1. The Project commences on or before December 18, 2009 and ends on April
16, 2010.

2. As soon as you join for your project work, send the contact details of the
organization and your external guide to the department (to your Internal Guide
& Project coordinator)
a. Project title and the Platform
b. Address of the Organization
c. Phone number, Fax number, E-Mail Address, URL
d. Address for Communication (where you stay during your project time)
e. Telephone / Mobile Number (Personal)
f. Personal E-mail ID

3. The dates for the Reviews


First Review - 13th Feb 2010 Sat
Second Review - 10th Apr 2010 Sat
Final Report Submission - 16th Apr 2010 Fri

4. It should be a single independent project; if your project is a part of a bigger


project, your work should have a few independent modules.

5. The duration of the project should be at least four months.

6. If you are working on a project that is part of a bigger project in which others
also work, you should not report the combined work. If combined work is
unavoidable, it should be limited to a chapter or two in your report.

7. If two of you work on parts of the same project (big enough to share between
two) your reports should be different and not two copies of the same report.

8. For the reviews


a. All students should be present for the entire review sessions.
b. Timing for individual presentation:
i. First Review : 10 Minutes
ii. Second Review : 15 Minutes (do not exceed the time limit)
c. Load the necessary information for your presentation in the system, the
day before the review.
d. Submit a written report (as applicable to your project) to your internal
guides as given below.
e. Also send a soft copy of the report to your internal guide (by mail or in
person), two days before the review.
f. Reviews will start at 09:00 a.m.
g. Be on time for the review and dress formally.

Documents to be produced for the First Review


1. Profile of the Company
2. Project Vision
3. Feasibility Study
4. System Study
5. SRS (include System Modules)
6. Design (Architecture, Database, Classes)
Documents to be produced for the Second Review
1. Design (Class, Database, UI, Architecture)
2. Test Case Design
3. Component Diagram
4. Implementation Report
5. Deployment Report

9. Use your own format for Profile of the Company and Feasibility Study.

10. Design document (Software Architecture Document) in the first review need
not be a complete one. But, partial Class and Database diagrams should be
presented. It (SAD) will be complete only in the second review.

11. Use the Deployment and Implementation View from the Software
Architecture Document (SAD) for the Implementation and Deployment
Report.

12. Your guide may want to visit the site to see your work, if necessary. You have
to make the necessary arrangements.