Commercial
Office
Ambuja
Reality
Development
Ltd.
Maryland
USA
Mixed Use
and
Residential
Doha
Qatar
ITC
Limited
Comfort
Systems
The WhitingTurner
Contracting
Co.
Tata
Consultancy
Services
Hyderabad
India
Education
Austin
USA
University
Building
Harper
Construction
Company
Inc.
Bengaluru
India
Mixed Use
and
Residential
Utalika
HBK
Contracting
Company
WLL.
45 MEP Engineers,
16 Architectural and
Structural Engineers
25 MEP Engineers,
20 Architectural and
Structural Engineers
8 MEP Engineers
64 MEP Engineers
7 Architectural and
Structural Engineers
9 MEP Engineers,
6 Architectural and
Structural Engineers
15 MEP Engineers,
8 Architectural and
Structural Engineers
4 Engineers
19 MEP Engineers,
12 Architectural and
Structural Engineers
6 Architectural &
Structural Engineers
and 25 MEP
Engineers
10 Architects,
5 Structural Engineers
& 48 MEP Engineers
Doha
Qatar
12
CLIENT
PROJECT NAME
DETAILS
TIME
LINE
PROJECT AREA
MANPOWER
Hotel
RK
Mechanical,
Inc.
February
2012
322,672 Sq.Ft.
Airport
Muscat
Oman
Bahwan
Engg.
Co. LLC.
February
2012
109,625 Sq.M.
Shopping Mall
General
Contractor
November
2011
417,500 Sq.M.
Turner
Construction
Co.
Hoar
Construction,
Mechanical
Construction
Co., Inc, Dixie
Metal Products
Inc.
Larsen &
Toubro
LLC.
Doha
Qatar
Resort and Spa
Bagsvrd
Denmark
Hospital
Arkansas
USA
Roadways
Infrastructure
Muscat
Oman
Resort and Spa
Jordon
Middle East
Hydro Electric
Facility
Kentucky
USA
Airport
New Delhi
INDIA
Water
Treatment
Plant
Yorba Linda
USA
Providing a clash free 3D BIM model (Architectural & Structural) for the entire
mall area along with the office building. Creation of a walk through presentation.
Baker
Concrete
Corporation
Inc.
Larsen &
Turbo
Ltd.
Shimmick
Construction
Company
Proper modeling the entire site along with the resort and spa buildings
adjacent landscaping and other features. Includes 4D simulation of the entire
site with buildings, walk through presentation of the Gorge and rendered images.
Entire designing of BIM for Terminal 3 and runways for this large
International Airport. Complete BIM for Passenger Terminal Building and
Domestic and International PIER and Sight line report for Air Traffic Control.
Simulated structures of Raft Foundation and Column along with Arrival and
Mezzanine level Concrete Structure. Clash detection between all services.
Quantity Estimation and Construction Phasing done as per PERT chart of the
project.
34 MEP Engineers
32 Architectural /Civil
Engineers
June
2012
8,800 Sq.Ft.
May
2011
729,524 Sq.Ft.
February
2011
2,776 Meter
10 MEP Engineers
4 MEP Engineers
15 MEP Engineers
8 Architect
March
2011
30,000 Sq.M.
June
2010
20,557 Sq.Ft.
May
2010
5,920,151 Sq.Ft.
4 Engineers
15 Structural
Engineers.
20 MEP Engineers
40 Architects
July
2008
9,234,712 Sq.Ft.
10 MEP Engineers
Colorado
USA
13
Lecco, Italy
Texas, USA
Durgapur, India
Abu Dhabi, UAE
Kolkata, India
Biswanath Todi
Operations Manager
Cell : 832 283 6628
Bimal Patwari
President
Cell : 713 589 9125
UAE Office
Kolkata Office
ITALY Office
Pinnacle Infotech Inc.
Nunki di M.Brossa,
via Calvi, 10 - 23801
Calolziocorte, LC - Italy
Phone : + 39 0341630070
Email : mbrossa@pinnaclecad.com
www.pinnaclecad.com